How to calculate the summery values in the query

Hi,
I have facing a typical problem , I can able to get the values for the detailed one
plant   material   qyt
a          x          100
            y           50
b           z            50
result               200
when I am removed the drilldown for material and plant b nothing is coming.
palnt          qty
a               -
result        -
here I am getting blank values . Since qty is calculated key figure .I have tried different options to like aggregation but I haven't succedd to get that .
is there any apporoch to summiered values .
Thanks in advacne .
Thanks,
Vijay

Hello Duygu,
restrict the original cost keyfigure with a variable which is based on fiscal period (this will be actual cost). And then create a new keyfigure(copy of original keyfigure) and use same variable but in detail of restriction use -1 for offset( this will be previous). And then define a new formula and subtract actual from previous or opposite)
Sarhan.

Similar Messages

  • How to calculate the ratio between the maximum and minimum peaks of the two waves using two looping to find the value of SPO2?

    hello everyone,
    i'm rai from indonesia
    I have a final project about pulse oximetriy, I have some problems,
    how to calculate the ratio between the maximum and minimum peaks of the two waves using two while loops to calculate SpO2 ?
    My program image can be seen below predicament ?
    Attachments:
    spo2 akusisi data with filter lpf hpf smoot nilai max min ir merah.vi ‏249 KB
    spo2 akusisi data with filter lpf hpf smoot nilai max min ir merah.vi ‏249 KB

    Hi rai,
    I would appreciate it as kind of respect for forum participants if you would clean up your VI before uploading it (or images of its block diagram)…
    That being said:
    - Your inner while loops each run exactly twice. Replace them with FOR loops!
    - Lots of unneeded operations, mainly induced by ExpressVI usage. Is there a reason to convert to DDT and immediately convert back to 1D array?
    - You already calculate some Min/Max values. Ratio is just a division of two values…
    Best regards,
    GerdW
    CLAD, using 2009SP1 + LV2011SP1 + LV2014SP1 on WinXP+Win7+cRIO
    Kudos are welcome

  • How to calculate the unit for RATE?

    Hey All,
    I am not sure if there is something standard for this or not.
    I am calculating the 'Rate' by using 'Value/Amount' and 'Quantity' as follows -
    Rate == Value /  Quantity
    I need to calculate the unit for the rate as below -
    Rate unit == Value unit (Currency) /  Quantity unit (Base_uom) 
    (for example -
    if value is 1000 USD and quantity is 10 TO then Rate should come out as 100 USD / TO)
    Could anyone please suggest how to calculate the unit in this case?
    Many Thanks!
    Tanu

    Hi,
    Go through the below link it may give some idea
    http://help.sap.com/saphelp_nw04/Helpdata/EN/19/1d7abc80ca4817a72009998cdeebe0/content.htm
    Regards,
    Marasa.

  • How to calculate the Current APC (Acquisition and Production Cost)

    Hi,
    Please help me how to calculate the Current APC.
    The Current APC (Acquisition and Production Cost) is a calculated value based on Previous Year Acquisition balance plus any value changes up to the time of the report.
    The Asset History Report (RAGITT_ALV01) calculates the Current APC value &
    The Current APC can also be found in the Asset Explorer (transaction code AW01N) under Country Book 10/ Posted Values tab then the line “Acquisition Value” and column “Posted values”.
    I suppose that the calculation of Current APC (Acquisition and Production Cost) is getting done in the GET statements in the report RAGITT_ALV01, but unable to find the actual logic.
    Please help me.
    Thanks in advance,
    Satish

    Hi,
    you'll find the logic in fm FI_AA_VALUES_CALCULATE
    A.

  • How to calculate the Current APC

    Hi,
    Please help me how to calculate the Current APC.
    The Current APC (Acquisition and Production Cost) is a calculated value based on Previous Year Acquisition balance plus any value changes up to the time of the report.
    The Asset History Report (RAGITT_ALV01) calculates the Current APC value &
    The Current APC can also be found in the Asset Explorer (transaction code AW01N) under Country Book 10/ Posted Values tab then the line “Acquisition Value” and column “Posted values”. 
    Thanks in advance,
    Satish

    Hi,
    I suppose that the calculation of Current APC (Acquisition and Production Cost) is getting done in the GET statements in the report RAGITT_ALV01, but unable to find the actual logic where it is being done.
    Please help me.
    Thanks in advance,
    Satish

  • How to calculate the variance in PO price history?

    hi
    i hav standard report ME1P, since i need to do some modifications in this program i copied to Y prgrm,,,'
    im getting all the values properly...
    but my prblm is im not getting how to calculate the variance? im not getting the logic behid it...
    can anybody expln me in breif plz....
    Regards
    Smitha

    Hi Venu,
    there is another way as well, however, you won't be able to see Variance and Variance% as a saperate keyfigure which is not under the period. Thats the reason I didn't mention it earlier.
    What you can do is, Drag the period to the columns, Now create a structure that has the two keyfigures std price, moving price. Here if you add Variance and Variance%, Then these CKF's would come under period as well, which you don't need. And the system won't allow you to add these CKF's outside this structure. The reason being because the interpretation of the data then wouldn't make any sense here. You can create a new structure as well with these CKF's but they would become a subpart of your previous structure.
    choose the required characteristics in the Rows section. Save it.
    Let us know, Sorry man, can't help u much at this problem.
    regards,
    Sree.

  • How to calculate the individual sums of multiple columns in a single query

    Hello,
    Using Oracle 11gR2 on windows 7 client. I have a question on calculating sum() on multiple columns on different columns and store the results in a view. Unfortunately I could not post the problem here as it keeps on giving error "Sorry, this content is not allowed", without telling where or what it is! So I had to post it in the stack-overflow forum, here is the link: http://stackoverflow.com/questions/16529721/how-to-calculate-the-individual-sums-of-multiple-columns-in-a-single-query-ora
    Will appreciate any help or suggestion.
    Thanks

    user13667036 wrote:
    Hello,
    Using Oracle 11gR2 on windows 7 client. I have a question on calculating sum() on multiple columns on different columns and store the results in a view. Unfortunately I could not post the problem here as it keeps on giving error "Sorry, this content is not allowed", without telling where or what it is! So I had to post it in the stack-overflow forum, here is the link: http://stackoverflow.com/questions/16529721/how-to-calculate-the-individual-sums-of-multiple-columns-in-a-single-query-ora
    Will appreciate any help or suggestion.
    ThanksLooks like you want a simple group by.
    select
              yr
         ,      mnth
         ,      region
         ,     sum(handled_package)
         ,     sum(expected_missing_package)
         ,     sum(actual_missing_package)
    from test
    group by
         yr, mnth, region
    order by      
         yr, mnth, region;I wouldn't recommend storing your data for year / month in 2 columns like that unless you have a really good reason. I would store it as a date column and add a check constraint to ensure that the date is always the first of the month, then format it out as you wish to the client.
    CREATE TABLE test
         year_month                              date,
        Region                     VARCHAR2(50),
        CITY                       VARCHAR2(50),             
        Handled_Package            NUMBER,       
        Expected_Missing_Package   NUMBER,   
        Actual_Missing_Package     NUMBER
    alter table test add constraint firs_of_month check (year_month = trunc(year_month, 'mm'));
    ME_XE?Insert into TEST (year_month, REGION, CITY, HANDLED_PACKAGE, EXPECTED_MISSING_PACKAGE, ACTUAL_MISSING_PACKAGE)
      2  Values (to_date('2012-nov-12', 'yyyy-mon-dd'), 'Western', 'San Fransisco', 200, 10, 5);
    Insert into TEST (year_month, REGION, CITY, HANDLED_PACKAGE, EXPECTED_MISSING_PACKAGE, ACTUAL_MISSING_PACKAGE)
    ERROR at line 1:
    ORA-02290: check constraint (TUBBY.FIRS_OF_MONTH) violated
    Elapsed: 00:00:00.03
    ME_XE?Insert into TEST (year_month, REGION, CITY, HANDLED_PACKAGE, EXPECTED_MISSING_PACKAGE, ACTUAL_MISSING_PACKAGE)
      2  Values (to_date('2012-nov-01', 'yyyy-mon-dd'), 'Western', 'San Fransisco', 200, 10, 5);
    1 row created.
    Elapsed: 00:00:00.01
    ME_XE?select
      2        to_char(year_month, 'fmYYYY')    as year
      3     ,  to_char(year_month, 'fmMonth')   as month
      4     ,  Region
      5     ,  CITY
      6     ,  Handled_Package
      7     ,  Expected_Missing_Package
      8     ,  Actual_Missing_Package
      9  from test;
    YEAR         MONTH                REGION                         CITY                    HANDLED_PACKAGE EXPECTED_MISSING_PACKAGE ACTUAL_MISSING_PACKAGE
    2012         November             Western                        San Fransisco                       200                       10                      5
    1 row selected.
    Elapsed: 00:00:00.01
    ME_XE?Then you have nice a nice and easy validation that ensures you data integrity.
    Cheers,

  • How to calculate the average inventory in ABAP

    Dear All,
    Please find the below formula and this formula how to calculate the Average inventory at value.Please let me know the abap base tables and the corresponding fields.
    Formula
    Inventory Turnover = Cost of Goods Sold (COGS) / Average Inventory at value.
    Thanks
    Regards,
    Sai

    Hi Arivazhagan,
    Thanks for your quick response .
    The field MBEWH from the table is fulfill the average inventory at value.
    For Eg :I want to calculate Inventory Turnover = Cost of Goods Sold (COGS)/
    Average Inventory at value.
    so shall i take Inventory Turnover = Cost of Goods Sold (COGS)/MBEWH
    The above formula will meet my requirement to find the average inventory Turnover.
    Thanks
    Regards,
    Sai

  • How to calculate the row size

    Hi,
    I am having a table of 4 column. First column is varchar2(10), Second column is Number(5), Third column is char(10) and Fourth column is Number(12,2).
    Now how to calculate the size of each row. I want to know how much space it will take for each row.
    Thanx & Regards,
    Swarup

    For a complete discussion of storage requirements for different datatypes see the Oracle 8i Concepts manual.
    All Oracle documentation is available on-line via the 'Documentation' link on the OTN home page.
    Your Col2 NUMBER(5) will take 4 bytes if it holds a 5 digit positive or negative number.
    Your Col4 NUMBER(12,2) will take 7 bytes if it holds a number with 12 digits that is positive and will take 8 bytes if it holds a number with 12 digits that is negative.
    The following is from the Concepts manual Chapter 12 (Copyright by Oracle)
    Built-In Datatypes 12-9
    Internal Numeric Format
    Oracle stores numeric data in variable-length format. Each value is stored in
    scientific notation, with one byte used to store the exponent and up to 20 bytes to
    store the mantissa. The resulting value is limited to 38 digits of precision. Oracle
    does not store leading and trailing zeros. For example, the number 412 is stored in a
    format similar to 4.12 x 10 2 , with one byte used to store the exponent (2) and two
    bytes used to store the three significant digits of the mantissa (4, 1, 2). Negative
    numbers include the sign in their length.
    Taking this into account, the column size in bytes for a particular numeric data
    value NUMBER ( p), where p is the precision of a given value, can be calculated
    using the following formula:
    ROUND((length( p)+ s)/2))+1
    where s equals zero if the number is positive and s equals 1 if the number is
    negative.
    Zero and positive and negative infinity (only generated on import from Version 5
    Oracle databases) are stored using unique representations. Zero and negative
    infinity each require one byte; positive infinity requires two bytes.
    null

  • Hi frinds ,how to calculate the  totals in smartforms

    1)how to calculate the  totals in smartforms .

    Hi,
        To calculate totals and sub totals in sap scripts you can use subroutines.
    Say if you have to add the unit price (KOMVD-KBERT) then in the main window whereever tat value is picked write this routine
    /: DEFINE &TOT_PRICE&
    /: PERFORM F_GET_PRICE IN PROGRAM /:USING &KOMVD-KBERT& /:CHANGING &TOT_PRICE& /:ENDPERFORM
    Then write the variable where ever you want it to be printed (mostly it will be in footer window)
    Then create subroutine pool program and you have to write the code.
    FORM F_GET_PRICE tables int_cond structure itcsy
    outt_cond structure itcsy. data : value type kbert.
    statics value1 type kbert.
    Read int_cond table index 1.
    value = int_cond-value.
    value1 = value1 + value.
    Read outt_cond table index 1.
    outt_cond-value = value1.
    Modify outt_cond index 1.
    ENDFORM.
    regards..

  • How to calculate the frequency of the search string in a row

    Hi,
    I would like to find the frequency of the number of the occurences of a search string in a row which is of type of xmltype content.
    For ex: I would like to find the frequency of the word "oracle" in a row which is of type xmltype content.
    Is there any fuction called frequency or freq...
    Thanks in advance....

    Oh!
    Then How to calculate the frequency of occurences in a row ?
    I hope the Score formula is S=3f(1+log(N/n))
    I want to calculate the f value alone, how is it possible.
    Thanks in advance.....

  • How to calculate the mt_bf  (optimum blocking factor) in mtio.h?

    Hi geniuses,
    One of our customers asks our tape driver to support the mt_bf defined as optimum blocking factor in mtget structure in mtio.h. The mt_bf is supported in MTIOCGET ioctl in Solaris native tape driver -- st. I can not find any Solaris document how to calculate the value for Developers. Please help me to figure out if you know the answer.
    Thanks in advance!

    I would have liked this as a homework assignment when I was in college - beats the heck out of "find the range of a given artillery shell..."
    good luck with it, looks fun
    Lee

  • How to calculate the coordinate after implementing Affine Transformation?

    Hi, guys!!
    I am working on a Map makeing program, like MS Visio. Then, I need to put an icon on the working space. And the icon can be moved, rotated, and scaled, when mouse drags handles (8 small circles) around the icon. However, the problem is that after the icon is scaled or rotated using AffineTransform class, I do not know how to calculate the coordinate to paint the mouse handles.
    Please give me your suggestions!! Thanks in advance!!

    Sure. The idea is that you track your translations, scaling, and rotation separate from the AffineTransform. That way, you know what you need to revert:
    AffineTransform at = new AffineTransform();
    at.translate(20, 20);
    at.scale(2, 2);
    at.rotate(45, 10, 10);
    At this point, let's assume you want to translate again. First you have revert the rotation and the scale:
    at.rotate(-45, 10, 10);
    at.scale(1/2, 1/2);
    at.translate(10, 10);
    In order to do this, you need to track your scaling and rotation values when you change them. If this isn't feasible, it's certainly possible to derive the values from the AffineTransform, but that's a bit tougher.
    Michael

  • How to calculate the phase difference between two square wave (acquired from two channel in one DAQ)

    Hello everyone ,
     I need a quickly help that as below :
    I am trying use PCI-6220 to acquired six signals from one rotation encoder (channel A, channel B,channel Z ,and their non-signals) .The encoder out signals will be square wave and 4000pulses per revolution. I set it rotation at 300rpm speed. I need show every square wave of six out channels in waveform and measure the A-B phase difference to check if the value is correct (designed value should be 90deg) .
    I have no idea how to measure or calculate the phase difference of two square wave base on synchronizate to acquire these two square wave from two channel on the PCI-6620....
    Anyone can give a idea how to calculate the phase difference with two square wave ?
    Thank a lot and Thanks again...
    Tim

    Tim,
    Here is a simple rising edge detector for one channel.
    Lynn
    Attachments:
    Rising edge.vi ‏15 KB

  • How to calculate the HFM Cube size in SQL Server-2005

    Hi
    How to calculate the HFM Cube size in SQL Server-2005 ?
    Below query used for Oracle. Then what is query for SQL Server?
    SQL> select sum(bytes/1024/1024) from dba_segments where segment_name like 'FINANCIAL_%' and owner='HFM';
    SUM(BYTES/1024/1024)
    SQL> select sum(bytes/1024/1024) from dba_segments where segment_name like 'HSV FINANCIAL%' and owner='HFM';
    SUM(BYTES/1024/1024)
    Regards
    Smilee

    What is your objective? The subcube in HFM is a concept which applies to the application tier - not so much to the database tier. The size of the subcube is the unique number of data strips (data values for January - December inclusive, for example) for the given entity, currency triplet or Parent.Child node. You have to account for parent accounts and customs which don't exist in the database but are generated in RAM in the application tier.
    So, if your objective is to find the largest subcubes, you could do this by querying the database and counting the number of records per entity/value (DCE tables) or parent.child entity combination (DCN tables). I'm not versed in SQL, but I think the script below would just tell you the schema size and not the subcube sizes.
    Check out Accelatis.com for a third party software product that can do this for you. The feature is called the Subcube Analyzer and was written by the same team that wrote HFM, so they ought to know how this works :-)
    --chris                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               

  • How to calculate the switching score

    Dear Experts,
    As per ISO 2859, the normal inspection can be changed to reduced Inspection if the production is steady, current value of switching score is 30, approved by responsible authority. My request is how to calculate the switching score?. I follow G-I inspections and AQLs 1.5.
    Regards,
    Krish

    Hi Sujit,
    Thanks for your reply.
    I have find work arround for switching score. but my problem is we are applying switching rule to multiple sample,
    for that as per ISO if the 4th sample is used score will be 0 but the batch is accpeted, as per dynamic modification set up this consider as OK lot but as per the ISO below30 score we will not go for next reduced inspection. if it is rejected then we will follow work arround. How to control in DMR? Is there any user exit is available .
    regards,
    krish

Maybe you are looking for