How to delete planned orders with partial quantities -reg.

Dear Friends,
the issue is
we are not able to delete the old planned orders in MD16 for which partial quantities are existing.
we require to delete these planned orders which are partially serviced to avoid creation of schedule lines  for excess quantities.
Is there any way to delete the planned orders for which partial quantities are existing ?
is there need to change any strategy to make MRP not to consider these planned orders with partial quantities for MRP run ?
thanks
Madhu Kiran.

Hi Madhu,
Are you getting any error message from MD16? if yes then please send us the messsage number with class. if you do not want that MRP to consider the planned orders then change the startegy 11 for these parts with mixed MRP indicator 1.
try this deletion from MD12 also..planned order change mode. Let us know the fresh update.
Regards
TAJUDDIN

Similar Messages

  • How to delete Planned Order in APO

    Hi,
    How can I delete planned orders in APO? I already tried //RLCDELETE but it says "Order not in live cash" but I can see the order in //RRP3.
    Let me know if you know another TCODE for this.
    Thanks
    David

    Hello David -
    Please use /SAPAPO/DELETE_PP_ORDER to delete planned orders.
    thanks
    Varun

  • How to cancel an order with service item - Reg

    Hi,
    We have invoiced an order for one service item later we have cancelled the invoice and order status has become as open.
    We have to cancel that order without deleting it.
    We rejected the line item despite it is showing as open order due for billing. Please let me know How can we cancel the order without deleting it.
    Thanx & Regards,
    Sp.Balaji
    Message was edited by:
            balaji soundarapandian

    Hi Prase,
    Thanks for your reply, Checked the status overview also, it shows item is fully rejected and open for billing.
    While generating billing due list the orders which are rejected by us is also reflecting as due for billing.
    Where as if we are rejecting any deliverable items in order it is not showing as open order.
    Please help.
    Thanks & Regards,
    Sp.Balaji

  • Where/ how do I set SNP to create Planned orders with multiple line items?

    Hi
    Currently our SNP is generating planned orders on a daily basis, it creates a single order with a single line item per location.
    Where/ how do set SNP to create planned orders on a daily basis to generate a single order with multiple line items per location, so therefore one planned order with multiple line items for a single location.
    Thanx
    Keegan

    Hi Keegan,
                   In SNP (APO) it is not possible to create order with multiple line items.
    But you can do some settings so that while planning system can do aggregation and disaggregation.
    But your requirment should be set on Aggregation/Dis-aggregation logic.
    Please follow the follwing links:
    http://help.sap.com/saphelp_scm2007/helpdata/en/2c/c557e9e330cc46b8e440fb3999ca51/content.htm
    Aggregation:
    http://help.sap.com/saphelp_scm2007/helpdata/en/42/f731d078e73ee4e10000000a1553f6/content.htm
    Disaggregation:
    http://help.sap.com/saphelp_scm2007/helpdata/en/a6/ebefaf32e22e468355da304cc59387/content.htm
    Please be sure that the setting of this logic will be at planning area level.
    You can't change aggregation/disaggregation logic further.
    Regards,
    Santosh

  • How to generate SNP planned order with different category

    Our SNP system receives Forecast and Salse Order from DP system.
    and we'd like to generate SNP planned order with different category..for example, 'AI' for Forecast Demand and 'AL' for Sales Order..
    currently, If we run CTM, system generate SNP planned order with the
    same category 'AI'..
    another system(APS) in Our company receives planned order from SNP
    and they want to receive planned order for forecast and planned order for sales order seperately..

    It is not directly achievable however can be done through BADIs and two CTM profile. I am assuming that sales orders are planned ahead of Forecast demands. So have two CTM profiles - one for Sales Orders (regenerative mode) and the other for Forecast Demands (net change mode). You may have to invoke two BADIs in the first run for Sales Orders - one that changes master data by putting a temperory Forecast Horizon in SNP2 tab (BADI /sapapo/ctm_matloc). The other BADI (BADI /sapapo/ctm_orders) changes the ATP category just before saving. in the second run though you just need to run the latter BADI by saving it in the ATP category required. BADIs can be invoked based on CTM profiles used.

  • Indicator "delete planned order" is set during conversion

    Hello Guys,
        While during Partial conversion of production error thru MD04, system shows the error message as indicator "delete planned order" is set. Whats the cause for this error How come we solve this issue . It's very most urgent Please PP gurus let me know the solution. Thanks in advance.
    Thanks...

    Dear Raja,
    If I have understood your problem correctly,then i Guess in the partial conversion screen,directly you are able to set the delete
    indicator and save the data.But remember that for the same planned order quantity the system generates a production
    order ,along with the planned order number linked to it ,when you do this deletion activity and save.
    You can check in MD04 with the available production orders and in the assignment tab page you can check the planned order
    number also.
    Check and revert back.
    Regards
    Mangalraj.S

  • Report to delete planned orders

    Dear Friends,
    Can anyone tell me which is the transaction to run the delete from live cache to delete planned orders.
    Thanks
    Vinay

    HI Vinay,
    Yes, you can delete the planned orders from either product view (rrp3) or receipts view (rrp4). I guess, the planned orders now are coming with the 'firm' indicator and using product view you cannot delete fixed orders.
    Which version you are working?
    Thanks & Regards,
    Jagadeesh

  • Problem when creating planned order with MRP run

    Hello,
    I create a material with a fix reorder point, MRP type VB. When I run MRP with MD03 on this material I have several problems :
    - planned order is created with an opening date in the past, so I have error 'Opening date in the past' in MD04. How can I generate a planned order with opening date not in the past
    - when changing manually opening date, after running again MD03, I have error 'No BOM selected'. Material is configurable, has a text BOM, a routing and a configuration profile. What is the problem? When modifying planned order, I have message :
    Material requires configuration
    Message no. 61259
    Diagnosis
    Orders and requirements for a configurable material must have characteristic values.
    Usually, you should create a variation for configurable materials managed in inventory management which has the default variant configuration.
    System Response
    MRP: Requirements without characteristic values for a material cannot be planned in MRP.
    Procedure
    Check requirements or orders.
    Create a configuration evaluation for the material in the material master record if necessary.
    Thanks in advance.

    Hi
    I am facing the problem. Could you please tell me if you have resolved the above problem? If yes, Could you please provide me as how you resolved? Thanks in advance.
    Thanks
    Nagesh.

  • How to delete internal order

    Hi,
    I don't know how to delete internal order. I have set a deletion flag but I don't see a transaction where I could erase Internal orders.
    Could you help me with that. Is it user's tree or SPRO transaction?
    Best wishes,
    Karol

    Hi,
    First you mark IO for deletion in KO02, then use OKO5 transaction code to delete the internal order
    Hope this helps. Assign points if helpful
    regards,
    radhika

  • Deleted Planned Order Trace

    Dear All,
                  I have one query regarding Deletion Of planned order. Is there any Table or report where we can find out deleted planned order. In my scenario there were four planned orders of which user have converted one planned order into production order but other three planned orders are not appearing in Stock and Requirement List ( MD04). I want to trace these three planned orders whether they are deleted by user. I have tried in PLAF table but could not find out.
    Regards
    Sunil Kumar

    Planned orders which are created temporally just to calculate the net requirement when you run MRP. Hence if you delete manually there will not be any record. If user has deleted the planned order don’t worry, when you run next MRP run system will calculate the net requirement and create new planned orders.
    If you want to restrict the deletion of planned order manually then try with authorization, use the following role
    SAP_MM_CBP_PLANNED_ORDER for MM planed orders
    SAP_PP_MRP_PLANNED_ORDER for PP planed orders.
    Or one more option is create a planned order manually in MD11.

  • Deleted planned orders

    Hi all,
    we are having an inconsistency in our productive system.
    Planned orders were manually deleted  (by deleting PLAF table records).
    Now dependent requirements exist in the Stock/Requirements list (MD04) for which no parent planned order exists and are not getting deleted with MRP run.
    SAP Note 633119 makes a reference to an ABAP code to safely remove the erroneous dependent requirements. Can someone send it to me or tell me where I can find it?
    Thanks and regards,
    Max

    Hi,
    I assume that you case is number 1 - Deleted planned order (for Standard or Simulative DepReqs). If yes the in that note is written that you need to create an OSS message and SAP will send you a report customized for your problem.
    Then create an OSS message in the component PP-MRP containing all the relevant information.
    Cheer

  • Delete Planned Orders

    Experts,
    is there a way to delete (Mass Delete) planned orders in SAP. Beside using MRP-Run ?
    Thanks in advance
    Jörg

    HI
    Check this program RMPLAF00
    also check this thread
    How to mass delete unfirmed planned orders?
    Regards
    Anupam Sharma

  • Delet plan order through mass processing (cohv)

    hello,
    PP experts i want the solution for deletion of plan orders in the transition cohv
    in the COHV transition  the mass processing selection do not have the function
    technically complete for plan orders.
    plase tell me how the function tech. complete can be created for the plan orders in the COHV.
    regards,
    mangesh

    Mangesh,
    As suggested by fellow forum members "MD16" is the only possible option in Standard SAP to delete planned orders in mass.
    If you need anything other than that you need to go for your own custom program to do the way you want.
    Please close the thread after rewarding points for answers which helped you.
    Regards,
    Prasobh

  • Report for PO's/Pr's/Planned orders with exception code

    Hi all,
    Is there any report which lists out Purchase Orders/Purchase requisitions/Planned orders for a specific exception message number?
    For example when MRP is run some times the finish date for a planned order may be in past (exception message number 07). I would like to get a list of all the planned orders with exception message number 07. Similarly i would like to get PO's/PR's for a specific exception code.
    Any help is highly appreciated.
    Thanks,
    Avani.

    Hi Neetha,
    You can use the Collective access tab on the MD06 T-Code, don't enter a material number, only the plant number and MRP Controller number.  Then click on the tab marked Exception Groups, check box  number 7 and execute the report.  This will give you a list of all materials with exception group 7.  If you need it as a report. Once the report comes up you can click on MRP List on the tool bar at the top of the page and then click print.  This will format it so you can download it into excel by clicking on the Local File Button.  When the box comes up click on spreadsheet and save it to your hard drive as an excel spreadsheet.
    Hope this is of some help to you.
    Debbie

  • How to delete the file with space in name

    Hi
    I want to delete the file "test ex.txt" file.
    i run the following command in command prompt.i can delete the file successfully.
    /bin/rm -f /mnt/"test ex.txt"
    I want to run the command from java.So i am using the following code
    String cmd = "/bin/rm -f /mnt/\"test ex.txt\"";
         Runtime rt = Runtime.getRuntime();
    process = rt.exec(cmd);
    The file was not deleted.
    How to delete the file with space in name?
    Help me

    Use the form of exec that takes an array of command + args.
    arr[0] = "/bin/rm"
    arr[1] = "-f"
    arr[2] = "/home/me/some directory with spaces";Or use ProcessBuilder, which is the preferred replacement for Runtime.exec, and which Runtime.exec calls.

Maybe you are looking for

  • Webi Server Performance Tuning

    We have Webi Server in a clustered environment. Our environment doesn't have much reports for Webi server to handle.. But, webi server goes down often and i have to restart the physical server to get webi running. Is there a way to tune webi performa

  • Error in IDOC ststus , for interface IDOC to File

    Hi All,           iI am doing IDOC to file interface , in which i am using IDOC Orders05, we are using the same IDOC for other interface to connect with DOTNET connectors , when i trigger the IDOC ORDERS05 for my interface when i check the ststus , i

  • GRUB 10_linux patch - what's the best way to share?

    New to Arch but not Linux. So, trying this adventure called Arch and one of the things that annoyed me right away is how GRUB discovers the kernels when you have both 'linux' and 'linux-lts' installed (primary and backup per the wiki) without version

  • What should range be with WRT54G?

    I'm using this router with my IMB T23. As long as I'm in the same room with the router it works fine but if I go upstairs Windows XP begins to lock up and I lose connection to the router even when the connection is shown to be "very good". About half

  • Socket IO on MIDP

    I opened a TCP stream connection between my MIDlet and a server. The connection is established, and what the MIDlet writes to the server is received fine, but when the server writes back an answer (a short test string), it is not picked up by the MID