How to delete process flow jobs
hi all,
need a piece of advice here. any idea how i can delete a process flow job scheduled using OEM without?? is there another way to do it without having Oracle Workflow Monitor? plz advice..
regards,
ykl
Hi,
If you meant to delete all the Process Flows deployed into Work Flow schema without using OEM, then take a look at the scripts available in WF Schema under the directory - <your oracle home>/wf/admin/sql.
The scripts you will be interested in are wfrmitt.sql which prompts you for the Process Flow Package Type and removes all the relevant information from the Work Flow schema. There are other scripts as well. Please look into those.
Thanks
Mahesh
Similar Messages
-
How to shedule process flow?
Hi,
I am able to deploy the process flows to the workflow repository.
Could any one please explain, how to start process flow as sheduled. and manually. I am trying to create a job usin OEM. But I am unable to locate the deployed process flow object in the workflow repository. .
Thanks and regards
Gowtham Sen.From OEM you can use the following to schedule your process flow package.
1, Select the RUN SQL*PLUS Script
2, "owner" "Process_Flow_Location" "PROCESS" "PF_NAME" "," ","
3, Then import the OEM_EXEC_TEMPLATE.SQL
4, Check the Overide credential with the Username and Password
This step is working for me. Also if you get an Role error make sure the comment
the following lines in the OEM_EXEC_TEMPLATE.sql
REM alter session set current_schema = &REPOS_OWNER;
REM set role wb_r_&REPOS_OWNER, wb_u_&REPOS_OWNER; -
How to run process flow outside owner project?
Hi,
I have two process flows (process_flow_A and process_flow_B) in two different projects (projectA, projectB). Process_flow_A has to be run after process_flow_B is finished. So what I am thinking now is either put process_flow_A in Project B or put process_flow_B in project A. But how to see process flows which are not in it's owner project? Or is there any other ways to do this task?
thanks.It can be done - in a round about way.
You can call a SQLPlus operator. The operator will call sqlplus_exec_template.sql. You can use this script to call your other process flow in the other project.
..owb_home/owb/rtp/sql/sqlplus_exec_template.sql
If you open up the .sql file, you will see examples of how to use it to call mappings, process flows, etc.
Hope this helps.. -
How to delete process forcedly
There are some problems in BPM Standalone 10g. The workspace shows a process is not available. I try to undeploy it from the BPM standalone. However, it cannot be undeployed.
I just changed the IP address one hour ago.
Error message:
The Process '/Process#Default-1.0' is not available. Caused by: Process '/Process#Default-1.0' not available. Caused by: Engine 'bpmengine' cannot process requests.
The bpmengine cannot be re started
Does anyone know how to delete process project directly?I change the IP address to the original one. It works.
-
How to Delete Process Chain?
How to Delete Process Chain?
When in the change mode of a process chain, choose the menu entry 'Process Chain --> Delete' (Only available on change mode).
Cheers
SAP NetWeaver 2004s Ramp-Up BI Back Office Team -
How to stop OWB Process Flow job
I have a problem.
For scheduling OWB Process Flows I use EM (create Job - SQL Script) in which I schedule jobs with script @/home/oracle/scripts/oem_exec_template.sql.
Sometimes it happens, that the job doesn't finish and I also can't expedite it through Workflow manager because it is not listed there. So next executions for this job doesn't fire, because it is still active (it is shown in EM as Running …..and also I can't stop it there).
I also can't find the session for this job and also in dictionary I can't find the job, I went through these views, but nowhere I can't find any of my scheduled jobs, and of course also not the ones that are still running.
DBA_SCHEDULER_JOBS
DBA_SCHEDULER_RUNNING_JOBS
DBA_SCHEDULER_JOB_RUN_DETAILS
Where in dictionary can I find my jobs?
How can I kill my running jobs?
OS: Red Hat Linux 3
DB: 10.1.0.3.0
OWB: 10.1.0.2.0
I'm quite desperate about this isue,
Thank you,
GorazdGorazd,
the best way to identify problem with processflow execution - using OWB Runtime Audit Browser.
Other variant - using public OWB runtime view, for example for reporting executions of you process run this select under OWB repository owner or any OWB user:
select created_on,elapse_time,return_result from all_rt_audit_executions
where object_name='<your processflow name in uppercase>' order by created_on;
RETURN_RESULT must be equal 'OK' and ELAPSE_TIME (in seconds) greater then 0.
If this query returns rows with null RETURN_RESULT or RETURN_RESULT<>'OK' or with zero elapse_time and this cases match (by date) with EM problems then you need analyze process executions in more detail with Runtime Audit Browser.
Alternatively use select from view ALL_RT_AUDIT_EXEC_MESSAGES / ALL_RT_AUDIT_MAP_RUN_ERRORS / ALL_RT_AUDIT_PROC_RUN_ERRORS.
Oleg -
How to schedule Process Flow in OWB10gR2 ?
Hi,
I have a mapping and a corresponding process flow that has the mapping within. Both the mapping and process flow are deployed successfully and they also execute successfully when executed from control center.
Now I want to run the process flow daily at 4 am in the morning. I have created a schedule and defined the parameters. Then for the process flow, I have added the schedule to the "Referred Calander". Then in control center I got a new object with _JOB as suffix. I deployed that as well and that was successfull. This implies that I have now a job that is scheduled to run daily at 4 am.
But the next day when I checked the target table that the mapping (wrapped in the process flow which in turn was scheduled to run at 4 am ) was supposed to insert some records, there was no record at all !!! Seemed to me that the job was not kicked off at all at the specified time.
I am using --
OWB client version : 10.2.0.1.31
OWB repository version : 10.2.0.1.0
Oracle Workflow Version : 2.6.4.0.0
Database version : 10g Enterprise edition release 10.2.0.1.0
Does anyone have any idea how do I make this arrangement running?
Regards,
SwagataChino -
Once you start the job, do you have to leave the "Job Details" window open in order for teh scheduled task to run?
thanks for the help ....
txb -
How to pass process flow input parameter to unix script external process
Hi,
I'm trying to pass a process flow input paramter (string) to an external process which is a unix script. I've been working on this for the last 2 days but can't get it to work. Here is the design. I have a process flow with 3 maps that create a file in the unix file system. I have a suffix, which is an input parameter to the process flow, that will need to be passed to the unix script to rename the file appending the suffix to the filename. I've tried different things and nothing works for me. Has anyone done something similar in OWB?
Thanks much!I tried using useBean inside the Jsp for this.
But following error comes:
OracleJSP error: oracle.jsp.parse.JavaCodeException: Line # 13, oracle.jsp.parse.JspParseTagExpression@102e37e
Error: Java code in jsp source files is not allowed in ojsp.next mode.
Please explain why?
How can set POST request params when calling to an external servlet? -
How to delete Process Variants in Process chain
Hello,
I created few test Process Variants I would like to delete how can we delete those?
Thanks,I created few process variants but i did not saved those in process chain so i can not edit those in process chain
when I am trying to create new process chain in the popup window still showing old variants how to delete those
Thanks, -
How to delete periodic DB13 jobs
Dear All:
Our system environment is ECC 5.0 on SQL SERVER 2005, we had defined a periodic backup jobs with DB13, now we wanna delete those jobs , i found i can only delete it one by one, how can i delete those periodic jobs in one time,please give some advice, thanks a lot
Regards
Alex Chengyou can truncate this table:
SDBAP
then, go into SM37 select:
job name DBA*
username *
dates 01011900 31129999
click on Execute
press F5
press Shift - F2 -
How to stop process flow?
Hi there.
I have oracle 9i + OWB 10.1..2.
During last changes on the server (AIX) there was a problem with starting JServer.
I didn't seem to be problem until I wanted to user Workflow Monitor. Obviously it didn't work.
My question is: how to stop a process flow that has errors?
I found scripts that should do it (described in Workflow
16. Administration Scripts in Oracle Workflow Guide.pdf) but I must have done something wrong cause it didn't work. Whats more I got lots of errors (failed flows deployment and execution)
Do you know how do use these scripts?
PawelHi Pawel,
did you read this thread
RPE-02062: How to abort a workflow process?
Hope this helps,
Oleg
Message was edited by:
tsiboleg -
How to import Process Flows without OWB
Hi,
I'm having trouble deploying my process flows to my PROD environment.
Process flows complile and run ok in TEST environment, and we are suppoused to deploy in both environments (TEST and PROD) from the same OWB repository, which is correct.
But due to technical problems with the net, by the moment I cannot see the PROD server from OWB repository installation, so I need to deploy manually (using scripts via SqlPlus or some other tool).
I can export the PFs from the 'generate' option provided by OWB, so I can get the file with the PFs' source code.
What I don't know is:
1) how to import/create that process flows in the new instance manually (I mean from outside OWB) from the exported file.
2) where should I create them, in the workflow instance or in the owb repository instance?
I'm working with OWB 10gR2
Can somebody help me with this?
Thanks in advance
MaxMany kinds of errors. For instance:
IMP-00017: following statement failed with ORACLE error 23327:
"BEGIN SYS.DBMS_DEFER_IMPORT_INTERNAL.QUEUE_IMPORT_CHECK('ORACN230.WORLD',"
"'IBMPC/WIN_NT-8.1.0'); END;"
IMP-00003: ORACLE error 23327 encountered
ORA-23327: imported deferred rpc data does not match GLOBAL NAME and platform of importing db
ORA-06512: at "SYS.DBMS_SYS_ERROR", line 86
ORA-06512: at "SYS.DBMS_DEFER_IMPORT_INTERNAL", line 30
ORA-06512: at line 1
I dropped all users except for schemas related to database structure such as SYS,SYSTEM,OUTLN,SYSMAN,XDB, WMSYS. I do not have access to original database because it's belongs to another organization. Only I got is dump file and log which I know the exp is full database with username SYS. The original database and and destination database (which I handle) probablly have different features (when create database, optional scripts run from rdbms/admin might be different). I did use IGNORE=Y every time. I tried SYS or SYSTEM to import but always are scared by too many errors.
Regards,
Richard -
How to delete the Background job for Deleted user
Dear experts
The User RAMESH was delted before one month
I dont know what job had he Created and Scheduled
where should i find the perticular user backgroung jobs and how to delet it
regards
krishnaFrom SM37....you can give the user name and find all jobs scheduled by the user
select all jobs>>>>delete
*This should have admin access on jobs
Regards,
Nick Loy -
Hi Guru's,
I have created a processorder in T-code COR1..now i want to cancel the confirmed process order..plz tell me the process.
Thanks & regards
cherukuriCherukuri,
Deleting a process order has multiple steps... I would suggest you to just set "TECO" and "CLSD" status in the change mode of the order. This would prevent any further processing of the order in terms of confirmation, goods movment and costs. From menu bar
You need to follow the steps below for archiving and deleting process order,
1. Use program "PRARCHP1" to set deletion flag (Can be reset). The prerequiste i would suggest is to create a selection profile to select orders with status "CLSD"
2. Use program "PRARCHP1" to set deletion indicator (Cannot be revoked)
3. Use program "PRARCHA1" to archive (Already basis should have setup the database link for storing)
4. use program "PRARCHD1" to delete and remove the data from the R/3 system.
Regards,
Prasobh -
Hi Experts,
I created Process chain for Deliveries in D sys and transported to P sys. Here we have six source systems so first we created 6 process chains for each source systems. Later we decide to add all those variants in one Process chain and we deleted individual process chain and transported to P sys.
So Process chains are deleted in D system and P system but changes are not effected in P system. Process Chains are not invisible both D & P systems.
But when we run the Deliveries Process chain, deleted Process chains are also running. And getting Error due to both are scheduled at same time. Because deleted Process chains are still showing in where used list....
Can any one help me guys!!!!
Thank you,
SureshHi Suresh,
Can you please let us know what type of scheduling option you have used in the start variant.
Also please have a check if the start variant in all the chains are the same?
As per my understanding unless the start variant is triggered the chains will not get scheduled.
Also there is a bug in Bi7.0, that once the process chain transport has been completed to other environemt its starts getting executed if the start variant hold tha option as Direct scheduling - > Immediate.
Prathish
Maybe you are looking for
-
How to terminate guest vm with in progress status in oem 11g
in grid control 11g -->virtual central show: name type status ovm_build1 Guest VM Editing guest :gvm11 status is alway "Editing". but in fact gvm22 status is Runing. virsh # list Id Name State 0 Domain-0 running 3 52_OVM_BUILD1 blocked becaus
-
URL Based Transaction Launcher not loading
Hi All, There is a URL based transaction launcher configured to display a crm opportunity report. All the settings seem to be fine. The configuration is done correctly in the wizard. The URL is defined in view CRMV_IC_LTX_URL. The logical link and Tr
-
After running Export from Access query the query empties itself
Hello, I'm facing a weird problem in Access 2010. I have several queries that I sometimes export to both Excel and HTML formats, sometimes when I export, the query empties itself. Meaning, the SQL code disappears from the query and I have to rebuild
-
How to integrate two picture?
Hi am trying to put picture above picture but i can't any idea?
-
The whole message is more like: The instruction at "0x7b1177a9" referenced memory at "0x7b1177a9" could not be "written". Then it tells me to close. Which means that Firefox would load. It is in a Firefox error window so I know its not due to another