How to change aspect ration after editing

The sequence I was editing my project turned out to be 720 but I need it to be 1080. I changed it to 1080 under sequence settings but the video comes out looking too small. Will I have to re-edit my project or is there an easy fix?

What you need to do is make a new sequence, with the proper settings...best way to do this is make a new sequence, add a clip of the footage you want to match to it...click YES when FCP asks "do you want the sequence to match the clip?"...delete that clip...then copy and paste the entire sequence from the old timeline do this new one. Then highlight everything, and REMOVE ATTRIBUTES>BASIC MOTION and DISTORT. If you did any resizing on clips, those will have to be manually redone. 

Similar Messages

  • How to change aspect ratio AFTER creating a project

    I created a project in FCPX and somehow it's got Black bars on the left and right (i think i created a 16:9 project and put 4:3 clips in). I can't enlarge the clips as they contain text that would be cropped out, so i need to turn my 16:9 project into a 4:3 project. Is this possible?
    Regards
    Mike

    Close your project if it's open by going back to the Project Library view (where you see all your projects). Select the project, open the inspector (command-4) if it isn't already open. At the bottom right of the inspector, click the wrench icon. Change your projects properties and click OK.

  • When I use Photoshop CS 6 to edit video, I don't know how to change video speed after I converted the clip to smart object?

    When I use Photoshop CS 6 to edit video, I don't know how to change video speed after I converted the clip to smart object? The clip color turns purple and it only allows me to add motion but not change the clip duration and speed anymore.

    Thanks for the reply and as a work around method I used the Photoshop to do all the adjustments then export the video to iMovie to finish the final cut. I also have a problem to paint or clone on a blank video layer created in Photoshop. It tells me the time is beyond the target frame time, I don't understand the message. Can you explain to me what did I do wrong? Thanks a lot!
    John Wang
    801-3618742
    [email protected] 
    http://johnwanggallery.shutterfly.com  

  • Heloo, my question is, how to make aspect ration 4:3 on i movie 10.01? i didn't find it :), heloo, my question is, how to make aspect ration 4:3 on i movie 10.01? i didn't find it :)

    heloo, my question is, how to make aspect ration 4:3 on i movie 10.01? i didn't find it :), heloo, my question is, how to make aspect ration 4:3 on i movie 10.01? i didn't find it

    Problem Resolved - it is a font issue. Apparently Acrobat can't handle particular fonts and it is best to stick with a very small slection of fonts - Arial, Helvetica, Times Roman.
    I haven't test a lot of fonts. If I do, I'll post there results here.
    Bob

  • Re-installed photoshop elements 12. In folder correct copies, how to change read-only to edit photos? After printing photo how to return to grid view?

    Reinstalled photoshop elements 12. How to change photo after printing back to grid view? In folder correct copies one or more files is read only. How to change so these can be edited?

    Reinstalled photoshop elements 12. How to change photo after printing back to grid view? In folder correct copies one or more files is read only. How to change so these can be edited?

  • How to change PO price after Goods receipt

    Hi Expert,
    This is very urgent. I have created PO with account assignment (Individual order/project (D)) and has material master last month and received goods last month too.
    PO item already been issued and used for production. There is no stock balance both urestricted and sales order stock.
    Now we need to change the PO price for paying the vendor right price. I have tried MBST to cancel/reverse material document and give me error message saying "Sales ord stk deficit" I think because of no stock avaible in the system.
    I need a urgent solution: How can  i change PO price or cancel material doc to adjust the PO price.
    Thanks,
    Mohammed Rahman

    Hi Mohammed
    Which step system appear error ?
    Example: Qty PO have already receipt 4 set, you already used 3 set. Stock have 1 set.
    When you use 561with quantity 5 set, stock have 6 set.
    after u cancel PO wrong price (qty is 4 set) - stock have 2 set  but when you change PO and Goods Receipt again stock will have 6 set.
    And you use 562 with Qty 5set => now stock still have 1 set.
    And price already changed.
    Regards,
    Thang
    Edited by: Cao Danh Thang on Jun 13, 2008 4:30 AM

  • HOW TO CHANGE HOST NAME AFTER SAP IS INSTALLED?

    i have installed ecc6 in my computer.But after installation is completed i want to change my computer(system) name.If i change the computer name is there any problem occur.May i change computer name after installation also.

    As far as my understanding goes it can be done. The only problem is SAP is not recommending it. Still if you want to give it a shot please go through the link to learn more and step by step guidance.
    [Click Here|http://www.saptechies.com/changing-host-name-on-r3-host-what-do-you-do/]
    Also take a look  at this SDN thread, you might find something interesting.
    [click here for SDN thread|How to change the hostname was set/defined in SAP system?;
    Edited by: santra.anirban on Sep 13, 2010 10:45 AM

  • How to change aspect ratio on shockwave

    Hi guys,
    I need your help. I cannot find the answers by how to change the aspect ratio on shockwave. Please can someone help me how I can change aspect ratio on shockwave??
    Thanks

    Just like this one:
    [IMG]http://www.photo-dvd-maker.com/img/howto/original_4_3_to_16_9_fit.jpg[/IMG]
    [IMG]http://www.photo-dvd-maker.com/img/howto/original_16_9_to_4_3_fit.jpg[/IMG]
    [IMG]http://www.photo-dvd-maker.com/img/howto/original_16_9_to_4_3_fill.jpg[/IMG]
    Is it possible to change the aspect ratio on the propert?? if so, which property that I should use to change the video frame??
    Thanks

  • How to change page type after the fact

    In the application builder, I click on an application and choose Details in View.
    I get the list of pages I have in my app.
    The page type column has:
    Interactive Report
    Navigation Form
    Dynamic HTML
    DML Form
    Chart
    Report
    How do I change this column after a page has long been created?
    Specifically, I want to the change "Dynamic HTML" to something else.
    Why?
    Because on this particular page, tabs do not work (error: page not found).
    Buttons created among a regions items do not work (same error, page not found).
    I need to use tab and buttons to go from this page to other pages.
    And I am suspecting the page type may have something to do with my problem.
    Thanks in advance for any pointers.

    Thanks for your consideration!
    For my current app, a clinical management system,
    I'd like to have, say, 1000 items.
    (For other applications I am thinking about, but have no time,
    nor expertise for now, I'd need millions of items,
    each corresponding to a pixel of a graphic.)
    Who cares if the current computers are too slow?
    How about make it a parameter that can be changed
    per app or per apex installation, and default to 100?
    Some forms can be broken up logically, as people have helpfully suggested,
    and I did follow that advise on some pages.
    But other forms cannot be. People have put a lot of thought on designing
    those forms, they are government or legal standards (or at least something more important
    than computer performance), and people have been trained
    with those original forms.
    Consider the hoops I have to jump through to get more than 100 items
    on a page I am currently working on:
    Generate the items (INPUT type="text" and INPUT type="checkbox") using PLSQL
    lots of htp.p('<INPUT ...>').
    a JavaScript function to collect all the values on the page
    and make up an XML string. submits this string to an application
    process, and application process parses the XML string and does insert or update.
    Another JavaScript to populate the items based on the current values of a row,
    using an application process to retrieve the columns of a row.
    There are about 150 items on this particular page.
    All these are ok, because I was aware of the restriction of 100.
    And because I wanted to generate my own HTML to mimic the original
    form anyway.
    Then things started to go weird.
    I need buttons to go back to another page. and I use tabs.
    Buttons to go back from this page,
    when a button is created with "Create a button in a region position",
    it works fine.
    When a button is created with "Create a button displayed among this region's items",
    it does not work, and I get HTTP 404, https://.../apex/wwv_flow.accept, page cannot be found.
    But I need a button to work like the one created with "Create a button in a region position",
    but displayed like the one created with "Create a button displayed among this region's items".
    This is still not too bad. I saw the difference between the two kinds of buttons.
    I copied the HTML code for the button "Create a button in a region position",
    and used a display only item to create a Back button where I wanted:
    '<table class="t15Button" cellspacing="0" cellpadding="0" border="0"><tr><td class="t15L"><img src="/i/themes/theme_15/button-l.gif"/></td>'||
    '<td class="t15C">Back</td>'||
    '<td class="t15R"><img src="/i/themes/theme_15/button-r.gif"/></td></tr></table>'
    Here P145_BACK holds the page number to which I want this page to go back to.
    Then I noticed that the tabs did not work any more. same error, page not found.
    That's is when I got a little frustrated and posted for help on the forum.
    Then I begin to undo my steps, and
    by lucky accident, I noticed that, if none of the checkboxes is checked,
    the tabs work fine. If at least one is checked, I get this error, page not found.
    My current solution is to add a function of my own in the doSubmit(B) function in file apex_3_1.js,
    which unchecks all checkboxes (o.checked=false).
    And now, from this page of about 150 items,
    the tabs are ok, and I have a button that is similar to one
    created with "Create a button displayed among this region's items", except I created myself
    using HTML.
    I think this trick of using a custom function in doSubmit(), that unchecks or even hides
    INPUT type="text" items (o_div.style.visibility = "hidden"; o_div.style.display = "none";)
    should work in general. this function is only invoked when the user clicks the tab,
    or buttons among a region's items.
    Somebody said regarding restrictions on drugs or sex.....
    you will not make people stop, you just make it harder or more expensive.
    Same here and many other things, a restriction is just making things harder.
    People will try to get around it.
    Now that I have a solution, and I am aware of the problem, I'll calm down and
    go back to my own thing for now.

  • How do I change cell focus after editing contents of a cell?

    Similar to tab/shift-tab to move focus a column right/left, respectively.  Is there a shortcut to move up/down?  I have tried every combination of fn/ctrl keys and can't seem to find this on the shortcuts for Numbers.

    Jerrold Green1 wrote:
    Badunit wrote:
    Or you can hit ESC to break the focus and stay in the cell.
    ...and cancel the input you just made.
    Jerry
    My mistake. In most cases it would do as you said.  I was doing something a little different than what was posted. I was entering the cell, typing in a number (or using option-return) to give it focus, then using the up/down arrow keys to adjust it before trying to break the focus. I guess I never tried entering a number then hitting esc which, as you said, cancels the change.

  • How to change shape properties after having created one?

    Photoshop CC 2014 -- latest update as of October 06, 2014
    Windows 7
    How can I change a shapes properties after having created one.
    I have created a simple ellipse.
    When I drew the ellipse with the tool, I had the option for the fill color/style and stroke, etc.
    After I have created said ellipse, I wish to change its properties.
    I can use the Paint Bucket, gradient tool, etc for the fill, but is there way to get back to the original set of tools with which I created the ellipse in the first place?
    If I use Edit > Stroke... it adds a new stroke around the existing shape.
    If I use Edit > Fill... the entire layer is filled.
    There must surely be a way to reenter the tool set to edit an existing shape. No?
    Thanks,

    Hi everyone,
    Thanks for the helpful tips, advice, etc.
    I didn't explain myself very well--I apologize.
    However, with your tips I figured it out:
    When I create a rectangle or ellipse, I can later click on its layer and the Properties window appears with options to change their "Live Shape Properties."
    However, not so with the Polygon and Shape tools. With them, the Properties window shows only the Masks, but the Toolbar still shows some basic properties I can change.
    I was stymied by the above differences while working only on a Shape.
    I've attached two JPEG screenshots.
    I didn't need to change the actual shape, just the fill/stroke, etc.
    Later, I may wish to change the actual shape, but that appears to be done by simply creating something new.
    Thanks much!!

  • How to change table name after creating page and application

    Hi HTMLDB Team,
    i have created a application with page where the region use master detail form with table name emp.Now after developing the page and the application i want to change the table from emp to emp2 where emp2 is the table with same structure of existing emp and same field properties.How can i edit the table as emp2 ?
    Thanks in advance,
    Cheers,
    koushik

    Koushik,
    Depending on the amount of customizations that you did, it may be easier to use the wizard to re-create the master-detail form & report.
    If you still want to give it a go:
    Assuming that you created the 2-page Master Detail report & form:
    On the first page, you will have to chage the SQL to reflect the new table name. Once you do that, you'll have to re-create the link on the EMPID column.
    On the second page, you'll need to do some more work. You'll have to change both Page Rendering Processes: Fetch Row from EMP and Get Next or Previous Primary Key. You'll then need to change the Page Processing Process: Process Row of EMP. Also, ensure that you have a proper Foreign Key relationship between EMP2 and DEPT (or your detail table).
    Thanks,
    - Scott -

  • Changing aspect ration in FCP 7, Easy Setup?

    I recently starting editing again in FCP 7 and am running into an aspect ratio problem.
    Earlier this fall i tried capturing some clips off of my new camera (Panasonic HVX) and i believe i changed some of the easy setup/capture settings to accommodate the HD footage.  This weekend i used my old mini dv camera (Sony vx2100) to record some skating.
    I didn't change the easy setup/other settings prior to capturing the tapes. 
    The image doesn't look as it looks ok in the viewer, but doesn't fully fill the canvas.
    When i export to vimeo, the image doesn't fill the whole screen.
    The image itself looks ok, but i believe the aspect ratio is off somehow.
    This is a link to how the vimeo export turned out
    https://vimeo.com/85702402
    here is a link to another edit i'd made previously in the summer where the image filled the screen better
    https://vimeo.com/73221381
    here is a screen capture of the canvas
    anybody know what i should do?

    You need to ask this on the Final Cut studio forum.

  • How to change field values AFTER Inbound IDOC Posted successfully

    Hi SAP Experts,
    In my project I receive the inbound IDOC PORDCR05 from PI and posted as an Purchase Order in ECC.
    I create the Z process code and Z function module (which is a copy version of IDOC_INPUT_PORDCR) and complete all the necessary configuration steps. It works perfectly.
    My problem is: I have to  collect some inbound idocs (that satisfied some criteria) and change the value of field EKPO-TXJCD and EKKN-KOSTL of the PO AFTER  it posted successfully (means the purchase order is created and save in database).
    How can I do this? I've try to put the logic code in Z function module, but it does not work, since at that time, the Inbound IDOC is not updated to the database yet.
    Aprreciate your advise.
    Regards,
    Elaine.

    Hi Elaine ,
    as per your cretiria pick the idocs and take created PO# from status 53 & use the BAPI (BAPI_PO_CHANGE) to change the neccessary values in the PO. We can't reprocess those idocs again.
    Reddy

  • HOW TO: Change page size after page is created?

    Is there a way to change the size of a page after the page has been created? In the documentation, the only way I have seen to set the page size is in a "with" statement right after creating the document. I have need to change the size of the document after a document has already been created. Any ideas?

    Yep, that's how I am doing it. I just wanted to make sure that I was doing it correctly. I need to keep debugging then and figure out what the real problem is. I am new to all of this (obviously) and I just needed to make sure I had the idea correct. I didn't mean to use document and page interchangeably, I understand that you can't have different size pages in the same document.
    Thank you for your help.
    [FYI]I created a class that creates a document with most of the document settings that I use (e.g. a standard number of pages, non-facing pages, units in inches, etc.) but I don't specify a page size, that's something that varies between documents, so I figured I could just apply that after I have created the page. The problem is, when I try to create multiple documents it doesn't work. The script will create the first document using the default page size settings and I can't get it to change the page size, but then the next document will be created using the page size I tried to apply from the previous document that the script created. I am sure this is totally a coding error somewhere else. I will try to track it down. Just when I think I have this stuff figured out . . .

Maybe you are looking for