How to change the posting periods

HI,
could anyone tell me that how to change the posting periods in SD module
regards,
chary

Welcome to the forum
What do you mean by this and where to change ??  Please be clear in your question.  Also before posting, please make a search in the forum
[Forum Search |http://forums.sdn.sap.com/search!default.jspa?objID=f246]
thanks
G Lakshmipathi

Similar Messages

  • How to change the posting period !

    Hello everyone
    I get the problem with posting period. I ready open the posting period for 2014.  The posting periods should be set per month and have erroneously been defined as per year.
    I ready follow the guide, but it is only successful in my test of SAP and it is not working in our company SAP system. I can not restrict the curent posting date range to 30.04.2014 such as my picture below: Pleas help me. Thanks

    Hi Mr Son
    Nice to meet you. I read the guide about this problem and it said that we can change if we had postings in this period. And I try it in test of my SAP company and it is ok. but when i apply in my SAP company, it is not working, i don't know why. I am only normal accountant, and i don't know the user and pass to access to your link. if you are in Vietnam now, how i can contact with you? do you have any email or phone number or skype. Please help me solve this problem.
    Please check this file
    Business One in Action – How to Correct Posting Periods?
    And this is my result in testing SAP
    http://scn.sap.com/servlet/JiveServlet/showImage/2-14962466-431165/u2.png

  • How to change the MM Period

    Hi Dear
    I wanna change the posting period from 02 - 2010 to 12 - 2009 means back date, Please help how it has to be done.
    i had tried in MMPV, MMRV, but no result. Give calender related error.
    Thanks in Advance
    Rakesh Paal

    Rakesh Paal,
    If you want to open previous period for reversal entry or additional entry
    The following are steps for Opening previous period in MM :
    1. Go to TCode SU01 (see OSS NOTES 487381)
    2. Choose "change" tab with your loging Name
    3. Choose "Parameter" tab
    give Parameters MMPI_READ_NOTE with date format as YYYYMMDD
    (say today 20071201)
    4. SAVE.
    5. Go to T-code MMPI
    6. open the old periods which you want to post into,
    Note :
    the period opening will be valid for only for the particular day only.
    7. Complete the posting you want to reverse or add
    8. Go to MMPV to close the periods.
    These steps first do it dev or quality then proceed furthere .

  • I want to change the posting period

    I want to change the posting period for closed period. how can to do?. My period 2010 is in period but I want periods in months. who can I help me?

    Hi Mary.......
    One you created you can not change the type of periods of Posting Period.
    This is SAP Standard that once you created you can not change it.
    But if you have not done transactions for that period then you can remove and recreate with the period type as 12 Months...
    Regards,
    Rahul

  • How to Change the Validity period

    Hi All,
    Could any one please explain how to change the validity period of SAP as when i am trying to post the PO with a delivery date in year 2011 it is not allowing me more than 2010 year. When i checked in Calender Maintenance the last entry in it is 2010. When i am trying to change the validity of the Indian settings it is not allowing me to change the year from 2010 to 2012 or any other.
    regards
    PSNG

    Hi,
    Just check "FOPC_CONSIST_CHECK" T-Code .
    Acthually this is for "Consistency Check on Validity Period"
    I am not very sure weather change option is there or not.
    Thanks
    Mayank

  • How to change the Validility period of the cost element

    Hi All,
    how to change the validity period of the cost element. In tranc code Ka02 only the text is allowed to change but i want to change the validity period of the cost element.
    best Regards
    stephen

    Hi All,
    Thanks for your response...........
    My  concern is, i have a document posted to 43100 GL Expense acct, which is also defined as cost element, GL field status G004(cost accts). But when the original document is posted no is no assignment of any cost object.
    But i have to reverse the document and when i use FB08, the reversal is popping up with error " Assignment of CO object is neccesaary " Assign the cost center.
    Is there any way we can update the cost center for posted docuemnt? if so how? and can i make the cost element invalid for previous month so that it will not ask for cost object and change the field status of the GL from g004 to G001 only for reversal and set it back after posting is done.
    Appreciate ur feedback and suitab;le points are rewarded with points.
    best

  • How to change the posting date at the line item level in a sales order

    how to change the posting date at the line item level in a sales order

    Hi,
    I believe the POSTING DATE will appear on the accounting document
    In the Accounting document, the posting date will be based on the  Billing date.
    Please let me know if you need any more details
    santosh

  • How to change the retention period of os watcher log,

    How to change the retention period of os watcher log, by default it is 7 days. but in our exadata env. automatically oswatcher logs are deleted , so i want to check the retention period.
    Regards,
    Ani

    Hi Ani,
    Go to :- /opt/oracle.cellos/validations/init.d/oswatcher
    Open the file "oswatcher" file.check for the line "/startOSW.sh X Y Z". Where X is the snapshot interval
    make the change and you are done
    Regards,
    Sunil Bhola

  • Change the posting period

    Hi Gurus,
    Can any one help me with changing the posting period of the company which is by mistake take as 12/2009 and i want to change it to 08/2008. I ahve already done some material movement in this and the system is not letting me change it in OMSY. Can i use MMPV to close this period and the use MMPI to open the new period as 08/2008. As this will be in past if compared to the current period in system, will there be any problems??
    Please advise.
    Thanks in advance.
    Anoop

    It is possible to re-open a previously closed period. However, it is NOT advisable to do so because the valuation data of the previous period could be affected.
    In general, it is only safe to reopen a previously closed period when no material postings have been done after the period shifting to the new period.
    If there has already been postings after the period shifting to the new period, reverting the period back will cause database inconsistencies in the history tables.
    If you decide to proceed with this process, you can use the program RMMMINIT, but, please review the documentation of this program first!! and the check the SAP notes 487381 (for the error message that you are receiving) and the 369637 (for an explanation about the inconsistencies that will be generated.
    Steps are as below;
    Go to Transaction Code SE38
    Enter program name RMMMINIT
    Execute or press F8 function button
    Enter your company code (From and To)
    Enter relevant date: Say 01/03/2008 for Mar. 2008 month to be opened as of now
    That means, user can post for the month of Feb 2008 as well as Mar. 2008
    Refer SAP Note No. 487381 for more details.
    As per SAP Notes 487381 ( If the periods are opened in advance in mmpv to again change it to current period the following process should be follow ), Go to Tcode MMPI, then go to menu bar and select system -> user profile->owndata.In that screen , under the parameters tab enter MMPI_READ_NOTE in Parameter ID field and enter, then under short description you will get Initialise period. Next Save.
    Again go to MMPI enter company code, period and year and execute.
    XXXXXXXXXXXXXXXXXX
    Other way of doing it is follow these steps( But try this method in Sand box Only):
    1. Go to OX18, and delete the plants assigned to your CO.Cd and save.
    2. Go to OMSY and change the posting period to the one u want and save.
    3.Go to OX18 and assign the plants you have deleted in step 1.and save.
    regards,
    indranil

  • How to change the posting date in UD stock posting for a HU managed item?

    Hi,
    We are using Handling Unit managed items with QM activation. For a specific HU managed material, we wanted to post the stock on a previous date. We have created PO on a back date and made GR also on a back date. Now the problem is, the system has generated an inspection lot. Now while trying to do UD and stock posting, I do not see the "Doc" tab which we normally see in UD stock posting for normal inspection lots (non-HU managed items) for changing the date.
    I don't see any other way to change the posting date for the HU managed item in UD stock posting. Anyone can help please?
    Thanks & Regards,
    Madhavan Krishnamoorthy.

    I don't think you can.
    Craig

  • How to change the current period in material master

    hi everybody,
    as i have installed sap 4.7 ides version on my home pc for practice , but hwenver i am creating the new material  master in the system , i observe that in accounting1 tab the current period is 12 2002 , how should i change the current posting period so that i can start the transaction in current uear 2009 and then later i can work in 2010 ....
    i have tried  the transaction mmrv, mmpv, mmpi through some resources but i didnt know how to do the settings in the system in IMG (SPRO) kindly help me through , i have wasted lot of time in this..
    i hope MM team will help me out of this...
    AMIT BATHLA

    Hi,
    Check in OMSY Transaction that, Which current month and year is having your comapny code.
    and go to T.Code MMPV
    enter Next Month of that cureent period and Year
    and Execute. You find the message that your current period has changed.
    Do the same process month by month till reaches to current period and year.
    Let me know if you have further queries.
    Padma.

  • How to change the posting date of confirmations?

    Hi,
    In my company CATA is scheduled as a background job and uses some ABAP logic to set the correct posting date for the confirmations that are transferred to the PS module. As a result of a wrong date entry in the table which is used in the ABAP logic, all the confirmations (8572) that should have had posting date in February got posting dates in March.
    As far as I can see some of the options are:
    - Use CN48N and cancel one and one confirmation
    - Manually add 8572 confirmations with the correct amount of time, employee number, periode, posting date etc.
    Due to the amount of confirmations this procedure will be very time consuming.
    My questions is what is the best procedure to correct the posting date for 8572 confirmations with wrong posting date?
    Regards,
    Petter Kvalvik

    hi
    write a LSMW or BDC to cancel the confirmation and correct it by another LSMW or BDC program for correct date.

  • Revert the posting period

    How to Revert the posting period? eg: if the posting period is dec 2007 how to change that to current month?

    HI,
    You need to initialise the posting period through MMPI todo that the following steps needs to follow
    1)once you close the period it will raise data inconsistency for that you need to miantain the MMPI_READ_NOTE with current date format in your User ID
    Then only system will allow to initialise
    Please check and let me know if you have any clarifications
    reward ponts if helpful
    Regards
    Damodhar

  • Problems with the posting period....

    Hi guys,
    every once in a while the old problem with the posting periods occurs. This morning it hit me and I went out to repair it.
    Starting out from MMRV I checked the open period and it said 062009.
    Using MMPV, by mistake, I opened 112009, so that I'm able to post to 112009 PLUS the previous period 102009 (which is ok so far). Later on I checked OB52 to see, if finance is not the problem. The opened period lasts from 012009 to 122009.
    Long story short: everything seems perfectly alright, however it still doesn't work. It says: Posting only possible in periods 2009/11 and 2009/10 in company code 1000
    I don't see where there could be a problem now...
    Any help is greatly appreciated!
    Thx & regards,
    Bobby

    Hi,
    It is possible to re-open a previously closed period. However, it is NOT advisable to do so because the valuation data of the previous period could be affected.
    In general, it is only safe to reopen a previously closed period when no material postings have been done after the period shifting to the new period.
    If there has already been postings after the period shifting to the new period, reverting the period back will cause database inconsistencies in the history tables.
    If you decide to proceed with this process, you can use the program RMMMINIT, but, please review the documentation of this program first!! and the check the SAP notes 487381 (for the error message that you are receiving) and the 369637 (for an explanation about the inconsistencies that will be generated.
    Steps are as below;
    Go to Transaction Code SE38
    Enter program name RMMMINIT
    Execute or press F8 function button
    Enter your company code (From and To)
    Enter relevant date: Say 01/10/2009 for Oct. 2009 month to be opened as of now
    That means, user can post for the month of sept 2009 as well as Oct. 2009
    Refer SAP Note No. 487381 for more details.
    As per SAP Notes 487381 ( If the periods are opened in advance in mmpv to again change it to current period the following process should be follow ), Go to Tcode MMPI, then go to menu bar and select system -> user profile->owndata.In that screen , under the parameters tab enter MMPI_READ_NOTE in Parameter ID field and enter, then under short description you will get Initialise period. Next Save.
    Again go to MMPI enter company code, period and year and execute.
    Other way of doing it is follow these steps: ( *TRY in Sandbox But do not try in PRODUCTION SYSTEM*)
    1. Use t.code: OX18, and delete the plants assigned to your CO.Cd and save.
    2. Use t.code: OMSY and change the posting period to the one u want and save.
    3.Go to OX18 and assign the plants you have deleted in step 1.and save.
    Regards,
    Biju K

  • How to change the field 'Current Planning Period' in xRPM portal?

    Hello All,
    In xRPM portal, under portfolio management --> financial planning, we have a field 'Current Planning Period'.
    Can anybody tell how to change the values of this field for all the projects/items at once?
    Also, when I am trying to change for individual projects. its opening the F4 help but not  selecting the date on which I double click.
    Thanks
    Niti.

    No, you cannot add another vPC peer-keepalive configuration.
    Taking down vPC peer-keepalive will not affect your vPC peer-link and vPC operation. It will be a problem if and only if vPC peer-link went down after the peer-keepalive is down first, this will cause dual active.
    Regards,
    jerry

Maybe you are looking for

  • Why JPEG - TIFF files in Bridge won´t open directly in Photoshop CC 2014?

    Since a couple of weeks ago, whenever I click a jpeg or tiff file in Bridge (last reinstalled in 17/08/14) it won't open directly in Photoshop CC 2014, but in Windows photo viewer.  Am I doing something wrong or is it Bridge's fault?

  • Links not displaying properly on mobile devices

    Hi All, I am having trouble with my website when viewing it on a mobile device (android, iphone). Everything displays well on the mobile devices except for links. Excluding menu items, everytime there is a link on the page, it creates a huge white sp

  • Message type ACPJMM error

    HI experts I'm getting a strange error while i try to post a goods receipt or goods issue. the message says receipients missing in Message type ACPJMM ( message B1003) The Idoc is passed through a ALE layer and the message is assigned with three rece

  • JECS value in sales order

    Hi all, I am creating a sales order. The condition type JECS in 100%, but it should be 2%. Kindly let me know how to configure it. I have maintained J1ID as suggested in other threads. But it is still 100%. Thank You

  • How do i uninstall Adobe reader XI

    I downloaded Adobe reader XI today and it messed up my Adobe Acrobat X.  I want to uninstall Adobe reader XI but it won't let me. How do I uninstall it.  I have Windows 7 home premium.