HOW TO BLOCK A RELEASE STRATEGY

Sir,
ply help me in blocking a release strategy as in i want to configure a new strategy
ply help
regards
amey

hi,
You can do the blocking of current release strategy via:
removing the connection of the release group to the release class and then deleting the release strategy parameters inside the release strategy tab under spro settings ...
Paul,
If we only remove the characteristics, system also determines internally,,, then will it be deactivated??
Regards
Priyanka.P
Edited by: Priyanka Paltanwale on Apr 27, 2009 4:52 PM

Similar Messages

  • How to setup a release strategy for store generated purchase order

    Hi there,
    Does anybody know how to setup a release strategy for store/plant generated purchase order? I have a request from our client, but I never cross this before. Please help and let me know the step with every single detail.
    Greatly thank for your help.
    Kind Regards,
    2tea

    Please go thru the below Release Procedure and check whether you have maintained all the settings properly.
    PO RELEASE STRATEGY
    The release code is a two-character ID allowing a person to release (clear, or approve) a requisition or an external purchasing document. The release codes is basically controlled via a system of authorizations (authorization object M_EINK_FRG).
    Use SE12, structure CEKKO to check all the fields available for controlling the Purchase Order.
    e.g. If the total value for the Purchase Order exceeds 10,000, release strategy 01 is assigned to the Purchase Order. There is only one characteristic created in this example. For controlling the Purchase Order type, create characteristic for CEKKO-BSTYP and the value NB.
    CT04 - Create Characteristic e.g. NETVALUE
    Click Additional data Table name CEKKO Field name GNETW and press enter
    (for currency dependent field, you are prompt to enter the currency which the system then converts the currency of the Purchasing document into this currency)
    In the Basic data (X refers to tick),
    X Mutliple values
    X Interval values
    In the Value data, in the Char. value column, type >10000 and press enter
    Save your data
    CL02 - Class
    Class - Create REL_PUR
    Class type - 032
    Click Create
    Description - Release Procedure for Purchase Order
    In the Same Classification section, click Check with error
    In the Char. (characteristic) tab, type NETVALUE to assign your characteristics to the class
    OMGS - Define Release Procedure for Purchase Order Type
    Release Group - New entries
    Rel.group Rel. Object Class Description
    02 REL_PUR Rel. Strategy for PO
    Release codes - New entries
    Grp Code
    02 01
    Release indicators
    Release indicators Release Description
    0 Blocked
    1 X Release
    Release Strategy
    Release group 02
    Rel.strategy 01
    Release codes 01
    Release status 01
    Classification Choose your check values
    OMGSCK - Check Release Strategies
    (make sure there are no error messages)
    Once the Purchase Order is not release, buyers will not be able to print the Purchase Order.
    Goods Receipts will be shown with Message no. ME 390 - Purchasing document XXXXXXX not yet released.
    In 4.6c, Purchase Order with Release Strategy have a tabs at the end of the Header. This allowed the buyers to check the release status of the Purchase Order.
    The person with the release authorization have to use ME28 to release the Purchase Order.
    Regards,
    Ashok

  • How to avoid po release strategy replicating in RFQ

    Dear Sapiens,
    I am aware  as we are using same class for PO RFQ and Contract the release strategy will repliacte in rest,
    but I dont want PO release strategy to get repliacted in RFQ,because I dont have realease for RFQ
    how to avoid po release strategy replicating in RFQ?
    Regards
    Kantha

    Hi,
    Yes they are same unless you differentiate by using
    1> Purchasing Document Category i.e CEKKO -BSTYP
    A.....     Request for Quotation
    F......Purchase Order
    K......Contract
    L......Scheduling Agreement
    So if you just create a characteristics for CEKKO-BSTYP then maintain its values only for F so it will not be applied to RFQ

  • How to control PO Release strategy using WorkFlow

    please tell me how to control PO Release strategy using WorkFlow.
    Moderator message: please search for available information/documentation.
    Edited by: Thomas Zloch on May 31, 2011 9:35 AM

    Hi,
    Yes they are same unless you differentiate by using
    1> Purchasing Document Category i.e CEKKO -BSTYP
    A.....     Request for Quotation
    F......Purchase Order
    K......Contract
    L......Scheduling Agreement
    So if you just create a characteristics for CEKKO-BSTYP then maintain its values only for F so it will not be applied to RFQ

  • How to set the Release Strategy without classification for PR

    Hi,
    I am able to set Release Strategy for PO with classification, however, now I want to set the Release Strategy for PR with classification. Can someone tell how to proceed to set the Release Strategy to PR with Account Assignment.
    I crated the Release Codes, however not able to find what options to choose in the following steps :-
    Release indicator
    Assign Release Indicators
    Release Points: Prerequisites
    Determination of Release Strategy
    Regards,
    Yogesh

    1. Release codes                                                            
       Create the release codes.     For  Purch. Officer, Manager and Sr. Manager                                                                               
    Like PO, MG, SM                                      
    2. Release indicators                                                       
       Define release indicators and branch to the detail screen. Here you      
       define whether fixed purchase requisitions may be changed by Materials   
       Planning, for example, and whether an RFQ or a purchase order may be     
       created from the requisition.                                            
       You can also determine the field selection here.                                                                               
    In the area "Changes after the start of the release procedure", you      
       specify whether a requisition may be changed after the release           
       procedure has begun. You specify whether the strategy has to be          
       redetermined after changes, or whether the release procedure has to      
       start all over again from the beginning.                                                                               
    This parameter bears a relation to the parameter "Value change". For     
       example, previous releases are not cancelled if the value of the         
       requisition item after the change does not exceed plus 10% of its        
       original value.                                                                               
    Attention:                                                               
       Be sure to create a release indicator (e.g. B for "blocked") that        
       serves as the starting point for subsequent indicators. Do not set the   
       indicators for release for the issue of RFQs and PO on the detail        
       screen for this indicator.                                               
       Also create a release indicator characterizing the released status.      
       Set the indicators for release for the issue of RFQs and PO on the       
       detail screen.                                                           
    You can use sytem defined indicator in this case you don’t have to do anything                                                                               
    3. Assignment of release indicators                                         
       Assign a release indicator in dependence on the status of the release.                                                                               
    Example:                                                                 
       You create a release strategy S1 consisting of two release codes 01      
       and 02. Release with 01 is a prerequisite for release with 02. If        
       release has been effected with 01, the requisition has been given the    
       "all clear" for the issue of RFQs.                                       
       You have created the release indicators B (blocked), 1 (cleared for      
       issue of RFQs) and 2 (cleared for RFQs and PO).                          
       Now enter the following as assignment:                                                                               
    Strategy   C1  C2  C3 ...                                                
       S1                          B (blocked)                                  
       S1         X                1 (RFQ)                                      
       S1         X   X            2 (RFQ/PO)                                                                               
    4. Release prerequisites                                                    
       Define which release codes are involved in a release strategy. Specify   
       whether a code is set for a release status following release, and        
       whether one release status is a prerequisite for another (+).            
       Example:                                                                 
      Strategy   Code  C1  C2  C3 ...                                  
    S1         01    X                                               
    S1         02    +   X                                                                               
    5. Determination of the release strategy                            
    Determine the conditions under which each release strategy is    
    assigned. The criteria are account assignment category, material 
    group, plant, and value of the requisition item.                                                                               
    Here you can define the you criteria but one thing you keep in mind that you hae to define all criteria.
    E.G if you will not define the Material group here but it will default in req in that case this will not work that’s the reason you have to work with Classification.               
    <b>In the classification whatever criteria you need that only you have to include like in your case you care about A/C category and value only.     </b>

  • How to Display PO Release Strategy in Enjoy Screen

    Dear all,
    I have a PO with a release strategy, which contain several release codes to release the PO (i.e. M1 & V1).
    However, I am only able to display the release code (i.e. M1 & V1) in t-code ME23. I could not do the same in the enjoy screen t-code ME23N for the same PO number.
    In the item level, there should be a tab with release strategy to display the PO release strategy (similar to PR), but it is not appearing.
    Could anyone tell me what is the problem here? I just could not find the tab or menu to view the release strategy of a PO in the enjoy screen. Similar goes to other PO. I could not view it as well. But in the old screen, I could view it.
    Thanks a lot.

    Thanks 4 the reply Rahul.
    I understand that it is only possible to release at header level. What my problem is that I am unable to view the release strategy (which code to release and who to release) for the PO in enjoy screen.
    In my earlier thread replying to Ankur, I am simply describing that I could just select a line item, click on the release strategy button and the release strategy is displayed. A different line item with different value generated a different release strategy of course. Different amount require different set of release strategies, usually more level of approvals.
    So, actually this question is not about where or how I can release a PO, but actually I could not view who is releasing for a PO in ME23N.
    I even simulate it in the development server and still the same thing happen. Is it the same for everyone else? If yes, how to view who is releasing the PO in ME23N? Version of system is 4.7.
    Thanks and appreciate if anyone could help.

  • How to turn off Release strategy

    Hi,
    We need to upload purchase orders via LSMW. While doing so, we do not wan the release strategy to be active to avoid the need for approving each order. How can I turn off the release strategy.
    Thanks in Advance.
    Regards,
    Pavan

    Hi
    Not sure if this requirement is to handle the cutover POs/ POs which were already approved in legacy system, I have handled this by two ways in the past ( as due to last minute changes we were not sure abiut frequency and need of turning release strategy to on / off
    1.  We have use a charactertistc (corressponding to PO date ) in Rel strategy and setup in such a way that REL strategy is active for PO with PO date > Go-live date ( all legacy POs were loaded with s date earlier than Go -live date)- this ensure that we need not to do on/off several time
    2. another case we created a seperate PO doc type and excluded from rel strategy, no uses was given authorization for creation of this except the cutover / data migration team which was responsible for cutover
    Hope these suggestion helps
    Reg
    Dheeraj

  • PR - How to use distinct release strategy

    Hello SAP's gurus,
    We use the procedure with classification for our release strategies.
    I cannot undestrand why I cannot work with 2 disctinct class (it means different characteristics list) for my company.
    Rel.Grp   /Rel.obj.   / OvRelPReq    /Class
    ZY          /1              /NO                 /RELEASE_STRATEGY_1
    ZZ          /1              /NO                  /RELEASE_STRATEGY_2
    We would like to define specific characteristics depending on the currency used in the PR.
    It means, if currency is USD (table CEBAN/WAERS) : characteristic "Total Value of Item in USD" (table CEBAN/GSWRT, currency USD) should be used and if the currency is EUR : characteristic "Total Value of Item in EUR" (table CEBAN/GSWRT, currency EUR) should be used in the release strategy.
    How can I work to set up a list of characteristics for the release strategy different from a currency to another one?
    Thank you so much in advance for your help.

    I'll have a quick check but assuming GSWRT is purely a value figure, that won't provide the distinction you want. You need to use a characteristic that represents the currency i.e. use CEBAN / WAERS. That will allow you distinguish according to the cirrency.

  • How to retrigger PO release strategy

    Hi all,
    We have configured PO release strategy. When creating PO, it is initially blocked. Then the manager have to release. When the PO price is increased, the PO will again be blocked. When the price is decreased, the PO is saved without any block. The requirement is to use the same logic when the price is increased and decreased. That is, to block the PO.
    Kindly let me know if this is feasible.
    Thank you.
    Nene

    Hi,
    You should check first of all with your MM consultant see if through configuration is possible. If its not possible, you could use an user exit when saving, and check if price changed, and reset the release code using the bapi BAPI_PO_RESET_RELEASE.
    Regards,
    Gilberto Li

  • How to Reject RFQ (Release Strategy)

    Hi,
    In ME29N , we have facility to Reject / Approve a Purchase order in Release staretgy tab .... but how to reject a RFQ .
    There is no option available in ME45 to Reject a RFQ, only we can release it.
    Need your help
    REGARDS
    SHREY

    hi
    rejection of rfq is not possible
    ru talking of calcelling or reversing the release
    if yes
    then in me45 select therel code then belowt that tick on cancel release
    execute ,select ur po and click on cancel release
    regards
    kunal

  • Release strategy in SD + workflow

    hi SD Experts,
    it is possible to customiz "Release Strategy " in SD as for the case of MM (PR, PO)??
    if it is possible, how can we customiz  "Release Strategy" in sales Order  or Outbound Delivery, ...? give the IMG path and the necessery custo to do please.
    NB: if you have any doc on release strategy in SD + Workflow in SD, please it to me on: [email protected]
    thank's in advance
    Cordialy
    Said

    Hi
    I dont think there release strategy for sales orders.
    You may use credit management functionality or delivery block.. set it in the item level or header level for the order, provide authorization to one person who can remove block.
    or Use TCode BS02 and create a status profile, maintain statuses and assign the authorisation code to the release status. You can get into details of each status and set the actions permitted for the status.
    regards
    Srinivas

  • Re-set release strategy of rejected PO,after doing respective changes to po

    Hi friends,
    I have created release strategy for Purchase order with release indicator 6 (Changeable, new rel. if new strat. or value change/outputted), and with 3 release codes (3 approvers)..
    Now in this case, After Rejection of a approver (creator of po will get an mail telling that its rejected). After rejection, the creator has did required changes and save the PO.
    However the release strategy is not reset...So i want to know how to reset the release strategy in this case..
    Where as in case after the approval, if creator do any changes in purchase order then release strategy is resets...  
    Here PO printout is possible only after the final approval...
    Pls give some inputs in fixing this issue..
    Thanks in advance....
    Regards
    Shashidhar...

    Hi
    What are the characteristics of your strategy?
    Try to change one of them save and then rechange it to the original
    eg.
    If the strategy depends for example on the Purchasing Group (PG)
    i mean according to different PG's different strategies working
    then with ME22N change the PG save and rechange it again to the original.
    or
    for example If the strategy depends on Materail Groups (MG)
    then do the change with MG
    With ME22N change the MG save and rechange it again to the original.
    I guess this will trigger the strategy again.
    Hope it helps
    Best Regards

  • How can Change PO Release Indicator to Released Status

    Hi Gurus,
    We are having an issue here, which user accidentally re-triggered customized program to re-trigger the release strategy of old PO documents.
    This program basically reset the PO release startegy status and update the PO with the latest PO release strategy configuration. It's using FM ME_REL_STRATEGIE_EKKO.
    So, currently some of the old PO which previously been fully released and closed PO (with GR & IR completed). So, we dont think that it's right for these old PO to be approved again, also the relevant approvers also refused to do so.
    Is there any way that we can use the same FM to change the release indicator to R from S? Appreciate your help. Thanks!
    Regards,
    Michelle

    may i suggest you accidently trigger the program to close the release strategy for all POs by modify class characteristics.
    and then reopen the  release strategy for necessary POs.
    or maybe, you can trigger the program to close the release strategy for old POs.
    please see below for details:
    How to turn off Release strategy
    Edited by: JiQing Zhao on Jun 14, 2011 1:19 PM

  • Release Strategy-estimation cost and po cost

    Hi
    Client issu like...in RS
    We are maintain our estimation cost in Ztable(Zdev).Purchase order net value is Actual Cost.
    My Purchase order cost is less then Estimation cost .NO Problem. We config the RS some Level.
    But My PO cost is Greater then Estimaton Cost ,that time client wants some RS in purchase order.
    How will i configure Release Starategy Negative Deviation occur in comparison Statement?
    Example estimation is RS 10000 (ztable)
    Actual PO cost is RS 13000(Ekko)
    Now Run Zreport (ZComp) The system Will give 3000 is negative deviation
    Nagative dev  RS 3000
    Above The RS 3000 ,How will i configure Release Strategy In PO?
    Rds
    Kavi

    Hi kavi,
    can you please eloberate your issue,
    as i under stood you are setting the releasestrategy for PO price.

  • Release strategy for Future validity period- (Outline agreements)

    Dear All,
    I want to create release strategy for Scheduling agreement.But I am creating the SA for furure validity period.In this case how the release strategy will triger.
    E.g Today 09.03.09 I create a Sceduling agreement and the validity period I maintain is from 01.06.09 to 31.12.09 and Amount say 100 Rs.
    I am using Characteristics Doct type and Amount.. The system checks the rate as on date (i.e on 09.03.09) and since it doesnt find any value the Release strategy is not trigeering.
    How to set up release strategy in the above case.
    Thanks in Advance.
    Regards
    Amar

    Hi Amar,
    1) if you maintain a target value (EKKO-KTWRT) in the header of the            
    contract this value is the basis for the determination of the release          
    strategy. If the target value is 0, the system will cumulate the               
    values of the items and will use this value for the determination.                                                                               
    2) So if the target value is 0 and you change the price of a condition         
    with a validity period in the future the system will react in the              
    following way:                                                                               
    Example:                                                                       
       the contract contains one item with quantity = 100 and a net price          
    of EUR 5,-.                                                                    
       all contracts with a target value from EUR 0 - 1.000,- should be            
    subject of a release strategy                                                  
       the contract is created and released on October the 1st                     
       ME32K -> October the 2nd you define a new price of EUR 7,- with a           
    validity period from 03.10.09 - 30-10.09 -> you save the contract              
    -> the release strategy is not reset, as the start date is not                 
    reached yet (system date < startdate of validity period)                       
       ME32K October the 3rd you change a field in the contract -> the             
    release strategy is reset                                                                               
    This is system design that a release strategy can only be reset through        
    an action by the user. The determination of the release strategy can't         
    be triggered automatically in the background.      
    If you create a document which is subject of an overall release strategy      
    (e.g. p.o., contract) the determination of the release strategy takes         
    place when the user hits the 'save' button or chooses the 'check'             
    function.                                                                     
    So there must be a kind of event that tells the system that something         
    has changed.                                                                               
    Regards,
    Edit

Maybe you are looking for

  • MacBook Pro disk locked

    Trying to reinstall mavericks from CMD R start up and get message "disk locked" Problem has been trying to start and just getting grey screen with spinning wheel at bottom. Computer won't even reboot in recovery mode. Any ideas?

  • Multiple *memberset instructions in script logic results in combined *XDIM_

    If you have more than 1 *memberset instruction in a 5.1 sp2 environment the resulting XDIM_MEMBERSET will be created incorrectly. The two membersets will be combined into one XDIM_MEMBERSET instruction.  A simple illustration follows: *Note that the

  • Local OS user from OAS

    Hi friends: I need to get the local OS user connected using db package. I am building a web application with web toolkit. I define a function with this code: function f_get_os_user_connected return varchar2 is v_os_user_connected varchar2(50); begin

  • Win 7 won't allow saving a new action in CS4 (32bit side)

    One would think that a clean install of CS4 under Win 7 Home Premium 64 bit would set the program to allow saving actions and presets.  I'm working in the 32 bit side (x86 Programs) because some of the filters I use aren't 64 bit compatible.  I creat

  • Converting WMV to MPEG into IDVD looses sound after burning

    When i convert a movie maker film (not my own ofcourse)into mpeg and burn it with IDVD There is no sound anymore. Can anyone help me with that?