How to define the OSB Configuration Project that an OSB Project uses?

Hello,
I'm using the Workshop bundled with "Oracle Service Bus 10gR1" (Oracle Workshop for WebLogic, Version: 10.3, Build id: 1137967).
Where does one define the OSB Configuration Project that an OSB Project should use?
I deleted an OSB Configuration Project. Now, all the OSB projects that were associated with it are in error stating "This project is not associated with an Oracle Service Bus Configuration". I created a new OSB configuration project so that I may re-associate the "orphan" projects with it. However, I can't seem to find a way to do that.

You can create a new osb configuration project and drag the other osb projects on this projects.
then i will link them to it. (make sure you use the oracle service bus perspective at the top right of the eclipse ide)

Similar Messages

  • How to limit the max dialog no that one user can use at the same time?

    Hi,
    I meet one performance problem that one user can open 6 sessions in the GUI and he/she can run 6 reports at the same time witch could occupy 6 dialogs in the sap R/3 instance. It makes poor performance for other users.
    Would you pls tell me how to limit the no. of sessions one user can create at the same time or how to limit the no. of dialogs one user can occupy at the same time?
    Thanks a lot!
    I used this parameters in the default profile as blew:
    rdisp/rfc_check 1
    rdisp/rfc_use_quotas 1
    rdisp/rfc_max_own_used_wp 20 (means: 20%)
    It still didn't work.
    Sean

    Hello,
    We can reserve DIA W.P by giving value to the parameter :- rdisp/rfc_min_wait_dia_wp=1(default)
    that have to necessarily remain free for other users.
    This parameter is used to reserve a number of dialog work processes for Dailog mode.
    For eg. If 10 dialog w.p. are configured for the instance(rdsip/wp_no_dia=10) and the parameter rdisp/rfc_min_wait_dia_wp=3 is set,parallel RFC's can occupy a maximum of 7 DIA W.P.3 DAI W.P. always remain free for dialog mode.
    But now the question is how we assign/restrict this free dialog w.p. to the specific user.
    Reply...
    Regards,
    JUNAID

  • How to stop the spinning ball/pizza that is stalling repairs to project on imovie 09? on macosx10.5.8 using iomega and superspeed ext h.d. as storage for the events and projects archive of a wedding video that has had audio sync problems on all share form

    How to stop the spinning ball/pizza that is stalling repairs to project on imovie 09? on macosx10.5.8 using iomega and superspeed ext h.d. as storage for the events and projects archive of a wedding video that has had audio sync problems on all share formats (iDVD, mp4, and last of all iTunes). The project label now carries signal with yellow triangled exclamation “i tunes out of date”.
    To solve the sync problem I’m following advice and detaching sound from all of the 100 or so short clips.  This operation has been stalled by the spinning ball. Shut down restart has not helped.
    The Project is mounted from Iomega and superspeed ext hd connected to imovie09 on macosx 10.5.8.
    What to do to resume repairs to the audio sync problem and so successfully share for youtube upload?

    How to stop the spinning ball/pizza that is stalling repairs to project on imovie 09? on macosx10.5.8 using iomega and superspeed ext h.d. as storage for the events and projects archive of a wedding video that has had audio sync problems on all share formats (iDVD, mp4, and last of all iTunes). The project label now carries signal with yellow triangled exclamation “i tunes out of date”.
    To solve the sync problem I’m following advice and detaching sound from all of the 100 or so short clips.  This operation has been stalled by the spinning ball. Shut down restart has not helped.
    The Project is mounted from Iomega and superspeed ext hd connected to imovie09 on macosx 10.5.8.
    What to do to resume repairs to the audio sync problem and so successfully share for youtube upload?

  • How to consume the sharepoint online Library data to Excel sheet using ODATA connection. That ODATA connection file resides in "SharePoint Online -Data Connections Library"

    I have created a OData Connection to my Library and published to SharePoint online site.
    To refresh the data, property is set like "Refresh when opening file"
    When I downloaded and open the file, the new data is consumed to me successfully because this ODF file referenced to my local computer
    If any other user downloads the file its not opening as reference file points to my local machine.
    I want to keep this ODF file in "Data connections" Library (or in any site/Library) and establish the connection to the excel sheet. so that any one can use the ODF file.
    or else any other alternative to use ODF file globally and get the SP Library data to excel ?

    Hi,
    it will use the connection in the ADF library. I recommend though that you not save database connect information in the ADF library. Instead:
    - define the ADF BC model to use JDBC data sources
    - In the ADF library, configure it to only contain the data source name
    - In the view project (the workspace) configure the database connection exposed by the library
    When the library is imported, check Application Resources --> Connections and right click on the imported connection name to configure it
    Frank

  • How to define the default activity for an unbounded task flow?

    In the new "Fusion Developer’s Guide for Oracle Application Development Framework 11g Release 1" documentation at the bottom of page 14-3 it states "An unbounded task flow .... contains a default activity, an activity designated as the first to run in the unbounded task flow, because an unbounded task flow does not have a single point of entry."
    What I can't find is how to define the default activity in an unbounded task flow and where this is recorded? Can we set this via the task flow diagrammer, and which configuration file is it stored?
    I note the first time I run the application with an unbounded task flow a dialog asks me which of the activities in the adfc-config.xml file to make the default, but I can't find where this is recorded.
    Anybody have any ideas?
    Thanks,
    CM.

    Chris,
    In fact this information is nothing that belongs into the taskflow meta data because unbounded taskflow have more than one entry point and there is no notion of default. Its a tools setting (JDeveloper) we had before
    Frank
    Message was edited by:
    Frank Nimphius

  • How to change the default BC image that shows in the address bar?

    Does anyone know how to change the default BC image that shows in the address bar? I want to swap it out so the client logo shows next to their URL.
    Thank you!

    Hi,
    If you are trying to change the favicon for your site,
    You can do it from Site Manager-> Page template -> Default Template
    Look for the code   <link type="image/x-icon" href="/Path for your image" rel="icon" />, and Click save.
    Now where you will use this template, it will display your favicon for that webpage instead of BC favicon. You can define it on Page directly if you are not going to use template.
    Please let me know if you have any doubt.

  • How to limit the number of items that a list control can hold?

    Hi,
    I am using a Flex3 List control for one of my projects.
    I add drag & drop functionality to it, so that i can drag & drop elements from one control to another.
    How to limit the number of items that a list control can hold / can be dropped in a list control ?
    - Sen.

    1. Listen for the dragdrop event on the control you are dragging onto.
    2. check the length of the items in the dataprovider - if it exceeds your maximum override the default drop action with e.preventDefault(); (assuming you used e for the event on the handler).
    Regards,
    Mark.

  • How to define the application parameter 'sap.xss.BaseConfigurationID'

    Hello All,
    I am developing a webdynpro ESS custom self service application. I have completed the development of the DC. But at the end when I am creating the application for the DC, I am not able to figure it out how to define the application parameter 'sap.xss.BaseConfigurationID' for the application. I have defined remaining all the parameters as specified in the following link.
    [http://help.sap.com/erp2005_ehp_03/helpdata/EN/43/3b95dab4ab1800e10000000a1553f6/content.htm]
    Could any one please detail the process to define the parameter 'sap.xss.BaseConfigurationID' ?
    Thanks a lot.
    Regards,
    Seshu.

    Pick a representative file.
    Get info. (Command-i)
    There you will see a place "Open with" where you can select the application for that file.
    Hit the "Change all..." button to do this for all files of this type.
    charlie

  • How to define the memory leak in stability test

    Hi
    Usually, we run our system with 70% CPU load for 72 hours for stability test (on solaris 10), because some plugin of our system is using mtmalloc, and we use prstat to monitor the memory of each plugin. But because of the complex memory usage of our application, we don't know when the application will use the Max memory, and because of the "mtmalloc", the memory showed by "prstat" will not released but continually increased.
    So fro the test point of view, there is the risk of memory leak, but actually, there may be no memory leak, so my question is how to define the memory leak in such condition.

    kevin wrote:
    Thank you for the input and all the info.
    isn't java heap the same as memory allocated to the java process in my weblogic
    starup script ?The heap is sized by the -Xmx and -Xms parameters you pass on the java
    command-line. The permanent generation is separate.
    >
    let me also download jprobe and try to run it and see what it gives me.
    I'd start by running with -verbose:gc. I'd want to know whether you're
    running out of heap or permgen space.
    -- Rob
    kevin
    Rob Woollen <[email protected]> wrote:
    Unfortunately memory leaks are not fun to track down even with tools.
    I'd first suggest determining whether you're running out of space in
    the
    permanent area (where classes are loaded), or you've exhausted the java
    help space.
    I'd start by adding -verbose:gc. Look at the gc messages right before
    you hit the OutOfMemoryError. If there's plenty of space left, I'd
    suspect you're running out of perm space. Search these newsgroups and
    the web for MaxPermSize, and you should see plenty of info.
    If you're running out of java heap, tools like jprobe and OptimizeIt
    are
    helpful. If you can tell me a little more about your application and
    how you're testing it, I can offer some more tips.
    -- Rob
    kevin wrote:
    Iam new to JAVA and weblogic. I have an application that runs out ofmemory time
    and again.
    please let me know how to pin point this problem and moreover, howto interpret
    or understand that there is a problem. I have downloaded JPROFILE tool,but it
    is very confusing to understand what is goin on in this tool.
    If somebody can let me know how to interpret and understand the memoryleak, that
    will be great !!!
    thank you.

  • How can define the cost center (department) manager?

    We are on 11.5.0.10
    Financials implementation is done(GL,AP,AR,FA,IA)
    In iAssets System, we want to set up the approval method to use "cost center-based approvals". (For cost center-based approvals to work properly, each cost center must have a manager defined.)
    How can define the cost center (department) manager? Thanks.

    I believe this is done in the organization definition screen. For each organization, we attach a classification "Company Cost Centre" (the same place where we attach the classification operating unit, inv org etc). In the others section, there are 2 additional information - GL company cost centre and reporting information. In the GL company cost, you need to attach the balancing segment value and the cost centre value. In the reporting information, you need to attach the manager for that organization. This ay the relationship between the cost centre and manager is created.
    Hope this clarifies.
    Vinit

  • How to define the copy rules in master contract

    Hi,
    Could you please help me on how to define the copy rule in master contract . I cann't find the link,it's not under IMG/SD/sales/contract/master contract/define referencing prodecures.
    Thanks/Cindy

    Hi Sai,
    I'm afraid VTAA may not resolve my problem. What I want is to define the copy rule. When you go into IMG/SD/sales/contracts/master contract/define referencing requirments/define reference procedure    you will find there is a copy rule in field area. What I really want is to define that copy rule.
    Thanks

  • Oracle VM 3.1.1 - How to define the YUM repository URL

    The documentation shows an example or two about how to define the URL of the Yum repository I created, but it doesn't seem to define EXACTLY what to do. For example, the URL to the directory with my RPMs in it is:
    http://my-yum.acbl.net/yum/OracleVM/OVM3/3.1.1/patch/x86_64/getPackage
    Can someone tell me how much of that path I should enter into the "YUM Base URL" sub-tab under the "Tools and Resources" tab in the VM Manager? I have tried to make an intelligent guess (or two), but it's not updating properly, and I don't know if I'm entering the URL properly.

    Thank you. I'll try that, and update this again, if it seems to be wrong.
    I actually opened an SR on this, and asked this same question. After several hours, I got a response, something like "What part of the documentation do you find unclear?". I tried to carefully explain that the docs don't (as best I can tell) define how much of the path should be in the URL given to Oracle VM. I still haven't heard back.

  • How to define the texts for UI element Dropdownlistbykey?

    Hi everyone,
      I don't know how to define the texts for Dropdownlistbykey. It seems that Dropdownlistbykey has an attribute "selected key", but where can I bind the texts I want to display when user clicks the downwards
    arrow?
    Thanks in advance.

    hi,
    you can use this code :
    method WDDOINIT .
      DATA : node_info TYPE REF TO if_wd_context_node_info,
             value1 TYPE wdy_key_value,
             set TYPE wdy_key_value_table,
             k1 type string value 'M',
             v1 type string value 'MAGO',
             k2 type string value 'S',
             v2 type string value 'Saurav'.
      value1-key = k1.
      value1-value = v1.
      APPEND value1 to set.
      value1-key = k2.
      value1-value = v2.
       APPEND value1 to set.
    node_info = wd_context->get_node_info( ).
    node_info = node_info->get_child_node('FOR_DROP').
    node_info->set_attribute_value_set( name = 'DROP_KEY'   value_set = set ).
    I hope it helps.
    Thanx.

  • Dear sir, i used this apple id in my IPAD 4,But some how i forgot the apple id password that was stored in my iPad. i reset the same in my another device. I put the new password in my I pad. Due to mismatching of

    Dear sir,
    i used this apple id in my IPAD 4,But some how i forgot the apple id password that was stored in my iPad. i reset the same in my another device. I put the new password in my I pad. Due to mismatching of password that was stored in iPad and new password ,it does not accept it. very unfortunately i also unable to connect my iPad with internet because it does not allow me to connect. In every second message displayed for apple id password. i am helpless. please help to get rid opt from this problem.
    rgds
    R K Hazarika
    <Email Edited by Host>

    you manage the appleID on this site
    https://appleid.apple.com/cgi-bin/WebObjects/MyAppleId.woa/

  • How to remove the old email address that was hacked from my iCloud account when iCloud won't let me?

    How to remove the old email address that was hacked from my iCloud account when iCloud won't let me?
    Pretty much the the email that I used (but didn't verify) to create my iCloud account was hacked and now I can't remove it from my iCloud account due to the iCloud password also being changed by the same person and the fact I had "Find my iPhone" app on my phone also??? I had to change my iTunes email as well but that was far easier so yeah :S.
    Please help. I live in NZ, out in the country, so reception is rare and so is getting into the nearest town that has an Apple Store.
    Thanks

    If you truly change your existing Apple ID's email address to a new email address, follow these instructions: iOS 7: If you're asked for the password to your previous Apple ID when signing out of iCloud
    If you created a whole new Apple Account because you couldn't access the old one after being hacked, you will need to contact the Apple Account Security Team. Apple ID: Contacting Apple for help with Apple ID account security

Maybe you are looking for

  • What's the best approach for handeling about 1300 connections in Oracle.

    What's the best approach for handling about 1300 connections in Oracle 9i/10g through a Java application? 1.Using separate schema s for various type users(We can store only relevant data with a particular schema.     Then No. of records per table can

  • ITunes not opening when device connected

    About a week ago, iTunes stopped opening when I connected my iPhone.  If I then open iTunes manually, the device will be recognized and will sync.  I checked in the system preferences and my Login Items had iTuneshelper checked, but the icon was a bl

  • Resource problem when running Entity Bean

    Hi, can someone please help me with the following problem I am getting weblogic.common.ResourceException: No resources available at weblogic.common.internal.ResourceAllocator.reserve(ResourceAllocator. java:568) at weblogic.common.internal.ResourceAl

  • Bizarre bootdisk 'problem'

    Hi all, I'm having a bizarre puzzling 'issue' concerning one of my boot hard drives, and I was just wondering if I should be concerned or not. So recently I reformatted my Bootcamp drive (no need of Windows anymore) with the intent of cloning another

  • Process Chain Terminates without errors

    Hi Experts, I'm facing a strange situation; my process chain terminates half way though. Loops are not completed till the end. e.g. it runs the Info Package and DTP then stop there, in some loops only the Info Package is run. There are no error messa