How to convert WBS bom to material BOM in PP-ps scenario

Hi experts
i am working on PP -PS scenario  anyone can suggest how to convert wbs bom to material BOM as well  as what are the further steps related to project mrp as well as project planning
your valuable reply is really appreciated
with regards
shaik

Hi,
In additional to the above u can choose the BOM usage as 3- Universal.
And then transfer WBS BOM using CN33.
Regards
JB

Similar Messages

  • How cani convert WBS report form one CAN$ to USD

    hi frnds
    I want to convert WBS element(Actual/plan/variance) report from CAN$ to USD.
    Can you please guid me how an i do this?
    Thanks

    Hi
    Go to GCTR and choose the Option Report and execute...
    Enter your report name and select "dependant objects"
    Generate a Workbench Request and transport it
    br, Ajay M

  • How can we pick WBS BOM for a Subcontrat order

    Hi,
    We are using WBS BOM instead of Material BOM for our projects.We also use Subcontract order scenerio.
    Where we wnat to pick WBS BOM.
    Can any one sujjest how to pick WBS BOM.
    Regards,
    somiraghu

    As per Standard SAP the stock should be unresrticted stock for Subcontracting process.It should not be a special stock.

  • Calculation wbs bom

    hello!
    is there an easy way to calculate just the material costs of a wbs bom (similar to transaction CK51N for order boms)? the wbs will be specific for each project, therefore i don't think that easy cost planing will work (SAP R/3 4.6c)
    thanks!
    matthias

    Hello ,
    I am facing similar problem.....can you please help me understand how u resolved it. I can not transfer the BOM in to Project because I have issues....
    1) I transfer, requirement for header component will not get generated.
    2) Requirement date for the child components will not flow as per the routing timings.
    3) While in planr parameters for MRP seetings , I flagged Sale orer/WBS bom indicator, hence during MRP run, if a WBS bom exists, system xplodes it and neglects Material BOM.
    4) Because seeting mentioned in point 4 , I amm assigning header component to project activity manually....drag nad Drop.
    However, similarly I want to dectate planned cost run to consider WBS Bom composition not the Material BOM.
    Help me with a solution.
    Thanks
    Saikishore Ganga.

  • How to transfer sales bom from SAP R/3 to APO?

    Hi Experts,
    I just want to ask how to transfer sales bom from R/3 to APO? if i change my bom usage to 5 and use this BOM in my Production version be enough to send it to APO?
    Also, this is my first time using sales bom, could you please help me understand how sales bom work in APO planning?
    Thanks so much.
    Mylene

    Hi Senthil,
    Thanks again for your reply. I was trying to CIF sales BOM in APO but only the header material are being created in APO. The component are not added in PDS. This is how I create it in SAP R/3:
    1. transaction cs01 -->  enter header material, plant and BOM USAGE =5
    2. inside cs01, i entered components, quantity for each components and ITEM category = L (stock item)
                            i also eneterd base quantity for header material
    3. create production version for header material with routing and this BOM
    4. create and activate material CIF model for header and components
    5. create and activate PDS CIF model for header and components.
    After doing all these steps, PDS is created in APO but I only have the header material (no components)
    I tried changing BOM to other bom usage and components were populated in PDS.
    Am i missing nay steps?  Thanks.
    Regards,
    Mylene

  • For one Urgent Change during performing the Approval(chnging the status to 'To be Tested') system does not recognize any changes using the CTS WBS BOM in the development system. The transaction is therefore incorrect or the status was reset by the system.

    For one Urgent Change while performing the one of the Approval before changing the status to 'To Be Tested'
    We are getting below error.
    The system does not recognize any changes using the CTS WBS BOM in the development system. The transaction is therefore incorrect or the status was reset by the system.
    COuld anyone please help us to know, How it can be resolved?
    We also have this below error.
    System Response
    If the PPF action is a condition check, the condition is initially considered as not met, and leads to another warning, an error message, or status reset, depending on the configuration.
    If the PPF action is the execution of a task in the task list, and the exception is critical, there is another error message in the document.
    Procedure
    The condition cannot be met until the cause is removed. Analyze all messages in the transaction application log.
    Procedure for System Administration
    Analyze any other messages in the task list application log, and the entries for the object /TMWFLOW/CMSCV
    Additional Information:
    System cancel RFC destination SM_UK4CLNT005_TRUSTED, Call TR_READ_COMM:
    No authorization to log on as a trusted system (Tr usted RC=0).
    /TMWFLOW/TU_GET_REQUEST_REMOTE:E:/TMWFLOW/TRACK_N:107
    For above error Table /TMWFLOW/REP_DATA_FLOWwas refreshed as well but still the same error.

    If you are in Test System, you can use function module AA_AFABER_DELETE to totally delete the depreciation area (tcode SE37, specify chart of depreciation and depreciation area), After that recreate your depreciation area and run AFBN. But before you do that, have you created a retirement transaction type that limits the posting on your new depreciation area? If not create one.
    Hope this helps.
    Thanks!
    Jhero

  • How to create Alternative Bom by given inputs

    Hi to all,
    I need to create BOM with alternative number.
    my inputs are
    BOM Header
    Material, plant, BOM usage, Alternate BOM, BOM status, Base Qty, Valid From, valid to
    BOM Item
    Item number, item category, component, component description, UOM, valid from, valid to, item ID, QTY
    if i use CSAP_MAT_BOM_CREATE to create BOM , it will not create alternative number
    if i use BAPI_MATERIAL_BOM_GROUP_CREATE , does my input value are enough to create alternative bom.
    please can any one, put some light on it, i search SDN ,but i dont know how to create alternative bom with input provided.
    i shall be thankful to you for this.
    Regards
    Pavneet Rana

    Try the program-RCSBI010

  • How to delete a BOM?

    Hi,
    Could anyone please tell me how to delete a BOM and the transaction which we use please?.I need to drop or delete a complete BOM
    Thanks in advance.

    Hi Suresh,
    m in need of help pls read my below query .. & if possible pls mail the sample code. your help is greatly appreciated ...
    Create a program that removes BOM allocations to plants for a specified range of BOM materials and plants.
    The selection screen should contain the fields:
    Material number (from - to and multiple selection)      - entry should be required/mandatory
    Plant (from - to and multiple selection)
    BOM usage
    Alternative BOM
    The program should utilze the entered information.
    Then remove the BOM allocations specified in the selection screen.
    After the program run the should be a list displayed that contains the following information:
    All errors that have occured while deleting allocations
    All BOM - plant - BOM usage - Alternative BOM combinations where the allocation has been deleted.

  • Change WBS BOM Structure

    Dear Experts,
    I have a WBS BOM ( Copied from Material BOM) in which one common child level component is used for differernt Superior Assembleis. Now when i am deleting this component from one of the Superior Assembly, a POP UP is coming stating that the same compoenent is used for Other Assemblies tooDo you want to delete this component from there other superior assemblies too. When i am hitting YES-only the Component is getting deleted from the Supeior assembly for which it is selected for not from the others.
    Can anyone throw a light Whats the purpose of that POP UP then?
    Thanks in Advance
    Best Regards
    Rohit

    Hi
    Use CN33 to transfer the multilevel BOM to WBS element /Project.
    Which t.code r u using ?
    Thanks
    S.Murali

  • Costing in WBS bom

    Hi All,
    I am using a WBS bom in project. I do the cost estimate in CKw1 and also activate it in CKW4. Now this new cost has to appear when I do a network costing. I tried changing the valuation variant but somehow it did not help. The system is still taking the old material master price. Do i need an exit to have the new price for this material and WBS combination.
    Any help in this reagrds is appreciated. Also would like to know the transaction to delete this costing run.

    Did you do CK24 (Price Update Release and Marking)after CKW1/CKW4?
    CK44 - Delete Costing Run
    CKR1 Delete Std Cost Estimate

  • Necessity of WBS BOM

    Hi Gurus,
    I am working on a PP-PS integration scenario. If I have a multilevel Material BOM and the header item is the final product. I had attached this in the network activity with Item category as L. I have not exploded the BOM here. To proceed further with MRP,  what i am doing is correct or should I create the WBS BOM as well? If so, what is the necessity of WBS BOM ?
    thanks in advance.
    Vinodh

    Dear Vinvidh_18,
    As per as my experiance; if your working with PS - PP Integration; it is a very difficult to map senarios, why because PP and PS has the similiar process or transaction codes.
    Here i am suggesting only, Dont go for WBS BOM.( If your working with the PP).
    1) Material BOM is the better option.
    2) Attach the Finished Goods to the Activity under Network.  Or manually Create the FG and RM under Activity (Caution should
        be taken care while creation of this, use -1 for FG under the Activity)
    3) Dont go for Network Order use the Production Order as a Cost Object (Assaign the WBS in the Production Order)
       Remaining Process is normall process like Production Order Confirmation etc.,
    Regards
    Edited by: raj on Dec 30, 2009 1:56 PM

  • WBS BOM

    Dear Gurus ,
    In normal change management situations (while having an open production order), when we make a change to main item BOM or internal phantom, we use a change number with release key which we reflect to production order using COCM.
    In WBS BOM, the change is being done by creating a new WBS BOM for phantom (so that we make a modification without changing the original phantom). This change, however is not reflected correctly using COCM. It does not display any procurement elements.
    I was only able to reflect the new BOM when i made Read PP master data in production order. Is there a way to affect it using COCM or a simliar method?
    Regards
    Keshav

    Dear Gurus,
    Please reply.
    Regards
    Keshav

  • How to create  the BOM for co product

    Dear friends,
    How to create the BOM for Co product  and How the production will create and  how the costing will capture for that.
    Regards,
    Sabhapathy R

    Dear Umesh,
    How Bom created for co product
    By product
    Header
    xxx
    101
    mvt
    mvt
    qty
    item
    yyy
    261
    1
    zzz
    531
    0.5-
    By product
    Same way how we create co product for BOM. pl explain with simple example.
    Thanks &regards,
    Sabhapathy R

  • Alternative for WBS BOM

    hello
    In standard BOM for PP in T-code eg cs01 I can write alternative. But if I want to create WBS BOM with T-code cs71 I can't see such field for alternative. I checked in help.sap.com that alternative for WBS BOM are not used. I don't know why but there is not alternative filed in CS71.
    So is there any other way to get alternatives for WBS BOM like modification, exit etc.
    I checked SAP notes for this but I can't find.
    Any help?

    hello
    Thank you for your answers.
    I have business process where I need WBS alternative. Why? Because of history of changes. My client wants to have 2 versions of one WBS BOM. One for history only and second for operative work. After some changes in WBS BOM and finish the project my client wants to analyse historical version which is created when project starts and the last operative version of the same WBS BOM.
    @Uddhab
    >If we prepare two BOM for a single WBS and attach the same in the WBS, then 2 requirement will flow and there will additional >quantity in the production.
    Yes, if we attach. I want to attach only one WBS BOM so I don't multiply quantity.

  • How to get costing BOM from R/3

    Hi friends,
    How to get costing BOM from r/3 with levels into bw.and the transaction in r/3 is ck13n

    Hi,
    You'll need to go in for a generic DS in this case.
    Cheers,
    Kedar

Maybe you are looking for