How to create Inpection Lot Z01 & 04 Type for same Material different Plans

I am trying to create an Inspectoin Lot for two different Inspection Types.  One for (Z01) Incoming Inspection via MIGO and the other for (04) GR Inspection for Production via MFBF.  The problem is I have the same Material for two different Inspection Plans.  The Z01 Inspection Type was copies from the 01 Inspection Type only difference is I activated the Multiple Specs feature for Z01.
1st Plan = Materia Group....BM206014,  Group Counter....1  (GR Incoming Inspectoin Z01 type)
2nd Plan = Material Group....BM206014,   Group Counter....2    (GR Inspection for Production 04 type)
A)  When I do the (Material Backflush) MFBF for the 04 type, the Inspection Lot gets created OK.  I then can go into QA32 and assign the correct Inspection Plat by clicking the Inspection Lot button.
B)  When I do the MIGO via the Purchase Order (type Z01), it will not create the Lot if I have the Multiple Specs selected in the QM Material Master MM02.  If, I turn off the Multiple Specs in the QM Material Master and create a new PO and MIGO, it will create the Lot, however, it automatically assigns the lot to the wrong Inspection Plan (2nd Plan see above)  I need to be able to select the plan like I can with the 04 type.
Is their some setting that can be changed in Config or somewhere that acts the same way as example A above?

>
dhayes12 wrote:
> A)  When I do the (Material Backflush) MFBF for the 04 type, the Inspection Lot gets created OK.  I then can go into QA32 and assign the correct Inspection Plat by clicking the Inspection Lot button.
>
> B)  When I do the MIGO via the Purchase Order (type Z01), it will not create the Lot if I have the Multiple Specs selected in the QM Material Master MM02.  If, I turn off the Multiple Specs in the QM Material Master and create a new PO and MIGO, it will create the Lot, however, it automatically assigns the lot to the wrong Inspection Plan (2nd Plan see above)  I need to be able to select the plan like I can with the 04 type.
>
> Is their some setting that can be changed in Config or somewhere that acts the same way as example A above?
For case A, create insp plan with usage "1- production" If you have one IP with this usage for given material then system will assign Plan to lot automatically. In your case for second plan update usage as 1.
For case B, system should assign 1st plan make sure for both plan udage is correct. for 1st plan usage should be 5 while 2nd plan usage should be 1. Now if your 1st have status 4 and key date before lot date then system will assign plan auto.
Thanks!!!

Similar Messages

  • GATP/ATP Check for Different Order Types for same material

    Hi :
    I have a material code X for which 2 different type of Sales Order (Say A and B )needs to be created.
    For Sales Order Type A the atp check needs to be done in APO through GATP for material code X.
    For Sales Order Type B the atp check needs to be done in SAP R/3 ECC 6.0 through availabilty check functionality for same material code X.
    It is not possible to create seperate material codes to carry out atp/gatp check seperately in R/3 and in APO.
    In real time the atp and cumulative atp position should be same in R/3 and in APO.
    Please let me know solution for this issue.
    With Regards
    Ashish Gupta

    Hi Ashish,
    Can you share with us as to how you were able to solve this issue. I have a similar issue like yours and I am totally clueless as to what needs to be done..
    My scenario goes this way:
    I have to modify the Schedule line dates for a GATP material according to a newly created date which I calculate based on the Route Schedule id (VL51, VL52) and display the same in the Sales Order schedule line items.
    Also can I get a new set of schedule line dates from the APO system for a date which I calculate based on the Goods Issue date - VALW-AULWE in any exit using a FM or a BAPI?? so that I can get these dates and populate the same in the Sales Order Schedule line??
    Thanks in advance,
    Susanth

  • Skip lot across multiple batches for same material

    Hi,
    I am looking for a way to control skip lots across multiple batches for the same material.
    We need to do a quality check in production after a certain quantity produced (on a machine, for a material). My idea was to do skip lots (for GR)  until we reach a threshold (say 10.000 pcs) and then do an inspection for the next GR for that material.
    Any ideas how to set that up?
    Thanks for any hint
    Andreas

    Hi mergler,
    Ref to your query pls check this link Stock Posting for Skip Lots
    Thanks in advance

  • How to create a new 'id and type rect' in _edge.js from your stage in javascript

    how to create a new 'id and type rect' in _edge.js from your stage in javaScript

    _edge.js is an object file their is any way to create ?
    if i run this script "alert(Stage);" in creationComplete
    i will get
    i have little idea on object example
    var obj = {car: "honda city"};
    obj.bikes = {model: "suzuki"};
    alert(obj.bikes.model);
    Anyway thank u vivekuma for ur kind reply!

  • How to create a new AP invoice type? (R12)

    Hi Experts,
    I'm trying to create a new AP invoice type, I wonder why there is no functions where to create a new one.
    Could you please tell how to create a new AP invoice type in R12?
    Thanks in advance,
    Nuel

    Hi
    We also have a requirement which can be fulfilled only by creating a new invoice type, because its a system defined am unable to change the access type to User. So what i have done is i have created a DFF in invoice header with new invoice type and doing a customization based on that.
    Regards,
    Vicky

  • How can we change the valuation type for a material created.

    How can we change the valuation type for a material created.
    Note : All open orders are closed for this material.3
    Please guide

    Hi,
    You can change valuation class, or you can set valuation category for your material master. If valuation category is set you can extend your material master and in this way creating records for different valuation types.
    Please try to set the desired changes in your mmr (MM02) > save > SAP will give you error message > push 'Display error' button and you will see what conditions must be eliminated to carry out the change.
    - you are not allowed to have open transactional data
    - no stock in the current and previous period (using proper posting date in MB1A + 201 you can reduce your stock level to 0, and after that you can set it back by MB1A + 202)
    - in case of valuation category setting batch archiving may be necessary
    BR
    Csaba

  • HT2534 Its is fake . i have bought iphone today but i haven't cred card so how i create account ? Your example type "none" window not come . New iphone but with out ID useless Phone :(

    Its is fake . i have bought iphone today but i haven't cred card so how i create account ? Your example type "none" window not come . New iphone but with out ID useless Phone

    Most of the people on these forums, including myself, are fellow users - you're not talking to iTunes Support here.
    Did you follow the instructions on that page exactly when creating the account (the instructions won't work with existing accounts) ? e.g. if doing it on your phone and you are currently logged into an account then log out of it, find a free app in the app store app, tap on its free price button, tap 'install app', and then tap on 'create new apple id' on the popup that you get. I tried those instructions on my phone a few days ago in response to another thread and I got the 'none' option on the payments screen.

  • Need to create a Store Business document type for material master and store a sharepoint link

    Hello,
    I need to create a Store business document type for material master and store a URL link . How do I do that?( or is there any functionality to upload a document for a  store business document that it will automatically saves to sharepoint?)
    Thanks,
    Ran.

    >
    dhayes12 wrote:
    > A)  When I do the (Material Backflush) MFBF for the 04 type, the Inspection Lot gets created OK.  I then can go into QA32 and assign the correct Inspection Plat by clicking the Inspection Lot button.
    >
    > B)  When I do the MIGO via the Purchase Order (type Z01), it will not create the Lot if I have the Multiple Specs selected in the QM Material Master MM02.  If, I turn off the Multiple Specs in the QM Material Master and create a new PO and MIGO, it will create the Lot, however, it automatically assigns the lot to the wrong Inspection Plan (2nd Plan see above)  I need to be able to select the plan like I can with the 04 type.
    >
    > Is their some setting that can be changed in Config or somewhere that acts the same way as example A above?
    For case A, create insp plan with usage "1- production" If you have one IP with this usage for given material then system will assign Plan to lot automatically. In your case for second plan update usage as 1.
    For case B, system should assign 1st plan make sure for both plan udage is correct. for 1st plan usage should be 5 while 2nd plan usage should be 1. Now if your 1st have status 4 and key date before lot date then system will assign plan auto.
    Thanks!!!

  • How to create a single 'not null ' validation for all the items in a page ?

    Hi everyone ,
    how to create a single 'not null ' validation for all the items in a page ? I have many textfields . Instead of creating 'not null' validation for each item , I would like to create a a single validation control that will serve the purpose
    Thanks & Regards
    Umer

    Nice1 wrote:
    bob , as u said I have done the following :
    1) under create button , there are 9 items and for each item I have set Required to 'Yes'
    2) under delete button , there is 1 item and have set Required to 'Yes' for the item
    3) defined page validation for 9 items under 'create ' button and have set it to fire when 'create ' button clicked
    4) defined page validation for 1 item under 'delete ' button and have set it to fire when 'delete ' button clicked
    now , when I click 'create' button it even shows for the item under 'Delete ' button that it is a required itemSorry, I didn't see this note. The required template won't work, there is no way to attach it to the button.
    The best solution is as the reply a couple replies up
    Create 2 page type validations as a PL/SQL with code
    1st validation
    :P1_ITEM1 IS NOT NULL and :P1_ITEM2 IS NOT NULL ...... and :P1_ITEM9 IS NOT NULL  include all 9 items
    Set the When Button Pressed to the CREATE button
    2nd validation
    :P1_ITEM10 IS NOT NULL
    Set the When Button Pressed to the DELETE buttonI think that's going to be the easiest way to do it.
    Edited by: Bob37 on Apr 27, 2012 12:02 PM

  • Workflow - Create a new buisness object type for an new infotype.

    Hi all,
    I have an issue with creating a new buisness object type, which is related to a
    supertype, for an new infotype.
    I am new to workflow and business object. I don't have much knowledge in these area. I need to resolve this problem ASAP.
    Could someone please provide me a step-by-step guide on how to create a new business object type, which is related to an existing supertype, for an newly created infotype?
    If would be very much appreciated if someone could assist me in resolving this issue.
    Thank You.

    Business objects are maintained in SWO1 creating a subtype is done with the button: Create subtype (F9)
    If you don't have knowledge of workflow or abap objects, it is perhaps better to tell your employer that and find someone who has.
    If your problem is simply only creating a subtype then go with the instructions I already gave you, if however more things need to be done, like extending the subtype with (virtual)attributes, methods, events, delegating the subtype and implementing the methods in newly created tasks and subsequently workflows I really advise to find someone who can do this, or attend a SAP course on this subject.
    Kind regards, Rob Dielemans

  • How to create a custom task in SRM for the standard task

    Hi Gurus,
    How to create a custom task in SRM for the standard task  eg: TS10407929
    regards,
    George.

    from PFTC itself. Same.

  • How to Create one more SOA-INFRA under the same domain in weblogic server

    Hi All,
    Can anybody can guide how to create one more soa-infra under the same domain. In order to maintain my composites to be deployed into
    different domains, I need to create one more soa-infra and deployed all the composites under that one.
    Please let me know if any demo is available for this activity to be gets completed.
    Regards,
    CH

    Hi Vijay,
    There are several composites which needs to be deployed and maintained in the server. So, we I'm trying to maintian
    by deploying composites into 3 different SOA-INFRA's so if one is not accessible, we can look into it and others can access the
    composites from another SOA-INFRA instead of creating domains.
    Let me know what will be feasible way to perform this activity.
    Regards,
    CH

  • How To Create A Technical And Business Systems For Web AS ABAP ???

    Hi Experts,
    How To Create A Technical And Business Systems For Web AS ABAP ???
    Please Let me Know All the Step-By-Step Process to Create ????
    Points Will be Given
    Regards
    Khanna

    Hi Sumit,
    When U Told the thing that first time to execute the RZ70 and All i Did this in XI System
    So I got An Entry for the Technical System for XI System.
    Now i Deleted that and Executed RZ70 in R/3.
    When I Executed RZ70, I got this Error.
    <b> "RFC Call failed: Error Opening an RFC Connection "</b>.
    Now I am Unable to see Any Technical System  Under Web As ABAP. It's Showing Empty Now.
    Please Let me know
    Regards
    Khanna

  • How to create distribution list in workflow? for  sending mail or work-item

    Hi,
    How to create distribution list in workflow? for  sending mail or work-item to multiple users.
    Regards,
    Surjith

    Hi Surjith,
    A.Working with Distribution Lists Creating a Distribution List.
    1 Businees Workplace->shared folder - create new subfolder name = WF_distributor
    2.Then click on the distribution list in Businees Workplace.
    say create Name = WF_Vliste
    folder Name = WF_distributor
    3.distribution list content tab
    Enter Recipient (SAP User ID)
    B.Wrkflow Builder
    Find out the dialig step in which u want to use distribution list
    Use workflow Rule 30000012 (SWX_READ_DLI).
    Maintain the binding from workflow container to rule container.
    Just pass the name of the distribution list from WF to Rule container.
    Regards
    Sagar S

  • How to create Characteristic group in CO-PA for assessment purpose

    Hi,
    Can anybody guide me as how to create Characteristic group in CO-PA for assessment of cost center balance to CO-PA?
    Thanks,
    Bijay

    You need to be more specific in your request - are you looking for a sender, or a receiver grouping? Which characteristic? Is it to be all the values in a characteristic, or is it to be groups of those characteristics.
    Have a look at the setting up of hierarchies for characteristics in COPA master data.

Maybe you are looking for

  • Getting at POST data from a pl/sql procedure through Path Aliasing

    Hi. I have mod_plsql configured with "path alias" and "path alias procedure" so that the request ends up in my procedure and i have the remaining path in p_path. This is what I want. http://<domain>/<dad>/<myalias>/<p_path> My question is; is there a

  • Wildcard * SSL Certificates for TTA??

    Is there any way I can use a wildcard SSL certificate like: *.mycompany.com in my TTA server? I was able to run all the cert commands successfully using the *.mycompany.com cert: Generated the CSR (tarantella security certrequest) Installed the Cert

  • Group texting.

    Group Texting is not working on my i phone 5. I m unable to receive texts.  I have version 8.1.2  Please help!

  • Interface versus abstract

    Hello, i want to support users with method calls that uses interfaces like this public void performOrder(Order order) { // do something So now i must define a good interface the user can implement and use these methods. In my special case the user mu

  • Could anyone suggest me for Month end closing!!!!!!!!!!

    What does closing subledger and other ledgers mean in month end closing. I am new , I would appreciate if anyone helps with monthend closing .I will assign you points.Thanks in advance.