How to create an 8/6 working day calander in Projects

I need to set my calander to 8 days work 6 days not working on a 12 hr day
If the calander had a 2 week cycle option this would be easy, but I need help please

Dale,
Sorry to butt in but you did throw out the challenge even if it was to Trevor. It's tough (for me) to ignore a challenge.
Actually the calendar is not that hard but a little tedious. First I created a custom calendar called "86" based on a 7 day a week calendar. I then set the working times for each day from 6:00am to 7:00pm with 1 hour lunch. Finally I created an
exception for 6 days off. I repeated that exception span every other week for as many weeks as necessary to cover the project. That gives an 8 days on, 6 days off pattern with 12 hour work days, just like the poster wanted. The tedious part of course is entering
each of the exception periods, which could be automated with VBA.
John
For the benefit of the original poster, here is a screen shot of the custom calendar. I only took the exceptions up through January 2015 to illustrate the process. Obviously additional exceptions are required, basically two per month, for the remainder of
the project.

Similar Messages

  • Is there a way of finding out how many active hours you've worked on a Premiere project?

    If not, it'd be a very cool addition for Adobe to implement... so you know exactly how many hours a project is taking (and how much to charge clients etc.) Obviously we're all prone to leaving Premiere on and wandering away, so I guess it would need to be able to differentiate between active and non-active time...

    Is there a way of finding out how many active hours you've worked on a Premiere project?
    There are two things a client get's billed for, my time, and my computer's time.  If either one of us are working on a project, the client get's billed.  Even if Adobe spent (wasted?) time on adding such a feature, they'd never be able to include any time I've spent working on the project with PP closed, so this feature would have very, very, VERY limited usefulness.
    The method suggested by the images is still the best way.

  • How to show no. of actual working days in Payslip in case of +ve time mgt

    Dear Experts,
    We have a requirement of showing no. of actual working days in payslip, which should be Calendar Days-(Paid+Unpaid absence). I created an w/t 1WRD for actual working days. Our paid absence w/t is 2006 and unpaid absence is 2005 copied from /845 and /846 respectively, both the absences are included in absence valuation table and working fine in that respect. But issue is i wrote a small PCR for calculating actual working days like below:
    ZWRD
         NUM=TKSOLL Set
         NUM-E 2005
         NUM-E 2006
        ADDWTE1WRD
    But still its fetching full working days i.e. calendar days 30 or 31 not deducting paid or unpaid absence for a month.
    Pls help, what else should i do.
    Regards
    Tan

    Sorry, i am unable to paste RT, but its exactly as below
    01, April, 2011
    1WRD Working days     30.00
    2006  Paid Absence       2.00                
    02, May, 2011
    1WRD Working days     31.00
    2005  Unpaid Absence   1.00                 
    regards
    Tan

  • Create absences on non-working days.

    Hello Time Gurus,
    I have a scenario in which the employees can record absences on a non-working day.
    The scenario is as follows-
    I have a Work Schedule -
    Sun(working) Sat(working) Mon(working) Tue(off) Wed(off) Thu(off) Fri(Working)
    The working days have a planned working hours of 9 hours and off day has planned working hours of 0 hours.
    I have two sets of employees (ESG) - Salaried and Hourly.
    The hourly employees should to be able to record absence on non-working day (non-working for me includes the public holidays as well).
    I have set the input checks for the absence type OFF on non-working day. I am able to record absence but with 0 absence hours, even though I input some absence hours...the absence hours turns zero because of the planned working hours maintained as zero on non-working day.
    How can I achieve this?
    Thanks & Regards, Swapnil Mishra

    Swapnil,
    How can I now configure so thet the hourly worker on non-working day...can record some absence...
    how will we overcome the planned working hours as zero abd convert the same to working using the sleection rules for daytype....
    I still don't understand why you want to put an absence on non working day.
    Suppose the first week of Jan is as below in period work schedule 01.01 to 07.01
    NORM NORM NORM NORM NORM OFF OFF
    NORM will have 8 working hours and OFF will have zero working hours. Suppose say that 03.01 is a public holiday.
    In DWS NORM planned hours will be 8 hours but still due to day type rules it will be a holiday(non working day) day type = 1
    So now 03, 06 and 07 are all non working days for both salaried and hourly class.
    Now do you want that for hourly employees these days should be considered as working? and the same days should be non working for salaried?
    AJ

  • How to create a control to work with a select function to display two separate texts.

    I'm currently taking a Labview course at my college and for a starting project we need to create a problem to convert x amount in USD to either Yen or Euro using a toggle switch and a select boolean function. I need to know how to display a text label for the Yen value and for the Euro value being displayed in the same numeric indicator when selected. Basically I have the program working I just need to know how to create a control that will show Yen next to the value when it calculates for Yen and likewise for Euro   

    Richx9252,
    As Ravens Fan said you can either use a string indicator next to the numeric indicator to display the currency type or use a property node to edit the label of the numeric control to display the current currency type.  Please let us know if you have more questions about how this will work.
    Regards,
    Sam K
    Applications Engineer
    National Instruments

  • How to create the default empty work book with company logo and address????

    Hi Guru's
    I am working in ECC5.0 (BW 3.5), i wann create the default empty work book with company logo and company address. so when i am executing any query's that should open in the default empty work book.
    greatly appreciated your help. will assign pt's for sure.
    thanks and regards
    Mohan

    Hi Mohan,
      Report designer is used in BI 7.It is a seperate application used for formatting
    the report.
    For BW3.5,go through this link.
    http://help.sap.com/saphelp_nw04/helpdata/en/33/746e393cf65c1ae10000000a114084/frameset.htm
    This would help you
    Regards,
    Senoy

  • How to create Report with different work sheets in XL Reporter

    Hi All
    I want to create a report in xl reporter where one report has multiple work sheets
    Regards
    Farheen

    Hi,
    There is no option to create report with different work sheets in XL Reporter. You may only use one sheet.
    Thanks,
    Gordon

  • Diffrence between working days & calander days

    HI Gurus,
                 What is diffrence between working days and calander days.
    In case of GR processing time in materail master it is working days but in case of planned delivery time it is calander days. Means planned delivery time is not consideruing any holidays, right.....
    Regerds
    ACP

    Hi
    Workings days ; will list the working days without the holidays.but
    calender days ; consider also the leave days also.
    so in GR processing time  is used to the interal acitivities say that after receive the material GR the material need to do the  GR process timing say inspection and documentations , then the material located to the Raw material sto location.
    so the GR processing time  is purelu based on the plant activies. so it consider the Working days only.
    but in  planned delivery time  is given for vendor to delivary the material. so it consider the calender days .

  • How to query the number of working days between two dates

    I'm looking for a solution to calculate the number of <i>working</i> days between two dates that I can use in a formated search. 
    Calculating the total number of days is pretty straight forward but does anyone know how to take into account the settings in the HLD1 (Holiday Dates) table?

    Hi Eric,
    If you are purely looking to exclude holidays defined in the HLD1 table, then you should be able to do it with the following query
    NOTE: The following query is an example using OINV table and the fields DOCDATE and DOCDUEDATE for a Particular DOCNUM  'xxx'
    If you planning to use within the SAP module then replace DOCDATE and DOCDUEDATE with dynamic field references $[$x.x.x]
    SELECT DATEDIFF(DAY,T0.DOCDATE,T0.DOCDUEDATE)-
    (SELECT COUNT(STRDATE) FROM HLD1 WHERE STRDATE >= T0.DOCDATE AND STRDATE <= T0.DOCDUEDATE)
    FROM OINV T0
    WHERE T0.DOCNUM = xxx
    Best Wishes
    Suda

  • How to Create Placement for contingent worker using API in 11i?

    We need to Create Placement for contingent workers using an API or program without using EBS forms.
    On the People form, there is an Action - Create Placement that does just what we need. We can select an Ex-contingent worker, create placement, and save. This creates a new Period Of Placement (PDP) record for the contingent worker with a new primary assignment. The result is the contingent worker can have multiple periods of placement to reflect different jobs they have worked on, for example one contract from Jan 10 - April 4, another from May 1 - 20, and a third starting Aug 7 without an end (yet).
    There are several APIs we find in the Integration Repository for 11i dealing with Contingent Workers, Assignments, and changing a Period of Placement, but we can't find any for creating a PDP.
    Thank you if you can advise on how to do this.
    Skip

    We need to Create Placement for contingent workers using an API or program without using EBS forms.
    On the People form, there is an Action - Create Placement that does just what we need. We can select an Ex-contingent worker, create placement, and save. This creates a new Period Of Placement (PDP) record for the contingent worker with a new primary assignment. The result is the contingent worker can have multiple periods of placement to reflect different jobs they have worked on, for example one contract from Jan 10 - April 4, another from May 1 - 20, and a third starting Aug 7 without an end (yet).
    There are several APIs we find in the Integration Repository for 11i dealing with Contingent Workers, Assignments, and changing a Period of Placement, but we can't find any for creating a PDP.
    Thank you if you can advise on how to do this.
    Skip

  • How to create schema to enable work with multiple users during developmet

    Hi,
    My goal is to enable all developers in the team to work on the same database and schema name installed on some server in the company but each developer will have a "personal" instance of the schema (so changes made to the database will not harm the other developers) and the connection to the schema will possibly made through different port (1521, 1522, 1523 etc). This kind of work is needed on developing time and possibly for the QA team. The oracle server is installed on some server and client installation can be installed (if needed) on each developer machine.
    What do i need to do in order to achieve this goal (if it possible at all) ?
    I am using Oracle 9.2
    Thanks a LOT for any help.
    simon.
    Message was edited by:
    user488209

    > Oracle and JBoss and Hibernate which is my
    persistence layer so Pl/SQL is not needed (right?)
    Simon, I would have taken a virtual lead pipe to you if you worked in our dev shop and made that statement. :-)
    Data persistance layers in the middle tier are fundementally flawed.
    Why? Because they attempt to do what the database is already doing. The database's core function is data persistance, data integrity, data processing.
    It does this better than any other piece of software in the architecture. If not, then why use a database tier (usually the most expensive one) anyway? What are the benefits? Why not simply persist the data in the middle tier and use file-based (not database-based) storage mechanism?
    Simple example. An employee object persist in the middle tier. Performance becomes a problem. JBOSS and other app server s/w scaled by adding more h/w. So now you have that employee object persisting as copies across several app platforms.
    One of the fundemental relational principles of dealing with a single copy of data is violated. Multiple copies exist. They need to be kept in sync'ed. Locking needs to be handled in a distributed fashion. And what happens when a batch process on the database, oblivious to the persistant copies in the app tier, changes that employee's data?
    Guess what.. the database does all this for you. Locking. Data integrity. Scalability. Etc.
    AND IT DOES IT BETTER THAN WHAT THE APP TIER CAN!
    So to answer your question. I write entire applications and systems in PL/SQL. Yes, PL/SQL is a capable language. Yes, anything you can do in Java (as far as data processing goes), PL/SQL does better and faster with more inherant scalability - with less development time. Fact and not opinion.
    Oracle has in excess of a million lines of PL/SQL source code for the Oracle Applications product suite. So PL/SQL is a "serious" language.. not something that is simply used for the odd thing.
    Performance wise? Oracle Replication is entirely written in PL/SQL - and not in something like C/C++ (which usually also outperforms Java).
    90% of all the code that we write, is PL/SQL. The remainder is Java (JBOSS) and Perl with some Pro*C legacy stuff (most of which is rewritten as PL/SQL). In fact, I think the guys now write more Perl code than Java (doing processing that needs to be done totally outside Oracle). And JBOSS is an integrated architecture that we're using... (we even have a JBOSS cluster with a Linux Virtual Server/Director as gateway)
    Not using PL/SQL? That will be a critical mistake. (I suggest that you visit http://asktom.oracle.com for more details on PL/SQL, Java, application tiers and database tiers).

  • How to create an imput text in an action script project in Flash Builder

    Hi, I am developing a game with starling framework.This is going to be an android game. What I'm trying to do is that when the game ends, the user can save his score and I want to create a form for this. How can I create a text entry field where you can enter your name for example?
    I've trying with this code, but doesn't works:
    var inputField:TextField = new TextField();
    addChild(inputField);
    inputField.border = true;
    inputField.width = 400;
    inputField.height = 50;
    inputField.x = 75;
    inputField.y = 50;
    inputField.type = "input";
    But flash Builder doesn't recognize the "type" value.
    Thank You.

    DPS only supports Single Edition applications on iPad devices. It doesn't matter what subscription level of DPS you purchase, we don't support Single Edition on Android (or iPhone).
    Neil

  • How to create two independent index in the same RH project?

    Hello everyone
    I used Rh html 9.
    I created a new index in my project to have two independent and different index, but the two index are connected. When I deleted one word in the new index, the same word is deleted in the first index.
    When I've created the second index, I didn't choose the option "from an existing index", because I wanted a new and empty index but RH created a copy of the existing index and linked with the existing index.
    It is possible toc reate a lot of different table of content and glossary but not different index ?
    If someone can explain me why it doesn't work for index.
    Thank you.
    Florence

    Hi there
    If you click File > Project Settings > General tab, is the index set to have keywords in Topics or the Index file (HHK)?
    If it's set for Index file (HHK) that would likely explain it because the keywords are stored directly inside the topics themselves.
    If the setting is already for Index file (HHK) I'm a bit stumped and can only fathom that maybe you have stumbled across a bit of a RoboHelp bug. I've not tried using multiple indexes before. Perhaps I should try and see.
    Cheers... Rick
    Helpful and Handy Links
    RoboHelp Wish Form/Bug Reporting Form
    Begin learning RoboHelp HTML 7, 8 or 9 within the day!
    Adobe Certified RoboHelp HTML Training
    SorcerStone Blog
    RoboHelp eBooks

  • How to create an executable file by including my C# project and database(SQL) in visual studio ?

    Hi,
         I had developed a project in visual studio c# and my database in SQL server. How can i create a executable file including both. 
    can any one give me a solution for this.
    I am trying to make executable in installshield.
    Thank you

    Hi,
    Try to use custom actions to call some managed method, execute the SQL script to create and initialize the database in the method.
    Check this article, it should be helpful for you to create the script and installation:
    https://msdn.microsoft.com/en-us/magazine/cc163919.aspx#S2
    We are trying to better understand customer views on social support experience, so your participation in this interview project would be greatly appreciated if you have time. Thanks for helping make community forums a great place.
    Click
    HERE to participate the survey.

  • How to create a simple File structure for a large project?

    Hi to all,
    I've own and operated my own website design/development (a 1 woman office, plus many sub-contractors) over the period of 8 years. I started hand-coding HTML sites in 1997, before the creation DW (though I think the first ver was for Mac in '97). Over the recent years I've udated my skills to include CSS and enough Java/PHP to customize and/or troubleshoot current projects (learn as I go).
    The majority of my clients have been other 1-10 person entrepreneur companies. I've recently won a bid to redesign a government site which consist of 30 departments, including their main site.
    The purpose of this thread is to get some ideas on creating a file management/structure. Creating file management setup for smaller companies was a piece of cake, using a simple file mgmt structure within DW. Their current file structure is all over the place. I've read about a very good, simple file struture in a DW CS4 manual and wanted to get feedback on different methods that have worked, and have not worked, or your client:
    Here's my thinking:
    1. within the root dir place home.htm and perhaps a few .htm related only to home
        2. create the following folders off the root, "docs, imgs/global, CSS, FLA, Departments"
                - sub folders within docs for each dept
                - site wide css's placed into CSS
                - site wide FLAs into the FLA
                - sub-folders created within 'imgs' for each dept, including a 'global folder' for sitewide images and menu imgs (if needed)
    - OR -
    1. create same file structure for each dept folder, such as 'imgs/CSS/FLA/Docs'
    Open for suggestions....
    Ciao

    It is a problem I have thought over at length and still feel what I use could be better. You are doing it the right way around researching before you start, as moving files once things are underway can course real problems. One issue is the use of similar assets across site(s), and version control if you have multiple versions of the same asset.
    Can not say I have built a site(s) of that size but would recommend putting together a flow chart to help visualise the structure and find out better ways organising (works for me). Good luck, post back with your solution.

Maybe you are looking for

  • Excise invoice creation problem

    Dear All, In the SAP Standard settings it is made in such away that during J1IS (creating excise invoice for return delivery) entry passed is CENVAT Input - Cr CENVAT Suspense - Dr. Now I have changed the settings from CENVAT Suspense to CENVAT Clear

  • Cant connect my 9pin to 4pin firewire to final cut express HD

    for some reason my firewire wont connect it the firewire on final cut expressHD is a 9pin to 4pin my computer only has one fire wire port and it is 9pin.

  • SWF-file not getting info from UI

    Hi All, I have a dialog that loads a flash-file. This swf-file gets info from my dialog and puts it in a datagrid. It works well, untill i try it the script on an other computer. The swf-file loads but is not receiving any information given through t

  • Is it possible to sort tags?

    I've tried various methods of sorting tags. None of them really represents the conventional output one would consider "sorting". I've had to, for example, prefix categories of tags in order to get some semblance of order. Lately not even this works v

  • How to get the previous record value in the current record plz help me...

    In my sql how to get the previous record value... in table i m having the field called Date i want find the difference b/w 2nd record date value with first record date... plz any one help me to know this i m waiting for ur reply.... Thanx in Advance