How to create a project in PS automatically wen it is created in cProjects.

Hai experts,
    How to create a project in PS automatically wen it is created in cProjects.
    After creating project in cProjects wen i flagged to transfer it is not transferring to PS...
How to achieve this...
Thanx in advance...

hi
Try with following settings if you have not done:
1) In define project type, for for accounting integration , select scenario as: Accounting integration in my SAPERP and type of transfer as : Always Automatic when saving
2) For Define object link for object type , define proxy class for WBS element and Project definition(PS)
Also define RFC for Single object Controlling on WBS element in Object types for object links.
3) For Accounting integration in Make general settings, for your project type select frame09 for your object type single object controlling on Internal order
4) Define CO scenario CPR2 with Strategy sequence as SAP040 in period end closing, costing sheet as standard and Costing variant as PC02(Internal Order)
5) In CO scanrio maintenance view, for your project type select contolling method as Internal Order( Project Definition, Automatic)
With these settings I am able to create a PS project from cProject when I save a cProject.
Regards,
Niraj

Similar Messages

  • I need an arrow or some sort of icon that points and moves to alert the website user to scroll down.  Are there such widgets or is there a method to make an image move on its own.  Also, how to get my muse webpage to automatically scroll down?

    I need an arrow or some sort of icon that points and moves to alert the website user to scroll down.  Are there such widgets or is there a method to make an image move on its own.  Also, how to get my muse webpage to automatically scroll down?

    Thank you for your help, but I believe my questions remains unanswered -- mainly, because my English isn't the good. 
    Here's what I am asking:
    1.  I need something that is animated that blinks or flashes to alert the viewer to scroll down the page.  I would put the wording:  Scroll Down for more (and then an arrow blinks or gently moves up and down to alert the user to move down).
    2.  is there a way that the entire homepage on it's own moves downward?
    Sorry for my poor English. 
           From: The Arthematics <[email protected]>
    To: preston reed <[email protected]>
    Sent: Tuesday, February 24, 2015 9:42 PM
    Subject:  I need an arrow or some sort of icon that points and moves to alert the website user to scroll down.  Are there such widgets or is there a method to make an image move on its own.  Also, how to get my muse webpage to automatically scroll down?
    I need an arrow or some sort of icon that points and moves to alert the website user to scroll down.  Are there such widgets or is there a method to make an image move on its own.  Also, how to get my muse webpage to automatically scroll down?
    created by The Arthematics in Help with using Adobe Muse CC - View the full discussionIf I understood correctly. You can place arrows on each section of the page and use "fade-in" and "fade-out". And maybe you want this widget Anchor + – Adobe Muse Widget Directory to automatically scroll down. If the reply above answers your question, please take a moment to mark this answer as correct by visiting: https://forums.adobe.com/message/7227429#7227429 and clicking ‘Correct’ below the answer Replies to this message go to everyone subscribed to this thread, not directly to the person who posted the message. To post a reply, either reply to this email or visit the message page: Please note that the Adobe Forums do not accept email attachments. If you want to embed an image in your message please visit the thread in the forum and click the camera icon: https://forums.adobe.com/message/7227429#7227429 To unsubscribe from this thread, please visit the message page at , click "Following" at the top right, & "Stop Following"  Start a new discussion in Help with using Adobe Muse CC by email or at Adobe Community For more information about maintaining your forum email notifications please go to https://forums.adobe.com/thread/1516624.

  • How to create a project structure with the Business Bluprint transaction S

    Hi
    How to create a project structure and add the required scenarios for your SAP system to your project structure with the Business Bluprint transaction SOLAR01.
    Also how to add your SAP system configuration structures to your project structure with the configuration transaction SOLAR02
    Thanks,

    Dear fr
    Have u already created a project?
    select the same in solar01 and click the structure tab
    On the left side select business scenarios and on the right side select the structure tab
    Press F4 here and check the Busines process repository is selected
    Nw you hav all the standard business process
    For non-standard just type there name and press save button.
    Add the relevant one's
    Once added here in solar01 reflected in solar02 automatically with relevant data for standard business process.
    you hav to add manually for non stand scean you have added.
    Hope it clarifies.
    Pls assign pts.

  • How to create a Project in Development system?

    Hi,
    I am starting my development on client system.
    Whenever i try to create infoarea or cube or catalog or whatever it is asking for request.
    before  creating request, Project must be created plz tell me how to create a project?
    whats the relation between project and package?
    And one more question...if i want to avoid asking requests then what settings must be done so that after all development is over i can transport to quality system at time.
    PLZ provide me the solution for above mentioned queries.
    Thanks in Advance,
    Vijaya.

    Thanks Tony.
    Please tell me in details or send me a document regarding this...what shoud be done in SE06.
    Here there are 2 options:
    1)Standard installation
    2)Database copy or database migration.
    and there s a option system change option.
    I am not getting the idea of this what can be done by clicking on system change option and perform post installation actions?
    plz help me out.
    Thanks,
    Vijaya

  • I know how to create a PROJECT template, but is there a way to create SLIDE templates?

    Basically I've got several modules, and throughout all the modules is several different pages (text&graphic page, hot graphic page, tab page etc etc).
    What I would love to do is create a set template for each page type (a template for text&graphic, a template for tab page etc) as I have numerous instances of the same pages throughout all the modules (and also for continuity as well).
    It would be great to create placeholders for slide templates just like the application in project templates, and then be able to drop these slides into different projects to have the same foundation to start adding data.
    Project templates is a good start, but only if i want to use the same template throughout the entire module.
    Any one know how to do this?
    Thank yo
    Rich.

    If you're using Cp5/5.5 you can create multiple master slides to them apply to the applicable slides (I don't remember if it was in Cp4).
    Master slides are portable, also, you can copy all the elements and paste them onto new slides in the same project or a different project.
    Insert > Master Slide
    Which should create a new blank slide in the Master Slide panel.  You add items to the slide like backgrounds, captions, rollover captions, highlights, shapes, animations (buttons/click boxes are not allowed).  You use the timeline as you would with a 'normal' slide, but you can't adjust the length of the master slide (this doesn't impact the length of a 'normal' slide).
    On your content slides you select the master slide in the Properties panel, general, master slide dropdown.

  • How do I create a project site after I publish a project in Project Server 2013?

    How do I create a project site after I publish a project from project pro 2013 in Project Server 2013? I'm trying to look for an option in the ribbon but haven't found any. 
    Thanks
    James T.F

    Hi James,
    See in the article the procedure for site provisionning settings.
    Note that the project site is created based on the template associated to the chosen project type (EPT) when the user first publishes his project. Be aware that if you allow the user to choose weither or not he'll create a sharepoint site when publishing
    his project, he will be prompted in Project Pro with a dialog box giving the choice to create or not the site.
    Hope this helps,
    Guillaume Rouyre, MBA, MCP, MCTS |

  • How can i create a project with my exisiting java code

    Hi All,
    I have a source code of one project and i want to execute this in jdeveloper 10.1.3.1.0 version.
    can u please suggest me how can i execute that project
    its using struts and ejb's
    i need clear steps of this.
    Thanks in Advance.
    Regards,
    588872

    Under file->new->Projects you'll find two options that are relevant to you:
    One is called project from WAR file - this will allow you to point to a project that has been packaged as a WAR and will create a JDeveloper project for it.
    The other option is called "Project from existing source" this will allow you to point to your existing code directory and will create the JDeveloper project for this.
    After you created the project, you might want to do a bit of tweaking under the project properties->content and sub categories for Web content, resources etc...
    And you might also need to add any missing JAR files you are depending on to the libraries node of your project properties.

  • While creating a project in Garage Band my sample tracks were cut short then overwritten in soundtrack pro. Any ideas why? and how to get my tracks back?

    While creating a project in Garage Band 09 my sample tracks were being cut short- I then discovered they had been overwritten in soundtrack pro.
    Any ideas why? and how to get my tracks back?
    I never opened soundtrack pro to edit the track just Garage band....the track just mysteriously saved as half the track.
    I am running Lion and I upgraded my Garage band to '11 hoping it would resolve the issue...it didn't. Now I can't find that tracks at all.
    The 2 songs having the issue are titled Exotic Yearning and Reunion.
    I am in the process of reinstalling the audio content from my discs. I just don't want to run into this again.
    Any thoughts and help would be greatly appreciated!
    Thanks!

    After spending some time reinstalling the soundtrack pro 3 content I opened the full track called Reunion.
    It showed back up in Garage Band.*It was the full track and wasn't chopped off until I dragged it onto the project. Then it showed up chopped.
    Then I closed Garaged band and opened soundtrack pro 3....The song was again chopped off at the 1:33min mark
    Very Frusterated...:(

  • How do i solve - cannot access web server - error message when creating a project in 4.5 with PHP

    How do i solve - cannot access web server - error message when creating a project in 4.5 with PHP

    Screenshot of how it looks when i try to show a ms access form inside a iframe:
    http://oi58.tinypic.com/2vj4ish.jpg

  • How to create an activity in CRM automaticly

    Hi
    I'm working in CRM 4.0 and try create an activity automatically when a BUPA_MAIN objects come from FI-CA.
    In the BDOC-flow I start an own developed FM to check if a new activity will be created, that's no problem but which FM/BAPI will I use to create the new activity and how to fill them?
    Thank for help//

    Hello Jan,
    To create a new Activity Document use BAPI BAPI_SLSTRANSACT_CREATEMULTI.
    To find out how to fill the parameters, create a documento directly in CRM and debug function module CRM_ORDER_MAINTAIN to see how you have to fill the parameters.
    Maybe there is an OSS note that explains how to use this BAPI.
    Regards,
    Mauricio

  • Bapi to create project version or create a project version automatically as soon as project get released

    Hi Experts,
    My client requirement is to create a project version as soon as project status changes to released .
    Can u please help me with bapi which will work same as CN72.Or any other way so that version get automatically created after project release.
    Thanks
    Suraj prakash

    Hi Sachin ,
    I tryied the same but failed to create it automatically,
    I have created version profile
    Assigned to control of project profile
    Created a project with same project profile and then released the project but no version got created.
    Am i doing something wrong.

  • How to create new project in SPRO Transaction

    How to create new project in SPRO Transaction
    I need to attach my program Transaction code under the created project.
    Please help me how to do?
    Regards,
    Purshoth

    Use SIMGH transaction.

  • How to create a project templace using a API?

    Hi all,
    I can create a project using API PA_PROJECT_PUB.create_project, but how to create a project templace using a API?
    thanks for your any effort.
    Caril

    Hi Caroline:
    If sub projects are not supported currently, does the EDK API support creating the project folders under a project? Please let me know.
    Thanks.
    Bhanu

  • How to create a project in Solman with PSCD content

    Hi All,
    I am looking for any potential article on creating a u2018projectu2019 in Solman, we are looking into creating an project in solman with the PCSD and Grantor content but we donu2019t know where we can find this info.
    Can some one please tell me where I can find this info?
    Regards
    k
    Edited by: kourosh Ghouchkhani on May 11, 2010 8:46 PM

    hi
    Try with following settings if you have not done:
    1) In define project type, for for accounting integration , select scenario as: Accounting integration in my SAPERP and type of transfer as : Always Automatic when saving
    2) For Define object link for object type , define proxy class for WBS element and Project definition(PS)
    Also define RFC for Single object Controlling on WBS element in Object types for object links.
    3) For Accounting integration in Make general settings, for your project type select frame09 for your object type single object controlling on Internal order
    4) Define CO scenario CPR2 with Strategy sequence as SAP040 in period end closing, costing sheet as standard and Costing variant as PC02(Internal Order)
    5) In CO scanrio maintenance view, for your project type select contolling method as Internal Order( Project Definition, Automatic)
    With these settings I am able to create a PS project from cProject when I save a cProject.
    Regards,
    Niraj

  • How do I prevent Photostream from creating empty projects?

    With photostream on, it creates a project labelled "Nov 2011 Photo Stream" that is empty.  I don't remember creating this project, but I can't swear that I didn't. I delete the project, but everytime I reopen Aperture, it is recreated.  If I turn photostream off within Aperture, this behavior stops.  Turn photostream back on in Aperture, the zombie project comes back. 
    How to stop this?

    But why does it keep coming back? I understand if the current month is recreated again, but we are in January 2013 and I have Aug, Nov and Dec 2012 that keep reappearing, even though I've already moved the photos to other projects and deleted them.
    I can only assume at this point its a bug, but do you have any other ideas on kiling it without having to disable the auto import?

Maybe you are looking for