How to Calculate the Space between two Characters in GDI + ?

I am Drawing the set of characters in Graphics, by Calculating the points using GraphicsPath for each Character. I Need to know how to calculate the distance should be given between the two characters?
I am using this code to generate points
PointF [] pnts;
var p=new GraphicsPath();
path.AddString("A","Arial",(int)FontStyle.Regular,50,new pointF(0f,0f),StringFormat.GenericDefault);
Matrix m=new Matric(1,0,0,1,0,0);
path.Flatten(m,1,0f);
pnts=path.pathpoints;
i am getting the points for all characters using the above code.
Now i am combining the two character Using the points generated by the above code.  Eg "AB"
Help me to calculate the the character space should be given between two characters?
Thanks in Advance...

Hi,
this link can assist you:>
Professional C# - Graphics with GDI+ 
Mark as answer or vote as helpful if you find it useful | Ammar Zaied [MCP]

Similar Messages

  • How to eliminate the space between two analysis in the Dashboard?

    Hi All,
    I have created a Dashboard which contains 12 analyses arranged vertically. When i see the report in the dashboard section it contains some standard space between each analysis. So it looks like separate separate analysis arranged in dashboard. But i want it to look a single table is it possible by reducing the space between every analysis? If possible please let me know how to achieve this in clear manner.
    Awaiting your valuable responses.
    Thanks in Advance
    Thenmozhi

    Hi,
    Yes,try to adjust the analysis view (table/pivot/chart view )Formating option...
    FYI: try to align formating left,right,top/bottom padding and also try to reduce the width and height..
    Please refer the below
    Re: Eliminating the space between two reports in OBIEE dashboard page Section
    THanks
    Deva

  • How to Calculate the Time Between two days in ABAP

    Hi,
                  I have one scenario like i need to calculate the time between two days please can you suggest me.
    Thanks,
    Harinath

    Hi Peeleti,
                Check this code,
    DATA : DATE1 LIKE SY-DATUM VALUE '19830125',
           DATE2 LIKE SY-DATUM VALUE '20070219',
           DAYS1 TYPE I,
           WEEK1 TYPE I,
           MONTH1 TYPE I,
           YEAR1 TYPE I,
           C_YEARS1 TYPE I.
    CALL FUNCTION 'HR_99S_INTERVAL_BETWEEN_DATES'
    EXPORTING
      BEGDA           = DATE1
       endda           = DATE2
      TAB_MODE        = ' '
    IMPORTING
      DAYS            = DAYS1
      C_WEEKS         =
      C_MONTHS        = C_YEARS1
      C_YEARS         = C_YEARS1
      WEEKS           = WEEK1
      MONTHS          = MONTH1
      YEARS           = YEAR1.
      D_MONTHS        =
      MONTH_TAB       =
    *WRITE : / 'DAYS   = ', DAYS1,
            / 'WEEKS = ',WEEK1,
          /  'MONTHS = ', MONTH1,
          / 'YEARS   = ', YEAR1.
    Using this code you can calculate the No Of Days Between two dates. Based On days you will easily calculate the Hour. [  No of days * 24 ].
    Thanks.
    Reward If helpful.

  • How to calculate the difference between two dates?

    Hello,
    I would like to write some code which figures out how many days are between the Date_of_change (which is of datatype DATE, length 7 and of format DD-MON-YY) and the current date today. Then if the difference between Date_of_change and the current date is greater that 30 days for example then I would like to delete that record from the database.
    Thanks
    Doug

    Something like this should work:
    SQL> select * from emp order by hiredate ;
         EMPNO ENAME      JOB              MGR HIREDATE           SAL       COMM     DEPTNO
          7934 MILLER     CLERK           7782 21-OCT-2005       1300                    10
          7902 FORD       ANALYST         7566 22-OCT-2005       3000                    20
          7900 JAMES      CLERK           7698 23-OCT-2005        950                    30
          7876 ADAMS      CLERK           7788 24-OCT-2005       1100                    20
          7844 TURNER     SALESMAN        7698 25-OCT-2005       1500          0         30
          7839 KING       PRESIDENT            26-OCT-2005       5000                    10
          7788 SCOTT      ANALYST         7566 27-OCT-2005       3000                    20
          7782 CLARK      MANAGER         7839 28-OCT-2005       2450                    10
          7698 BLAKE      MANAGER         7839 29-OCT-2005       2850                    30
          7654 MARTIN     SALESMAN        7698 30-OCT-2005       1250       1400         30
          7566 JONES      MANAGER         7839 31-OCT-2005       2975                    20
          7521 WARD       SALESMAN        7698 01-NOV-2005       1250        500         30
          7499 ALLEN      SALESMAN        7698 02-NOV-2005       1600        300         30
          7369 SMITH      CLERK           7902 03-NOV-2005        800                    20
    14 rows selected.
    SQL> delete from emp where hiredate < sysdate - 30 ;
    10 rows deleted.
    SQL> select * from emp order by hiredate ;
         EMPNO ENAME      JOB              MGR HIREDATE           SAL       COMM     DEPTNO
          7566 JONES      MANAGER         7839 31-OCT-2005       2975                    20
          7521 WARD       SALESMAN        7698 01-NOV-2005       1250        500         30
          7499 ALLEN      SALESMAN        7698 02-NOV-2005       1600        300         30
          7369 SMITH      CLERK           7902 03-NOV-2005        800                    20
    4 rows selected.
    SQL>

  • Calculate the Difference Between two dates excluding weekends and Holidays

    Hi,
    We need to calculate the difference between the two dates by excluding the Local public holidays (It is global and varies across countries) and weekends should not be included in calculation for a business day in OBIEE.
    We have two dates: Open date and close date when ever close date is null we are calculating age based on taking the current timestamp and need to exclude the weekends and Holidays when ever the close date is null.
    Ex:
    Col1 col2 Total
    11/9/2010 2:46:38 PM Null 13
    11/2/2010 8:06:26 PM 11/3/2010 5:37:03 PM 1
    (In the Total we shouldn't include the weekends,holidays)
    Please let me know how to calculate the difference between two dates by excluding the weekends and holidays.
    Thanks
    Edited by: user10441472 on Nov 22, 2010 3:14 PM

    You already asked this question and I answered it...
    Re: calculation of Business day in OBIEE

  • How to calculate the ratio between the maximum and minimum peaks of the two waves using two looping to find the value of SPO2?

    hello everyone,
    i'm rai from indonesia
    I have a final project about pulse oximetriy, I have some problems,
    how to calculate the ratio between the maximum and minimum peaks of the two waves using two while loops to calculate SpO2 ?
    My program image can be seen below predicament ?
    Attachments:
    spo2 akusisi data with filter lpf hpf smoot nilai max min ir merah.vi ‏249 KB
    spo2 akusisi data with filter lpf hpf smoot nilai max min ir merah.vi ‏249 KB

    Hi rai,
    I would appreciate it as kind of respect for forum participants if you would clean up your VI before uploading it (or images of its block diagram)…
    That being said:
    - Your inner while loops each run exactly twice. Replace them with FOR loops!
    - Lots of unneeded operations, mainly induced by ExpressVI usage. Is there a reason to convert to DDT and immediately convert back to 1D array?
    - You already calculate some Min/Max values. Ratio is just a division of two values…
    Best regards,
    GerdW
    CLAD, using 2009SP1 + LV2011SP1 + LV2014SP1 on WinXP+Win7+cRIO
    Kudos are welcome

  • How to calculate the ratio between the maximum and minimum peaks of the two waves using two while loops?

    hello everyone,
    i'm rai from indonesia
    I have a final project about pulse oximetriy, I have some problems,
    how to calculate the ratio between the maximum and minimum peaks of the two waves using two while loops to calculate SpO2 ?
    My program image can be seen below predicament ?
    Attachments:
    spo2 akusisi data with filter lpf hpf smoot nilai max min ir merah.vi ‏249 KB

    Hi Rai,
    You should post this into the LabVIEW forum rather than Real-Time since this isn't a Real-Time application. Your post will see more replies in the LabVIEW forum. 
    As far as your question is concerned, you can write the max and min from the respective loops to a local variable to send the data out of the loops to a third loop or just do the calculation in one of the loops. This would be ideal if you're trying to do this while the loop is running. 
    -Jayk
    Applications Engineering
    National Instruments

  • How to remove white space between two answer reports

    How to remove white space between two answer reports
    In Dashboard section I have 2 rqeuest. Each request renders Table View. When I display dashboard, it show white space separating the 2 table views. How do I get rid of the white space/white band ?

    See this link
    Re: Eliminating the space between two reports in OBIEE dashboard page Section
    Regards,
    Sandeep

  • How to share the data between two or more frames

    How to share the data between two or more frames based on the database relationship in JDeveloper?

    You can pass data between frames by passing it as parameters.
    That is when you are invoking another frame, pass your data as arguments through the constructor to that frame .
    You can also achieve this through static or public methods, but static variables as we know is not suggested which might occupy more memory space.
    Regards,
    Srinivasan AShwath
    <BLOCKQUOTE><font size="1" face="Verdana, Arial">quote:</font><HR>Originally posted by [email protected]:
    How to share the data between two or more frames based on the database relationship in JDeveloper? <HR></BLOCKQUOTE>
    null

  • Calculate the difference between two dates times in infopath form 2013

    Hi,
    I have an infopath 2013 form that contains three fields:
    2 date time and the 3rd contains the difference between the two in hours
    how I can make the difference between the two so that the display will be like this:
    Date Time1           08/21/2014           22:00 
    Date Time2           08/22/2014           1:00
    Diff Field                                             3:00

    Hi,
    Please refer to the following article which matches your requirement exactly.
    Calculate the difference between two date picker controls in InfoPath using rules and formulas - no code!
    Please mark it answered, if your problem resolved.

  • Calculate the difference between two dates

    I would like to calculate the difference between two dates in PL/SQL and return the result as a number of days expressed as an integer value.

    Denes,
    A fair point, I should really have posted this on the SQL forum (I'm new to the forum as well as PL/SQL) but thanks for responding anyway. It does raise a question as to how to implement this in ApEx though.
    I have created the function and am calling it as shown below from the source window of a form. The source type is 'PL/SQL expression or function' and the expression in the source window of the form is:
    calc_date_difference (:p26_c_payment, :p26_c_rec)
    The two parameters being passed are of type date but I'm not sure how to handle the ruturned number and populate the form in ApEx with this value.
    Is it possible to do it this way or am I taking completely the wrong approach?
    Regards
    Sandy
    This is not ApEx related but SQL related:
    CREATE OR REPLACE FUNCTION calc_date_difference (
    p_date_1   VARCHAR2,
    p_date_2   VARCHAR2
    RETURN NUMBER
    v_difference   NUMBER;
    v_sql_err      VARCHAR2 (4000);
    BEGIN
    v_difference := TRUNC (TO_DATE (p_date_1)) - TRUNC
    (TO_DATE (p_date_2));
    RETURN v_difference;
    CEPTION
    WHEN OTHERS
    THEN
    v_sql_err := SQLERRM || CHR (10) || CHR (10) ||
    SQLCODE;
    ND calc_date_difference;and
    SQL> SELECT calc_date_difference ('23.01.2007',
    '20.01.2007') diff
    2    FROM DUAL;
    DIFF
    3
    Denes Kubicek                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           

  • In BADi , How to pass the values between two Method

    Hi Experts,
    We have two methods in BADis. How to pass the value  between two Methods. Can you guys explain me out with one example...
    Thanks & Regards,
    Sivakumar S

    Hi Sivakumar!
    Create a function group.
    Define global data (there is a similiar menu point to jump to the top include).
    Create one or two function modules, with which you can read and write the global data.
    In your BADI methods you can access the global data with help of your function modules. It will stay in memory through the whole transaction.
    Regards,
    Christian

  • How to adjust the space between images in a carousel or images with horizontal scroll

    I use the next steps to create a carousel or horizontal scroll of images:
    Webcenter portal: Spaces
    Spaces
    Manage Settings
    Pages
    Create page
    Content management
    Content presenter
    Add images with Plus Icon
    It works, but between every image has a lot of space, can you tell me how to reduce the space between every image.
    My Oracle Version 11gR1 (11.1.1.3.0)
    Regards
    Tomas Reyes

    Remove line 234 in your HTML code.
    <p>& n b s p</p>
    This is a redundant line of code. Your spacing should get resolved.
    PS: I've given spaces between the tag because otherwise this forum would not display the line correctly.

  • How to manage the space between a table and its title?

    Have tables where titles are very close to the main text and need a couple of points to separate these elements. How to reshape this space?
    1. Titles were separated by a return that is not  visible...  (any code is revealed by ID)
    2. When a Return is inserted after the title, nothing happens aparently, but this return is now visible and could be used as a «paragraph space after» value:
    3. A solution could be Grep to catch the end of paragraph assigned to titles to insert a return;
    but Grep only catches the right border of the table (the yellow mark shows the big blinking cursor);
    Grep cannot see the end of paragraph in the tables's title.
    It another method?
    Basically, how to modify the space between a table and ists title

    I think you and Bob are not in synch here.
    Bob suggested that you could use paragraph spacing, but for that to work you do need to use separate paragraphs for the title and table, which you don't seem to be doing. Using GREP to find the end of the paragraph only works if there IS and end to the paragraph. As far as I know there is now meta-character to use in Find/Change that would allow you to find a table and insert a paragraph break ahead of it, but I bet it could be scripted.
    I'm not quite sure what you were trying to find in the GREP you posted. Did you actually have a paragraph return inserted already after the title? In that case you only need to redefine the style for that paragraph to add the space (or redefine the style for the paragraph that holds the table itself). You don't need the GREP. But the reason it does nothing is that you've found a location -- the end of the paragraph, but haven't found any actual text to modify. To do anything you would need to use something like .$
    But back to NOT having a separate paragraph... If you put the cursor in any table cell and go to Table Options > Table Setup tab you'll see fields to set space before and after the table that should do what you want. That was the second part of what he posted.

  • How to Break the cluster between Two servers

    Hi Experts,
    Since Iu2019m new to BOBJ XI R2.I would like to know how to break the cluster between two servers.
    Description :
    So far we took the copy of QAS Server1 to the new QAS server2 (Through Mirroring Tool ). Now those two servers are cluster together, I can see QAS server1 CMS Name, Cluster Name, cluster member name in QAS Server2 (CMC-> Setting -> Cluster).
    Besides in QAS Server1 CMS Name and Cluster name are pointing to the QAS Server1, except Cluster Member (This is still have two members Server1 and Server2).(CMC-> Setting -> Cluster).
    In QAS Server1 and QAS Server2 (CMS-> Servers), I can able see both server name under Machine Name tab.
    I would like to make those two servers as independent servers. There are two different data source for those two servers. I want to remove the cluster in both servers.
    Right now QAS Server1 is running and QAS Server2 is stopped.
    If i create/modify a group under new Mapped NT Member Groups in QAS server2 ,it is getting reflecting in QAS server 1.
    Could you please tell me the steps to resolve this problem.
    BO Version: BO XI R2
    Regards,
    Sridharan

    Hi,
    Maybe the external CMS is still 'attached' to your SIA node. Please go to the CCM (Central Configuration Manager) and stop the SIA (Server Intelligent Agent). On one of the tabs you can see if there is an external CMS part of your environment. Delete it and restart the SIA. Retry if you can delete the services now from within your CMS. It may well be that you have to stop both environments and delete each others CMS via the CCM to get it working. If you have not changed any permissions for your Administrator account the security model will not be the one causing this.
    Hope this helps...
    Martijn van Foeken
    Focuzz BI Services
    http://www.focuzz.nl
    http://nl.linkedin.com/in/martijnvanfoeken

Maybe you are looking for

  • Can I install Tiger on 400 MHz G3?

    My daughter has a 400 MHz G3 (10 GB drive, 1 GB RAM, Firewire, slot-loading DVD) currently running OS X 10.3. We are finding that she does not have access to all web content, because of outdated Flash player. In order to upgrade Flash player, she nee

  • Duplicate External Users in Hyperion Shared Services 11.1.2

    Hi, I was wondering if anyone had the same similar issue with Hyperion 11.1.2 Shared Services while configuring with MSAD. When i configure shared services with MSAD and create a group in Native Directory and add users to the group i see a duplicate

  • How can i smooth my graph?

    hello guys. i want to smooth out my graph so i can distinguish big peaks (pitches) in it from other spurious smaller peaks.how can i do that?is there a way to make it more visual easy for someone to see the big peaks or to emphasize even more the big

  • Sharing issues

    We have 1 pc, 2 PC different logins and 2 ipods.  I have the itunes folders in a "public" folfer..accessible to both of us (I think). When my husband adds a cd via his pc login, it does not show on mine.  And my downloads from itumes do not show on h

  • Publishing through Portal - "Connection to backend system failed"

    We are having a problem publishing documents through our SAP Portalu2019s service u201CPublish Course Contentu201D under Course Administration. When we go to publish, we get a status u201CConnection to backend system failedu201D with the message u201