How to check transport in Production environment

Hi,
I did some standard configuration as OBYA (Intercompany automatic Posting clearing account) in development Box and get it transported to Production.
I have to verify that the configuration I have done has been transported to Production Environment.
Where should I check? I don't have access to SE16 in Production.
Quick response will be appreciated.
Thanks & Regards.

hi Mehak,
go to transaction SE01 (either in development/customizing or in production system), in the first tabstrip enter the transport number and click on Log (2nd Pushbutton). This will display the Transport Log, and you can see if there were no errors during import into Production System, then your changes are there.
hope this helps
ec

Similar Messages

  • How to manage connections in production environment

    Hai
    We are using Statless Session beans which will call bean managed entity beans
    as a developer we completed the first phase of our project successful but when
    comming to the production environment they(Higher authoritites of the company)
    are asking abt the connection pools. Suppose if my wlserver5.1 has 100 hits per
    a second how many connection pools i need to put in the production envirornment
    and also is it the right way to increase the connectionpools depends upon the
    clients hits????. Can anybody help me regarding this It is very urgent for us.
    Thanks in advance
    Cheers Kiran Nallam

    Hi,
    It all depends on your infrastructure and what products you are using.
    In most cases dev/prod are on different servers and are separate installs, this is the route I would promote.
    Some clients do share an environment for dev/test but not all, not everybody is the same.
    Cheers
    John
    http://john-goodwin.blogspot.com/

  • How to manage Development/Tset/Production Environment in Planning

    Hi Gurus,
    I wanted to know what is the best method to manage these 3 environment in Planning.
    Does it require to install seperate installation on seperate servers or we can use one installation of planning, RDBMS and essbase.
    or
    it require some other technique.
    Please advise me, though i know it is simple question but small hint will be a great help.
    Thanks
    Kumar

    Hi,
    It all depends on your infrastructure and what products you are using.
    In most cases dev/prod are on different servers and are separate installs, this is the route I would promote.
    Some clients do share an environment for dev/test but not all, not everybody is the same.
    Cheers
    John
    http://john-goodwin.blogspot.com/

  • How to check module abbreviations and whether they are installed or not ?

    Hi All -
    There was a question raised , that is self service parts planning module available/installed/registered in our current EBS or not ? How to check whether self service parts planning module is installed or available or not ?
    Also i would like to check all the modules which are currently installed and can be used ?
    Regards,

    Our question says , we do not know the code for Self Service Parts Planning Module . How to check particularly these product is installed or not ?
    from the link given , it describes that for self service parts planning code is "SPP" . Can you please confirm ?It is part of "Advanced Supply Chain Planning (ASCP)", so run the query in (How to Find Out Product Installation Information in Oracle Applications? [ID 1275690.1]) and pass the module name.
    Similary can we get the product codes for all shared products, installed products and non-installed products. The doc referenced above in this reply will list all the module names, with the product codes and the status.
    What does shared products actually mean ?Patching Shared Oracle E-Business Suite Products [ID 1069099.1]
    Thanks,
    Hussein

  • Custom table entries transportable / maintainable in production environment

    Hi,
    I have a custom table with table maintenance generator (automatic transport of table entries). I would also like to maintain the table entires in the production environment (i.e. using SM30 transaction, rather than transporting the entries from Quality). I hope there is a cofiguration to do this.
    Could any one help me on this.
    Thanks in advance.

    Adding to what others have suggested, it is not advisable to give SM30 access to your users. Its better to create a parameter transaction for the maintainance dialog and give the user access to that transaction. Other way of restricting the access is using authorization group selection while creation of maintainance dialog (&NC& will give access to every one). Check the below link to see how to create a parameter transaction for sm30.
    [Parameter transaction for sm30|http://www.divulgesap.com/blog.php?p=MTg=]
    Cheers,
    Ravikiran

  • How to download run time ABAP dump in production environment

    Hello,
    I am getting run time ABAP dump in production environment. Please guide me onHow to download run time ABAP dump in production environment?
    Also, please tell me how best can analyze that dump. Like there are tools like gdb, purify etc. to analyze problems in other languages.
    Regards,
    Sameer.

    Hi,
    Go to ST22, and Double click on the error line, It will show you the detailed analysis.
    See the section How to correct the error for details on error correction and the instructions to download the log( you can download in the format you want - HTML would be a nice option).
    And there are no tools to analyze errors but ST22 has a large data regarding the location of the error, the reason and the source code which caused. So you need to use the debugger to reproduce the error and check the source code,
    Regards
    Karthik D

  • How to Checked The Object Not Locked by Others in Transport

    Hi all,
    I have problem in transporting workbook to production, the question is:
    a. How to Solve Object that is locked by other transport requests
    b. How to Check Object Not Locked by Others Request before doing transport.
    Thanks in advance
    supriatna

    Hi Supriatna,
    In the same screen where you have been 'Search for Objects in Requests/Tasks' place your cursor in one of the empty fields (the second column, eg. PROG) and look up for XLWB. You have increase the number of displayed entries in the look up screen to atleast 1000 to find the R3TR XLWB entry (Excel workbook entry).
    Hope this helps.
    Thanks

  • How to port database changes from development to a production environment

    How do I port database changes from the development to the production environment?
    I am using v8 and have always had to redo everything using the schema manager all over in the production environment. Is there an easy way to generate a script, for example to dump the database changes on the development machine to be executed later on the production machine?

    This should already be a clearly defined change control process. Once a procedure, function, package, trigger, or whatever completes the testing rounds, it should be promoted to production.
    Forgive me if it seems I'm trivializing, but I don't see the problem, just copy the object(s) from your software library (or development) into production using whatever tool works best or has been chosen. If you are doing data copies then you have various options again including good old export/import.

  • How to check whether transport path exist between two systems in sld??

    Hi,
         I have two systems namely 'A' and 'B' and created business systems for both of them.Then i created transport path between the two systems.How i check whether what i have done is right in SLD.

    <b>WRT to CMS</b>
    am not sure with this but u can try:
    1. Start CMS: http://<host>:<J2EE Engine http port>/webdynpro/dispatcher/sap.com/tcSLCMS~WebUI/Cms.
    2. Goto lansdscape configurator and check there
    Message was edited by:
            Prabhu  S

  • How to delete ABAP program of production environment

    Dear Experts,
    I have to delete a Z program, exists in production environment. But the program does not exist in development environment. Is this possible to delete the program using transport request? or other ways to delete the program in production environment.
    Thanks in advance.
    Tanay

    Hi Tanay,
    If you have access tcode SE80 in Production system, you can delete it.
    Srivijay

  • Installed Photoshop Elements 13.  Upon activation, get through sign in screen, but when doing serial number validation, validate goes round but does not validate.  Connect Later is only way out of screen.  How do I validate.  Checked account but product n

    How do one validate Photoshop 13. (Windows 8) Upon activation, get through to sign in screen, but when doing serial number validation, validate goes round but does not validate.  Connect Later is only way out of screen.  Checked account but product not listed.  Installed with serial number that was sent  by Adobe.  Have attempted numerous times at different times of the day.  On-line connection working.

    Have you bothered to do any research at all? Not every app was upgrade to 5.5. Those that weren’t will next be upgraded to CS6.
    Bob

  • How can i check my iphone production details by any site?

    how can i check my iphone production details by any site?

    Exactly what do you mean by production details...manufacturing, hardware?
    Try http://www.everymac.com
    They have listings for just about eveything made by Apple.

  • How to check whether the system has eclipse environment: urgent

    Hi gurus
    can you please tell me how to check whether my crm system has eclipse envirionment.
    Thanks
    shashi

    There is no way to check whether a system is used productively or not, I believe what you mean is checking a client is productive or not in an ABAP-stack based system. Remember although a SAP ABAP system is identified by a SID but from a business perspective the system is recognized by a client, as it is a unique business identity.
    Thus, to check whether the client is productive or not in txn SCC4 check the role of the client, it will show you the correct status. The data of SCC4 is stored in table T000, you can also opt to check that.
    - Regards, Dibya

  • How to use connection pools in production environment

    Hai
    We are using Statless Session beans which will call bean managed entity beans
    as a developer we completed the first phase of our project successful but when
    comming to the production environment they(Higher authoritites of the company)
    are asking abt the connection pools. Suppose if my wlserver5.1 has 100 hits per
    a second how many connection pools i need to put in the production envirornment
    and also is it the right way to increase the connectionpools depends upon the
    clients hits????. Can anybody help me regarding this It is very urgent for us.
    Cheers Kiran Nallam

    Hi Aravind,
    It can be used only for calculation kinda "minimum size".
    Nothing can prevent a developer from writing something
    like this:
    Connection con1 = ds.getConnection();
    Connection con2 = ds.getConnection();
    Connection con3 = ds.getConnection();
    Regards,
    Slava Imeshev
    "Aravind Krishnasamy" <[email protected]> wrote in message news:3bfa85f6
    You can fix the size of the weblogic connection pool depending on yourexecute
    thread count value. For example the default value of execute thread countvalue
    is 15. So at a given point of time you cannot use more then 15 databaseconnection.
    Database connection pool size should be equal to or less then the size ofexecute
    thread count
    "Slava Imeshev" <[email protected]> wrote:
    Hi Kiran,
    It's hard to provide exact dependence between number of hits
    and actual number of consumed connections because it's a highly
    variable distributed environment. But the general approach is
    simple - before rolling out your application, make sure you
    tested it under simulated peak load. Your connection pool should
    have enough connections to serve peak load. Without such a testing
    you will never know whether your app scales or not.
    Regards,
    Slava Imeshev
    "Kiran" <[email protected]> wrote in message
    news:3bf9d676$[email protected]..
    Hai
    We are using Statless Session beans which will call bean managed entitybeans
    as a developer we completed the first phase of our project successfulbut
    when
    comming to the production environment they(Higher authoritites of thecompany)
    are asking abt the connection pools. Suppose if my wlserver5.1 has100
    hits per
    a second how many connection pools i need to put in the productionenvirornment
    and also is it the right way to increase the connectionpools dependsupon
    the
    clients hits????. Can anybody help me regarding this It is very urgentfor
    us.
    Cheers Kiran Nallam

  • How To Check Oracle Product Version (Ora 11g)

    Hello!
    I want to check my Oracle 11g product version (Standard or Enterprice, etc...).
    I use this query:
    select * from product_component_version
    Result:
    NLSRTL      11.2.0.1.0     Production
    Oracle Database 11g      11.2.0.1.0     64bit Production
    PL/SQL      11.2.0.1.0     Production
    TNS for 64-bit Windows:      11.2.0.1.0     Production
    How to check product version? (Standard or Enterprice, etc...)

    Try
    SQL> select * from v$version;
    BANNER
    Oracle Database 10g Express Edition Release 10.2.0.1.0 - Product
    PL/SQL Release 10.2.0.1.0 - Production
    CORE 10.2.0.1.0 Production
    TNS for 32-bit Windows: Version 10.2.0.1.0 - Production
    NLSRTL Version 10.2.0.1.0 - Production
    SQL>
    Marcello

Maybe you are looking for

  • RAZERBACK MOUSE COMPATIBLE WITH MAC???

    any info on this subject would be nice. i want to get one for my macbook. TY.

  • Message change for duplicate EAN

    my client don't want to alllow duplicate EAN, I came to know that using message type control we can change the present status of warning to error. plz suggest the process flow where can i make changes for message number M3348 from warning to error. I

  • Close a JFrame from a button?

    How do I close a JFrame using a JButton to trigger the event? I want to dispose of the frame. thanks

  • Install JCRM

    Hello Guys; I have a CRM Server as ABAP and i need to install the JCRM (E-Commerce). Have i install a netweaver for JAVA? or Have I a java add-in to CRM Server? is it necesary to install a j2ee standalone? This instalation is for Development, but in

  • SMP 2.3 with xcode

    i finished SMP 2.3 hybrid application and implemented to  XCode . now i finished the first steps that means i created the hwc container on xcode. now i added my application it give some error .