How to change the Live Bookmarks expiration date?

When I open Firefox Brief will search for the most recent feeds. I noticed that when for some reason (like holidays) I do not open Firefox for some weeks I miss a lot of feeds. This is normal because Brief uses Live Bookmarks and it can't fetch what is no longer present in Live Bookmarks. Is there a way to force Live Bookmarks to extend the expiration date of the feeds?

Firefox will reload the Live Bookmarks with every start by retrieving the XML file from the server. So items that are no longer in that list will disappear. AFAIK then that XML is not kept on the computer. I don't know how Brief works, but I assume that it works similarly.
Your above posted system details show outdated plugin(s) with known security and stability risks.
# Shockwave Flash 10.0 r32
# Java Plug-in 1.4.0_01 for Netscape Navigator (DLL Helper)
Update the [[Java]] plugin to the latest version.
*http://java.sun.com/javase/downloads/index.jsp (Java Platform: Download JRE)
Update the [[Managing the Flash plugin|Flash]] plugin to the latest version.
*http://www.adobe.com/software/flash/about/

Similar Messages

  • How to change the HTML/XML test data to test my_abap_proxy in SE80?

    Hello,
    I am trying to test my_abap_proxy in SE80 by usng a HTML/XML file of my desk top, the test data is as below
      <LoadingDate>20110422</LoadingDate>
      <DocumentDate>20110422</DocumentDate>
      <SDDocumentCategory>G</SDDocumentCategory>
    so on.......
    Now, i want to change the Loading date in this test data, so, i tried after Loading file in Test Service Provider screen of my_abap_proxy of SE80, but i could not make change ANY data in this test data, pls. let me know how to change the data?
    Thank you

    Hello ABAP_SAP_ABAP ,
                                          Youneed to select the option "generate template data " and then on the displaying template there you will see the option for editing in the top left corner toolbar.
    Then after editing you can do a XMl syntax check and test your proxy.
    Hope this helps.
    Thanks,
    Greetson

  • How to change the execution order of data control and backingbeans

    Hi,
    I have a form for a BPM human workflow. It has an inputText and a selectOneChoice component in the form.
    The list of value for the selectOneChoice is initiated based on the value in the inputText.
    I have a data control - JavaBean, which returns a list of values based on a parameter for the selectOneChoice and the parameter is binded with the value of inputText defined in a backingBean. I also set the default value of the inputBox in the backing bean with setValue().
    The problem I have is that the data control for selectOneChoice is loaded before the inputText or backingBean is loaded. Therefore, the parameter is null.
    I tested the same combination in an ADF web app and it works fine. In the app, the inputText and the backingBean are loaded first and then the value of inputText is sent to the data control.
    How can I change the order of the execution? I need to make the inputText and backingBean loading first before the data control for the list of values loading.
    Edited by: user626218 on Oct 10, 2012 9:25 PM

    Hi,
    The inputText is pre-populated based on the user profile in the BPM instance. I tried to render the selectOneChoice if the value of the inputText exists but the data control for selectOneChoice is loaded before the backingBean so it keeps getting a null as parameter.

  • How to change the column name of Data Entry View of CAT2?

    Hi experts,
    The requirement is to change the name of one of the columns in the Time Sheet: Data Entry View appearing on execution of t-code CAT2. What should be the procedure to do the same?

    I came across the thread
    CAT2 Worklist enhancement.
    which aims to do the same. Does this method work? How is the problem mentioned in Step 5 of the final post to be resolved?

  • How to change the format of a date field inheriting format from subclass.

    Currenctlty date filed is inheriting the format from a property class. The date format in my property class is 'dd/mm/rrrr'.
    Now my requirement is to change the format mask according to my applications user from 'dd/mm/rrrr/ to 'dd/mon/rrrr'.
    Some may use 'dd/mm/rrrr' and some may use 'dd/mon/yyyy'.
    Thanks.

    Some may use 'dd/mm/rrrr' and some may use 'dd/mon/yyyy'.
    I want a generic solution to change the date format at runtime These two seem to conflict. How will you decide which one to change and which not?

  • Using HTML,how to change the color of column data in an interactive report?

    Hi,
    I want to change the color of data of a column in an interactive report.
    I want to do it by HTML.
    I have tried the code
    <style type="text/css">
    #apexir_EMP_MANID{color:blue;}
    </style>
    But it changes the color of the heading of column only. Not the data.
    Plz can anyone suggest me something ?
    Thanks in advance

    Hi Vaibss!
    Is it that what you're looking for?
    Color Coding (Post number 5)
    regards

  • How to change the content dynamically by date wise

    Hi,
    In my application, i have a survey module.
    In that i have to change the question by every week, which iam getting
    from the Database.
    Iam using java,and mysql DB, framework struts.
    How can i update the question for every week ??
    What is the procedure to attain it.
    Give me suggestions and tips to startup.
    Thanks,
    Mohan

    The cron command would do that on Linux and Solaris. On Windows, use a similar command.

  • How to change the value of project data in the BPM instance?

    Hi Everybody,
    I have a situation that after the bpm instance was created. We found that one of the project data/variable contains the incorrection information. Is it a way we can change the value of that project data/variable? I checked the BPM workspace, as administrator, there are not function for it and we can't stop/withdraw the instance. Can we change the MDS database for it? Please advise. It is so important for us that will stop us to move on of our project.
    Thanks

    As per my knowledge we can not change the value of BPM project variables from outside BPM. If you look at PAPI API also you will find methods to get values from BPM but not to set to BPM.
    If this is daily issue for your application then change your design to add a Edit Data Activity (Screen) and then use Grab functionality to get the control to this Edit Data Activity to change the required data.
    Else if it is an issue with the only one instance then it is better to Abort this instance and re-create the instance with correct data. Changing value in the MDS database is not encouraged.
    Hope this helps.

  • How to change the settings for Last data update in BI

    Dear All,
    If you want to display that "Status of Data " field in the report... Then you need to set it at...
    Run the query -> from the BEx toolbar choose LAYOUT -> Display text elements -> General.
    If this is not set, then it will not show in report output.
    Status of data is the time on which the latest load occured to the cube. Lets say, you have built a report on a cube which is loaded on 01/10/2007. When you run the report, the status of data will show this date 01/10/2007 until you load the cube again. In this case, if you load on 01/20/2007, the status would now show up as 01/20/2007.
    If we want to display that field in the report...
    Run the query -> from the BEx toolbar choose LAYOUT -> Display text elements -> General.
    The above all is for BW 3.5
    but i want to know for BI 7 and EP
    Regards
    venu

    Hi,
    First thing here is, in SM58 u r finding the entries means those are related to TRFC LUW's. we shuld never stop this unless those are not useful.
    These TRFC's moves from the source system to different Target systems by their respective users.
    As u said that these Entries are occupying the system resources i.e in accordance to that we have to increase our dialog process in the system not to simply stop that TRFC entries.
    These trfc's move basing on the Dialog processes in the system i.e if the processes are free then these entries move freely from system to system.
    Automatically system generates these LUW's when ur scheduling a load from R/3 to BI system.
    This will not be generated to BI by a particular job in R/3.This depends on the volume of the data only.
    So pls have a talk with BASIS team regarding the resource availability and the movement of the LUW's/TRFC's into BI system.
    rgds,
    Edited by: Krishna Rao on Jun 25, 2009 1:38 PM

  • How to change the default date in Person assignment tab?

    Hi experts,
    Does anyone know how to change the default date in person assignment tab in cj20n? Currently, the system always take the scheduled finish date to the date of the person assignment tab. Can I change it to the start date?
    Thanks and rgs,
    Michelle

    Hi Michelle,
    Goto SPRO->Project system->Dates->Scheduling->Specify Parameters for Network Scheduling, Here you can control the workforce planning dates.
    Hope this is useful...
    Regards
    Aatish

  • How to change the date format?

    Hi,
    I need to display the data format as(YYYY-MM-DD). But now it displays(2009-1-9)
    Here is my code snippet which i used to display the data format as(2009-1-9)
    *<INPUT TYPE=TEXT NAME="date_submitted" MAXLENGTH=20 SIZE=10 VALUE="" onBlur= "return dateSubmitted()">  (YYYY-MM-DD)*
    *<SCRIPT LANGUAGE="javascript">*
    dateSubmitted()
    *</SCRIPT>*
    function dateSubmitted()
                        if (document.pgUpdate.date_submitted.value == "")
                             date = new Date();     
                             month = date.getMonth() + 1     
                             document.pgUpdate.date_submitted.value =
                                            date.getYear() + "-" + month + "-" + date.getDate();
                        return true;
    Can anybody help me how to change the date format?
    Thanks in advance!

    prit123 wrote:
    use SimpleDateFormat class. The code is :He posted a Javascript related question, not a Java related question.
    Please use forums devoted to Javascript. You're here at a Java/JSP forum.
    There are JS forums at webdeveloper.com and dynamicdrive.com. Good luck.
    String formatPattern = "yyyy-mm-dd";
    SimpleDateFormat sdf = new SimpleDateFormat(formatPattern);
    sdf.format(yourdate);yyyy-mm-dd denotes year-minutes-days. Please go read the SimpleDateFormat API as well.

  • How to change the year in a range of column dates to the new year?

    How to change the year in a range of column dates to the new year?

    Depends on the pattern of the dates. The last procedure will work for any pattern, or no pattern at all.
    For examples.the dates are assumed to be in column A, starting at A2
    Sequential dates?
    Enter first updated date in the first cell.
    Enter =A2+1 in cell A3. Copy the cell.
    Select A3 to the end of the list. Paste.
    With the cells still selected, Copy, then go Edit > Paste Values.
    Evenly spaced dates?
    Same procedure as above, but replace +1 in the formula with + and the number of days between dates in the list.
    Randomly spaced dates?
    Select cell B2. Press option-left arrow to insert a (temporary) column to the left of column B.
    Click on the empty cell B2 in the new column. Enter the formula below:
    =DATE(YEAR(A)+1,MONTH(A),DAY(A))
    Copy the cell, then select B2 - Bn where n is the last ow containing a date to be converted. Paste,
    With the cells still selected, Copy.
    Click on A2, then go Edit > Paste values.
    Click on the column B reference tab to select all of column B.
    Hover the mouse over the right end of the reference tab, and click the black triangle when it appears.
    Choose Delete Column from the menu that appears.
    Regards,
    Barry

  • How to change the posting date at the line item level in a sales order

    how to change the posting date at the line item level in a sales order

    Hi,
    I believe the POSTING DATE will appear on the accounting document
    In the Accounting document, the posting date will be based on the  Billing date.
    Please let me know if you need any more details
    santosh

  • How to change the date and time during OVM installation for Fusion Apps

    Hi,
    The customer is using Fusion Instance which is a V1 (Build 19) OVM installation shipped by Oracle with Demo Data (including seeded user IDs and roles) in it.
    Now they have issue with Date format for the application on the screens is showing MM/DD/YYYY where as it should be (Singapore) Standard is DD/MM/YYYY.
    Q/A: How to change the date/time in OVM image
    Refer SR : 3-5640792461
    Regards
    Ganesh Ananthapadmanaban

    Not a problem. There are a number of other system and network setup commands that you might find useful at some time. From within the Remote Desktop Admin in the Send Unix Command window type:
    networksetup -help
    systemsetup -help
    That will give you lists of the commands, including the one I posted above, with their basic syntax. They're handy to know.
    Cheers.

  • How to change the Org Data depending on the Person Responsible?

    Hi Group,
    I have a requirement relating to Org data changing as :
    while creating the activities in CRM, by default I was getting the <b>Org data</b> for the person responsible ( whoever has created the <b>Activity</b> ).
    there is a provision that, we can change the <b>Person Responsible</b> for the Activity.
    and when the <b>Person Resp</b> is changed, the <b>Org data</b> also to be changed accordingly....
    But, this was not happening due to some technical reasons....
    So please give me some inputs as how to change the <b>Org data</b> according to the changes to the <b>Person Resp</b>.
    Thanks in advance.
    Regards,
    Vishnu.

    for this u have to maintain the rules profiles and attach this to transaction type for header or item category
    documentaion is there
    spro ->MD->org managment ->org data deter -->change rules and profiles

Maybe you are looking for

  • Is it possible to resize the partitions without losing data?

    I have following issue: I have dual-boot Arch with Windows XP. I created 4 partitions: 40GB XP's system disk (ntfs), 80GB ntfs data disk, 1GB swap and 25GB Linux partition. But I am running XP so rarely, that it is frustrating, that I have most of my

  • Is this external hard drive fast enough?

    Looking at this drive It is FW 800 and 7200 rpm.: http://store.apple.com/us/product/H0303VC/A?fnode=MTY1NDA0Nw&mco=MTczMTA1MDI Is there some other spec to look at or is it fast enough to edit directly off of? Thanks.

  • Weblogic Server 6.1   IIS5

    I'm trying to configure IIS to run an application which uses the weblogic server. I have 2 servers. 1 is a webserver runnning Win2K IIS5. The other is an application server which is running BEA WebLogic Server 6.1, & other apps. I'm trying to allow a

  • CS5.5 Mobile White Screen of Death

    HI, I am a N00B to CS5.5 and I am testing it out with a trial version.  I developed an app in Dreamweaver CS5.5 with phonegap.  I launched the app in CS5.5's Build and Emulate.  After my splash screen I get a white screen that never goes away.  I can

  • Low frequency measurement (1 to 5 Hz) issues - Reg

    Hello All, i am facing a problem in measuring Low-Frequencies in the range of 1-5 Hz. I am using VIs used for pulse-width measurement and the card is PCI-6031E. i am generating frequency using PCI-6013 card. Actually i am trying to develop an applica