How to change the motion of a clip

Windows 7 ultimate    
AE CS 4
Footage 1080p 24fps
Gentlemen
A very simple question
How do I change the motion setting of a clip
I mean I have a clip of a girl dancing on a chess floor background
I made duplicates of the same clip ,I changed the outfit of each girl by using effects
Now I wanna change their standing positions , I wanna make it look like many girls are dancing on that chess background , since I am a Premiere user, all I have to do is go to selection track motion and I can put her up and down (dont take me wrong here) by changing the X, Y and few other numbers,
So, how do I move here up, don , left and right
Many thanks.

Mylenium's initial response is correct:  select the layer, press P, and adjust the position parameters.  As you have also descovered, you can manually change those values by moving the layer within the preview window as well.
These are fundamental basics for using After Effects.  You will have much more success and satisfaction using AE if you spend an hour or two with the resources here:
http://blogs.adobe.com/toddkopriva/2010/01/getting-started-with-after-eff.html

Similar Messages

  • How to change the speed of a clip without frame blending?

    Hi,
    I changed the speed of a clip to 200%. I expected Premiere to drop every second frame. Instead, there is some frame blending making my progressive footage interlaced. For some reason, the frame blending cannot be disabled by using the Use Frame Blending option.
    How can I make Premiere simply dropping every 2nd frame?
    Thanks in advance!

    In my test, all I need do was right click the clip and make sure Frame Blend was not checked.

  • How do change the duration of multiple clips with timestreach?

    All of the options are grayed out.

    AdminID
    What version of Premiere Elements and on what computer operating system?
    Let us assume Premiere Elements 11, 12, or 13 on Windows 7, 8, or 8.1 64 bit for the purpose of an example.
    1. Select all the clip on the Timeline (all at one time) that are being targeted for same duration change.
    2. Right click anywhere in the selection, select Time Stretch, and, then in the Time Stretch dialog, change the duration 00;00;0O;00. (hours; minutes; seconds; frames).
    Do you have one of those versions that I mentioned, making sure to select all the involved clips ahead of time before going
    after Time Stretch?
    Selections
    If you want all the clips on the Timeline, then Edit Menu/Select All
    or
    Hold down the Shift key of the computer main keyboard, and, with the mouse cursor, click on each of the clips to be involved in this duration change
    or
    With the mouse cursor, draw a rectangle around the clips to go into the selection in order to select them
    Any questions or need clarification, please do not hesitate to ask.
    Thank you.
    ATR

  • Video tutorial on changing the colour within a clip on Pr CC

    Evening again,
    Please, would someone help me. The other day I watched a clip narrated by a women who took you through how to change the colour within a clip using a scene from someone surfing - turning the murky water into a deep blue colour.
    I'm dearly trying to find it but to no avail, can anyone point me in the right direction. I've searched using many terms.
    Thanks
    Ashley

    Hi Ashley,
    You're talking about changing one color within a scene? That's secondary color correction. Here is a tutorial for you:

  • How to change the clip's duration under imovie 10.0.3?

    How to change the clip's duration under imovie 10.0.3?

    This is a new feature introduced in 10.0.3 which works fine for me.  The old way was to select Modify - Fast Forward.  You can only select certain speed ratios but a slider should appear near the top of the clip which allows finer speed adjustment.  have you tried this?
    Geoff.

  • How can I change the duration for all clips in iMovie 10.2

    How can I change the duration for all clips in iMovie 10.2?  I'm used to working in the older version of iMovie where all I had to do was click on the gear on the clip and change the duration. ALso could use the tool bar to set the duration for all clips. Can't figure out how to do that in this new version. Any suggestions would be appreciated.

    In the timeline select the clip whose duration you want to change. Click the adjust button at the top of the viewer and then click the i button and you can set the duration. For multiple clips select them all and in the i button type in the duration you want and it will be applied to all the selected clips. You can also change the duration of a clip in the timeline by putting the cursor over the beginning or end of a clip and dragging. A popup will show the new duration.

  • How do I change the fps of a clip?

    Hi,
    I'm working on an HD project with a sequence running at 23.98fps. Most of my clips are running at this speed except for a couple which are somehow running way too fast even though the audio is at the right speed.
    Is there a simple way I can change the fps of a clip?
    Fingers crossed
    Matt

    I think you're using Final Cut Pro. This is the Final Cut Express forum.

  • Why doesn't siri know how to change the time of a reminder? When asked, "Do you want to confirm or cancel your reminder?" Reply, "Can I change the time to a half hour later?" Siri doesn't know how to respond.

    Why doesn't siri know how to change the time of a reminder? When asked, "Do you want to confirm or cancel your reminder?" Reply, "Can I change the time to a half hour later?" Siri doesn't know how to respond.

    Hi
    In iMovie'11 (version 9.0.x)
    on top menu row - Apple/iMovie/File/Edit/Cut (Can vary dep. on language - in Swedish Apple/iMovie/Arkiv/Redigera/Klipp . . . )
    down Cut menu - Slow playback/Raspid Playback/Re-play in Slow Motion and onvards
    Here one can select the Pre-Set speeds
    Are you familiar with getting 'inspector' to run?
    No - but I guess that Double Click on clip/sequense or ctrl-Click on it might open it.
    Yours Bengt W

  • How to change the speed of a slideshow

    How to change the speed of a slideshow

    In my test, all I need do was right click the clip and make sure Frame Blend was not checked.

  • How to change a motion tween speed

    on a timeline of 6 second I need to scale a jpg from 100% to 300% is it posible to slow it down or not? If yes how without changing the time frame or the size...
    Thanks in advance
    Pascale
    P.S. if my question is not clear enough just mention it I will attach an example

    Do you mean easing? If so option the Motion Editor Panel and adjust easing in there. Otherwise slowing it down literally will require adding more frames or reducing the document frame rate (slowing down everything else and/or making it choppy).
    Motion Editor ex (don't forget the ease value at bottom):

  • How to change the "content created" date/time in FCPX?

    Since I've had problems importing my whole iMovie event library into FCPX I decided to run some tests with importing individual files (part of iMovie events and originally imported from camera into iMovie). Some of them for some reason got the wrong "content created" date/time in them while in iMovie they have the right date/time set. Does anybody have an idea on how to change the "content created" timestamp?

    I had a bunch of DV files that imported stamped with the file modification date and time.  I did not find a way to change it in FCPX. With FCPX not running, I used A Better Finder Attributes to modify the creation and modification dates of the files in the event folder. FCPX reconnected to them but the event still showed the old range of dates so I created a new event and moved the clips to it. Maybe ther is a beter way but that is how I did it.

  • How to change the OraSSO login link in webcache/load balance

    Hi
    we have 10gAsR1 installed as a Portal instance. We have 6-server
    load balancer => webcache as loadbalancer (listening port 80)
    Wb ch1 and wb ch2 => webcache (listening port 7777)
    portal1 and portal2 => Portal listening 7778
    infra =>Infrastruture with repository Portal/Oracle SSO (listening 7777)
    This set up is working fine for our intranet setup, now we need to open this for couple of external clients. Well initially we need to open on the load balancer server on port 80 for external team to access, it works fine when we make it publc access.
    Now when we need to make it SSO (siteminder) enables, when users click on login link it first goes oracle sso then it internally redirects the page to site minder sso.
    Well, I have noted that the sso server details are mentioned in global setting sso/oid details. Since we need to open this for external client we have to add a DNS entry for this so that we can allow its access over firewall..
    Now I have made DNS name change at my infrserver level, now I need to update the change at the load balancer server (where wheb chache is running).
    Any one know how to chang the URL at load balancer.
    I am struck at this point please suggest how should i proceed..
    Thanks,

    Extract from Personalization Guide - Page Footer - Personalization Considerations
    * If you wish to personalize the URL that points to the Privacy Statement for a page that displays a standard Copyright and Privacy (that is, its Auto Footer property is set to true), set the Scope to OA Footer, in the Choose Personalization Context page of the Personalization UI.
    * If you wish to personalize the URL that points to the Privacy Statement for a page that displays a custom Copyright and Privacy (that is, its Auto Footer property is set to false), set the Scope to Page in the Choose Personalization Context page of the Personalization UI. In the following Page Hierarchy Personalization page , identify and personalize the Privacy page element.

  • How to change the privacy statement link url

    I looked into the previous threads , could not find the answer to "Changing the privacy statement url to clients privacy statement url".
    I am talking about the privacy statement URL in the page that user see it as soon as user logs into the e-business suite.
    I have read the previous theads and developers guide regading how to show or hide this autofooter thing. but could not find any thing about how to change the one in the login page.I even looked ino personalization but could not find a place to change this url. please HELP.
    Another question is " is it ok to show privacy statement in just the first page and hide it in rest of the application pages?"
    Thanks
    karan

    Extract from Personalization Guide - Page Footer - Personalization Considerations
    * If you wish to personalize the URL that points to the Privacy Statement for a page that displays a standard Copyright and Privacy (that is, its Auto Footer property is set to true), set the Scope to OA Footer, in the Choose Personalization Context page of the Personalization UI.
    * If you wish to personalize the URL that points to the Privacy Statement for a page that displays a custom Copyright and Privacy (that is, its Auto Footer property is set to false), set the Scope to Page in the Choose Personalization Context page of the Personalization UI. In the following Page Hierarchy Personalization page , identify and personalize the Privacy page element.

  • How to change the default apex port

    hi,
    i am installed apex4.0 in EBS R12 DB with HTTP Server method. my apex is running from application server 10g and default port is 7777.
    URl: http://hostname:7777/pls/apex
    My EBS R12 running on http://hostname:8007.
    is it possible to change the apex port to EBS Apache port(8007) in R12 and finally i want to change above URL like this
    Before change : http://hostname:7777/pls/apex
    After Change : http://hostname:8007/pls/apex
    Thanks in advanace....

    How to Change the Default SSH Port from Terminal ?
    now showing default SSH Port 22 i need change it pls help me how can do

  • How to change the default Path of Prompt Played by MicroApp

    Hi
    I need to store all the Self Service application prompts in dedicated Media Server. I can modify location of all the Media files by passing the related URL form CVP application, however I need to know how to change the default location of Prompt file played by Play Media Microapplication in ICM Scripting.
    Currently the default location taken by Play Media Micro App is the Media _Server.variable path set for VXML Server location while I have a separate Media Server.
    Please advice how we can customize the MicroApp Media path.
    regards
    Kapil Kumar

    Hi Kapil,
    Try this in your ICM script, define set variables i.e.
    set Media Server= ip address of media server
    set Locale = en-us
    set input Type = DTMF only
    set App Media Lib = " you new location i.e. test "
    So, the application path will be
    http://media server ip address/en-us/test
    hope this helps.
    Cheers

Maybe you are looking for