How to change company code from notifications ??

Our company code has changed so now I have to change all the notifications accordingly. we use notifications to register our issues for the customer.
what are the options to change everything to the new company code ?
Message was edited by:
        A. de Smidt

Hello,
as far as I can see you can check the following tables:
QMEL
QMIH
QMSM
QMFE
QMUR
QMMA
I am not quite sure what kind of notifications are involved the easiest way to find the correspondent notifications is by using QMEL-QMART for the selection which is the notification type used.
If you could specify what you mean with company code, I could possibly be able to offer you more information.
Regards,
Isabelle

Similar Messages

  • How to change company code in cost center master

    Hi,
    Can anyone throw me the light about how to change company code in cost center master? User make some mistake. They maintained wrong company code in cost center master and there are some transactions already posted to this cost center. I would appreciate all attention and point will be reqard. Thanks much
    Best Regards,
    Bird

    Hi,
    The cost center master data fields have time dependancy.  Following are the details of time dependancy.
    You can maintain master data for cost centers, cost elements, activity types, and business processes as time-based. Changes to any other time interval are possible at any given time. Data storage is also time-based. In this way, you can store multiple database records for a master data record, each holding different information.
    The time-based dependencies are determined by SAP and cannot be changed. The following dependencies are possible:
    Not time-based
    Day-based
    Period-based
    Fiscal Year-based
    Cost Center's company code field's time based dependancy is Fisal Year Based and hence, the company code can be changed on cost center only on new fiscal year.  And hence, system will not allow changing company code on cost center master data until new fiscal year if transactions are posted to the cost center.
    You may have to think of work around :
    1) Create new cost center with correct co code
    2) Repost the cost posted to old cost center (with wrong co code) to the new cost center.
    Explore the possibility of this work around on your system with the key user and then see whether this option works out.
    Hope this helps.  Pls. assign points if this is helpful.
    Regards,
    Chirag

  • How to get company code from Shipment

    Hi,
    I am working on a user exit on shipment (VT01N). I have shipment data. I have to get the value of KVERMfield from LFB1 table. There are multiple entries in LFB1 table with same Vendor with different company codes. How should i find the correct "Company Code" from shipment?
    Please help.
    Thanks,
    Mohammed Ibrahim

    Hello,
      in table VTTK  you have field "TransportPlanningPt" VTTK-TPLST. Get this value then enter in the customizing table TTDS, where the TransportPlanningP is assigned to the Company code.
    Hope to be useful.
    Best regards,
    Andrea

  • How to change company code currency after psotings have been made

    Hi,
    Good day! May I ask for your expert advice about changing company code currency? Is it advisable? or is it at all possible? If so, do you have a procedure for this? Thanks in advance.
    Regards,
    Peter

    Dear,
    no this is not advisable.when You decide to create a Company, You have to decide which kind of currency You have to use for it. This is an asset. Therefor You have to take the correct decision before going live.
    Now You can think to activate a parallel currency( transaction OB22), but please have strongly a look at the note 39919.
    If You strictly wants to change the currency, You could refer to SLO service into SAP Market place.
    Go Service Market Place homepage or Sapnet                  
    http://service.sap.com/slo              
    I hope this helps You.
    Mauri

  • How to change company code in Assignment tab (CJ20n-project builder)

    Dear All,
    Is there any config to maintain company code in assignment tab (project builder) ? We have a problem in our project. It shows that in basic data, user put company code A (in basic data) but in Assignment tab they put different company code let say B. When we do settlement , two accounting document created to company code A and B. By right it should be only company code A. In addition, we cannot change the company code, when the status is already Release (REL).
    Please help how to change the company code B to A and how to reverse the accounting document that has been created under these two accounting document.
    Thank you.
    Best Regards,
    nies

    Now I understand your scenario, you have the Requesting Company Code and the Company Code Different.
    You usually use this primarily with IM module if you want to manage the asset under construction (cross company) belonging to a different i.e., company code (Requesting ) than company code on main WBS.
    You can not change the company code (Assignment Tab) as you already have actual posted against it.
    You've also created an AUC (in wrong company code) and even if you reverse the settlement you would not be allowed to delete the AUC or the delete the settlement rule (its grey out as its already used)
    What I can suggest is to reverse the settlement, lock this WBS which was created wrongly, create a new WBS and then continue with you regular process.
    Above are my views but you can expect views from others.
    Regards
    Sreenivas
    Please close the post if satisfied.

  • How to change company code address in Print form used

    Hi.
    I have maintained the company address under the gobal data in config. However when I used the print form to print out the invoice from AP (FBL1N -> correspondence -> Request), the address of the sender / company code is different.
    How do I change the address from the form / invoice ? How to find out where the form pulls the data from ? I tried SE71 but couldn't trace out anytime.
    Please help.
    Thanks.
    Angel

    Check your configuration.
    Please follow the following steps:
    IMG ==> Financial Accounting ==> Accounts Receivables and Accounts Payables ==> Customer Accounts ==> Line Items ==> Correspondence ==> Make and Check Settings for Correspondence
    Define Correspondence Types
    Create Report Variants for Correspondence
    Assign Programs for Correspondence Types
    Define Form Names for Correspondence Print (even you assign your form to blank company code also)
    If you complete these steps you will get the spool request get generated.
    Please ask your ABAPer to change the company code address and logo etc. on the form.
    You go to FB12 - request for the statement
    then go to F.61
    Then go to SP02 - Take print out.
    Regards,
    Ravi

  • How to change company code in vendor master data?

    Hi everyone,
        I  have a problem, a vendor master data was created without assign a company code,how to assign a company code for the vendor after the recode was saved?
    Thank you.

    You can do this again with FD01 or XD01.
    Fill-in the vendor number you created and the company code where you want to create it for.
    Paul

  • Re :- How  to  change company code currency

    Hai kings
    My company code currency was followed by AED . Unfortunately My company code currency was changing to USD In the financial year. I did all the settings for the company code and transaction also posted.   RBI given direction to change currency AED to USD what i do.

    Dear Ramu,
    http://www.sap-img.com/financial/change-in-company-code-currency.htm
    You`ll use the same client for the new currency, or you`ll have a brand new one. 
    What we`ve done before was creating a brand new environtment. 
    Re: Company Code Currency - In Slovakia
    Hope this will help.
    Regards,
    Naveen.

  • Change of Company code from one Cons Group to another Cons Group.

    Dear All,
    Please advise on change of company code from one Cons Group to another Cons Group , we have Cons Structure - at present few companies are in one cons group and as a policy we have to move the companies to another cons group. So please advise me what will be the case if we move int he following senarios:
    1. if till period 012 year 2008,  company A is in Cons Group AA and we want  the same to Cons Group BB. How it  will move to Cons Group BB in a Company code with the opening balances? 
    2. if there is no data in SEM BCS total Cube - and we want to move the Company A from Cons Group AA to Cons Group BB.
    What will be the effect in both the scenarios.  How to do this? if you can specify some steps then I will try to analyze the situation.
    Thanks in advance

    The changes are not complicated but company A must be placed in cons group BB as of period 12 2008 and in the master data of the cons group it should be indicated that the first consolidation is at the end of the period (EOP). Likewise in cons group AA must continue to include company A but in the cons group master data it must be indicated that the period of divestiture is 12 2008 EOP.
    The cons group changes tasks must be executed to move the balances in period 12 2008.
    If there is not data for company A in the totals infocube you may simply drag-and-drop company A from cons group AA to cons group BB without any concerns.
    The affect in each scenario is different because if there is data that is to be reported as part of cons group AA company A must be included in cons group AA.

  • If an employee changes Company code,how his YTD cumulations in CRT table calculates as per SAP Standards ?

    Hi All,
    Please help me out in understanding below scenario.
    If an employee changes from one company code to another code, how his/her YTD cumulates in CRT table as per SAP Standards.
    Let me go with example to make a clear understanding.
    Ex : Payroll has run for an employee upto payperiod 05. As per his pay assume that his /101 is 5000.
                             Monthly                  Yearly
    PP 1      :           5000                       5000
    PP 2      :           5000                      10000
    PP 3      :           5000                      15000         
    PP 4      :           5000                      20000
    PP 5      :           5000                      25000
    In PP 6 he has shifted from one company code to another company code. Now, how the system cumulates as per SAP standards ?
    PP 6       :           5000                        ?
    Will the amount nullifies or else adds to previous PP5  ?
    Thanks in Advance....

    Hi Ameet,
    I understood the same. But my client is asking that the amount should nullify in CRT table for yearly when an employee changes company code.
    And they have maintained different tax grouping for company codes in table v_t7ph0a. will that table makes any difference ?
    Regards,
    Nalini.

  • How to Materials has to be extended to new company code from ecc to crm

    Hi ,
    Please guide me how to Materials has to be extended to new company code from ecc to crm , step by step.
    How to assign the  pricing procedure from ecc to crm , step by step.
    How to maintain the pricing conditions in crm , step by step.
    Your answers will be appreciated in advance.
    Thanks
    Mohmus

    Please use select all button in the top of the screen and click on copy button, here you have to change the company code.
    That's it.
    Rgds
    Murali. N

  • How to find out Company code from Plant in BW

    Hi,                                                      This is probably a very basic question.                                 
    In one of my ODSs, I have 0PLANT infoobject but do not have the Company Code. I thought 0COMP_CODE should have been an attribute of 0PLANT. But it is not and I am NOT finding anyway to derive the company code from the Plant code.                              
    I guess I can change my datasource to get that value but thought the Plant-->Company Code link is one of the most basic things in SAP R/3.    
    I cannot imagine it can be missed in the Business Content design by SAP.  
    So thought I would check with you to see if my expectation is correct.    
    If not, what might have been the reason behind the exclusion of the link between Plant and Company Code from the Business Content.                                                                               
    Thanks and regards,                                                       
    Atul Kulkarni

    Hi,
    we are running RETAIL and by design:
    a plant (0PLANT ) belongs to a sales organization (0SALESORG attr of 0PLANT) which belongs to a company code (0COMP_CODE attr of 0SALESORG)
    this defines a unique comp_code for a plant.
    You can therefore put the following two fields in an internal table of a start routine
    SELECT pPLANT sCOMP_CODE
    INTO CORRESPONDING FIELDS OF TABLE lt_internal
    FROM /BI0/PPLANT p
    INNER JOIN  /BI0/PSALESORG s ON sSALESORG = pSALESORG
      AND sOBJVERS= pOBJVERS
      AND s~OBJVERS = 'A'.
    and look it up in your IObj routine.
    In R/3 that's true WERKS (T001W9 belongs to a BWKEY (T001K) which belongs to a BUKRS.
    hope that helps...

  • How to find out company code from a plant ?

    Hello friends,
    I have to modify a program that uses FM "BAPI_COMPANYCODE_GET_PERIOD".   For that, we have to export company code ID.  Currently it is hard coded with one company code.  Now we want to make this program usable by all company codes.  So instead of hard coding, I would like to dynamically find out company code based on the plant.   So I want to know - how to find out company code from a plant ?  Is there any table that has plant to company-code assignment data, or any other FM/BAPI to get this info ?
    Thanks,
    - Chetan

    hi
    u can find this from table T001K
    or just goto EC01
    here click on STRUCTURE>NAVIGATION
    double click on co code u will get the list
    u can slo try this in EC02
    regards
    kunal

  • HT201263 If yor phone is lost how do you change lock code from computer?

    If your phone is lost how do you change lock code from computer?

    You cannot remotely change the lock code

  • Restrict PR/PO/GR for a particular company code from particular date

    Hi Experts
    How we can restrict PR/PO/GR for a particular company code from a particular date?
    I know PR is not directly linked with company code
    PO can be restricted by deactivating the assignment between company code & plant
    GR- we can use posting period option.?
    Suggest me the best solution for the above requirment.
    Thanks/karthik

    hi
    Obvoiyusly , you can stop the company code posting by not activating the month end closing of periods (MMPV) in MM and similarly in FI ( OB52).
    By removing the assignment you can stop PO creation for the company code but you need to ensure that all the old, un-finished PO/SA and other related activities are taken care off before that.
    Regards

Maybe you are looking for

  • Problem with data template in XML publisher

    When I create data template in xml publisher and save it, I get next message: dbase: Failed to save data. Error occurred when creating xml data. undefined NaN NaN dbase is a database server JDBC connection name:asu_fox JDBC connection URL: jdbc:oracl

  • IPod starting to freeze

    I have an iPod photo which is now just over a year old. Recently and with regularity my iPod freezes and needs to be reset. The last time it needed to be reset it appeared to wipe all the music, although I can listen to the tracks when I play them th

  • Get TOC based on Paragraph section filtered on keywords

    Need to get the Table of Contents for those whose Paragraphs for all the keyword/s that are supplied as search parameter are met. E.g: Search for Keywords like 'Documentation', 'Analysis' - This will get all the Table of Contents whose subsequent par

  • Migrate reports from 3.5 to 7.0

    Hi I want to migrate the bex reports in BI 3.5 to 7.0 Please suggest how to proceed with that. Thanks, Srini

  • Requirement in Table  Control

    Hi, How do i make the non key fields inactive after selecting the row in table control. Please tell me. Thanks, Ahmed