How to change validity from.. to dates in cost centre(production) ?
Dear All,
We have created cost centre(production) on current dates ? Due to this,
We were unable to maintain activity price for work centre.
Message is telling us to maintain activity price for current fiscal year.
How to change validity from date in production cost centre(KS02) ?
Appreciate valuable inputs.
Jeyakanthan
Dear ,
1.Go to Transaction Code KS02 - change cost center and in the next screen go to Menu bar > Edit > Analysis Period.This will pop up another window - in this you can change the analyis period and save it.
2.Or Use the tcode OKEON from the hierrachy choose the cost center in the basic data tab u will see one button named Validity period.Change the validity there.
3.You can do it using 'KSH2' transaction.Open the hirarchy and select your cost center. now select the business area and new hirarchy node where you want to move it. and click on 'INSERT AT LOWER LEVEL' to move the cost center from one business area to another.
Try and check
regards
JH
Similar Messages
-
How to change validity period of cost centre or activity type
Hi
How to change validity period for an Activity type or Cost centre?
Can we change the validity period once created?
regards
PrakashPlease note this can be done.
Go to Edit Cost Center
Goto Edit, Analysis Period.
Create a new validity period say today until 3112999
Change the data you want and save.
When you go into the CC again it will show two validity periods. -
How to change validity in info record
dear experts ,
how to change validity in info record
Srithar KHI,
Tocode - ME12
Enter Vendor code and Material and press enter button.
After you can change the Validy on Date.
Regards,
PK. -
How to change it if some data is wrong in ODS and infocube
hi all:
could you please tell me how to change it if some data is wrong in ODS and infocube ?
Best regardsYou receive information on all requests that have run in the InfoCube and you can delete requests if required.
http://help.sap.com/saphelp_nw04s/helpdata/en/d4/aa6437469e4f0ae10000009b38f8cf/frameset.htm
Request ID you can find in administration of the InfoCube. If a cubes is compressed you can't delete requestwise...
Regards
Andreas -
Podcast how to change speed from 1.5x to 1x speed without having to go through 2x, 3x etc?
Whereas I need to be
able to go from disc 1/track 1 to disc 1/track 2,
instead the iPod goes from disc 1/track 1 to disc
2/track 1.
Right click on any of these files and do a Get Info. Notice that there is, in fact, a Disc number field. So you can make disc numbers 1/10, 2/10 and so on.
iTunes and the iPod are both smart enough to recognize that there are disc numbers there and act correctly. So it'll start with Disc 1, play all that disc, then go to Disc 2, and so forth. It's just a matter of having correct disc number tags.
You can tag disc numbers for a whole disc at once. Simply select all the songs in a single disc (hold SHIFT or CTRL while selecting the songs), right click, Get Info, and you get the mass tag editor screen. Add the disc number info for this disc, and it'll tag that info to all those songs. Repeat for each disc. -
I am trying to airprint a brochure from my iPad from the Pages app. I need it to be landscape but I cannot find how to change it from portrait to landscape. Can anyone help me with this?
I think you have to sign into your Amazon Kindle Account, find the book in your archive and delete it there. Otherwise you can delete it from the device and leave it in the archive, should you want to look at it again.
-
How to Change programlanguage from danish to english - in Creative Cloud single-app membership
I would like to know how to change programlanguage from danish to english - in Creative Cloud single-app membership Photoshop (one year)?
See this document: http://helpx.adobe.com/creative-cloud/kb/change-installed-language.html
-
How to change direction from right/left to left/right in a clip
How to change direction from right/left to left/right in a clip with final cut pro x
Use the Flipped effect.
-
Please could someone tell me how to change stores from Canada to the U.k store
Please could someone tell me how to change stores from the Canadian store to the U.K Apple store on my I pod touch ?
Settings > iTunes & App Stores > tap your Apple ID: > View Apple ID > Country/Region
If you find that it is set to the correct region, log out of your iTunes Store account, restart your iPhone, and sign into your account again.
Note that you will need an account in the UK iTunes Store to use it.
Regards. -
Download of the master data of cost centres
Hi Friends,
How to download the master data of cost centres from
SAP where these cost centres are not on the accrual generator.
Could you please let me know the procedure.
Regards,
KHi Krishna,
You can take download of following two tabels.
CSKS & CSKT
Regards,
Abhijit -
How to change Valid to date in BOM
Hi Sap experts
I have two questions:
1. How to change the valid to date in BOM for either header or component material.
2. If the answer of the above question is NO, then from where the system takes the value for valid to date in BOM. If its default, then where that default date is actually set in?
Thanks & Regards
Akhtar ShaikhDear Akhtar,
If ECM is not activated then deflaut systems takes Valid to-date as 31-12-9999
It is inbuilt in program designed by SAP
Valid from date will be the date which you are creating BOM
If ECM is activated then you can go with required dates ( with change numbers )
Check this link in which you can find Mr. Mangalraj and experts Replies
[ECM|Re: BOM valid to date]
Regards
Madhu -
How to get valid from date in KONH Table
Hi ,
I am sending COND_A idoc for MRP. Now when I create a record using VK11,the valid from date is fine.
But while changing the same using VK12 changed date does not reflect in KONH Table (when the new valid from date is greater the the previous one) .I understand the SAP Logic behind this from previous threads .
But my issue is this :
Suppose I have a Material X created with Valid from = 10.01.2011 & valid to = 31.12.9999
Now I change this Valid from = 28.01.2011 & valid to = 31.01.2011.
Now how can I send the data for 28.01.2011 in my I-doc , as KONH still has 10.01.2011 as valid from date.even if you send the data for 28.01.2011, it should pick up the condition record because the start date for condition record is in past? why do you think it is a problem? now if your concern is that if your input date is 27.01.2011 and it should not pick this condition (that is a different matter altogether)...
-
Business partner change Valid From Date field
How can I change the Valid From Date field in tables:
BUT000
BUT020
BUT0BK
BUT100
Currently the of date of creation of the business partner is in this tables' Valid From field.
In transaction BP the Address of the Business Partner is valid from 01.01.1990 but still I get a warning that the business partner is not valid for date 01.11.2011.Sounds like the problem is the valid to date. What is that date set to?
-
Changing valid from Date in MDG Finance
Hi,
We have a valid edition say E1 that has the validity of 08.08.2014 to 31.12.9999. We have assigned few master data objects (Cost centers, profit centers etc) into this edition. Now we have to change only the Valid from date (say to 10.10.2014) of few cost centers that are part of the edition E1. How do we achieve this? I tried creating a new edition say E2 that has the validity of 10.10.2014 and tried including into it. However I see even after including the cost centre into the new Edition E2 the cost centre still shows as having validitity E1.
Please help.
Regards,
Ponraj MHi ponraj
You can change here as per sceeen snap ( Available in MDG 7.0 and future versions) -
Component - Change valid from date
Hi Experts,
I am using function module CRM_IBASE_COMP_CHANGE to change the component data. I am able to make all the required changes in the component except valid from date. Even though I am specifying it in VALFR of the structure IBAP_COMP3
Can you suggest me how do I change the valid from date of the component.
Regards,
AbdullahHi Abdullah,
Valid-from date cannot be modified. If you go to IBase Display or if you create a new IBase with one Component, then you can observe there, that Valid-from date is only a Display field which takes current date by default (during creation) and not an input field. Hence i think you cannot modify.
Thanks,
sksingh
Maybe you are looking for
-
DBDatasource Date Value to Datetime
Hi, I get a string representation of a date field using DBDataSource.GetValue("U_Date",0) I get for example: "20070503" What type of format is this? What is the simplest way to convert this to a standard DateTime variable? .Ben
-
Making a 100mm x 150mm postcard
Hi folks I have been struggling with this for three hours now and wonder if anyone can please help me? I have designed a postcard which MUST be exactly 100mm x 150mm. This is being professionally printed mail-order in a batch of 60, so I don't get an
-
Logic Express 8 with MBox 2 Pro
Anyone succesfully using this combination? I am so sick of ProTools. pbc
-
we found a broken symbolic link /platform/sun4u/kernel/drv/sparv9/disk_ata this is on a V440, Solaris 9 would like to ask, any issue if we remove this link, think it should not be a problem, but this is a live server. Thanks!
-
I'm planning on buying a new ipod reletivel soon, but i need to know if the new one will be coming out soon. please help.