How to change the value of data supplier host parameter in PI7.1

Hi Frnds,
I want to change the data supplier host parameter to Hostname,when i checked in SLD Administration its pointing to local host,so i wnat to change it.
What is the procedure to change the value to host?? i am working on PI7.1 EHP1.
THANKS,
Raj

thanks

Similar Messages

  • How to change the schedule line date in SO with reference to value contract

    Hi SD Guru's,
    I need to change the schedule line date in the sales order with reference to the value contract by using some algorithm that i will write. The problem that i can't find the suitable place to add the algorithm. I can't add it to the Copy control because there is no schedule lines in value contract and copy control for schedule lines does no exist.
    I can not add to user exit MV45AFZZ  , because order that was created with reference to the value contract, does not go through this user exit.
    Do you have some ideas where i can add it?
    Thanks and Regards
    Viky
    Edited by: Viky Sloutsky on Oct 20, 2010 12:43 PM

    Hello Viky
    How about using program MV45AFZB- USEREXIT_CHECK_VBEP or USEREXIT_MOVE_FIELD_TO_VBEPKOM
    or program FV45EFZ1- USEREXIT_CHANGE_SALES_ORDER
    Does the program go through these exits when an order is created with ref to a value contract??
    Also I am wondering why you need to change a Schedule line determined by Availability check and/or delivery scheduling?

  • How to change the value of project data in the BPM instance?

    Hi Everybody,
    I have a situation that after the bpm instance was created. We found that one of the project data/variable contains the incorrection information. Is it a way we can change the value of that project data/variable? I checked the BPM workspace, as administrator, there are not function for it and we can't stop/withdraw the instance. Can we change the MDS database for it? Please advise. It is so important for us that will stop us to move on of our project.
    Thanks

    As per my knowledge we can not change the value of BPM project variables from outside BPM. If you look at PAPI API also you will find methods to get values from BPM but not to set to BPM.
    If this is daily issue for your application then change your design to add a Edit Data Activity (Screen) and then use Grab functionality to get the control to this Edit Data Activity to change the required data.
    Else if it is an issue with the only one instance then it is better to Abort this instance and re-create the instance with correct data. Changing value in the MDS database is not encouraged.
    Hope this helps.

  • How to Change the Value Field Type of a Value Field

    Hi,
    How can I change the value field type from Currency to Quantity of a value field? I have tried to do it in KEA6. I can change the value field and its description, but not the value field type from currency to qty. If I change this config, is there any other changes that I need to make so there is no side issue of this change?

    Hi Prem,
    Once you created value field as quantity or currency, you can not change this nature of value field. Based on this, system creates lots of data and tables. For this reason system will not allow any changes in quantity or currency.
    Alternative way is to remove the old value field and  create a new value field assign to operating concern and put all your seetings.
    Please let me know if you require any clarifications.
    Thank you,
    Regards,
    Santosh
    Reward points if helpful.

  • How to change the IDOC segment data

    How to change the segment data for all IDOCs at one shot J.
    For exmple E1EDK02-QUALF - 004
                       E1EDK02-RGID  -  100000008 (Inquiry No)
                   to
           E1EDK02-QUALF - 004
                       E1EDK02-RGID  -  200000005 (Quotation)
    Any hints, tips….Appreciate your help and more rewards.
    Regards,
    Cris

    Hi,
    You can change the IDOC values using the transaction WE09
    Give the IDOC number..
    Press F8..
    Expand the tree..
    Double click on the segment..
    Then in the menu..DATA RECORD -> DISPLAY/CHANGE..
    It will go in change mode..Change the IDOC value..
    Thanks,
    Naren

  • How to change the Value of a Varible while debugging in ECC 6.0

    Hi all,
    How can i change   and Save the Value of a varible while debugging a FM in ECC 6.0.
    I can able to change the Value of a variable by clicking the Pencil Icon (Change icon) which is there next to that value
    But i am not able to save that value
    Please give the suggestions
    Thanks in Advance
    Regards
    Ajay

    Ajay,
    I think you are changing more than one variable value at a time...this things generally happen in this case.
    Go step by step.....
    Press on the pencil button
    value filed becomes editable
    change the value
    and at once press the enter
    the ediatble field automatically becomes non editable, and hence retain the changed value.
    Pooja

  • How to change the value of a variable in new ABAP debugger.

    Hi Guys,
                 I can't change the value of a variable in the new ABAP debugger.. when I change its revert back to old value. but this is not the case with the old version. How to do this..
    Cheers
    Senthil

    Hi,
    1. Dobule click in the variable in the variable tab.
    2. Click the Change icon in Detail.Dis.
    3. enter the new value and press enter
    Refer
    [http://www.sapdb.info/new-abap-debugger/|http://www.sapdb.info/new-abap-debugger/]
    [http://help.sap.com/saphelp_nw70/helpdata/en/84/1f624f4505144199e3d570cf7a9225/content.htm|http://help.sap.com/saphelp_nw70/helpdata/en/84/1f624f4505144199e3d570cf7a9225/content.htm]
    <removed_by_moderator_together_with_points>
    Regards,
    SB
    Edited by: Julius Bussche on Jun 24, 2008 8:21 AM

  • How to change the value of Valuation class.

    dear friends:
    i want to change the value of Valuation class in the material master .but system  warning info occurs .
    The valuation class cannot be changed
    Message no. M3 368
    Diagnosis
    You wanted to change the valuation class. However, this is not possible because one or more of the following already exist for the material:
    Valuated stocks in the current period or in the previous period
    Open purchase orders or delivery schedule lines
    Production orders for which a goods movement has already taken place
    System Response
    Your change is reset by the system.
    Procedure
    If valuated stocks already exist, you can change the valuation class only as follows:
    a) Post the stocks of the material to an interim account.
    b) Change the valuation class in the material master record.
    c) Post the stocks of the material back to their original account.
    If open purchase orders already exist, you can only change the valuation class if you first flag the corresponding purchase order items for deletion.
    If production orders exist for which a goods movement has already taken place, you can only change the valuation class if you first set the status of the production orders to Deleted.
    Procedure for System Administration
    In Customizing for the Material Master, you can switch the check for open purchase orders and/or for production orders to a warning. You do this in Define Attributes of System Messages by assigning the message type Warning to message MM 326 and/or MM 327 respectively. However, first ensure organizationally that further processing of the open purchase orders or production orders cannot result in inconsistencies.

    To resolve SAP error message M3 368 I would suggest that you refer to SAP note number 1967543. This note outlines the issue and a resolution to it:
    Please have a look at the description of the error M3 368. This error may occur if one or more of the following already exist for the material:
    1. Valuated stocks in the current period or in the previous period
    2. Open purchase orders or delivery schedule lines
    3. Production orders for which a goods movement has already taken place
    Resolution:
    If you have valuated stocks in the current period or in the previous period, you will get message "Stocks already exist.". You have to clear all the stocks both in current period and previous period. Please have a look at SAP Note 30656, it shows an example on how to clear the stocks in
    previous period. You can use transaction MIGO to execute this step.
    If you have open purchase orders or delivery schedule lines, you will get message "Purchase orders already exist.". You can find related purchase orders after you click 'Display Error' button. Please delete them in transaction ME22N.
    If you have production orders for which a goods movement has already taken place, you will get message "Production orders already exist.". Please archive these production orders. You need to set deletion flag for these orders firstly and go to SARA, use archiving object PP_ORDER to archive
    these orders.
    Kind regards,
    James

  • How to change the value of Label in runtime

    Hi All,
    I want to change the value of the Label in runtime. Is it possible to change? If so then can you please let me know how to do it?
    Regards,
    Raghu

    Hi Ram,
    Check the below thread
    Dialog program - label problem
    The above thread has been updated just couple of hours ago only
    if it is Standard Screen then try using SHD0 Tcode , but this donot dynamically change the Field labels
    for more info go through Transaction Variants might be helpful,
    This demands Field Exits to be implemented
    Cheerz
    Ram

  • How to change the value of  COMPANY_NAME in "Subject:%COMPANY_NAME% Welcome to SAP Sourcing

    Hi All,
    Can some tell me How will I change the value of COMPANY_NAME which will reflect in subject of Final mail.
    For more clear picture the subjectis"
    Subject:%COMPANY_NAME% Welcome to SAP Sourcing .
    The change vlaue of COMPANY_NAME should refleat in final subject of the mail.
    Please help me in urgent.
    Thanks
    peeyush ranjan

    Hello Peeyush,
    Because I am unaware of your exact config, I'll try to provide a generic answer:
    1. Go to Setup -> Mail Configurations
    2. Identify the Mail Configuration for the Company you want to change
    3. Click on the highlighted Company link
    4. Change the highlighted Name:
    Regards,
    Bogdan

  • How to change the value from one input control to another input control?

    Hi Experts,
    I want to change the value from  one input control to another input control. For Example if i change month in first tab. it should reflect in second tab also. How should we acheive through input control or some other option.
    Here I attached screen shot.Please help me for this

    Hi,
    It is not possible to have Input controll in all tabs that will be set from another .
    But There is one workaround .
    Follow the link below .
    http://davidlai101.com/blog/2013/08/13/web-intelligence-input-control-that-affects-all-tabs/

  • How to change the value

    Respected,
              I want to change the value of a order which is predefined,how it is done reply with the procedure .

    HI
    my question is very simple if you make an order{va01} for material A it picks the value x in amount column. From where did this value comes from ,where it is stored,what is the transaction code.
    IF my assumption is correct like your asking about the value / Amount of that particular condition Type
    suppose Material is X and maintained the Condition Record (VK11) with your combination
    at the time of Sale Order if you enter the Material with Qty system will take automatically what you maintained in Condition Record
    rate as a amount whether is Price / Discount & Surcharge/ VAT
    if you want to change that value try to check the Corresponding Condition type (T-Code :V/06) select that Condition type and TICK the Amount /Percentage Field 
    At the time of SO system will pick the Pricing Procedure based on the Sales Area + Doc.pricing procedure for Sales Doc.Type + Customer pricing procedure
    if you want to know the table and field name put the Cursor on amount col mum and press F1 or otherwise check in the VBAK, VBAP
    if i am wrong clarify
    Regards,
    Prasanna
    Edited by: prasanna_sap on Sep 13, 2011 1:00 PM

  • How to change the "content created" date/time in FCPX?

    Since I've had problems importing my whole iMovie event library into FCPX I decided to run some tests with importing individual files (part of iMovie events and originally imported from camera into iMovie). Some of them for some reason got the wrong "content created" date/time in them while in iMovie they have the right date/time set. Does anybody have an idea on how to change the "content created" timestamp?

    I had a bunch of DV files that imported stamped with the file modification date and time.  I did not find a way to change it in FCPX. With FCPX not running, I used A Better Finder Attributes to modify the creation and modification dates of the files in the event folder. FCPX reconnected to them but the event still showed the old range of dates so I created a new event and moved the clips to it. Maybe ther is a beter way but that is how I did it.

  • How to change the values of Map Region Column "REGION_NAME"

    Hi guys,
    To correspond with the values in my "CITY" column, I have to change the values of Region_name column in the map..
    region_name column contains the name of the territories in English
    but City column in my table contains the names of the territories in Arabic.
    To enable the link of the map, the values of both column ( CITY in my table, REGION_NAME in the map region ) should be identical.
    How can I change the values of REGION_NAME COLUMN ???
    This is the first time for me I deal with maps, and I hope my question is clear..
    Regards,
    Fateh

    Solved by using the following code
    var particulars = this.parent.COURSENAME.resolveNode("#items"); 
    this will bring the dropdown list into the variable particulars
    then
    for (var i = 1; i < particulars.nodes.length; i++)
    p = particulars.nodes.item(i);
    here p.value will have the dropdown line by line;
    add your valdiations etc

  • How to change the value of a two dimensional vector

    hi,
    I have a two dimensional array, Vector<Vector> myData, which contains strings. It's size is 5 rows and 6 columns
    I would like to change the value of, say, row 3, colum 5 from whatever it contains now to "new data"? I have searched and searched, but no luck
    thanks

    micheleg wrote:
    hi,
    I have a two dimensional array, Vector<Vector> myData, which contains strings. It's size is 5 rows and 6 columns
    I would like to change the value of, say, row 3, colum 5 from whatever it contains now to "new data"? I have searched and searched, but no luck
    thanksFirst off, you do not have an array of any dimension.You have a Vector that contains Vectors that contain Objects (you should provide a more specific type in your declaration).
    To change the element at position x in the y'th Vector, get the y'th Vector and change the x'th element in said Vector.
    As a side note, you should be using ArrayList instead of Vector these days.

Maybe you are looking for

  • Error while generating objects in SMOGTOTAL

    Hai All, I tried to generate the industry specific objects in CRM through the transaction SMOGTOTAL. But when I check the status in SMWP, I found some of the objects were in errror status under replication objects per Industry and Publication objects

  • I am accessing iCloud from my Mac and want to know where I find my iMessages in my Mac.  Thank you!

    I am accessing iCloud from my Mac and want to know where to find my iMessages within iCloud.  Can anyone help me out with this?  Thank you so much!

  • Z-Reports

    Hi Experts, I would like to understand about Z Reporting.  Please explalin, if its the job of FI consultant to prepare Z reports through Report Painter or is that an ABAP person who does this. sonica

  • Deleted account - lost emails

    I deleted an email account as the email address no longer exists and Mail was trying to send and receive (and failing so showing an error all the time). It's lost all emails too that were saved. No doubt they're still on the hard drive somewhere - ho

  • HELP! I can't install OSX Mavericks on MacBook Air

    Help! I just download and install OSX Mavericks on MacBook Air (2012), its already downloaded and installed but when booted, the wheels machine on the screen keep running. its even more an hour and i restarded it for severel times. but still not work