How to change order of songs played
I want to change the order of songs in a particular album in my general music library. I tried changing the track number, but it does not seem to do anything. Any help?
Thanks in advance.
Changing the track numbers should be enough IF the Album and Artist or Album Artist fields are identical for each track.
I just solved a similar issue for someone -- see http://discussions.apple.com/message.jspa?messageID=4035849
Similar Messages
-
Changing Order of Songs in Album-iTunes 12
Like the title says, how do I change the order of songs in a album? Before you could use get info and sort by track number.
ThanksHey Lando25,
I understand that you want to change order of songs that are playing in iTunes. This functionality should still be available to you, as confirmed in this article:
iTunes 12 for Mac: Edit song and CD information
https://support.apple.com/kb/PH19618
You may need to simply scroll in the information field in order to find the fields that you wish to edit. Thanks for coming to the Apple Support Communities!
Cheers,
Braden -
Can anyone tell me how to change all the songs in my I Tunes Library to the Graphic Equilizer Setting of Bass Boost, without having to change each song individually? Thank U. [email protected]
Hello guinness guzzler,
You can set the equalizer from the View menu, which will affect any songs played in iTunes.
iTunes 11 for Windows: Adjust the sound quality
http://support.apple.com/kb/PH12334
Cheers,
Allen -
Can't edit a specific playlist and change order of songs.
I set up a new playlist and am unable to move the songs around to the order I want. My other playlists are letting me edit/move around the order without a problem. How can I access the edit feature for my "blocked" playlist.
If you want to order your songs manually select your playlist and display your playlist in the browser,
then click on the header row - the small triangle in the leftmost column.
Then you should be able to drag your songs into the correct order. -
How do I prevent unchecked songs playing on my i phone?
I have songs which I would like to keep in my library but not listen to regularly on my I phone, therefore they are unchecked. However they still play. There is a cloud icon next to these songs. How do I prevent them from playing without deleting them entirely?
Hello Sue,
To only see the songs that have been downloaded to your iPhone, go to Settings > Music and toggle off Music. By default it is turned on and you will see all your purchases that you have made, regardless of them actually being downloaded. Take a look at the article below for more information.
Download past purchases
http://support.apple.com/kb/HT2519
Regards,
-Norm G. -
Changes order of songs within album on iPod playback
My iPod classic now decides for itself what the order of songs on an album should be. The songs are listed in the correct order, but it essentially does a shuffle play when you go from one song to the next. Any ideas?
I'm having the same problem. The songs on the album are ordered correctly in iTunes, I checked the number in "Get Info" and that was correct. When I update my iPod Classic, they're all out of order.
-
How to change order unit in ME22n for particular vendor
Dear All,
We have defined ordering unit in material master as "L".
For other vendors & new PO we get proper ord.unit display.
But we r not getting in PO of particular vendor.
How to get order unit in ME22n ? What is the relation of order unit with Vendor ?Hi
Did you ordere the particular material for the vendor concerned already with different Order unit (SKU), this might be the reason why you are not getting the ordering unit in PO while ordering. Did you maintain the details of conversion in master between SKU & Ordering unit,if yes, then check for Info Record for the material and vendor combination and in the Genaral Data Tab chek for the variable order unit activation if not available then activate it and if the system is asking the conversiondetails enter herr the conversion also. Now if you create PO you will be able to assigne the new order unit.
Regards -
How to change order data in APO
Hi,
I am keen to know on ways to change order data in APO say order category BI.....we want to change date by taking input from cif user exit APOCF006.We need this information for the ongoing project.
I know two options...1) using BAPIs 2) Not very sure about this option ...Function Module:/SAPAPO/OMORDER*CHANGE.
Could you please help to have better understanding on ways to change orders in APO?
Thank you
Best Regards
Nilesh PatilHello Rishi,
Thanks for your reply.
Demand node ofr purchase Ordre( BF) in SNP is Conrel( BI category). We want to change date( start date) at this demand node . We will get this date from R3 using say non cif method.
There are few ways to do it....
1) If we ignore Menas of Transport( so essentially transit time or lead time in tlane) in that purchase order and change this requirement date directly using purchase order save BAPI( requirement node) ......Question will system allow us to do so and even if it allows us to do so will it casue some problem( inconsistencies) later?
2) Second option I am thinking is...
For one product we maiantain GR processing time in product location master and this is considered while determining strat date of BI (Start date= Delivery date -GR procesisng time- means of Transport lead time - some other times ....). For this product let's say we have 100 Purchase Orders (BF). We have requirement that each of these POs should get separate treatment while calculating Start date. It means start date can be different for different POs and once we change it forcibly then it shoulkd not change unless we again change it forcibly.
We are thinking to change GR processing time at runtime wheneveer Purchase Order is changed. So if GR time in product location master is 1 day ....for different Purchase Orders different GR processing time can be considered. Say for Po1...its 2 day...for P2 its 4 day.
Or similar way we can change transit time as given in means of transport in tlanes.
Will appreciate your or anyone's comment
Thank you
Nilesh -
The playlists in version 10.7 always put the songs in alphabetical order rather than the order in which I add them. With my older version I could re-order them by dragging them. With this one they just pop back into alphabetical.
It turns out that by clicking a little arrow to the left of "name" on the header, the titles can be unalphabetized.
-
Change order of songs on itunes
How do I change the order of the songs in itunes? I have albums out of chronological order and want to move them so that when I play all the songs from a band on my IPOD it plays them from the first to last. Thanks for any help.
In addition to what macmenno said, if you want to sort your albums in chronological order, then you need to make sure there is a date in the date field. If there is not, or not for all tracks for an album, select all the tracks and press Commend-I to bring up the Get Info box. Fill in the date and close the box. The change will be applied to all tracks. If you have your Library sorted on Album, you can easily select all the tracks by clicking on the top track and shift-clicking on the bottom one.
The second thing to consider concerning chronological order is which date to use and how consistent do you want to be in dates? The original vinyl release date? A reissue date? The first issue date of the cd? For albums that have only been issued on cd, this should not be a problem, but there have been plenty of discussions here concerning reissues and ports to cd. -
How to add a single song plays to an album?
Hi
I have a single song in my itunes and i played it 18 times...
my artist album is already come and i buy the CD and import it to the itunes library, The album is already have that single song but with different tags (name of album in single is "name of song single" and in album it is " album name" and about track number and artwork and ... )
my questions is : How i can add plays from the single to abum's track?
ThanksUse this script to change the Plays count for a track.
-> http://dougscripts.com/itunes/scripts/ss.php?sp=newplayedcount -
This may sound ridiculous but how do you stop a song playing ?
I can play a song, pause a song, shuffle and many other things but I can not find any function that just stops it altogether!
In video you press the "done" button but no such thing appears in music - am I going mad?!I think that the "Close" just means "make this little music window go away now," not "Close down the music app." At least, that's how it's always worked for me (before and after the upgrade). If you are playing music and doing something else and bring up that music window on top of what you're doing, you still need to hit pause in order to stop the music.
If you hit pause and the "Now Playing" arrow is still up, it doesn't really mean much except that you can easily get back to what you were playing if you go back into your music. Your music isn't still playing. It's just holding your place. That's how I think of it, at least. -
How to change Order of display variables in WAD.
Hi,
I am woking in BW 3.5 WAD.
I am using a standard template in which 2 queries can be embedded.
now I have different variables in both the queries hence the order of dispaly variables
in not as per my desire.
In query properties we can change the order of varialbes but,
I want to change that order, how do I achieve it in WAD?
Thanks & Regards,
RK.If you create a regular playlist in iTunes, you have to update it manually. Remove old podcast episodes and add new ones, put them in any desired playlist order.
If you want to automate the process, you can probably get what you need using a Smart Playlist. To create a new Smart Playlist, click the plus sign below the iTunes sidebar, and select New Smart Playlist.
Check the box for Match ALL of the following rules. Then add the rules needed to get what you want on the list.
The first rule you need is to put podcasts on the playlist.
Media Kind - is - Podcast
To exclude podcasts that have been played
Plays - is - 0 ("zero")
Those two rules should give you a playlist with unplayed podcast episodes. To include only specific podcasts, not all podcasts, use the checkbox for Match only checked items (and you'll need to uncheck the podcasts you don't want on the iPod).
Also check the box for Live updating.
Click OK. See if that Smart Playlist creates a playlist with the podcast episodes you want. If you need to change the rules, right-click on the Smart Playlist and Edit Smart Playlist. You can post back if you have some other ideas that you want "translated" into rules.
To put the podcast episodes in order by Date Added, select the Smart Playlist in iTunes so that you see the list of items. If Date Added is not one of the columns shown on the list, right click in the list's header area and select Date Added. To sort by Date Added, click on Date Added in the header. Click on it again, if you need to reverse the order.
Sync that Smart Playlist to the shuffle. It should play in the order shown in iTunes.
An iPod shuffle is meant to be a simple device. It doesn't have a screen (where you can change a bunch of preference settings), so it is designed to operate in a certain way. If you need the iPod to work more flexibily, you may want to get an iPod nano instead. -
So ever since I installed iOS5 onto my iPhone 4, some of my music wont play (not all, but some), what will happen is, while on shuffle, my music will play a song normally, then get to a song that it for some reason cannot play and either
a) plays another song, without changing the information about the song, then when the second song is finished playing under the first song's name, it gets to the second song's actual information and stops playing and moves to option b
b) does not play the song, does not skip the song, but has the play icon in the corner next to the battery, but it doesn't show any time going by on the progress bar of the song, but drains my battery
when i shake my iPhone after this (i.e. activates the automatic shuffle) if it happens to land on a song it can play, it skips to the next song.
It is incredibly inconvienient, and i understand that a new operating systems do have bugs, but I would like to be able to fix it as soon as possible
thanks for the helpI found a solution recently, (and well, this is the only apple product I own, so i didn't think to post it) basically what you do is follows
when your iphone is plugged in and you have itunes open, go to the phone page, then to the music page, select sync with library, but then select certain playlists. After that select none of the playlists (removing the music from your phone) and sync, then sync again with the playlists you want selected, and voila! Takes an hour or 2, but you can do it in the background of whatever else you are doing.
Cheers -
How to change order of action items
I've got four photos involved in a "dissolve" action.
When I see them in the HUD window, I would like to be able to re-order them. Can't figure out how to do this -- clicking and dragging doesn't work and I've tried do that while holding down various keys (alt, ctrl, etc), but to no avail.
Can the order of the photos be changed in a way other than deleting and reselecting the photos?
Thanks!Okay....never mind. Not sure what my problem was, but I just tried clicking and dragging again and it works.
Time for more spiked egg nog...
Maybe you are looking for
-
Hi I have installed Adobe Reader 11.7.1 The highlight feature in not working. After highlighting the text and coming out of the application the highlighted portion is not gettig saved Pls advise.
-
How to define a client in sap?
hi experts can u help me for this
-
What is the limit of the size of a disk under Solaris 8?
Hello, I have a problem when I try to run format command to label a disk of 1TB under solaris 8. # format....... 114. c9t14d3 <DGC-RAID3-0322 cyl 32766 alt 2 hd 1 sec 0> /pci@8,700000/lpfc@4/sd@e,3 Specify disk (enter its number)[115]: 114 selecting
-
Site Meter Issue on Safari, Firefox and Opera
Hi - Sorry if this should actually be a OS X question, but since it's a browser issue I thought this might be the place. I have several blogs that have Site Meter on them. When I view the blogs, the Site Meter "bugs" do not appear. When I try to acce
-
Precalculation and save workbook
Hi, Can i Precalculate a workbook and save it to the server. For example i have workbook, and i don't "refresh query when opening workbook." I will precalculate Workbooks and save the last results to the server, so users can see the last results ever