How to calculate fixed cost for by-product in costing run?

Dear,
We want to have some fixed cost calculated for by-product B in costing run.
Our current practise,  we only calculate the delivery cost as variable cost for this by-product B in the costing run for B. The by-product B is a component in the BOM of finish product A.
However, we need some fixed cost to be countered in for by-product B, which can be by controlled by us.
Any thought?
Thank you all in advance.
Christina.

Dear,
You have to maintain  BOM Usage-Costing-6 i.e., Costing BOM with all your required  Fixed Cost related Material components and assign it  in the by-product Material Master to include the Fixed Cost in by-product Standard Cost Estimate.  Based on this setting, system will calculate Standard Cost Estimate with this Fixed Cost and display in the related reports.
Regards
appalas

Similar Messages

  • [svn:fx-trunk] 10545: Make DataGrid smarter about when and how to calculate the modulefactory for its renderers when using embedded fonts

    Revision: 10545
    Author:   [email protected]
    Date:     2009-09-23 13:33:21 -0700 (Wed, 23 Sep 2009)
    Log Message:
    Make DataGrid smarter about when and how to calculate the modulefactory for its renderers when using embedded fonts
    QE Notes: 2 Mustella tests fail:
    components/DataGrid/DataGrid_HaloSkin/Properties/datagrid_properties_columns_halo datagrid_properties_columns_increase0to1_halo
    components/DataGrid/DataGrid_SparkSkin/Properties/datagrid_properties_columns datagrid_properties_columns_increase0to1
    These fixes get us to measure the embedded fonts correctly when going from 0 columns to a set of columns so rowHeight will be different (and better) in those scenarios
    Doc Notes: None
    Bugs: SDK-15241
    Reviewer: Darrell
    API Change: No
    Is noteworthy for integration: No
    tests: checkintests mustella/browser/DataGrid
    Ticket Links:
        http://bugs.adobe.com/jira/browse/SDK-15241
    Modified Paths:
        flex/sdk/trunk/frameworks/projects/framework/src/mx/controls/DataGrid.as
        flex/sdk/trunk/frameworks/projects/framework/src/mx/controls/dataGridClasses/DataGridBase .as
        flex/sdk/trunk/frameworks/projects/framework/src/mx/controls/dataGridClasses/DataGridColu mn.as

    Hi Matthias,
    Sorry, if this reply seems like a products plug (which it is), but this is really how we solve this software engineering challenge at JKI...
    At JKI, we create VI Packages (which are basically installers for LabVIEW instrument drivers and toolkits) of our reusable code (using the package building capabilities of VIPM Professional).  We keep a VI Package Configuration file (that includes a copy of the actual packages) in each of our project folders (and check it into source code control just as we do for all our project files).  We also use VIPM Enterprise to distribute new VI Packages over the network.
    Also, as others have mentioned, we use the JKI TortoiseSVN Tool to make it easy to use TortoiseSVN directly from LabVIEW.
    Please feel free to contact JKI if you have any specific questions about these products.
    Thanks,
    -Jim 

  • How to create  the BOM for co product

    Dear friends,
    How to create the BOM for Co product  and How the production will create and  how the costing will capture for that.
    Regards,
    Sabhapathy R

    Dear Umesh,
    How Bom created for co product
    By product
    Header
    xxx
    101
    mvt
    mvt
    qty
    item
    yyy
    261
    1
    zzz
    531
    0.5-
    By product
    Same way how we create co product for BOM. pl explain with simple example.
    Thanks &regards,
    Sabhapathy R

  • Target cost for a Production order

    Hi
       How to get Target Cost for a production order?
    Thanks
    Naga

    Well Naga, Right now I’m on HR implementation , but I programmed same kind of requirement two years before , but I got planned cost and actual cost .
    I also notice “cost analysis" the cost is not exact , it wont read the value from KP26 of that particular month .
    Here I am talking about 4.5b system.
    You can find the sales order ref on production order, and your production order is made up of your different kind of material like scarp, raw, semi-finished etc
    Here are the steps I followed .
    1- I read the material which you can see in material component on production order in Co03.
    After that I take the qty and also multiply by the cost at which machine is posted .
    I have that programs, as I need to find out . I’ll post you later .
    But you have to read the tables afko,afpo,afru,caufv,cost ..etc
    Do you see information structure I refer you , If i am not wrong this CO3 ( cost analysis ) report use report painter ( Tr.Gr51,Gr52 ) . you can also see by going in to said transaction which information structure its populating . This’ll also help you.
    Hope this’ll give you idea!!
    <b>P.S award the points.!!! DOn`t forget :)!!!!</b>
    Good luck
    Thanks
    Saquib Khan
    "Knowledge comes but wisdom lingers!!"
    "Some are wise and some are otherwise"

  • How system calculate Exchange Rate for material?

    I have some doubt how system calculate exchange rate for material when doing GR.
    For example, standard price of material is 0.01 USD per ea. PO is created in foreign currency (THB) with qty: 40,000 ea (THB 2,852.00)
    Actually when I do GR ea then accounting doc is:
    Dr. Inventory 400 USD (12,800 THB)
       Cr. GR/IR    88.64- USD (2,852.00- THB)
       Cr. Variant 311.36- USD (9,948.00- THB)
    for 2nd and 3rd line item, exchange rate M (THB -> USD) is 0.03108 which is correct.
    Could anyone advise where system get exchange rate for 1st line item?

    Hi
    First of all, as mentioned by you, the exchange rate for Item 2 and 3 is not 0.03108.. It is as below, based on the figures given by you...
    Dr. Inventory 400 USD (12,800 THB)........ Exch rate is 0.03125
    Cr. GR/IR 88.64- USD (2,852.00- THB)....... Exch rate is 0.03108
    Cr. Variant 311.36- USD (9,948.00- THB).... Exch rate is 0.0313
    I guess the item 3 is just a derivation from Items 1 and 2.. The Price diff results as a difference between std cost and purchase price...
    I believe, the exchange rate would have been 0.03125 at the time of GR... You need to check this in your system... For sure, it uses  exch rate type M in the standard... Check if 0.03125 (USD -> THB) or 32 THB -> USD exists in your system at all
    Item 2 is based on your PO negotiated rate...
    Regards
    Ajay M

  • How to Calculate over head for a material?

    Dear Experts,
    How to Calculate over head for a material? please explain me step by step.
    Regards,
    Santhosh
    Moderator: Please, avoid asking basic questions

    Dear Santhosh,
    Please review the following documentations in the SAP Library for details:
    [Applied Overhead |http://help.sap.com/saphelp_47x200/helpdata/en/7e/cb815143a311d189ee0000e81ddfac/frameset.htm]
    [Costing Sheet|http://help.sap.com/saphelp_47x200/helpdata/en/7e/cb815143a311d189ee0000e81ddfac/frameset.htm]
    [Overhead Keys|http://help.sap.com/saphelp_47x200/helpdata/en/7e/cb815143a311d189ee0000e81ddfac/frameset.htm]
    Best Regards,
    Antje

  • How to calculate Opening balance for a customer?

    Hi Experts,
    How to calculate Opening balance for a customer? I am trying to develop a report where in i have to get opening AR balance,current sales,adjustments etc of a customer. Please let me know how can i do this. I have some tables with me KNC1, BSAD, BSID.
    Thanks in Advance.
    Sharat Chandra.

    Say for example ..
    Get the opening bal for Customer 'K' in CCode 'C1' in 2008 ..
    First get all items from BSEG ..
    Select * from BSEG where KUNNR eq 'K'
                                     and BUKRS eq 'C1'
                                     and GJAHR eq '2008' .
    Sum all the DMBTR values (This is the total value).
    Second get the cleared items form BSAD for the above entries;
    Select * from BSAD for all entries in BSEG where KUNNR and BUKRS and XBLNR eq BSEG-XBLNR.
    Sum all DMBTR values ( this is cleared value).
    Third substract the cleared value from total to get Open value.
    This is a overview .. you should go to the tables and look for fields and etc.. and then define the logic meeeting your requirements .... this is a genric undersatnding ....
    Thanks,
    Aditya. V

  • How to calculate Average balance for an account

    Hi,
    How to calculate average balance for an account for a particular period say for JAN-12 period and after the end of that period for another two days 01-feb-12 and 01-feb-12 ?
    I'm using the following query :
    SELECT cc.segment1||'-'||cc.segment2||'-'||cc.segment3||'-'||cc.segment4||'-'||cc.segment5||'-'||cc.segment6 "Account_XX",
    nvl(sum(l.accounted_dr - l.accounted_cr),0) "Balance"
    FROM gl_code_combinations cc,
    gl_je_lines l
    WHERE cc.code_combination_id = l.code_combination_id
    AND l.set_of_books_id ='XX'
    and code_combination_id = replace it with code combination_id for account_xx
    AND l.effective_date <= '31-Jan-12' (january period end ??)
    GROUP BY cc.segment1||'-'||cc.segment2||'-'||cc.segment3||'-'||cc.segment4||'-'||cc.segment5||'-'||cc.segment6
    There are some discrepancies in "average balance" after end of month (Jan-12)?
    How to calculate average balances for a particular account (Account_XX above)from end of month of Jan to first two days of february?
    Thanks,
    Kiran

    Kiran,
    Please let me know first, is Average Balancing feature enabled in your GL Ledger?
    Regards
    Muhammad Ayaz

  • How to calculate acquisition value for specified day

    Hi,
    in my z program I have a problem how to calculate acquisition value for my asset for specified day.
    Example:
    I have asset created 8.7.2008 with TTYPE 104 (External asset acquisition) with value 5950.
    30.11.2008 there is another TTYPE 272 (Retirement of current-yr acquis., w/o revenue) with value 950.
    So BEFORE 30.11.2008 acquisition value is 5950. After is 5000. Is there any function module (or something else) in SAP system where I can send asset number and date a it return to me acquisition value for that day?
    Many thanks for any answer!

    Hi,
    your suggestion means that I have to compute acquisition value by myself (sum all TTYPE 1** - sum all TTYPE 2**). So SAP does't provide such functionality (LDB ADA have it, because it can compute acquisitiob value for specific day)?
    Mant thanks for answer

  • Keep getting error message 4310 when trying to burn music onto CD? How can I fix this for free?

    Keep getting error message 4310 when trying to burn music from playlist onto CD. How can I fix this for free?

    You can use the email form here >  Apple - Support - iTunes Store - Contact Us
    iTunes Store & Mac App Store: About your Apple ID and password

  • BAPI KPF6 POST PLAN COST FOR INTERNAL ORDER AND COST ELEMENT

    Hi all gurus,
    I would like to use in a custom report a BAPI/Function Module that help me to simulate KPF6 in order to post planning costs for internal order and cost element (layout 1-401).
    So the input should be:
    1) Version
    2) period from
    3) periodo to
    4) year
    5) internal order n.
    6) cost element n.
    7) value
    I found a lot of BAPI but don't know the correct one and how to use it (example how to fill the input value).
    Can anyone help me on that?
    Kind Regards

    In additio  to the previous I found the BAPI_COSTACTPLN_POSTPRIMCOST but don't know if it's the correct one and how to use it (some example fitting the my case will be very appreciated).
    If the quoted BAPI is correct.
    I tested it filling all fields as following:
    HEADERINFO:
    CO_AREA=FFCA
    FISC_YEAR=2008
    PERIOD_FROM=001
    PERIOD_TO=012
    DOC_HDR_TX='blank'
    INDEXSTRUCTURE:
    OBJECT_INDEX=000001
    VALUE_INDEX=000004 (hope this point at Interna Order)
    ATTRIB_INDEX=000000
    COOBJECT:
    OBJECT_INDEX=000001
    ORDERID=ZO53-08IMZ
    TOTVALUE:
    VALUE_INDEX=000004
    COST_ELEM=3224048
    FIX_VALUE= 200,0000
    DIST_KEY_FIX_VAL=2
    The Return table is set to 0. Nothing happens.....I suspect something related to indexstructure or index is wrong..
    Could anyone help me on that?
    Kind Regards

  • CK13N How to display Costing for a product with level as the transaction IH

    Hello to all:
    When I calculate the cost of a product, in the transaction CK13N I use the button Costing Stucture On to display the detail by item but there is no level notion.
    I would like to display the cost like in hte transaction IH05, depending of the level in the bom.
    Is somebody know a mean to do that.
    Thanks in advance.
    Regards.
    Jean-marc

    Hi Jean
    With "Print preview of entire hierarchy", what I see in my system is exactly what you want
    What i did is this
    1. Execute CK11N for p1
    2. Do not click on Costing Str on or off
    3. SImply click on the printer icon as i said and "Print preview of entire hierarchy"
    What I see is
    P1
    Under P1, I see
    AS1
        - C2
        - C3
    C1
    Regards
    Ajay M

  • How to fix "Licensing for this product has stopped working - Error 150:30"?

    I cannot pen PSE or Bridge. It get the message "Licensing for this product has stopped working - Error 150:30".
    I assume it is because I recently upgraded my Mac to Yosemite.
    What do I need to do to be able to open PSE again?
    Thank you.

    Thank you. I appreciate your tips. I tried solution 5 and it doesn't work.
    The rest is essentially gibberish to a basic user like myself. I have
    neither the expertise nor the confidence to go into these folders and start
    mucking around in there. Can I please have someone call me and guide
    through the necessary steps. My number is 06 46 40 94 39 (Location: France).
    Cheers.
    Michel Payen-Dumont & Nancy Feyerer
    www.gaulejac.blogspot.com
    Tél.: 05 53 50 72 80
    M: 06 46 40 94 39
    N: 06 45 29 59 40

  • How to calculate milestone percentage for final milestone (billing rule 3)

    Hi,
    Client is using percentage based milestone billing. For final milestone, billing rule is set to "3 Closing invoice in milestone billing" and milestone percentage, field FPROZ, is empty without any value.
    My aim is to calculate final milestone percentage, so it would be printed on invoice layout.
    I have suggested below logic to developer:
    "If RV60F-SFPRO field is not equal to  0,00 (zero), pass billing plan VBRP-FPLNR and item numbers VBRP-FPLTR into FPLT table to get FPLT-FPROZ"
    But developer can't find RV60F-SFPRO value anyway...
    Therefore, I have a problem - how to calculate final milestone percentage in this case?
    Could anyone provide any other logic how to calculate it?

    Percentage can't be added into final milestone in SO billing plan, field FPROZ is not editable....
    Moreover, this milestone just have billing value in SO billing plan.
    I am going to use this logic that hopefully would fix the issue:
    If invoice billing type VBRP-FKART value is XXX and billing plan rule FAREG value is 1, or 3, or 4, or 5, then milestone percentage should be calculated by following formula: milestone billing value x 100 and then divided by order net value from VBAP-NETWR.
    If invoice billing type XXX, but billing plan rule is different then, no milestone percentage is not printed. This logic is valid for header and item level billing.

  • In house mfgd. raw materials for a production order- Cost capturing

    Hello Experts,
    The scenario is as below:
    Client wants to manufacture in house some of the raw materials for a production order of sub assembly. These raw materials are made from scrap, with some manhours spent on it. After making them in house, these are handed over to stores for kit preparation.
    The planner wants to create a stock of these materials (without making individual prod. orders since there are many of these). One option is, planner can do the cost centre issue reversal (202 movement). But the raw material cost is also getting captured in it from the material master.
    From costing point of view, the cost of raw material should not be included since it is made from scrap. Only the cost of man hours spent is to be accounted for.
    Please help as to how to map this scenario. For capturing cost of man hours spent, we can include a routing for it in the production order of the sub assembly. But how to eliminate or exclude the material cost. All inputs from your side are appreciated. Thanks in advance
    Regards,
    Chetan.

    Hi Chetan,
    Your scenario has some major issue.
    1. You cannot produce RAW material in SAP.
    2. The cost of material produced inhouse will be different than that of original RAW material.
    3. There will be some cost effect in the final finished product if you consider this inhouse produced material for product costing of finished goods.
    We have similar scenario with my client and here is what I have implemented.
    1. Create a new HALB type part number for the inhouse manufactured RAW material. This will ensure that you assign Routing and BOM to same and can capture the COST for the same.
    2. Creating new material will enure that the product costing for inhouse produced RAW material is done.
    3. You can create single Production order for the same as you only have to capture cost. This depends on your Business scenario.
    4. Once you have inhouse produced raw material, you can create alternate BOM for the FINISHED Material with this new Part number in BOM.
    5. Create Production Version for the two BOM and ask Planner to select the Version 2 if he requires new part number in Production Order. I assume that this case would genrally appear in very small numbers.
    6. Now coming to product costing for final assembly. Since we are going to reuse scrap material to create the new part number, only activity cost and component cost will be used to determine cost. This cost will be less than that of RAW material cost.
    So we always suggest our customer to consider OLD part number to determine the PRODUCT COST of final material. BUT business will have to take a call on this.
    Do let me know if u need any thing else.

Maybe you are looking for