How to change sheduled jobs from one users to other user?

Hi,
I want to change shoulded jobs from one users to other user.
Is there any way that we change job from one user to other user.
apart procedure with sm37: single job selecting with copy option.
Regards,
Gianluca Vinco

Hi,
Please try the folloiwng for changing the User of a Scheduled job:
1. Go to transaction SM37, select the 'Scheduled' Job by checking the check box and then use the menu path Job -
> Change
2. You may reach the Change Job xxx screen. Here, click on the Step button
3. You may reach the Step List Overview screen
4. Here select the step in the list and click on the Change icon to make the User change in the pop up Edit Step window
I hope this helps you in your work.
Best Regards
Sitaraman

Similar Messages

  • How can we copy table from one schema to other schema

    Hi,
    I have create one table in one schema and i want to copy it to other schema.How we can copy table from one schema to other schema

    Hi,
    You can try something like this :-
    SQL> CONNECT SYS/SYS123@SERVER AS SYSDBA
    Connected.
    SQL> CREATE USER TEST_1 IDENTIFIED BY TEST_1;
    User created.
    SQL> CREATE USER TEST_2 IDENTIFIED BY TEST_2;
    User created.
    SQL> GRANT CONNECT,RESOURCE,DBA TO TEST_1;
    Grant succeeded.
    SQL> GRANT CONNECT,RESOURCE,DBA TO TEST_2;
    Grant succeeded.
    SQL> CONNECT TEST_1/TEST_1@SERVER
    Connected.
    SQL> CREATE TABLE TEST_COPY ( TEST_COL NUMBER );
    Table created.
    SQL> INSERT INTO TEST_COPY VALUES ( 1 );
    1 row created.
    SQL> INSERT INTO TEST_COPY VALUES ( 2 );
    1 row created.
    SQL> COMMIT;
    Commit complete.
    SQL> GRANT ALL ON TEST_COPY TO TEST_2;
    Grant succeeded.
    SQL>  CONNECT TEST_2/TEST_2@SERVER
    Connected.
    SQL> CREATE TABLE TEST_COPY AS SELECT * FROM TEST_1.TEST_COPY;
    Table created.
    SQL>  SELECT * FROM TEST_COPY;
      TEST_COL
             1
             2Regards,
    Sandeep

  • How to read a table from one host to other host

    Hi Everybody,
    How to read a table from one host to other host.
    For Example,
    a/a@abcd - host 1
    b/b@xyz - host 2
    suppose im having a table called emp in a/a@abcd
    i want to read the table emp in b/b@xyz
    how to do this.??
    I know that we have to create a dblink...after that how to proceed.
    Plz help..
    Thanks in Advance,
    Gita

    connected as scott/tiger@test
    SQL>
    CREATE DATABASE LINK local
    CONNECT TO admin IDENTIFIED BY pinnet
    USING 'pinnet';
    Database link created.
    sql>
    select count(*) from
    users@local;
    COUNT(*) 
    16
    Message was edited by:
            jeneesh                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               

  • Hi,how can i transport objects from one server to other like (Dev To Qty)

    Hi Sir/madam,
       Can u explain how can i transport objects from one server to other like (Development To Quality To Production).
    Regards,
    Vishali.

    Hi Vishali,
    Step 1: Collect all Transports(with Packages) in Transports Tab(RSA1)- CTO
    Step 2: Release the subrequests first and then the main request by pressing Truck button
    Step 3: STMS or Customized transactions
    Object Collection In Transports:
    The respective Transports should have the following objects:
    1. Base Objects -
    a. Info Area
    b. Info object catalogs
    c. Info Objects
    2. Info Providers u2013
    a. Info Cubes
    b. Multi Providers
    c. Info Sets
    d. Data Store Objects
    e. Info Cube Aggregates
    3. Transfer Rules u2013
    a. Application Components
    b. Communication Structure
    c. Data Source replica
    d. Info Packages
    e. Transfer Rules
    f. Transformations
    g. Info Source Transaction data
    h. Transfer Structure
    i. Data sources (Active version)
    j. Routines & BW Formulas used in the Transfer routines
    k. Extract Structures
    l. (Note) If the transfer structures and related objects are being transferred without preceding
    Base Objects transport (e.g. while fixing an error) it is safer to transport the related Info
    Objects as well.
    4. Update Rules u2013
    a. Update rules
    b. Routines and formulas used in Update rules
    c. DTPs
    5. Process Chains u2013
    a. Process Chains
    b. Process Chain Starter
    c. Process Variants
    d. Event u2013 Administration Chains
    6. Report Objects u2013
    a. Reports
    b. Report Objects
    c. Web Templates
    Regards,
    Suman

  • How to move BCS data from one box to other

    Hello Expert,
    Dose any one know how to move BCS data from one box to other box ?
    Thanks & Regards,

    1) The best is to do the test. In my case, my customer was just doing this transfer (in full) to perform tests on the BEX reportings. Actually, they never raised any issue regarding document number when they did additional postings in test system... I would also say that during the transfer, the number counter in Qual gets not synchronized with the one in Prod. So, I think the system will just take the next number available in Qual. Should not be an issue.
    2)  As explained in answer 1), in my case, the purpose was not to perform data migration from one system to the other one. Thus, my customer never performed a subsequent consolidation in the target system. But, basically, the transfer copies all data : posting levels 00 to 30, for all periods you have selected + Additional financial data and sequence of activities. Thus, for me, everyhting is available in the target system, including COI documents. In other words, the "picture" regarding the data should be exactly the same between both system. The only thing you need to pay attention to is the customizing : it must be the same in Qual and Prod (example : date of acquisition and divestiture, structure of the group, etc...).
    Another very important thing, is that your export data source must not be enriched due to the BCS Delta load scenario. If it is the case, the system will write the consolidation logic (i-e the consolidation group + reporting mode) when transferring the data from the source Real Time Infocube to the Target Real time infocube, which will lead to inconsistent data in the target system.

  • How to make data flow from one application to other in BPEL.

    Hi All,
    I am designing work-flow of my application through BPEL(JDeveloper), I am making different BPEL projects for different functions, like sales manager got the order from sales person and sales manager either approve it or reject it, if he approve it it goes to Production manager and he ships the goods, now I want to keep sales person, sales manger,production manager in seperate BPEL files and want to get the output of sales person to sales manager and sales manager to production manager please help me in dong this.
    I was trying to make partner link in Sales manager of sales person and getting the input from there. I dont know this is right even or not, if it is right I dont know how to make data flow from one application to other.
    Experience people please guide.
    Sales Person -----> Sales Manager ----> Production Manager
    Thanks
    Yatan

    Yes you can do this.
    If you each integration point to be in different process, you have to create three BPEL process.
    1. Create a Async BPEL process 'A' which will be initiated when sales person creates the order.
    2. From BPEL process 'A' call a ASync BPEL process 'B' which has the approval flow. Depending on the input from process 'A' the sales manager will review the order in workflow and approve or reject and send the result back to process 'A'.
    3. Based on the result from workflow, invoke the Sync BPEL process 'C', where you can implement the shipping logic.
    -Ramana.

  • How to Migrate VO Extension from One Instance to Other

    Hi,
    How to Migrate VO Extension from One Instance to Other.
    Thanks
    Vishnu

    Move the VO.xml and Class files as usual to other Environment.
    Also move the .jpx of the Project and run the jpx importer.
    Thanks
    --Anil                                                                                                                                                                                                                                                                                               

  • How to transfer all materials from one plant to other plants?

    How to transfer all materials from one plant to other plants?

    Hi
    To transfer stock in one step  between plants belonging to same company code use movement type "301" and using transaction code "MIGO". IF you like in two step it helps to monitor stock in transit use movement type "303" and "305".
    303 Transfer posting plant to plant in two steps - removal from storage
    305 Transfer posting plant to plant in two steps - placement in storage
    to transfer stock between plants of diffrent company code go for stock transpor order using tcode "me21n"
    hope it helps

  • How to transfer my iBooks from one ipad to other?

    How to transfer my iBooks from one ipad to other?

    Purchased iBooks can be redownloaded on all devices. If they are not from the iBookstore, connect your iPad to computer and 'transfer purchases'. They should now be transferred to iTunes (or iBooks if you are using Mavericks). You can then sync using the other iPad.

  • How to change the value from one input control to another input control?

    Hi Experts,
    I want to change the value from  one input control to another input control. For Example if i change month in first tab. it should reflect in second tab also. How should we acheive through input control or some other option.
    Here I attached screen shot.Please help me for this

    Hi,
    It is not possible to have Input controll in all tabs that will be set from another .
    But There is one workaround .
    Follow the link below .
    http://davidlai101.com/blog/2013/08/13/web-intelligence-input-control-that-affects-all-tabs/

  • How to change  XML  Structure from one form to another form using OO ABAP.

    Hi Experts,
    In my Scenario, i need to do ABAP Mapping in order to change Incoming structure from one form to another.
    My Input to ABAP Mapping (OO ABAP Program)would be :
         <A>..........</A>
         <B>..........</B>
         <C> .........</C>
         <D>..........</D>
         <E>..........</E>
         <F>..........</F>
    OO ABAP Program need to read this input and change the XML Structure into below form:
         <A>..........</A>
         <B>..........</B>
         <C> .........</C>
          <X>
                <D>..........</D>
                <E>..........</E>
          <F>...............<F>
    Please provide inputs (sample Code) to solve this issue.
    Thanks,
    Kish.
    Edited by: Kishore Reddy Thamma on Jan 22, 2008 2:51 PM
    Edited by: Kishore Reddy Thamma on Jan 22, 2008 2:52 PM

    Hi,
    Please provide sample code or Material for converting XML Structure from one form to another using OO ABAP and
    Steps for ABAP MAPPING.
    Thanks,
    Kish.

  • One computer with 2 accounts-how to move an iPad from one to the other.

    imac with 2 accounts-how to move an ipad from one account to the other account

    Yes it is possible using PAPI. I have just used PAPI to create instances . I have not tried the requirement which you want. But as per my knowledge it can be done.
    Good Luck
    Right Chord

  • How to move supporting details from one intersection to other?

    Hi,
    I want to move data from one intersection to other along with supporting details and comments. Now i want to delete everything (data, supporting detail and comments) from previous intersection. I know how to clear data but do not know how to delete comments and supporting details form that intersection.
    Can you help me with this?
    Thanks!

    I have found it.
    Thank
    Its Adminstration -> Clear Cell details..

  • How to copy-paste frames from one document to other with there respective layers intact?

    Hi All,
         I am facing an issue while copy paste frames from one document to other. I have a 3 frames in first documents each one on different layer. First document has 3 layers. The second document too have 3 layers , I am copying frames from first document to scrapdata using 'ICopyCmdData ' and 'kCopyCmdBoss'. I have 'Paste Remembers Layers' menu 'Checked' on Layer panel. I am using following function to copy frames to scrapdata.
    bool16 copyStencilsFromTheTemplateDocumentIntoScrapData(PMString & templateFilePath)
         bool16 result = kFalse;
        do
            SDKLayoutHelper sdklhelp;
            PMString filePathItemsToBeCopiedFrom(templateFilePath);  //("c:\\test\\aa.indt");
            IDFile templateIDFile(filePathItemsToBeCopiedFrom);
            UIDRef templateDocUIDRef = sdklhelp.OpenDocument(templateIDFile);
            if(templateDocUIDRef == UIDRef ::gNull)                 
                break;
            ErrorCode err = sdklhelp.OpenLayoutWindow(templateDocUIDRef);
            if(err == kFailure)                 
                break;
            InterfacePtr<IDocument> templatedoc(templateDocUIDRef,UseDefaultIID());
            if(templatedoc == nil)               
                break;
            InterfacePtr<ISpreadList>templateSpreadUIDList(templatedoc,UseDefaultIID());
            if(templateSpreadUIDList == nil)                  
                break;
            IDataBase * templateDocDatabase = templateDocUIDRef.GetDataBase();
            if(templateDocDatabase == nil)                  
                break;
            UIDRef templateDocFirstSpreadUIDRef(templateDocDatabase, templateSpreadUIDList->GetNthSpreadUID(0));
            InterfacePtr<ISpread> templateSpread(templateDocFirstSpreadUIDRef, IID_ISPREAD);
            if(templateSpread == nil)                 
                break;
            UIDList templateFrameUIDList(templateDocDatabase);
            if(templateSpread->GetNthPageUID(0)== kInvalidUID)                  
                break;      
            templateSpread->GetItemsOnPage(0,&templateFrameUIDList,kFalse,kTrue);  
            InterfacePtr<ICommand> copyStencilsCMD(CmdUtils::CreateCommand(kCopyCmdBoss));
            if(copyStencilsCMD == nil)                
                break;
            InterfacePtr<ICopyCmdData> cmdData(copyStencilsCMD, IID_ICOPYCMDDATA);
            if(cmdData == nil)                 
                break;
            // Copy cmd will own this list
            UIDList* listCopy = new UIDList(templateFrameUIDList);
            InterfacePtr<IClipboardController> clipboardController(gSession,UseDefaultIID());
            if(clipboardController == nil)              
                break;
            ErrorCode status = clipboardController->PrepareForCopy();
            if(status == kFailure)                  
                break;
            InterfacePtr<IDataExchangeHandler> scrapHandler(clipboardController->QueryHandler(kPageItemFlavor));
            if(scrapHandler == nil)                 
                break;
            clipboardController->SetActiveScrapHandler(scrapHandler);
            InterfacePtr<IPageItemScrapData> scrapData(scrapHandler, UseDefaultIID());
            if(scrapData== nil)                
                break;
            UIDRef parent = scrapData->GetRootNode();
            cmdData->Set(copyStencilsCMD, listCopy, parent, scrapHandler);
            if(templateFrameUIDList.Length() == 0)       
                return kFalse;      
            else      
                status = CmdUtils::ProcessCommand(copyStencilsCMD);    
            if(status != kFailure)
              result = kTrue;
            sdklhelp.CloseDocument(templateDocUIDRef,kFalse,K2::kSuppressUI, kFalse);
        }while(kFalse);
        return result;
    After this I need to close first document. Now I am opening the second document from indt file which has same number of layers as first document. I am trying to paste frames from scrap data to second document using '' 'ICopyCmdData ' and 'kPasteCmdBoss' as shown in follwoing function
    bool16 pasteTheItemsFromScrapDataOntoOpenDocument(UIDRef &documentDocUIDRef )
        bool16 result = kFalse;
        do
               InterfacePtr<IClipboardController> clipboardController(gSession,UseDefaultIID());
                if(clipboardController == nil)
                    break;
               InterfacePtr<IDataExchangeHandler> scrapHandler(clipboardController->QueryHandler(kPageItemFlavor));
               if(scrapHandler == nil)               
                    break;
               InterfacePtr<IPageItemScrapData> scrapData(scrapHandler, UseDefaultIID());
                if(scrapData == nil)
                   break;
                     //This will give the list of items present on the scrap
                UIDList* scrapContents = scrapData->CreateUIDList();
                if (scrapContents->Length() >= 1)
                    InterfacePtr<IDocument> dataToBeSprayedDocument(documentDocUIDRef,UseDefaultIID());
                    if(dataToBeSprayedDocument == nil)
                       break;
                    InterfacePtr<ISpreadList>dataToBeSprayedDocumentSpreadList(dataToBeSprayedDocument,UseDef aultIID());
                    if(dataToBeSprayedDocumentSpreadList == nil)
                         break;
                    IDataBase * dataToBeSprayedDocDatabase = documentDocUIDRef.GetDataBase();
                    if(dataToBeSprayedDocDatabase == nil)
                         break;    
                    UIDRef spreadUIDRef(dataToBeSprayedDocDatabase, dataToBeSprayedDocumentSpreadList->GetNthSpreadUID(0));               
                    SDKLayoutHelper sdklhelp;
                    UIDRef parentLayerUIDRef = sdklhelp.GetSpreadLayerRef(spreadUIDRef);
                    InterfacePtr<IPageItemScrapData> localScrapData(scrapHandler, UseDefaultIID());
                    if(localScrapData == nil)
                        break;
                    if(parentLayerUIDRef.GetUID() == kInvalidUID)
                        break;
                    InterfacePtr<ICommand> pasteToClipBoardCMD (CmdUtils::CreateCommand(kPasteCmdBoss));
                    if(pasteToClipBoardCMD == nil)
                        break;
                    InterfacePtr<ICopyCmdData> cmdData(pasteToClipBoardCMD, UseDefaultIID());
                    if(cmdData == nil)
                        break;
                    if(scrapContents == nil)
                        break;               
                    PMPoint offset(0.0, 0.0);
                    cmdData->SetOffset(offset);
                    cmdData->Set(pasteToClipBoardCMD, scrapContents, parentLayerUIDRef );
                    ErrorCode status = CmdUtils::ProcessCommand(pasteToClipBoardCMD);
                    if(status == kSuccess)
                        CA("result = kTrue");
                        result = kTrue;
                }//end if (scrapContents->Length() >= 1)       
        }while(kFalse);
        return result;
         Here in above function its required to set Parent Layer UIDRef and because of this all frames are getting paste in one layer.
    Is there any way we can paste frame in there respective layers?
         Also I need to work this code with CS4 server and desktop indesign.
    Thanks in advance,
    Rahul Dalvi

    Try,
    // dstDoc must be FrontDocument
    InterfacePtr<ILayoutControlData> layoutData(Utils<ILayoutUIUtils>()->QueryFrontLayoutData());
    InterfacePtr<ICommand> createMasterFromMasterCmd(CmdUtils::CreateCommand(kCreateMasterFromMasterCmdBoss));
    createMasterFromMasterCmd->SetItemList(UIDList(srcMasterSpreadUIDRef));
    InterfacePtr<ILayoutCmdData> layoutCmdData(createMasterFromMasterCmd, UseDefaultIID());
    layoutCmdData->Set(::GetUIDRef(layoutData->GetDocument()), layoutData);
    CmdUtils::ProcessCommand(createMasterFromMasterCmd);

  • How to send condition types from one client to other ?

    Hi ,
    I have a requirement to send condition types (VK13) from one client to other exp : 350 to 320
    In Vk13 we have one button send condition when we press that data need to move to specified client.
    I have no idea about this please help me.
    It is very urgent plz thanks in Adv.
    Regards,
    Raj.

    Hi,
    YOu can do with ALE and EDI by configuring the systems as per the requirement.
    You can create 2 Logical systems for sending and receiving in two different clients and can continue with idocs by sending them to the clients.
    You can go thru the below links to get more info about ALE and EDI.
    http://www.sapgenie.com/ale/index.htm
    http://www.sapgenie.com/sapedi/index.htm
    regards
    Rakesh

Maybe you are looking for

  • Sample editor doesn't open selected audio file in 8.0.2

    Hey there. I've just upgraded to Logic pro 8.0.2 from 8.0. When i drag an audio file (a) into the arrange page and then double click on it, it says "nothing to display". It then randomly displays the file (a) but when i double click on another audio

  • Anyone know how to copy/export previous recipients list from Outlook to iCloud?

    Hi, Ever since using MobileMe and now iCloud to sync contacts with Outlook, I've had horrendous issues with mulitple duplicates within my contacts. In an attempt to resolve this, I've manually removed all the duplicates, synced with my iphone and ipa

  • Order Fulfillment of LSP Service - multiple routing options - PR generation

    Hi, We are a logistics company and in the process of implementing SAP in our organsiation. We are referring to SAP Best Practices for LSP which suggest that we create a service type material master record called 'LSP Service' with variant enabled for

  • Copy AP Configuration Templates-WCS 7.0.172.0

    I am wondering if anyone has seen a way to copy an AP configuration template. We have several distribution centers and the templates are essentially identical other than the Template name and the AP Group VLAN (different for each DC). We set up a new

  • Mac Mini Ram

    does the mac mini have buffered or unbuffered ram. i have the original 512mb and i want to upgrade to 1gb, i have found buffered and unbuffered for the same price, whats the difference and which is better for the mac mini ? thanx