How to change prices by percentage (indesign CS3)

Further to the V.A.T. changes in the UK this has raised some issues in a catalogue we are working on. All the prices are currently based on the old V.A.T. rate of 17.5 percent and we need to do a global change to 15 percent. Obviously the idea of going through and amending thousands of individual prices is not an option and assume someone must have done a plug-in or script, does anybody no of anything out there? we are currently using indesign CS3 - PLEASE HELP DEADLINE FOR PRINT IS WEDNESDAY!?!?!

Shaun,
Have you considered copying the text into Word then performing the percentage change? I am not aware of an option in InDesign that will do what you need. I hope someone else has a better answer.

Similar Messages

  • How to change background color in photoshop cs3

    how to change background color in photoshop cs3
    Please help me...

    Background for what? You need to explain better and be more specific.
    Mylenium

  • How to select a spread in Indesign CS3?

    Hello All!
    Can somebody give me an idea how to select a spread in Indesign CS3 ?
    The simplest script
    #target indesign
    var myDocument = app.documents.item(0);
    app.activeWindow.zoom(ZoomOptions.FIT_SPREAD);
    for (j=0; j < myDocument.spreads.length; j++) {
           app.select(myDocument.spreads[j]);
           alert("j: " + j);
    Windows XP is used, and here this script works in CS4 and CS5 absolutely correct -- I see what it jumps from one spread to next and shows in alert message an index of current spread.
    But in CS3 the program only calculates number of next spread but on screen I see the same layout.
    May be there is an another way to select spread?
    Thank you.
    Mikhail

    app.activeWindow.activeSpread = myDocument.spreads[j];
    app.activeWindow.zoom(ZoomOptions.FIT_SPREAD);

  • How to change price total for "Change Unit Cost Estimate Screen" for KKE1 Tcode ?

    There is a requirement of bringing the Material Price in KKE1 while entering the Item Catogory M ( M for Material) from the Gross Price in the condition type (P001) that is entered in the Purchase order.Currently systems brings the material value from MAP(Moving average Price) in the Material Master data.
    I have looked into the user exit 1) EXIT_SAPLKKEC_001 2) EXIT_SAPLKKEC_002  available in this T code KKE1.When I put break-point in these user-exit,it is not going in debugging mode while fetching the price value in Price total column  for "Change Unit Cost Estimate" screen in KKE1.
    How will change pricing condition for material in KKE1?
    I want to change price condition for material  as marked in red as shown in the screen-shot.
      Where will write the code such that I will bring Price Total based on material number as shown in the image?

    Hi Ram,
    I think you can do the same in thei manner.
    Go to program SAPMV45A.
    use menu GOTO -
    > Text Elements----
    >Text Symbols
    Here make change of Text-002 Sold-To Party as saleable .
    Regards,
    Pravin

  • How to change Layer Mode in Flash CS3?

    Hello,
    I would like to know how to change the layer mode to
    "multiply" with flash.
    I usually use photoshop CS2 to color my lineart. I set the
    top layer (the lines) to "multiply" to make the white transparent,
    and then apply color on layers underneath.
    I want to learn how to color my art on Flash, but I'm still a
    noob. I imported my bitmap lineart (inked by hand) and turned it
    into vectors (modify>bitmap>trace bitmap). Then I created a
    second layer underneath for the color, just like I would do in
    photoshop.
    But, the first layer's white areas are not transparent, so
    the color is not visible.
    So basically I just need to know how to change the top
    layer's mode to "multiply" so I can see through the white areas .
    Any help will be very appreciated.

    Nicochi,
    > So basically I just need to know how to change the
    > top layer's mode to "multiply" so I can see through
    > the white areas.
    Convert the top layer's artwork (raster or vector, doesn't
    matter) into
    a movie clip symbol -- select the artwork and go to Modify
    > Convert to
    Symbol -- and you'll be set. Once the symbol exists, you'll
    see mode
    choices in the Property inspector.
    David Stiller
    Co-author, Foundation Flash CS3 for Designers
    http://tinyurl.com/2k29mj
    "Luck is the residue of good design."

  • How to change price of item using salesorder create bapi

    hi all,
         As per requirement i have to change price of the item while i am creating sales order using sales order create bapi. kindly tell me the process or if possible any sample program.
          thanks in advance
    thanks,
    pavan
    Message was edited by: pavan kumar pisipati

    hi max ,
          i created sales order using following code. from here onwords i have to update to change the price of the item. kindly do the needful. i am working 4.7 ides
    <b>report  zmybapi1        .
    data : my_order_header_in like bapisdhd1 occurs 0 with header line,
           my_order_header_ix like bapisdhd1x.
    data : my_orderitemsin like bapisditm  occurs 0 with header line,
           my_orderitemsix like bapisditmx occurs 0 with header line.
    data : my_order_partners like bapiparnr occurs 0 with header line.
    data : my_return like bapiret2 occurs 0 with header line.
    data : w_vbeln like bapivbeln-vbeln.
    data:
         my_orderschedulesin like bapischdl occurs 0 with header line,
         my_orderschedulesinx like bapischdlx occurs 0 with header line.
    start-of-selection.
    this is to assign values to internal table my_order_header_in
      my_order_header_in-doc_type   = 'TA'.
      my_order_header_in-sales_org  = 'JNJ1'.
      my_order_header_in-distr_chan = '02'.
      my_order_header_in-division   = 'J1'.
      my_order_header_in-sales_off  = 'JNJ1'.
      my_order_header_in-purch_no_c = 'testbapipo'.
      my_order_header_in-purch_date = sy-datum.
      my_order_header_in-req_date_h = sy-datum.
      append my_order_header_in.
    this is to assign values to internal table my_orderitemsin
      my_orderitemsin-material      = '000000000000000727'.
      my_orderitemsin-plant         = 'JNJ1'.
      my_orderitemsin-target_qu     = 'EA'.
      my_orderitemsin-target_qty    = '50'.
      append my_orderitemsin.
    this is to assign values to internal table my_order_partners
      my_order_partners-partn_role = 'AG'.
      my_order_partners-partn_numb = '0000000011'.
      append my_order_partners.
      my_order_partners-partn_role = 'WE'.
      my_order_partners-partn_numb = '0000000011'.
      append my_order_partners.
    This is to assign values to internal table my_orderschedulesin
      my_orderschedulesin-itm_number = '10'.
      my_orderschedulesin-req_qty   = '10'.
      append my_orderschedulesin.
      my_orderschedulesin-itm_number = '20'.
      my_orderschedulesin-req_qty   = '20'.
      append my_orderschedulesin.
      my_order_header_ix-updateflag = 'I'.
      my_order_header_ix-doc_type   = 'X'.
      my_order_header_ix-sales_org  = 'X'.
      my_order_header_ix-distr_chan = 'X'.
      my_order_header_ix-division   = 'X'.
      my_order_header_ix-sales_off  = 'X'.
      my_order_header_ix-purch_no_c = 'X'.
      my_order_header_ix-purch_date = 'X'.
      my_order_header_ix-req_date_h = 'X'.
      my_orderitemsix-updateflag    = 'I'.
      my_orderitemsix-material      = 'X'.
      my_orderitemsix-target_qty    = 'X'.
      my_orderitemsix-plant         = 'X'.
      my_orderitemsix-division      = 'X'.
      my_orderitemsix-target_qu     = 'X'.
      append my_orderitemsix.
      my_orderschedulesinx-updateflag        = 'I'.
      my_orderschedulesinx-itm_number       = 'X'.
      my_orderschedulesinx-req_qty          = 'x'.
      append my_orderschedulesinx.
      my_orderschedulesinx-itm_number       = 'X'.
      my_orderschedulesinx-req_qty          = 'x'.
      append my_orderschedulesinx.
      call function 'BAPI_SALESORDER_CREATEFROMDAT2'
        exporting
      SALESDOCUMENTIN               =
          order_header_in               = my_order_header_in
          order_header_inx              = my_order_header_ix
      SENDER                        =
      BINARY_RELATIONSHIPTYPE       =
      INT_NUMBER_ASSIGNMENT         =
      BEHAVE_WHEN_ERROR             =
      LOGIC_SWITCH                  =
      TESTRUN                       =
      CONVERT                       = ' '
        importing
          salesdocument                 = w_vbeln
        tables
          return                        = my_return
          order_items_in                = my_orderitemsin
          order_items_inx               = my_orderitemsix
          order_partners                = my_order_partners
        ORDER_SCHEDULES_IN            =  my_orderschedulesin
          order_schedules_inx           = my_orderschedulesinx
      ORDER_CONDITIONS_IN           =
      ORDER_CONDITIONS_INX          =
      ORDER_CFGS_REF                =
    if sy-subrc ne 0.
        write: my_return-message, my_return-number, my_return-type.
      else.
         call function 'BAPI_TRANSACTION_COMMIT'
         EXPORTING
           WAIT          =
         IMPORTING
           RETURN        =
          write: my_return-message, my_return-number, my_return-type.
    endif.</b>
    thanks,
    pavan
    Message was edited by: pavan kumar pisipati

  • How to change price determination form blank to 2 on the material master?

    Hi expert,
    I had a difficult problem:
    Material ledger is active in our company Normally, in material master data accounting view 1, we always set price determination 2 and price control V. Price determination 2 is set default if creating a material master by entering no price determination.
    Today, my Key user came accross a prblem: In our company, for batch processing of material master, we made a mistake that  price determination were set blank (neither 2 or 3, In MBEW table, field MLAST is blank) when inputting material master. all data were imported without error warnings. But ,acturally, all materials' price determination in accounting view 1 was set Blank! This is a big problem that we can not release standard price or do any other price changing~~~.
    I have used CKMM to try to change price determination. But it failed: it can not identify this situation because old price determination must be set a word rather than blank in CKMM.
    I don't know any other solutions to change price determination from Blank into 2.
    Hope you can help me out. Very thankful!

    Hello,
    I have the same problem with a type material, the material ledger is active but the price determination were set blank.
    I already checked the OMX1 transaction... and all configurations of ML and type material and apparently is ok.
    Has anyone knows the solution?
    (maybe with applying a program or SAP note).
    Please help.
    Regards,
    Eliana

  • How to change Price determination from blank to 2

    Hi expert,
         I had a difficult problem:
         Material ledger is active in our company Normally, in material master data accounting view 1, we always set price determination 2 and price control S.  Price determination 2 is set default if creating a material master by entering no price determination.
         Today, my Key user came accross a prblem: In our company, for batch processing of material master, we use a IDOC to process inputting material master fields including the price determination field. But, because absence of the key user, price determination were set blank (neither 2 or 3, In MBEW table, field MLAST is blank) when inputting material master. all data were imported without error warnings. But ,acturally, all materials' price determination in accounting view 1 was set Blank! This is a big problem that we can not release standard price or do any other price changing~~~.
         I have used CKMM to try to change price determination. But it failed: it can not identify this situation because old price determination must be set  a word rather than blank in CKMM.
          I don't know any other solutions to change price determination from Blank into 2.  Specially, some materials that had already lots of movements and prices changing.
         Hope you can help me out. Very thankful!

    Hi,
    Currently the materials are inconsistent and there is no way to repair them with the standard
    programs. The problem should be corrected by Sap Support. Please create a oss message
    providing a detailed description of the incidence and the remote connection to check the problem
    in the system.
    Sorry for not giving you a better alternative.
    Regards,
    MLM

  • How to change default fonts in Indesign

    I've tried the usual recommended steps - open InDesign, select a font, then close the program, etc. -- but nothing seems to work. Every style reverts to MetaPlus. Help!

    Respectfully, I've tried this, and I'm not looking for suggested working solutions as I have a pretty clear understanding of how to set defaults and how to utilize paragraph styles.  I'm simply pointing out that contrary to what you're saying, setting the font in the character palette does NOT change the true default font in my experience (CS4, OS10.4.11). I do understand that the default is set with no documents open by then selecting the font in the character palette.
    I'm attaching 2 screen shots to show you that I'm not making this up.  In the first you can hopefully see I've clearly set the "default" to Arial now.
    In the second I've created a new document and a new paragraph style. You can see it already considers "Arial" as deviating from the base "No Paragraph Style" and if you click on "Reset to Base" you will see that sure enough, the true default font is still Geneva (Geneva in my case as outlined in my previous post).
    Generally, this isn't much of a problem. As you've all pointed out we can accept that these additions are the new default for a new paragraph style, but it really isn't changing the true default font. Depending on your working environment and the experience of the designers this may be good enough. For my environment I'm looking for the ability to change the true default font and the only solution I've come across is the one from my previous post (deleting preferences).

  • Changes lost after saving InDesign CS3 (WIN)

    Part of our work is to make amendments to books we've typeset in InDesign. As is normal practice, we save and check our work as we go along, and subsequently close the indd file. On a few occasions now, when we have re-opened a file, we have found some of the changes we've made have not been kept. These seem to happen at random through a book, and it has happened rarely enough to prevent us getting to the bottom of it (are we doing something wrong in haste, etc?). For instance, we thought it could be our inadvertently causing Undo to do more than one edit, but our investigations on the latest occurrence of this have convincingly ruled this out. The working files are stored on the computer's hard drive (before being backed up to our server), so it's not a qestion of problems saving directly to a server, either. (So far we haven't experienced this problem on our Mac.)
    We are now wondering if InDesign's ability to keep track of every save (version) of a document, which I understand is accessible through Version Cue (which we don't have installed) is at the heart of the problem. Could InDesign be retrieving earlier save-versions of a file each time we save?
    Anybody any idea what could be going on? More to the point: how can we prevent this happening without our having to check again (and possibly repeatedly) through what can sometimes be more than a hundred author's amendments?
    Ideas would be gratefully received.
    Rob Fris
    documen

    In a message dated 29/03/2010 23:25:17 GMT Daylight Time, [email protected] 
    writes:
    http://forums.adobe.com/message/2698024#2698024
    Many thanks for this. As a result we have adjusted our way of working in 
    InDesign to use Save As and overwrite rather than use Save.
    Rob

  • How to change the frameset in Contribute CS3

    How can I make changes in an existing frameset in Contribute CS3 4.1
    Where can i find the frameset file? It seems that everything in de project/website is live, not local.
    I appreciate it to get help to solve this.

    Background for what? You need to explain better and be more specific.
    Mylenium

  • How to change Over head percentage

    Dear friends,
          I want to change the Over head percentage which is already maintained,   how  and where to change the percentage.
          Please advice me.

    Hi
              Overhead rate and percentage is maintained for transaction code KZZ2 and to move the changes to QAS systems from DEV - Is it via a transport ?? or do we make them individually in each system etc ...
    or to  this addresses this issue check Oss Note:164222.
    Tables in which  overhead rate and percentage is
    T685 - Conditions: Types
    KONX - Overhead Rates: Help Table for Variable Fields
    Regards

  • How to change price in Sales order using user exit ?

    The scenario is -  when the user creates a sales order,  there has to be an RFC called to another system to get the price of the materials in that system. Then it has to overwrite that price in this S.O.
    Which exit in S.O can be used for this and then what processing needs to be done after the RFC call to get price. Like how the price can be overwritten on this S.O ? (Lets say to get price we use some BAPI to the other system).  Any help ?

    Dear Theodorous,
    1)Please check the Material has been extended to the second plant.
    2) Assign the second Plant to Sales Org and Dist Channel
    If you have any concern revert back the same
    Regards
    Amjath

  • How to change price from x€ to 0€ in Google Checkout?

    Google Checkout is quite new thing for us so any help will be highly appreciable. We would like to change the price for certain in-app billing ID from eg. 5€ to 0€ (free) for a time being . We changed from retail to free in Folio Producer tools unfortunately there is no change isndie the viewer (kiosk). Still there is a 'buy' button, not download. When we changed in-app billing for this particular ID from 5€ to 0€ we got error after tapping 'buy' button that makes sense. Any ideas?

    Whenever you change the status of a folio from Retail to Free or Free to Retail, unpublish (remove) the folio, and then publish it again.

  • How to change graphics colour in InDesign?

    I've got a frame with a grey scale picture inside (preparing a brochure, two colours: Black and any other colour of my choice).
    Rather than have the picutre in black (grey scale), I want to have it in shades of the other colour that I have available. Can I do this from within InDesign?
    Every month we change the colour of the brochure, so ideally I just need to double click the respective colour in Swatches and all the text items, graphic etc in the colour will change.
    Thanks for your help!

    You can colorize non-transparent grayscale images or bitmap mode images either by selectiing them with the direct select tool and chhosing a swatch for the fil color, or by dragging the swatch and dropping it on the image.

Maybe you are looking for