How to control follow up doc for  Activities

Hi...
I have created 10 different types of Activitiy Doc. When I open any activity in crmd_order I'm getting all other activities as follow up docs(when I click on follow up icon). I dont want all of them, may be I need one or two out of those. How to control those can anyone have idea
Regards,
Ajay

Hi,
Check the copy control for transactions in
spro-->Customer Relationship Management->Transactions->Basic Settings->Copying Control for Business Transactions->Define Copying Control for Transaction Types
If the transactions are maintained as follow up for the transaction you have created then remove the entries which you dont want as follow up.
Reward points if it helps.
Shridhar

Similar Messages

  • How to control change request creation for particular IBase Component?

    Dear Experts,
    Can anybody suggest , how to control change request creation for particular IBase Component?
    We have implemented ChaRM which is integrated with SAP ECC & SAP BI.
    ChaRM is not integrated with SAP Solution Manager.
    End Users are creating support notifications from -Help Menu- Create Support Notification.
    The IBase Component is not editable once notification is created. This Ibase is copied to change request when the action-create change document is saved.
    Requirement is that, during creation of change document, system should check the IBase component of support notification. If the IBase is related to solution manager system, system should restirct the change request creation.
    Kindly suggest how to achieve this.
    Regards
    Vivek

    Hello Vivek,
    The way to do what you want is to create a schedule condition for action Create Change Document. The action has to be displayed only when the IBase/Component value differs from SolMan. To add the IBase/Component value to the container so that it can be evaluated during runtime, you will have to create a subtype of BUS2000116 on which condition can be buit.
    See the following posts for more information :
    Hope this helps,
    BR.
    Stéphane.

  • Error during determn of backend follow-on doc. for shopping cart

    I am using Classic Scenario in SRM 4.0 and R/3 ECC5.
    When I am making PO in SOCO against approved shopping cart I am facing following error and PO is not getting created.
    "Error during determn of backend follow-on doc. for shopping cart XXXXXXXXXX"
    I have Checked up following :
    1. Product Cat defined in backend and in Org plan attribute
    2. Object for Prod Cat Vs. PGR defined in SPRO
    3. Doc type in R/3 attribute defiend in BSA attribute of Org Plan.
    Still problem is coming.
    Any clue form some one.
    Sanjay

    Hi Sanjay/Vadim,
    We are also having a simialr issue..
    for SRM server 500 SAPKIBKS08...
    R/3 4.7
    "But this issue comes up only in the Test system and works fine with the Dev sys.." Double checked all the config steps and looks alike..
    We are using the classic scenario RFx process to create a backend PO from the bidding engine after the bid is accepted..
    it alwayz throws up the error SC/ Local Error..
    : Error during determn of backend follow-on doc. for shopping cart 0010000103 / 0000000001....
    we just started debugging from the web by breaking it at META_BAPI_DISPATCH and still looking into it..
    but in the mean while just want to know if this is more a config issue or and RFC connection issue..
    could you forward me any OSS notes if any regarding this issue..
    thanks in advance..
    Regards
    Manoj

  • How to configure follow up transactions for service order

    Dear All,
    I want to configure follow up transactions for service order as I already there is follow up transaction
    For Service order below are follow up transactions
    Service confirmation
    Warranty claim
    complaints
    Task 
    If I want to add customized one then how to add ?? as I am not able to find out configure in IMG
    kapil

    Have you already customized Copy Control for your Service Order? If you want to add other transaction types the setting is necessary.
    The customizing path is shown as below.
    SPRO
    -> CRM
      -> Transactions
        -> Basic Settings
          -> Copying Control for Business Transactions
            -> Define Copying Control for Transaction Types
    Regards,
    Web

  • How to get some good docs for general troubleshooting issues of WLS 8.1?

    Hi,
    In my company we just have started WLS, m working as WLS admin.
    How can i get some good docs for general issues as I m facing a lot problem in this early stage.
    If ther is any link, or community which can help me?
    I have tried on google n got some basic info.
    I think ther r some useful info is available on the site " http://eudownload.bea.com/" but m not able to open it.....is this url is changed?

    Troubleshoot Cluster :-
    http://download.oracle.com/docs/cd/E12840_01/wls/docs103/cluster/trouble.html
    Troubleshoot JMS :-
    http://download-llnw.oracle.com/docs/cd/E13222_01/wls/docs92/jms_admin/troubleshoot.html
    Troubleshoot SAF :-
    http://download.oracle.com/docs/cd/E12840_01/wls/docs103/saf_admin/troubleshoot.html
    Troubleshoot JDBC:-
    http://download-llnw.oracle.com/docs/cd/E13222_01/wls/docs81/jdbc/troubleshooting.html
    Troubleshoot JTA:-
    http://download.oracle.com/docs/cd/E11035_01/wls100/jta/trbtrx.html
    Its more or less same for all versions. You can refer to specific version docs. Hope this helps.

  • How to controll follow-up Business Activity list from Opportunity

    Hi Forum,
    I don't want to see any business activities or tasks when I click follow-up button from opportunity screen.
    I've checked copy controll settings form for opportunity but we cant controll business activities there.
    I even tried by modifying Obj Ref Profile  but fo no use.
    Your help would be highly appreaciated
    Thanks & Regards
    Manjushail

    In standard it is always allowed to create a task or activity as
    a follow up. Since system works as desgined, so to realize your expect
    you have to do a modification which described in note 661305.

  • How is the follow-on doc triggered from shopping cart in SRM 7.0?

    Hi!
    We are on SRM 7.0 and want to make a solution where we create a PM order (Work order) as a follow-on document in backend instead of a Requisition or PO. There are desciptions on how to change document type and function using BADI's for the older SRM solutions, but this does not seem to work in SRM 7.0.
    Right now we have customized the system so a Requistion is created in backend and that works fine.
    Next step is to find a BADI to replace the call to BAPI_REQUISITION_CREATE  with a Work order BAPI  call  (BAPI_ALM_ORDER_MAINTAIN),
    I have tried to debug the process in Web Dynpro from the Shopping Cart where I press the 'Order' button', but never get to a point where the BAPI is called. It only seems like the shopping cart is saved in SRM tables and that the Workflow for approval process is started. We do not use the approval Workflow and the SC gets the status 'Approved' immediately.
    When I monitor the shopping cart I can see that it gets the status 'Follow-on document created' about one minute after the Approved status, and that also makes me wonder if the transfer of the SC to backend is done in a batch job, from a Workflow program or anything like that - and not from the Web Dynpro method calls behind the Order button.
    Does anyone know the technical details of the solution of the follow-on document creation in SRM 7.0?
    Where is the triggering done??
    Regards, Tine

    Hi Ricardo!
    Thanks for you reply. So this means we have to create a kind of batch job with a program which runs FM BBP_PD_SC_TRANSFER  ? How can we avoid that the original backend document is not started in addition (the reqiusition which is set up in customizing) ? Is it possible to customize the shopping cart solution so it does not trigger any backend documents automatically - so we can take the complete control using this batch job mentioned?
    PS: Do you know exactly where the BAPI for the requisition is triggered in SRM 7.0? Would be nice to know after all my debugging with no results
    Regards, Tine

  • How to control explicit language downloads for multiple devices sharing one user id?

    I set the parental controls for iTunes on my primary Mac under my account with my user id, etc.  My kids have their own devices but we all share the same user id for making purchases.  I had erroneously assumed that if I set the parental controls on my device, that it would apply to all purchases using the same id.  How can I make the parental controls universal?

    These are found at the end of a tutorial on doing what you already have done...
    Find out how to use restrictions on your iPhone, iPad, or iPod touch.
    Find out how to request and approve purchases with Ask to Buy.
    Learn more about about iTunes Store Parental Advisories.
    CCC

  • How to get list of docs for particulat billing type on plant wise

    very urgent
    is there any t-code, report to look thi
    how to get list of billing docs grnerated  for particulat billing type and if possible  on plant wise also
    very urgetnt
    points to be rewarded
    eagerly waitng from sap gurus

    Dear chakri
    As you may be aware, in VF05 you need to enter either Payer Code or Material Code and then based on the selection criteria, the report will generate.  Please give the (ensure that this code is exist in billing document) Payer code and now select "Further sel.criteria" and DONT forget to enter the date in from column of "Billing docs.date".  By default, there you can see one month date range. 
    Still if you get error message, please let me know the error message.
    thanks
    G. Lakshmipathi

  • SEPA - How to control payment method used for SEPA during invoice entry?

    Hi,
    To implement SEPA Credit Transfers, a new payment method must be created.
    But this payment method will coexist with other payment methods that can be used for EUR payments between non-SEPA countries...
    Is there a way to control during invoice entry that the user is using the right payment method? Thus, if the payment is to be made between two SEPA countries, is there a way to control that the payment method used is well the new SEPA payment method? These pmts would fall in error if OSS note 1406227 has been implemented (it creates a table that controls the validity of pmt methods per country of destination) but obviously, we want to control this before the payment run F110...
    Or is it only controllable via a user-exit?
    Thanks a lot!
    Rgds
    Vincent
    Edited by: Vincent_Belgium on Dec 30, 2010 3:22 PM
    Edited by: Vincent_Belgium on Dec 30, 2010 3:26 PM

    Hi,
    You need to Use User Exit MEVME001 in SAP as well please see the below link for more
    http://www.sap-img.com/materials/price-difference-po-iv-vendor.htm
    Regards
    Ninad Kshirsagar

  • Error during determn of backend follow-on doc

    Hi,
    We are suddenly facing this error after the shopping cart has been approved:
    "Error during determn of backend follow-on doc. for shopping cart xxxxxxxxx".
    There are many shopping carts having the same error or they are simply as "ERROR IN PROCESS".
    Can you help us, as why is this happening & how can this be resolved.
    This error was not exsisting previously. We have checked all the organizational data in the structure.
    We have also tried pushing them from backend but they still result in error.
    The BASIS have checked the RFC connection & the logs but have found no error.
    Please let me know what could be the problem & the solution for the same.
    Thanks,
    Bhakti.

    Hi Bhakti
    SPRO > IMG > SRM > SRM Server > Cross Application basic settings > Define objects in back end system
    can you check what are the settings here?
    are you in classic mode?
    Are you geting all sc s for the same error? or only for particular material group only. update us.we can explore..
    Note 945340 - Sourcing Cockpit: No backend error message displayed
    check the above notes aplicable for you.
    Are you taken this sc to soucricg cockpit.
    Note 885397 - Backend PO cannot be created from the Bid Invitation
    what version are you in.The above note is applicable.check it up.
    explore what is the history of that errored sc.
    regards
    Muthu

  • How to keep that valve open for certain period of time and shut off automatically

    Hi everyone,
    The objective of the VI is to measure pH and then open acid or base valve based on pH valve. Below is my UNFINISHED VI
    My question is:  if, for example, the  pH is 10, then, the program will open acidic valve for 5 seconds and then shut off automatically. After that, wait for 5 second. this process will go on and on as I use while loop, but I just dont know how to control the valve on for 5sec and off and then wait for 5sec.
    Anyone can help me out?    Thank you very much
    In the picture, please enter those values before running
    P.S The VI is based on previously posted vi by someone who made it 1 yrs ago.
    Attachments:
    project_trial_1_26.vi ‏27 KB
    Capture.JPG ‏79 KB

    1. The reason the valves close immediately is that the Elapsed Time VI does not cause any wait, it only measures the time. So the valves closed within a small fraction of a second of the time they opened.
    2. I modified your VI to wait until the Elapsed Time has ended.  See the "wait" state.  I probably modified some of your other functionality in the process, but this shows one way you could do the timing. 
    3. You do not need any Value property nodes.  They should never be used if the value can be wired directly.
    4. You do not need any sequence structures. Dataflow will determine the order of things occurring.
    5. If you use an enum for the state machine (and it is a good way to name and select states), you should make it a type def. Then when you need to change it as I did to add several states, you only need to change the Type Def in one place and the changes propagate through to every place you used the control or constants derived from it.
    6. I added a Halt state which will close both valves before stopping the program.  When you are controlling a real world process, it is important to consider the start up and shutdown requirements. For example the digital outputs of the USB-6008 default to inputs when the device is first powered up. And, the inputs are pulled high by a 4700 ohm resistor (at least I think I recall that value). Will this open your valves before the program starts running and sets the I/O lines to outputs and forces them low?
    The USB-6008 has rather limited drive on the digital lines. You will probably need a buffer between it and the valve coils.
    PID and PWM are more complicated than I want to get into here.  First, are your valves proportional or on/off? Second, (assuming that they are on/off) how fast can you open and close them without destroying them in the first week? What is their expected lifetime in terms of the number of operations? How fast do you need to be able to change them to keep your pH where you want it?  Are these values compatible?
    Lynn
    Attachments:
    pH State.ctl ‏12 KB
    project_trial_1_28.2.vi ‏66 KB

  • How to find the guid for the follow up doc!!

    Hi All,
    I am creating a follow up doc i.e Complaint.Let me know how will i find the guid or complaint id
    in CRM at the object level in buffer before the complaint is created in CRM.
    Thanks..

    Hi Anjum,
    You will not be getting the object ID untill you save the document in CRM. You can get the GUID of the document in CRM before saving the complaint.
    How you are creating the complaint, means using crm_order_maintain fm or using BOL code?
    If it is BOL code you will get from BTADMINH context node you can fetching GUID attribute value.
    If it is Order_maintain FM you will creating a GUID on your own and passing it to ordermaintain FM.
    Best Regards,
    Dharmakasi.

  • How do I configure Billing doc as the follow up doc to sales order in CRM?

    Hi,
    I have the Sales Order transaction type and Item category created and did the item category determination.
    Next step is to make the Billing Doc as the follow up doc. I do not know how to do it.
    I know copy control for Transactions, item categories and Item Category determination. Do i have to create billing transaction type and item category and do the copy control to link to sales order? if so what is the transaction type for billing?
    Can someone explain to me?
    Thanks.
    Edited by: SAP GK on May 10, 2011 4:08 AM

    This is done under spro>crm>Billing>Item Category Determination>Assign Item Categories. Here you link transaction type and item category of that transaction type to billing item category. according to that billing type is determined. link between billing item and type is set under spro>crm>Billing>Define Billing Item Categories
    Regards.

  • CRM Web UI :- How to Control number of session of Web UI for a user

    Hello Experts,
    We do have very specific requirement which SAP doesn`t recommend in terms of multi-sessioning for a user.So we are little worried upon the challeges.Could you please share your ideas/Experience on following?
    1.How to Control number of Internet explorer session for the web UI (may be 2 or 3).?
      Though SAP doesn`t recommned more than one but our client requires 2 or more than that but we need to fix it either 
      2 or 3.
      So we are looking for specific setting for this.
    2.What are the challenges we need to face if we implement option 1?
    3.Specially in interaction record management
        a. Is there chance of loosing the data if agent has opened more than two session.
        b. In which session interaction record data will get stored,the one on which agent picked up the call or in the latest 
            one?
    Please let me know if I am not clear enough on any point.
    Thanks in advance,
    Shailendra Tolambiya

    Hi Shailendra,
    The following wiki page might be useful in this respect:
    http://wiki.sdn.sap.com/wiki/x/gxdKDQ
    Best Regards,
    Shiromani

Maybe you are looking for

  • Itunes 11.1.1.11 freezes when I try to sync 4s and ipad Windows 8

    I have recently update all my devices to os7 and now every time i connect any device (I phone 4s or Ipad 3rd gen) to my computer and try to change any setting itunes freezes and I have to force a shut down. Itunes acts normal until I connect a device

  • 500k Unique Limit not behaving as it should?

    Hoping to get an official "Adobe" answer here as results via Twitter were not too successful, plus this is just too detailed to be accurately articulated in 140 character chunks.  Anyways, the problem comes with an instance I am working on where uniq

  • EBS BAI2 file - Transaction 475, check clearing - extra character appending

    Hello experts, We are using Algorithm 13 for processing checks which are processed using the transactin 475 on the incoming bank file. In the BAI2 file format, the check numer is contained in record 16 in the following format- 16,475,58740,0,91809147

  • How sync iPhone Calendar back to Google calendar?

    (1) Events I add to the iPhone Calendar app or the Mac OS X Calendar app do not get synced to the Google calender I view at https://www.google.com/calendar. However: (2) Events do sync back and forth between my iPhone Calendar app and the Mac OS X Ca

  • Bridge CS6 rating info

    Hi there, using Bridge CS6 (OS X 10.8.4). I have a large number of .cr2 files and, in order to have a smaller file size to preview, I batch processed them all to .jpg files, while keeping the original .cr2 files on an ext. disk. The filenames of the