How to capture event in process chain....Please help...

Hi All,
Please tell me how can I capture any event triggred by ABAP program in process chain...The ABAP program is there in the process chain...ABAP prog is triggering one event based on some condition..Please tell me how can I capture that event in the process chain...
Thanks in Advance...

Also check this link...
https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/com.sap.km.cm.highlightedcontent?documenturi=/help/sdn_nw04/saphelp_nw04/helpdata/en/8f/c08b3baaa59649e10000000a11402f/content.htm
Hope this helps...
Thanks,
Raj

Similar Messages

  • How to create event based process chains

    Hi All,
    I would like to know about event based process chains. In connection to this, could you please answer the following queries,
    1. How to create events
    2. How to link created event to the process chain in the same BI or BW system and as well as from  
        externel BI system.
    3. How link one process chain with other process chain (i.e, After completion of one process chain, it
        should trigger other dependent process chain)
    Thanks and Regards,
    Kotesh.

    1). Doubt regarding first question.
    For example, i would like to create time based event (it should be trigger daily at specified time),
    where we have to maintain scheduling options while creating event.
    When i checked SM62 there i found only two options a). Event name and b). Description.
    Could please send any doucument link if you have.
    Ans : You can use function modules like "BP_EVENT_RAISE" in a program and schedule the program to trigger.
    2). For externel BIW system also same procedure we need to follow or any difference.
    Ans : Externally you need to trigger the same event.
    3). i found dependent process chain also had scheduling options as direct scheduling insted of start using meta chain or API. As you said dependent process chain should be mata chain. it seems dependent process chain may be Meta chain or Direct scheduilg.
    Ans : Its your choice how you want to schedule it.You can either make that dependent chain a metachain or schedule it separately.
    I found at the end of first process chain they kept one process like Raise event and second process chain connected with the help of raise event process event name. If you have any idea about this process could explain a bit more.
    Ans : May be they are raising the event in the main chain and triggering the dependent chain using this event.
    But Metachain is preferred for such thing.Though it does similar thing.
    Hope this helps.

  • "Still waiting for replays Issue In process chain please help me"

    Hi Xpertz
    Could any one clarify me in the following aspect .I have a process which is having
    4 infopackages updating to a single ods and then in to a cube I copnverted it in to
    a process chain evry thing seems to be fine how ever one issue is ther .I am not
    getting any repeat option on the failed infopackage .But if the ods activation fails
    then am able to see the repeat option on that activation process.
    How can we get the repeat option on the failuere info package .
    Other than segis weblog is ther any other option to restart the process chain.3
    ITs in BW 3.5
    Thanx in advance
    Regards
    R M K
    No need to say good answers willl get full pointz***

    Hi..
    I have worked on process chains..and I too have seen this..that when chain fails..often repeat option does not appear at infopackage step..
    but then this does not cause an issue..as I simply double click on the step..open the infopackage and run it..
    Siggi's blog is very useful..I havent found another method to kick off a chain from the failed step..(other than repeat)..
    sometimes..u manually correct the failure..but the process chain step remains RED..
    as per the blog..change the field on the table..so that step goes GREEN and kicks off further steps of the chain..
    Vishvesh

  • Use of events in process chains

    Hi All,
    Could some one help me in givving me detailed information about the use of events in process chains with some examples .How are they used and what are they performed in background .I am going to start,creating process chains according to the requirements which are based on event scheduling before ..
    Your detailed information is really appreciated..
    Thanks & Regards

    Hi,
    Suppose your process chain needs to be started after certain activity is finished, then you can create an event to be triggered when that activity is done. The process chain will start once it gets that triggered event.
    This is one use in using events in Process Chains.
    Thanks,
    Raj

  • Trigger Event in Process Chain

    Hi ppl,
    i want to push the data into ODS and intocubes whenever the data has been placed in the Delta Queue. how can i do that? i heard that i need a abap program to trigger the event in process chain, is anyone here can help me with the abap program? thanks...

    Hi,
    see OSS Note 135637
    Triggering a Process Chain From R/3 pgm
    Hope this helps.
    GTR

  • How to check the parent process chain of a meta chain

    Hello Friends,
    Recently I joined a new project, which is of environment BW 3.0. I am trying to find the dependent process chain's parent, but could'nt able to find them. I went through all the process chains manually to check whther the dependent process chain is mentioned in them, but could'nt find any......
    Can any of you help me to know how to find the parent process chain of a meta chain ?
    I really appreciate your time, will be awarding points to any answers.......
    Thanks,

    Hello Radhan,
    thanks for your quick reply. I searched the table based on your advice, but i could'nt get the parent process chain's name. Can you throw some more ideas please..........
    Thanks,

  • HELP Event-driven Process Chain

    HelloCommunity,
    I aim to develop a tool for modelling Business process using EPC (Event-driven Process Chain)
    I have just discovered Sirius, followed some tuturial....But when I started to
    design my own project I got stuck.. My metamodel still complicated and I couldn't deal with some cases and some specific relationship.
    Could you please share with me some links or ressources for project similar to mine?
    Thank you in advance
    Regards,

    Hi Han, Le 28/07/2015 15:56, han sirius a écrit :
    > HelloCommunity,
    >
    > I aim to develop a tool for modelling Business process using EPC
    > (Event-driven Process Chain)
    >
    > I have just discovered Sirius, followed some tuturial....But when I
    > started to
    > design my own project I got stuck.. My metamodel still complicated and I
    > couldn't deal with some cases and some specific relationship.
    >
    > Could you please share with me some links or ressources for project
    > similar to mine?
    Did you try the tutorial [1] ?
    You might discover concrete examples of modeling tools created with
    Sirius for various use-cases in the gallery [2] and lab [3].
    You will also find the documentation in [4].
    >
    > Thank you in advance
    >
    > Regards,
    >
    >
    Regards
    Maxime - Obeo
    Need professional services for Sirius?
    http://www.obeodesigner.com/sirius
    [1] https://www.eclipse.org/sirius/getstarted.html
    [2] https://www.eclipse.org/sirius/gallery.html
    [3] https://www.eclipse.org/sirius/lab.html
    [4] https://www.eclipse.org/sirius/doc/

  • How can we set a process chain to trigger the nodes w/o manual intervention

    SDNers,
    We have a Master PC which has the loading & activation of some Hierarchies.Wats happening is some of the hier activations are failing (we got track of the root cause as well) and the nodes below are not getting triggered automatically, eventhough they have been designed to get triggered irrespective of success or failure of this hierarchy activation. The chain prompts for the u2018Status change & trigger the following eventsu2019 opo-up and only when it was said u2018yesu2019, the subsequent node gets triggered in the chain. If this manual intervention was not there, the Chain gets struck at the activation node, whic is running in yellow status for long, though a short dump - error has already been thrown.
    My query is how can we set a process chain not to anticipate the manual intervention of chnaging the status & trigger events pop-up

    Hi ravi,
    i'm not sure abt the query but what i got thru ur qustion is u have to automtaically go to the next load/step even the proceess chain fails in the step......
    for that we have the same master meta chains with link of so many local chains...for this even if there are some interventions/fails in between the process chains it never gets stopped....
    it goes to the next step and we'll work, analyse and finish the failed load manually....the next day it'll be
    fine...
    b4 to this make sure that there is no dependency for the previous loads....
    And now the solution i found for this is in the process chain design itself.......
    while giving the links itself we'll be getting the options as status RED,GREEN and RED(or)GREEN.....now if u got for the third option the event goes to the next step even it is unsuceesful....
    rgds,
    nkr.

  • How can we delete a process chain?

    Dear Ones,
    By Mistake I have converted an infopackage group into process chain in Quality system. How can we delete a process chain?
    Thanks,
    Raj

    Hi Bhanu,
    I've doubt that what is the difference between cancel with core and cancel without core with respect to process chain.
    Could you please advice how do we start a process chain daily without using the schedular window for transaction data.
    Thanks in advance...
    Amarnath.

  • How to stop the running process chain

    How to stop the running process chains or infopackges...just qm status change is enought?

    BI - SM 37 - Kill the Job
    ECC - SM 50 - Kill the job

  • How to create document in process chain

    Hi,
    can u plz tell me how to create document in process chain and wat i need to edit the text for particular info package when document.

    Hi Anil,
    Goto Tcode:RSPC and select your load data process type where you have to right click on the process chain and select Select create message,there are three types of messages
    1>Successful
    2>Error
    3>Always
    If you already created message then go to maintain message
    Where you have two buttons
    1>is for Edit Document
    2>Maintain Recpiants
    Goto Edit Document and put your comment and set their mail address in Mail recipiants.
    Note there are 2 types of messages you can kept at execution of infopackage process type.
    If load is successful send the mesaage to recipients
    If load is failed send the message to mail recipt.
    It would help you.

  • Explain: how to include Infospoke in Process Chain where destination is  DB

    Explain: how to include Infospoke in Process Chain where destination is  local machine database [NOT Flatfile]

    Hi vijay,
    First you create an Infospoke with destination as a DB table in your local BI or BW Machine. Now add this infospoke by going through below steps.
    1. Call up the process chain maintenance. Choose This graphic is explained in the accompanying text Process Chain Maintenance from the Administrator Workbench toolbar. The Process Chain Maintenance Planning View screen appears.
    2. In the left-hand screen area of the required This graphic is explained in the accompanying text display component, navigate to the process chain in which you want to insert your InfoSpoke. Double-click to select it. The system displays the process chain plan view in the right-hand side of the screen.
    If no suitable process chain is available, you need to create a new process chain. You can find additional information under Creating a Process Chain.
    3. To insert a process for extraction by means of an InfoSpoke, choose This graphic is explained in the accompanying text Process Types in the left-hand area of the screen. The system now displays the process categories available.
      4.In the process category Loading Process and Post Processing, choose the application process type This graphic is explained in the accompanying text Data Export into External Systems.
      5.Insert the Data Export into External Systems application type with Drag&Drop into the process chain. The dialog box for inserting a process variant appears.
      6.In the Process Variant field, enter the name of the InfoSpoke that you want to include in the process chain, or select it by means of the input help.
    Once You have added the infospoke you have to write a program which will fetch the database table that you filled and transfer the data fetched to other legacy system with the help of XI System
    For more information on how to infospoke on 3rd party pls find the link below
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/5f12a03d-0401-0010-d9a7-a55552cbe9da
    Hope this help
    Harish

  • My sis. tryed to break my pass and now it says to conect to itunes  but i captured so many photos from the last sync  how to sync without deleting this photos please help

    my sis. tryed to break my pass and now it says to conect to itunes  but i captured so many photos from the last sync  how to sync without deleting this photos please help

    egzoni 123 wrote:
    my sis. tryed to break my pass and now it says to conect to itunes  but i captured so many photos from the last sync  how to sync without deleting this photos please help
    If you Restore using last computer you synced to the password will be removed and you can restore the last backup on your computer, which includes your camera roll.
    If you enabled Photo Stream in iCloud your photos are in Photo Stream.
    If you had installed one of the many apps that can upload photos to a photo sharing site and had used it you will have your photos.
    If you have done none of these things you are out of luck. The phone comes with many tools to preserve content, but you have to use them.

  • How can u know the process chain total time, individual time?

    Hi guru's
    How can u know the process chain total time, individual time?
    and what options will available in sm37?
    Thanks
    prabha reddy

    Hi Prabha
    Iam not very sure about total time and individual times.
    But you can go to tcode rspcm for monitoring the daily process chains. it gives you details like 1. status  2.start date & time  3. Log ID  of each process chain.
    or you can go to log view of particular individual chain to know how long it has run.
    SM37: tcode for simple job selection.
    here you check the status of job.
    you can select for certain conditions like
    1. scheduled
    2. released
    3. ready
    4.active
    5. cancelled
    Assign points if it was helpful
    Revert back if you need further info/
    regards
    AP

  • My ebay toolbar and the ebay logo that was in my system tray at the bottom have both disappeared when I installed FireFox??? How do I get them back? Please help.

    my ebay toolbar and the ebay logo that was in my system tray at the bottom have both disappeared when I installed FireFox??? How do I get them back? Please help.

    Option 1
    Back Up and try rebuild the library: hold down the command and option (or alt) keys while launching iPhoto. Use the resulting dialogue to rebuild. Choose to Repair Database. If that doesn't help, then try again, this time using Rebuild Database.
    If that fails:
    Option 2
    Download iPhoto Library Manager and use its rebuild function. (In Library Manager it's the FIle -> Rebuild command)
    This will create an entirely new library. It will then copy (or try to) your photos and all the associated metadata and versions to this new Library, and arrange it as close as it can to what you had in the damaged Library. It does this based on information it finds in the iPhoto sharing mechanism - but that means that things not shared won't be there, so no slideshows, books or calendars, for instance - but it should get all your events, albums and keywords, faces and places back.
    Because this process creates an entirely new library and leaves your old one untouched, it is non-destructive, and if you're not happy with the results you can simply return to your old one. 
    Regards
    TD 

Maybe you are looking for

  • Opportunities with Products not pulling after recent patch

    I have multiple opportunities with products and costs associated with them that are not pulling when I run a historical report. For example: I run a report on Thursday at 2:00 PM. I have a user who has modified an opportunity on Thursday morning. I u

  • Time Capsule and Bell Fibe

    I just purchased a TIme Capsule yesterday but haven't been able to get it to connected. After spending almost an hour on the phone with Apple Support, she told me that the TC may be faulty and to exchange it for a new one. However, after reading thin

  • Raw files in iphoto 09

    When I drag a photo from iphoto to the desk top, the file info changes from a nef file to a jpg file. My OS is 10.5.8 and am using iphoto 09. My camera is a Nikon E 8800 (CoolPix). The reason I drag the file from iphoto to the desk top is that I want

  • TS3297 my itunes wish list does not have a purchase allbutton why not it did before

    My itunes wish list does not have a purchase all button anymore why not?

  • New iMac Maya freeze

    My new iMac 20" 4GB memory - freeze every time when Maya starts. Was tested Maya Unlimited 8 and 2008, same result. Maya was started with or w/o Rosette result the same. Maya freeze computer when shows "Learning Movies" dialog. After reformat HD inst