How to consider production capacity plan on sales order's delivery date.

HI experts,
How to consider production capacity  on sales order's delivery date.
Say for example :
Production workcenter capacity to produce the XYZ material 10qty in a Day.
today i have created the sales order XYZ materail qty of 100. lead days has give based of MMR 21 days 17-07-2010( 3 sundays)
and in same day i have created other sales order XYZ material qty 5000 ,the lead days again it will came 17-07-2010.
Now my client requiremnt is when the schedule days is confirming in the sale order it sholud also consider the production capacity planning also
Even though my work centers are overloaded it is confirming the sales order on 17-07-2010 (based on leads days in MMR)
Thanks in Advance..
Sudha

Sudha,
Tell your client he needs to install SCM.  Here, you can use either CTP or MLATP to confirm orders based on production capacity.
There are a couple of standard workarounds available in R/3. 
One is to create a constrained forecast for planning materials, consistant with capacity, convert the forecast to PIRs, and then perform ATP against 'Planning' rather than against product, using MRP Strategy 63.
http://help.sap.com/saphelp_erp60_sp/helpdata/en/a2/4e799a927d11d1800f00c04fadcb73/frameset.htm
Another method is to leave the Sales orders unconfirmed at original order entry (eg, no lead time).  Run MRP, run capacity levelling, firm the levelled planned orders, and then run BOP (called 'rescheduling' in R/3) against the unconfirmed backlog, with an ATP that considers firmed planned orders as supply elements.  The sales orders will confirm against the planned orders, which are scheduled according to available capacity.
Either of these two methods will work, but the CTP SCM solution is by far the better answer.  Downside of SCM solution in general is the substantial implementation effort required.
Rgds,
DB49

Similar Messages

  • Load a sales order with delivery date in the past

    Hi,
    We want to load in the system a sales order with delivery date in the past, and maintain the schedule delivery date in the past. To do that, in the customizing Sales And Distribution / Basic Functions / Delivery Scheduling and Transportation Scheduling / Define Scheduling By Sales Document Type, I selected the flag Blackwards. But the problem is that the rest of the dates in the scredule line: goods issue date, loading date, material avail.date and transportation Plan Date, are in blank and you cannot enter any data because the system deletes it.
    How can I have these dates informed with dates in the past?
    Thanks in advance,

    You can control this using the "Message Control" in the SAP IMG.
    Supplier Relationship Management>SRM Server>Cross-Application Basic Settings>Message Control>Influence Message Control
    Using this you convert Error to Warning or even swith off this message.
    Please refer this thread for complete steps:
    Re: How to change an error message to a warning message in SRM
    Note: you need to suppress the messages relevant to your case here.
    Regards
    Kathirvel

  • Sales Order : Calcul delivery date with only working days

    HI,
    When I create sale order, the delivery date is calculed with the number of days mentionned in type of sale document. SAP add this number of days into the day's date.
    Is it possible to calculate this delivery date only with working days in the corporate calendar ???
    Thank's

    HI
    Delivery date in the Sales order will be calculated the calender only basedon the Transportation lead time and Pick/Pack time and excluding the holidays
    Please cross the same in your instance
    Regards,
    Ram.

  • Abap Report including sales orders and delivery data.

    Hi Experts,
    I Want to develop a new abap report which would contain the data for sales orders and delivery.
    I want to fetch all the sales orders based on the ship date (LIKP-WADAT_IST) of the delievry.
    Could anyone please let me know how to fetch teh data or is their any function module which would help me to solve my problem.
    <Removed by moderator>
    Thanks,
    Komal.
    Moderator message : Spec dumping not allowed. Thread locked.
    Edited by: Vinod Kumar on Aug 10, 2011 1:25 PM

    post this in ABAP forum for quicker response.
    Regards
    Raja

  • How to change the pricing rate of Sales Order after delivery is created?

    Is it possible to update(change) the pricing rate which belong to a specific condition type, of the "Sales Orders"  after corresponding delivery is created ?
    number of the Sales Order to be changed is huge. How can I handle this situation ?
    immediate replies would be rewarded

    Repricing is only possible if your pricing record has a valid from date that is equal to or before the pricing date on the order. Otherwise, your pricing rate change will be applicable only from the begin date of that record.
    Assuming that it is allowed by config, you can go to VA02, go to conditions, and then there is small button at the bottom, that says 'Update'. By pressing that, your system will automatically reprice the sales order, provided, as I said, all pre-conditions are met. Once you know that you can do this, then you can adopt any of the technical solutions that Rich had suggested above to do the mass changes.

  • Sales Order- scheduling delivery date for Procurment type F

    Hi Expert,
    In material Master , in MRP 2 View mailtained data as  1. Procurment type- F, Plant Storage Loc- 1140, In-House Production- 21 days, GR - Processing time-1 days. But while creating sales order for this material it shows only one day difference in sheduling delivery date.
                         Thanks in advance.
    Manoj

    Hello
    Procurement type F is for external production indicator
    If you want to see a change in schedule accordingly, then maintain Planned Deliv. Time.
    As per SAP, Planned Delivery Time in Days is Number of calendar days needed to obtain the material or service if it is procured externally. If you have different vendors for a material, you must specify an average value. The same applies if you order the material from a fixed vendor that has varying delivery times.
    Or in sales doc type, maintain Lead time in days, this specify the number of days after the current date that the proposal for the requested delivery date in the sales document should be.
    FYI - GR Processing Time, Goods Receipt Processing Time in Days is number of workdays required after receiving the material for inspection and placement into storage.
    Thanks & Regards
    JP

  • Sales order Request delivery date map with PO delivery date

    Hi
    I have an requirement. While run the MRP to create PR from Sales order.
    We need take the delivery date in the sales order to PO delivery date. How to configure
    Pl advice
    Regards,
    Kumar

    Check with your SD/LE functional specialist on whether this can be configured.  Alternatively, you might insert a specific future date and update when the delivery date is known...Generally, however, one expects that someone wanting to buy something from us has a delivery date in mind...whether we agree to that date or can promise to deliver on that date is a different matter....

  • AFS Sales Order Requested Delivery Date

    Dear all,
    The Requested Delivery Date in sales order usually default as current date, however, when I create sales order in AFS, the Requested Delivery Date is blank. I have also tested the same order type with different sales org., the Requested Delivery Date can be default as current date.
    I wonder why the Requested Delivery Date is blank, and how to set.
    Please kindly help~
    Thank you very much.

    Hi
    Then create a BDC with the help of ABAPER for the t code VA02
    or use the below bapi and include in the program and do as per the business requirement
    BAPI_SALESORDER_CHANGE
    Regards
    Damu

  • Sales Order "Required Delivery Date" Mandatory Field

    Hi all,
    We want to create sales orders with blank required delivery date field. We will fill this field in future time cause of our processes. But it is a mandatory field when creating order.
    Can we implement this as above not a mandatory field and will it have negative effects to the system ?
    Thanks,

    Check with your SD/LE functional specialist on whether this can be configured.  Alternatively, you might insert a specific future date and update when the delivery date is known...Generally, however, one expects that someone wanting to buy something from us has a delivery date in mind...whether we agree to that date or can promise to deliver on that date is a different matter....

  • Delivery date does not match sales orders  proposed delivery date

    when i create sales order the requested delivery date by default is todays date and if nobody changes it, it will stay the same even after i save the order but the acutal delivery date is diffrent in the sales document or delivery document
    can anyone please throw some light on it
    Thanks in advance

    Hi Raj,
    Req D Date is the date on which teh custoemr wants the goods to be delivered. But it wont be possible always. So there will be an availability check on the stock of that material and based on the availability and transportation lead times, the possible delivery date will be determined and populated at the schedule line level of the document.
    Hope this clarifies your doubt.
    Reward if this helps.

  • Sales order schedule confirmed date will consider Production capacity load

    As we know about schedule confirm delivery dates of sales order will consider based on material master lead time ,shiping point etc
    How to consider production capacity plan on sales order's delivery date.
    Say for example :
    Production workcenter capacity to produce the XYZ material 10qty in a Day.
    today i have created the sales order XYZ materail qty of 100. lead days has give based of MMR 21 days 17-07-2010( 3 sundays)
    and in same day i have created other sales order XYZ material qty 5000 ,the lead days again it will came 17-07-2010.
    Now my client requiremnt is when the schedule days is confirming in the sale order it sholud also consider the production capacity planning also(CR01,CR02)
    Even though my work centers are overloaded it is confirming the sales order on 17-07-2010 (based on leads days in MMR)
    Need your Inputs on issue

    Hi,
    This is a complex issue; best solution is by using APO/GATP.
    If not, then in ERP only, the second best is:
    1) Work with assembly processing in SO, meaning that a production/planned order is automatically created in the customer order during order creation.
    2) Then, after the order is created it is scheduled, and the delivery date proposal is based on that.
    3) Now you can check in the order that there are no capacity overloads, and all capacity required to produce on the proposed date is available. If yes, you're done. If not, it gets a bit complex, since you actualy need to switch to capacity planning, do capacity leveling and dispatch (PP), and the you get a new feasible schedule proposal based on that.
    APO/GATP could do all that automatically!
    Regards,
    Mario

  • Why does old sale order (The deliver date before current date) show VSF (independent requirement) in MD04?

    Dear All,
    I face one issue, the old sales order (the delivery date before current date) has became VSF (independent requirement) in MD04, could someone let me know why and how to fix it?
    Take 01.09.2014 as example, we have one 50PC's sales order with delivery date as 25.08.2014, in MD04, the system will show two independent requirements, one is 50PC's customer order and another is 50PC's VSF.
    We are looking forward to your kind help and answer, thanks in advance!
    Best Regards,
    Gavin

    Hi Gavin
    If I understood the issue correctly, system is showing both the sales order and the PIR on the same date, right?
    If this is the case, it's probably a PIR consumption issue. Take a look on the following note, especially question 10:
    772856
    FAQ: Consumption of planned independent requirements
    BR
    Caetano

  • How to create Billing Plan in sales order using Function module /BAPI

    hi,
    How to create Billing Plan in sales order using Function module /BAPI
    i hv check few FM such
    BILLING_SCHEDULE_READ
    BILLING_SCHEDULE_GET_NUMBER
    BILLING_SCHEDULE_SAVE
    But unable to create billing plan for a sales order.....any other method to create???

    Hi,
    Use this link.
    Create sales order with billing plan via LSMW and BAPI BUS2032
    BAPI or Function to update Billing Plan in Sales Order Items
    Hope this will help you.
    Regards,
    Vijay

  • How to go about capacity planning for storage ?

    Hi Experts,
    How to go about Capacity Planning? For  instance if clients wants to upgrade to new server and new storage and asks us how much additional storage do you need for next 5 years, how can calculate the amount of storage.
    I don't have any baseline info about the server of past years. Where can I start and any scripts you guys use for doing capacity planning?
    Appreciate your help.
    Thank you.
    Sam

    Please see this link:
    SQLAuthority News – Storage and SQL Server Capacity Planning and configuration...
    T-SQL Articles
    T-SQL e-book by TechNet Wiki Community
    T-SQL blog

  • How to hide variant configuration screen in sales order

    Hi Friends,
    Could you please help : how to hide variant configuration screen in sales order for a configured material
    Ranjan

    Hi
    The very purpose of VARIANT CONFIGURATION is to for this material these are the characteristics available
    In this you choose one characteristic then these are the values available
    If you make a choice then this is the price
    Means Maruthi car is the product
    Say 800
           Alto
           Zen
    These are characteristics
    In this you choose say black, cherry red, white these are the values
    When you put a sales order for Maruthi car then if it is 800 black colour then price is X
    if it is 800 white colour then price is y
    So that according to the choice of the customer the pricing and other details are fetched
    Why do you want to defeat the very purpose of VARIANT CONFIGURATION
    Rather than listing out of the whole product list the system simplifies the thing
    Without that popup variant configuration is meaningless
    Regards
    Raja
    Edited by: ramanathan raja on Dec 11, 2008 3:48 PM

Maybe you are looking for

  • DMS document attachment

    Hi, I am new to DMS & I have to attached scanned images of invoices through MIRO transaction to SAP object. How should I go with it? Anyone has worked on DMS??? kindly help...

  • Task Creation API is failing in Oracle Projects, Error: A structure version is required.

    Hi, Can anyone seen the below error as we are trying to create the WBS using API. We are using the shared structure. And can any one have a list of setups need to done in Projects for integrating Primavera using WEB services or SOA. Thanks in advance

  • I can't download anything because of payment information when the app is free I want to remove it

    When ever I want to download a free app it asks me to enter a payment information to complete payment, this was not doing this before. I want to completely remove my payment information but I don't know where the NONE option is in payment information

  • Calculator Array

    Hi everyone, Making an array for a calculator, and am stuck and have 57 similar errors. If someone can check what's wrong and show it to me that'll be great... Thanks PART 1 import javax.swing.*; public class TestMySwing{      * @param args      publ

  • No found PanelCustomizable component

    I am see the book Fusion Developer's guide For Oracle ADF, sections 28.5.3 How to Create a Login Page for Your Application, should drag the PanelCustomizable component from the component palette, bu not exist... could someone help me? please...