Good Morning Guys
Am trying to implement shift sequence in my company.There are three shifts currently running and between the shifts are divided into two, managers and the subordinate staff.Managers go on a 3day shift with 4 shifts one being on standby while the suborditates go on a 7 days shift rolling both of which work on the same work center.Am having challenges to do the configuration as i have no prior source of reference on how to implement such a scenario
kindly assist
Regards
Hussein

Your requirment is not very clear, according to my best understanding of your above explanation it is
3 shifts per day for 7 days cycle
7 days all subordinates (which means 3 days managers +subordinates and 4 days only subordinates)
while only managers available for 3 days (Managers and Subordinates capacity available)
This is how I managed to create the interval and shift in the same work center, check if this is what you are looking for
Regards
Murad

Similar Messages

  • How to create New Work Center

    Dear Experts
                      How to create New Work Center?, what are all the inforamtions  need while creating workcenter.
    Regards
    Rajakarthik

    Hi,
    In addition to the above post, you need to identify that:
    1. Whether you need separate activity types and cost center for the newly created work center. These details are entered in the Costing View of the Work Center.
    If these are required then use KL01 to create new activity, KP26 to define the activity price.
    If required create cost element using T Code KA01 and Cost Center using KS01.
    Take help from the CO guy on this.
    2. Also  you need to ask the concerned about the operating times for the wor center. That is Start time and End time of WC. It is used for capacity evaluation and scheduling of the orders. It is maintained in the capacity view (Bottom left Button in the view).
    this view will also contain the details regarding the calendar, to be assigned to the work center, if needed. Collect details for this requirement. Also you can assign a different calendar to WC apart from factory calendar.
    3. Find out whether this WC will be operating in shifts or not. Accordingly maintain the details.
    Hope it is useful for you.
    Revert for clarifications
    Regards,
    Rohit.

  • How to create new profit centre to Cash Journals

    Hi Friends,
    Please suggest me how to create/assign profit centre to Cash journals ( Cash Payment & Cash Reciepts)
    Thanks & Regards,
    Naveen.

    Hi Naveen,
    As already replied, we do not fix Profit center to cash Journals, but when you enter your cash Payments>Expenses, then you enter a cost object and from there the profit center entry is derived.
    For balance sheet accounts, you enter profit center manually..
    If you want to fix P.Cntrs for Cash Line posting, then you need to write Substitution and for that you will have to use User Exit.
    Usually in a New GL Scenario, the balance sheet line item gets split in the expense ratio, so we do not fix P.Cntrs for Cash line items..
    If your question is something else.. do let us know.
    Regards,
    SAPFICO

  • How to create a work flow template

    HI
    how to create work flow template using EP.
    I am new to this division of  EP .
    Could some please give me a head start to go with this
    some how to docs or weblogs
    thanks
    pk

    Universal Worklist Configuration
    http://help.sap.com/saphelp_nw04s/helpdata/en/0c/19dfc6febc4f888701697ef23b16cd/frameset.htm
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/com.sap.km.cm.docs/library/xi/xi-how-to-guides/how to configure the universal worklist.pdf.
    Patricio.

  • How to create a working link anchor in an EXCEL document with the report generation toolkit?

    I am using the latest report generation toolkit and want to add links on the first worksheet pointing to the other worksheets in the same document.
    I am using the "Append Hypertext Link Anchor to Report" VI. The links are created, but don't work when clicking them.
    Question now is: How does a link to a cell on a different worksheet needs to look like?
    It can not be that complicated but all variations I tried did not work and I could not find any information about this problem. So any help is appreciated!
    Thanks and Regards,
    Ingo
    Solved!
    Go to Solution.

    Thanks, Brian, for your support! - It's working.
    It's hard to understand why NI did not pass this parameter to the top of the call chain...
    I also needed some time to understand the syntax of the string passed to the subaddress node:
    The name of the worksheet needs to be framed by single quotation marks and the following cell address must preceeded by an exclamation point (!).
    A working link pointing to cell "A1" of "Worksheet 1" looks like:
    'Worksheet 1'!A1
    Maybe also of interest: If you want to point the link to a worksheet inside the document itself, the parameter "address" (URL of link - href) can be left empty.
    Thanks and Regards,
    Ingo

  • How to create a working day/holiday attribute in Time Dimension with OWB ?

    Hello everybody,
    I am trying with no success to create a Time Dimension (with the wizard it would be easier...) with a working day or holiday attribute (0 or 1) to be able to calculate measures only on working time !!! I am totally sure it's possible, obviously, but I found nothing on forums... Could you help me ??
    I use OWB 11g, I need all fiscal year/quarter/month/week and all calendar year/quarter/month/week attributes so without any wizard it would be quite impossible... thank you for your help !
    NB: of course I know how to define if a day is a working one or not, but I currently can't add any columns in Time dim created with wizard...
    Francois
    Edited by: [email protected] on Jun 15, 2009 8:24 AM

    Hi,
    First of all, thanks everyone for your help.
    I did several tests this morning.
    First of all, i've tried with time_from = 000000 and time_to = 235959 (23:59:59 CET) and the activity has been created with Time From = 04:00:00 and Time To = 03:59:59
    Strange no ??
    I've also tried with 230000 for time from and time to but the activity has been created with Time From = 03:00:00 and Time to = 03:00:00
    I cannot understand the logic behind....
    Thanks,
    Johnny Baillargeaux

  • How to create a work center for Workflow

    Dear all,
    I need some material or help to create work center in workflow
    for agent assignment.
    or
    How to assign Multiple responsible agents for a specific task
    Regards,
    Gaurav Sood

    Hi Imthiaz,
    Good Morning,
    I will Like describe you the secnario that i am in.
    I have customised workflows for
    1. Please release PO
    2. PO release effected.
    Both creator and relesing authority get notification for the same
    in SAP Inbox.
    In Addition to that i want to assign few other people who should get notification of mail PO Released.
    can you explain a bit more about Expression table
    regards,
    Gaurav

  • How to create 2 Work Manager Apps on SMP Server (Agentry)

    Hi All,
    I encountered a problem with my SMP 2.3 SP3 in combination with Agentry  6.1.. and Work Manager 6.0.
    I have an already working version of WorkManger on my SMP Server on port 7003, but whenever I create another WorkManager version on a different port e.g. 7005 the SMP/Agentry Server displays the status STARTING but never finishes this processs state.
    The version of both Work Manager instances is the same, with the exception that the section [ANGEL Front End Ports] in the file Agentry.ini contains once the port 7003 and in the other file e.g. 7005.
    Has anyone a encountered a similar problem or is able to create two different WorkManager versions on the same AgentryServer?
    Regards,
    Thomas

    Hello Steve,
    thanks for your quick reply, the listenOn Port is at both applications the same I will fix that in a few seconds.
    the entry nonStandardJavaOptions is at both apps empty.
    the startup.log of the second application:
    14:16:58 03/19/2014: Starting server (64-bit Windows)
    14:16:58 03/19/2014: Administration client command port is 55086, status port is 55087
    14:16:58 03/19/2014: Looking for initial status connection...
    14:17:04 03/19/2014: Event: 0, 30, Admin client 10.33.160.94:55094 authenticated successfully.
    14:17:04 03/19/2014: Event: 0, 27, Admin client 10.33.160.94:55094 has connected
    14:17:04 03/19/2014: Reading system ini file.
    14:17:04 03/19/2014: ID: SAP Work Manager Server v6.0.0.0, Name: ???, Location: ???
    14:17:04 03/19/2014: Starting log file.
    14:17:04 03/19/2014: Loading message groups.
    14:17:04 03/19/2014: Starting threads.
    14:17:04 03/19/2014:    1 initial threads.  Threads will auto-scale.
    14:17:04 03/19/2014: Starting Server: Agentry v6.1.3.10212
    14:17:04 03/19/2014: Event: 0, 2, System Startup
    14:17:04 03/19/2014: Loading 1 front ends
    14:17:04 03/19/2014: Loading front end from angelvine.dll
    14:17:04 03/19/2014: ANGEL Front End: reading init files.
    14:17:04 03/19/2014: Event: 17, 14, ANGEL Front End v6.1.3.10212
    14:17:04 03/19/2014: Event: 0, 2, Loading the Agentry Server's public/private key for password exchanges.
    14:17:04 03/19/2014: Event: 0, 2, Key pair loaded successfully.
    14:17:04 03/19/2014: Starting Server Agent.
    14:17:04 03/19/2014: Agentry: Starting threads.
    14:17:04 03/19/2014:    1 initial threads.  Threads will auto-scale.
    14:17:04 03/19/2014: Agentry: Adding messages.
    14:17:04 03/19/2014: Event: 1, 4, Agentry v6.1.3.10212
    14:17:04 03/19/2014: Loading 1 agents
    14:17:04 03/19/2014: Loading agent from ag3.dll
    14:17:04 03/19/2014: Starting Server
    14:17:04 03/19/2014: Server: reading ini file
    14:17:04 03/19/2014: Initializing 2-HTTPXML from ag3httpxmlbe.dll
    14:17:04 03/19/2014: SystemConnection-2: Reading configuration information.
    14:17:04 03/19/2014: SystemConnection-2: Setting name to 'HTTP-XML Back End'.
    14:17:04 03/19/2014: HTTP-XML Back End: Initialized.
    14:17:04 03/19/2014: Event: 24, 4, Loaded HTTP-XML Back End (HTTPXML v6.1.3.10212) from ag3httpxmlbe.dll
    14:17:05 03/19/2014: Initializing 1-Java from ag3javabe.dll
    14:17:05 03/19/2014: SystemConnection-1: Reading configuration information.
    14:17:05 03/19/2014: SystemConnection-1: Setting name to 'Java Back End'.
    14:17:05 03/19/2014: Java Back End: Initialized.
    14:17:05 03/19/2014: Java Back End: Java Virtual Machine loaded.
    14:17:08 03/19/2014: Java Back End: Java Back End AJAPI version 5.0, release 6.1.3.10200
    14:17:08 03/19/2014: Event: 23, 101, Java Back End: AJAPI JAR version 6.1.3.10200 does not match the version of the Agentry Server
    14:17:08 03/19/2014: Java Back End: Initialized.
    14:17:08 03/19/2014: Event: 23, 4, Loaded Java Back End (Java v6.1.3.10212 (JVM version 1.6.0_22, AJAPI version 5.0 build 6.1.3.10200)) from ag3javabe.dll
    14:17:08 03/19/2014: Event: 20, 150, Loading Production application definitions using file "SAPWM-v1-0-0-app"
    14:17:08 03/19/2014: Event: 20, 152, Loading Production application definitions for default localization

  • How to create a working SaveAsDoc command

    Hi Everybody,
    I need to create a SaveAs command to save converted document (from previous versions to CS5) without any user intervention.
    Unfortunately all the utility functions like IDocFileHandler, IDocumentUtils, etc. don't work or miss the saveAs command completely or in part.
    I'd like to create a command using the usual way like:
    InterfacePtr<ICommand> saveAsCommand(CmdUtils::CreateCommand(kSaveAsDocCmdBoss));
    It works but I don't know what parameter I need to pass to the command object.
    May any of yout poin me out on where to find the right information?
    Is there any class for the SaveAs command data like for many other commands? (for example IID_IRECOVERDOCUMENTCMDDATA for
    the command kRecoverDocumentCmdBoss).
    Some of you may wonder why I need to create a SaveAs command when there is plenty of helper functionalities to achieve that. Well, it seems
    that all the functionalities I know don't work (crash) in my specific situation. :-\
    Thanks a lot in advance.
    Luca Severini

    Thanks for your helpful reply Jack.
    I was going to infer the right parameters from other commands using same parameters but your reply speeded-up my work.
    About the boolean flag, accordingly with SaveAs command defined in IDocFileHandler interface it may be this: bool8 asStationery.
    As happens with Save command, also SaveAs command doesn't crash if I avoid to use IDocFileHandler, IDocumentCommands or
    any other helper interface.
    Take present this code runs inside a cooperative thread from IIdleTask::RunThread().
    Here is an excerpt from my code which seems to work fine:
    If there is any mistake pleas elet me know.
    Luca
    UIDRef docRef = gGlobals->GetCurDocRef();
    IDataBase* database = docRef.GetDataBase();
    ASSERT(database);
    InterfacePtr<IDocument> curDocument(docRef, UseDefaultIID());
    ASSERT(curDocument);
    InterfacePtr<IDocFileHandler> docFileHandler(Utils<IDocumentUtils>()->QueryDocFileHandler(docRef));
    ASSERT(docFileHandler);
    if(curDocument->IsModified())
         ErrorUtils::PMSetGlobalErrorCode(kSuccess); // Cleans the global error code
         if(curDocument->IsConverted() || curDocument->IsMissingPlugins() || !curDocument->IsSaved())
              if(docFileHandler->CanSaveAs(docRef))
                   const IDFile *destFile = database->GetSysFileFromOpen();
                   ASSERT(destFile);
                  // docFileHandler->SaveAs(docRef, destFile, kSuppressUI); // Crash on CS5 with Automatic Import...
                   InterfacePtr<ICommand> saveAsCommand(Utils<IDocumentCommands>()->CreateSaveAsCommand());
                   ASSERT(saveAsCommand);
                   saveAsCommand->SetItemList(UIDList(docRef));
                   InterfacePtr<ISysFileData> fileData(saveAsCommand, UseDefaultIID());
                   ASSERT(fileData);
                   fileData->Set(*destFile);
                   InterfacePtr<IUIFlagData> uiFlagData(saveAsCommand, UseDefaultIID());
                   ASSERT(uiFlagData);
                   uiFlagData->Set(kSuppressUI);
                   InterfacePtr<IBoolData> stationaryFlag(saveAsCommand, UseDefaultIID()); // Does this the asStationery flag like in IDocFileHandler ?
                   ASSERT(stationaryFlag);
                   stationaryFlag->Set(kFalse);
                   if(CmdUtils::ScheduleCommand(saveAsCommand) == kSuccess)
                        while(!saveAsCommand->IsDone() && ErrorUtils::PMGetGlobalErrorCode() == kSuccess)
    #ifdef DEBUG
                             DebugStr("Waiting to finish with document saving...\n");
    #endif
                             idleTask->YieldToEventLoop(100);
    else
              if(docFileHandler->CanSave(docRef))
                   // docFileHandler->Save(docRef, kSuppressUI); // Crash on CS5 with Automatic Import...
                   InterfacePtr<ICommand> saveCommand(Utils<IDocumentCommands>()->CreateSaveCommand(docRef, kSuppressUI));
                   ASSERT(saveCommand);
                   if(CmdUtils::ScheduleCommand(saveCommand) == kSuccess)
                        while(!saveCommand->IsDone() && ErrorUtils::PMGetGlobalErrorCode() == kSuccess)
    #ifdef DEBUG
                             DebugStr("In attesa conclusione del salvataggio...\n");
    #endif
         result = ErrorUtils::PMGetGlobalErrorCode();
         if(result != kSuccess)
              errorMessage = ErrorUtils::PMGetGlobalErrorString();
              time.CurrentTime();
              sprintf(msgStr, "Errore %d \"%s\" in salvataggio documento\r", result, errorMessage.GrabCString());
              gGlobals->GetLogs()->WriteLog(&time, msgStr);
    if(docFileHandler->CanClose(docRef))
         docFileHandler->Close(docRef, kSuppressUI, kFalse);
         result = ErrorUtils::PMGetGlobalErrorCode();
         if(result != kSuccess)
              errorMessage = ErrorUtils::PMGetGlobalErrorString();
              time.CurrentTime();
              sprintf(msgStr, "Errore %d \"%s\" in chiusura documento\r", result, errorMessage.GrabCString());
              gGlobals->GetLogs()->WriteLog(&time, msgStr);
    else
              docRef = UIDRef::gNull;

  • How to create a working  Gateway service utilizing an Existing ECC Function Module?

    Hello All,
    Our ECC (Back end) has a Function module which is to be used by creating a Gateway service .Can you suggest the step by step procedure with which i can continue to expose the service?
    Any help on this is much appreciated!
    Thanks,
    Usha

    Hi Usha,
    the flag 'Local app' indicates where the implementation of the service is done because it can be done on the Hub or on the backend. (see my blog about deployment options SAP Gateway deployment options in a nutshell).
    If you choose 'Local App' the BEP API will be called on your hub while otherwise it will be called on the backend system to which the RFC destination points to which has been maintained in your system alias definition.
    Best Regards,
    Andre
    This is explanation offered by SAP Help:
    Indicates that the System Alias is to be used by BEP
    SAP NetWeaver Gateway applications can be developed either on a SAP Business
    Suite backend system or on a SAP NetWeaver Gateway hub system. To access the
    business logic from an SAP Business Suite backend system the software component
    IW_BEP (Backend Enablement and Event Provisioning) has to be deployed in your
    system landscape. IW_BEP can be deployed on the backend system or locally on the
    SAP NetWeaver Gateway hub system. Communication is handled via system aliases
    (RFC destinations).
    Use
    Set this flag if you use this system alias for an OData Channel application
    that has been developed on the BEP add-on which is deployed on the SAP NetWeaver
    Gateway hub system.
    In this case the system alias information (such as RFC destiation, Web
    service group, software version) is not used by SAP NetWeaver Gateway to
    call the BEP API (it is called locally). Instead the system alias information is
    passed through to the OData Channel application, so that it could then itself
    make a call to the corresponding backend system.

  • How can we create a work schedule number

    Dear pp masters
    i have one issue in our client side, we are in repetitive manufacturing(with mrp),how to create the work schedule number,,,, ,in that we have see only semifinished not finished,what is the t-code pls reply back
    thanks in adavance
    devendra

    Hi,
    Please check the below link ;
    http://www.sap-img.com/production/commonly-used-tcodes-in-pp-module-part-1.htm
    Regards
    Sreedhar reddy

  • How     do we create shift group

    hai friends,
    how to create shift group plz
    suitable answer will be rewareded
    aruna

    hai aruna kumari,
    In shift groups we have ti enter all the shifts in your company(DWS),absence types,attendance types as per your requirement.
    Reward points.
    Regards,
    Chiran Reddy.
    Edited by: chiran reddy on May 6, 2008 11:38 AM

  • How to measure work centre performance in the pp point and pm pinot of view

    Dear Guru`s,
    how to evaluate the work centre performance in the pp,pm point?
    how to evaluate the OEE (overall equipment efficieny)?
    can anybody suggest that, if there is any transactions are avialable to get the reports or any process is to be followed to evaluate these?.
    regards,

    hi
    you can evaluate the PM work center using t-codes
    CR05 - Work Center List
    CR06 - Cost Center Assignment
    CR07 - Work Center Capacity
    CR08 - Work Center Hierarchy
    with this you can get the requirment,available and overlaod of the capacity
    OEE cannot be directly calculated you can develop the custom based program to calulate the one with available input,( available hrs,down time hrs)
    regards
    thyagarajan

  • How two create UPDATE FUNCTION MODULE

    Hi,
    I have 2 tables to update one after the other...
    I have geard it is advisable to use update function module for this..
    can any1 tell me how to create and work with update function modules...
    Answers will be rewarded....

    Abhay,
    How an update function module works is, the execution of the FM is delayed to until when a COMMIT WORK statement is executed.
    Hence if you have the data available for updating the two DB tables at the time of calling the FM, you can pass the tables to the same FM and program the DB update for both in the same FM.
    However the COMMIT WORK should be outside the FM further down in the calling program.
    This link is very good and easy to follow
    http://help.sap.com/saphelp_erp2005vp/helpdata/en/41/7af4daa79e11d1950f0000e82de14a/frameset.htm
    Hope it helps
    Aditya[url=http://help.sap.com/saphelp_erp2005vp/helpdata/en/41/7af4daa79e11d1950f0000e82de14a/frameset.htm]
    Message was edited by:
            Aditya

  • When Creating a Work Order Import Standard Operations

    A client is requesting the following functionality when creating a Work Order: Create the first nine operations with different work centers and number operations 0001 u2013 0009.  For operation ten continue numbering with 0010 and increase by 10, ie, 0020, 0030, etcu2026 .   And operation 0010 would default header data.
    Can this be accomplished through standards configuration or would this entail a user exit?
    Thanks in advance!!
    JAM

    It can be possible, depending on how you create the Work Order.   If these operations are used often and are in a task list, you can create a work order and import the task list operations by using the menu "extras -> task List selections" inside the work order.    If it is part of a preventative maintenance plan, you can configure that your task list is automatically copied to the notification/work order when generated by your maintenance plan.  Of course in the task list you could save all the increments and work centers as you want.   But this would never be a dynamic check to your header data, it would only be as accurate as your task list.

Maybe you are looking for

  • Can I change my iTunes account country without a credit card

    Ok I made an account and it was made for the us store. But I live in nz (new Zealand) and I need a credit card to change it. Can i put a iTunes gift card code in instead to change it?

  • Not able to Create Product Group.

    Hi All, Not able to Create Product Group. I has to be solved urgently. The below message form SAP. The field  is defined as a required field; it does not contain an entry Message no. MG144 Procedure Transfer a suitable value. If the field is the mate

  • Arch doesn't boot up after Windows Update on Surface Pro 3

    Hi all, I am using a Microsoft Surface Pro 3. I have a persistent installation of Arch on a USB drive. It works very well on the Surface. The only problem I am facing is, whenever I run Windows Update, I am not able to boot from the USB Arch installa

  • Buying ALL songs from Wish List

    There used to be a button on the Wish List page to buy all the songs from your Wish List but now with the latest upgrade, it's no longer there. Is there a new way to buy ALL the songs from your wish list? I have 14 songs and I don't want to buy each

  • HIDE CHART COLUMN

    Hi all, Is there a way in obiee that can we hide a column in chart format report. If there is a way please let me know. i need to hide one of the columns in the chart report. Thanks Edited by: Copter on Oct 24, 2011 10:15 AM