I would like to make report on Work center capacity with Remaining capacity requirement, available Capacity and Remaining available capacity requirements.
Can please let me know the Transparent tables for below Fields?
BEDAKT: Capacity Consumption Rest
OUTPUTLEN: Capacity Consumption Offer
SLIBELAS: Capacity load and
SLIDELTA: Capacity Unused.
Could you please help me accordingly
Regards
Bhupal

Wrong space. Please move this to BW area.

Similar Messages

  • How to calculate the size of web forms in hyperion planning?

    Hi Experts,
    I am trying to calculate the size of planning forms in Hyperion smart view., but i am unable to find out the way to calculate.
    Can you pls explain how to calculate the size of web form in Smart view?
    --- Srini.

    Hi Srini,
    First, here is what Oracle says:
    Data Form Size Estimation:
    To get a rough estimate of data form size, open the data form and select File > Save As from the browser. The size of the .HTML file is the portion of the data form that changes based on grid size. The .JS files remain the same size and can be cached, depending on browser settings. Information such as data form definitions, pages, and .gif files are not compressed when data forms are opened and sent to the Web browser.
    I have not been able to find out using their method.
    In any case, you can find out the size of grid by using below
    1. Right click on the form grid and click "View source"
    2. Save the source file as "Example.html"
    3. Right click the saved file and click "Properties"
    4. The Form size whould be same as that of file..
    Let me know if it helps.
    Cheers
    RS

  • Remaining capacity requirements scheduled for operation in Planned Order

    Hi all,
    I'm workig with planned orders, and I need the "Remaining capacity requirements scheduled for operation" data to list it in a Z Report, but I don't know how to get it.
    You can see the info in the "Detail Scheduling" of the planned order in MD13.
    Anyone knows how to get the info? Any table or any FM to get it?
    Points will be given for helping
    Thanks in advance!

    Did you ever find out where the planned order capacity information lives?  I can find the production capacity information in table KBEZ, but it appears that there is no planned order info there.
    Thanks,
    Matthew Bruckner

  • How to calculate the variance in PO price history?

    hi
    i hav standard report ME1P, since i need to do some modifications in this program i copied to Y prgrm,,,'
    im getting all the values properly...
    but my prblm is im not getting how to calculate the variance? im not getting the logic behid it...
    can anybody expln me in breif plz....
    Regards
    Smitha

    Hi Venu,
    there is another way as well, however, you won't be able to see Variance and Variance% as a saperate keyfigure which is not under the period. Thats the reason I didn't mention it earlier.
    What you can do is, Drag the period to the columns, Now create a structure that has the two keyfigures std price, moving price. Here if you add Variance and Variance%, Then these CKF's would come under period as well, which you don't need. And the system won't allow you to add these CKF's outside this structure. The reason being because the interpretation of the data then wouldn't make any sense here. You can create a new structure as well with these CKF's but they would become a subpart of your previous structure.
    choose the required characteristics in the Rows section. Save it.
    Let us know, Sorry man, can't help u much at this problem.
    regards,
    Sree.

  • How to calculate the quota base quantity in quota arrangement?

    Hi all,
    As we all know, when a new supplier is added in the quota arrangment, we take the help of quota base qunatity so that the new supplier does not get any unfair advantage over the existing suppliers. Would you please help me on how to calculate the quota base quantity or on what basis the quota base quantity is calculated?*
    Regards,
    Ranjan

    Dear,
    Quota arrangement divides the total requirements generated over a period of time among the sources of supplied by assigning a quota.
    Quota u2013 quota is equal to a number and its represents the proportionate of requirements. Total quota of all the vendors is equal to 100% of requirements.
    This quota arrangement is also specific to material and plant level.
    Quota rating = quota allocate quantity + quota base quantity / quota.
    Quota based quantity used only when a new vendor introduced.
    In the as on date situation, the minimum quota ratings will considered as preferred vendor.
    The 2 vendors has 2 same quota rating, the vendor who is having the highest quota will considered first.
    In the running quota, a new source of supply is included. (In situation of short supply) including a new source not means to reduce the quota for existing.
    Regards,
    Syed Hussain.

  • How to calculate the average inventory in ABAP

    Dear All,
    Please find the below formula and this formula how to calculate the Average inventory at value.Please let me know the abap base tables and the corresponding fields.
    Formula
    Inventory Turnover = Cost of Goods Sold (COGS) / Average Inventory at value.
    Thanks
    Regards,
    Sai

    Hi Arivazhagan,
    Thanks for your quick response .
    The field MBEWH from the table is fulfill the average inventory at value.
    For Eg :I want to calculate Inventory Turnover = Cost of Goods Sold (COGS)/
    Average Inventory at value.
    so shall i take Inventory Turnover = Cost of Goods Sold (COGS)/MBEWH
    The above formula will meet my requirement to find the average inventory Turnover.
    Thanks
    Regards,
    Sai

  • How to calculate the row size

    Hi,
    I am having a table of 4 column. First column is varchar2(10), Second column is Number(5), Third column is char(10) and Fourth column is Number(12,2).
    Now how to calculate the size of each row. I want to know how much space it will take for each row.
    Thanx & Regards,
    Swarup

    For a complete discussion of storage requirements for different datatypes see the Oracle 8i Concepts manual.
    All Oracle documentation is available on-line via the 'Documentation' link on the OTN home page.
    Your Col2 NUMBER(5) will take 4 bytes if it holds a 5 digit positive or negative number.
    Your Col4 NUMBER(12,2) will take 7 bytes if it holds a number with 12 digits that is positive and will take 8 bytes if it holds a number with 12 digits that is negative.
    The following is from the Concepts manual Chapter 12 (Copyright by Oracle)
    Built-In Datatypes 12-9
    Internal Numeric Format
    Oracle stores numeric data in variable-length format. Each value is stored in
    scientific notation, with one byte used to store the exponent and up to 20 bytes to
    store the mantissa. The resulting value is limited to 38 digits of precision. Oracle
    does not store leading and trailing zeros. For example, the number 412 is stored in a
    format similar to 4.12 x 10 2 , with one byte used to store the exponent (2) and two
    bytes used to store the three significant digits of the mantissa (4, 1, 2). Negative
    numbers include the sign in their length.
    Taking this into account, the column size in bytes for a particular numeric data
    value NUMBER ( p), where p is the precision of a given value, can be calculated
    using the following formula:
    ROUND((length( p)+ s)/2))+1
    where s equals zero if the number is positive and s equals 1 if the number is
    negative.
    Zero and positive and negative infinity (only generated on import from Version 5
    Oracle databases) are stored using unique representations. Zero and negative
    infinity each require one byte; positive infinity requires two bytes.
    null

  • In labview,how to calculate the parameters of the bilinear model that simulates the generation electroencephalogram?

    Dear Sir or madam:
    I have collected a lot of electroencephalogram data, which looks like a continuous sine wave plus a noise signal. what i want to do now is to fit the data with the bilinear model as the attached jpg file. the problem is the parameters of the model are changing with the evolution of the signal. would someone like to tell me how to calculate the parameters in the bilinear model?
    thank you very much
    Attachments:
    Bilinear_Model.jpg ‏33 KB

    I can point you in the right direction, but probably not answer your question really well. If you have the pro or full distribution of LabVIEW, you can use the curve fitting VIs to match any set of data to a theoretical curve. The curve fitting Express VI may do all you need to do (use the nonlinear option). To get the signal evolution, break your data into pieces and process each. If you need to average a bit, you can use a sliding window of your data for each analysis, moving the window less than the window width for each analysis.
    There are a plethora of curve fitting techniques built into LabVIEW - matrix operations, linear and log linear fits, Levenberg-Marquardt methods, downhill simplex, etc. You will probably need to experiment a bit to get a stable
    algorithm for your case. Check your literature for ways other people have done this. There may be an easy, stable method out there.
    If you are unfamiliar with curve fitting techniques, or you do not have the pro or full versions of LabVIEW, I would recommend "Numercial Recipes in C" by Press et. al., published by Cambridge University Press. The chapter on Modeling of Data will get you going. The rest of the book will provide any background you need.
    This was a very general answer. If you need something more specific, let me know. Be aware that this type of problem usually requires some trial and error to get right. The answers should be tightly scrutinized before being believed.
    This account is no longer active. Contact ShadesOfGray for current posts and information.

  • How do you determine remaining capacity on ipod shuffle

    How can you determine remaining capacity on ipod shuffle?

    I tried this and did not see anything in iTunes. I'm not the smartest guy on the block when it deals with computers. Hey i'm 73 years young!! Thanks for your help anyway.

  • Table for Remaining capacity requirements

    In Project Systems, Person Assignment tab of an activity, there is a field Remaining capacity requirements (which result from subtracting the requirements of the individual split from the overall requirements). Can you tell me the table where I can findout the total details of this filed.

    Hi
    Click on F1 on the field and go to technical information and check the field name. If you dont find table over there, take the field name and go to SE84 transaction code.
    click on ABAP Dictionary  --> Fields  --> Table fields
    Enter field name and execute. YOu will get list of tables, where this field is containing. You can check relevant table from list.
    Hope it helps.
    regards
    Srinivas

  • SCB68 how to calculate the correct resistor

    Hi,
    sorry I am a new NI user.
    I didn't understand how to calculate the correct resistor to apply in scb68 in order to obtain a differential signal.
    My application requires an acquisition of a differential voltage channel of 0-5V.
    Can I use the ach+ and ach- channels without change anything on scb68?
    if no, how can I find correct settings?
    I read on scb68 manual page 5-2 "Conditioning Analog Input Channels" but I didn't understand wot to do.
    thank you
    Sarah

    Hi,
    Last question first; the cable impedance is at higher frequencies. So with you (almost) DC application don't worry about this cable impedance.
    I would choose resistors of 100k as the lowest value as bias resistors.
    You mentioned the power consumption of your sensor (transmitter ?) Does this mean that the sensor is powered through the same lines ?
    I don't know how you want to 'cascade' your sensors depends on your sensors. Normally you measure each sensor with a different input.
    Can you post (or link to) the datasheet of the sensor ?
    Message Edited by K C on 12-12-2007 10:44 AM

  • How to calculate the unit for RATE?

    Hey All,
    I am not sure if there is something standard for this or not.
    I am calculating the 'Rate' by using 'Value/Amount' and 'Quantity' as follows -
    Rate == Value /  Quantity
    I need to calculate the unit for the rate as below -
    Rate unit == Value unit (Currency) /  Quantity unit (Base_uom) 
    (for example -
    if value is 1000 USD and quantity is 10 TO then Rate should come out as 100 USD / TO)
    Could anyone please suggest how to calculate the unit in this case?
    Many Thanks!
    Tanu

    Hi,
    Go through the below link it may give some idea
    http://help.sap.com/saphelp_nw04/Helpdata/EN/19/1d7abc80ca4817a72009998cdeebe0/content.htm
    Regards,
    Marasa.

  • How to calculate the Current APC (Acquisition and Production Cost)

    Hi,
    Please help me how to calculate the Current APC.
    The Current APC (Acquisition and Production Cost) is a calculated value based on Previous Year Acquisition balance plus any value changes up to the time of the report.
    The Asset History Report (RAGITT_ALV01) calculates the Current APC value &
    The Current APC can also be found in the Asset Explorer (transaction code AW01N) under Country Book 10/ Posted Values tab then the line “Acquisition Value” and column “Posted values”.
    I suppose that the calculation of Current APC (Acquisition and Production Cost) is getting done in the GET statements in the report RAGITT_ALV01, but unable to find the actual logic.
    Please help me.
    Thanks in advance,
    Satish

    Hi,
    you'll find the logic in fm FI_AA_VALUES_CALCULATE
    A.

  • How to calculate the Current APC

    Hi,
    Please help me how to calculate the Current APC.
    The Current APC (Acquisition and Production Cost) is a calculated value based on Previous Year Acquisition balance plus any value changes up to the time of the report.
    The Asset History Report (RAGITT_ALV01) calculates the Current APC value &
    The Current APC can also be found in the Asset Explorer (transaction code AW01N) under Country Book 10/ Posted Values tab then the line “Acquisition Value” and column “Posted values”. 
    Thanks in advance,
    Satish

    Hi,
    I suppose that the calculation of Current APC (Acquisition and Production Cost) is getting done in the GET statements in the report RAGITT_ALV01, but unable to find the actual logic where it is being done.
    Please help me.
    Thanks in advance,
    Satish

  • How to calculate the Daily Call Volume

    Hello,
    Can anyone please advise how to calculate the daily call volume in a contact center - the counts of the calls terminated in ICM ?
    Is there any webview report or a SQL query which provides the count ?
    Many thanks in advance for the help!
    Thanks & Regards,
    Naresh

    The ICM software generates a Termination_Call_Detail record for each call that arrives at the peripheral. From This report you can get the number of calls to ICM as well as the call details.
    To get the report run this sql query
    select * from dbo.t_Termination_Call_Detail where convert (varchar(10), DateTime, 101) = '12/03/2010'

Maybe you are looking for

  • Credit Memo Process Issue

    Hi, 1) SAP allows credit memo to be created with reference to credit memo request and with reference to an invoice. In what what scenarios we should give option of creating credit memo with reference to invoice and in what scenario we should give opt

  • Azure Backup CATALOG FAILURE 0x80131500 on Windows 8.1 Pro

    I recently installed the new Azure Backup client on a Windows 8.1 Pro computer to test the service. Every backup that is run is resulting in hundreds of skipped files showing the same error:  CATALOG FAILURE 0x80131500  A random check of some of the

  • 3rd Gen Touch video-out

    I recently purchased a set of composite AV cables from my local Apple Store for use with my 3rd gen Touch (v. 4.3.3).  When I connect to the TV, I get audio output, but no video.  When I connect my daughter's 4th gen Touch in the same way, with all s

  • CS4 Keyboard Shortcuts - German

    Would some kind sole lead me in the direction where I can download a list of shortcuts applicable to a German keyboard? Whilst I'm using an English language version of CS4 (in fact my OS (XP Pro) and all applications are also in English) I'm stuck wi

  • Runtime Error when trying to trigger smartform from VL03N

    Hi all, i am having a runtime error while trying to triger my smartforms from transaction VL03N. The error is 'The current ABAP program "SAPLV60U" had to be terminated because it has come across a statement that unfortunately cannot be executed.' The