How to disable task schedule in vista

My hard disk keeps spinning is likely due to the refreshing of the Task Schedule, but I can't find a way to disable it.
Please advise if you know.

Its is due to the continuous indexing of files by vista.You can disable indexing
Follow the instructions in the given link.choose a method which suits to your needs.
http://www.mydigitallife.info/2007/09/17/disable-and-turn-off-windows-vista-search-indexer-and-index...
Cheers and regards,
• » νιנαソѕαяα∂нι ѕαмανє∂αм ™ « •
●๋•کáŕádhí'ک díáŕý ツ
I am a volunteer here. I don't work for Lenovo

Similar Messages

  • How to disable forward scheduling in Sales order

    Hi SD Experts,
    Can you please provide the solutions for the below requirements.
    Requirement details are below:
    How to disable forward scheduling in sales orders....
    For My sales order type i already configured in customizing that delivery scheduling should only carry out backward scheduling.
    The results is tht no forward scheduling in carried out when material is i stock .. this is ok...
    But when there is no stock and ATP indiates an expected inward movemnt, the system ignores the indicator and carries out forward scheduling anyway.
    Is there any possibility to change this behaviour?
    Appreciate any help....
    Regards
    Sudheer

    Hi
    If you do not want the system to switch to forward scheduling automatically, you can specify per plant in Customizing for MRP, in the IMG activity Parameters for determining the basic dates that the system is to continue the backward scheduling calculation even if the resulting start date lies in the past.
    Thanks & Regards
    Bhaskar

  • Disabling the 'Schedule' tab on the Reports Portlet Parameter Form

    Hi,
    I have deployed several Oracle Reports through Portal using the built in Reports Portlet Parameter Form and I was wondering if anyone knows how to disable the 'Schedule' tab located on this form. I would like users to run the reports but not to schedule them.
    Thanks

    Hi .
    I forgot to say that, the reports is an XML report .
    regards
    rajesh
    Hi.
    I am facing a problem with the parameter form in reports 10g. The number of parameters in this report are huge. After designing the parameter form , i save and close the report. Now if i re-open the report to do changes, the width and height of the parameter form is reduced (which i increased changed previously) and if i click on any field , that specific field is repositioning itself inside the (reduced)border lines.
    I request the forum to give a remedy on this issue.
    thanks in advance
    regards
    rajesh

  • How to disable scheduled task through database?

    I would like to know to disable scheduled task without OIM running, preferably through the database.
    OIM has out of the box schedule tasks that are set to run when OIM starts, and I would like to prevent that from happening.
    Is is possible to disable these tasks when OIM is not running?
    if possible I would like to know what I need to do, preferably through the database

    The QRTZ92_TRIGGERS table contains the trigger time of the schedule tasks. You can directly modify the START_TIME and the NEXT_FIRE_TIME columns to future dates in order to prevent the scheduled jobs from starting.
    You can also stop the Scheduler, which is responsible for kicking off the scheduled jobs.
    To manually stop the Scheduler go to http://OIM_HOST:OIM_PORT/SchedulerService-web/status
    You can configure the oim-config.xml so that the Scheduler is not started when OIM starts.
    Reference: Managing Scheduled Tasks
    To disable a schedule task, you have to have OIM running. You can use the APIs, modify the schedule tasks metadata (<taskStatus>false</taskStatus>), or use the UI to disable the schedule tasks.

  • How to distinguish between enabled and disabled tasks in SSDT-BI 2012

    Hi,
    I've got SSDT-BI 2012 together with VS2012 installed. Simple questions: What is the difference between enabled and disabled tasks in control flow from the design/color point of view? I do see that the disabled tasks changes to grey (omg are you really kidding
    me????) from black. This could be a bad joke or dream however is not.
    So I'm kindly asking you to help me solve this problem. How can I change the color difference between these two options (enabled task vs disabled task)? I do not care whether the one will be yellow or pink, simply just need to be recognizable at first
    look and not under long and painful examination.
    Thanks for your reply. Hopefully it will be useful.
    Karol.

    Hi Karol,
    It’s true that it only changes the font color of the task name text to grey after disabling a task in SSDT 2012. In SSDT 2010, the whole task control including icon will turn grey after it is disabled; in BIDS, the background color of the task control will
    turn grey after it is disabled. These behaviors are by design. Personally, I agree with you that this behavior in SSDT 2012 is not very readable.
    If you have concerns, I would suggest you submitting a wish at
    https://connect.microsoft.com/sql.
    Connect site is a connection point between you and Microsoft, and ultimately the larger community. Your feedback enables Microsoft to make software and services the best that they can be, and you can learn about and contribute to exciting projects.
    Regards,
    Mike Yin
    If you have any feedback on our support, please click
    here
    Mike Yin
    TechNet Community Support

  • How to disable the edit Permission after the task approval in project server 2010.

    Hi ,
    Can this be done.
    How to disable the edit Permission after the task approval in project server 2010.
    I mean How to Disable approve/Reject Permission Once task approved in project server 2010.
    Any Help Would be more than Welcome.

    Hi Rohan,
    Just talking about the tool capabilities, preventing a task approver (status manager) to approve/reject updates once he has already approved once is not possible out-of-the-box. You grant permissions to user: if you grant a user to approve task updates then
    he has the permission to approve updates, no matter if it is the 2nd or 3rd time the task is approved or rejected.
    Then of course you could do not custom development to do that.
    I'd say that in order to help you, we would need to understand a little bit more your business need. Why do you need to achieve such a goal? We can surely propose you workaround.
    Hope this helps.
    Guillaume Rouyre - MBA, MCP, MCTS

  • How to automate the data load process using data load file & task Scheduler

    Hi,
    I am doing Automated Process to load the data in Hyperion Planning application with the help of data_Load.bat file & Task Scheduler.
    I have created Data_Load.bat file but rest of the process i am unable complete.
    So could you help me , how to automate the data load process using Data_load.bat file & task Scheduler or what are the rest of the file is require to achieve this.
    Thanks

    To follow up on your question are you using the maxl scripts for the dataload?
    If so I have seen and issue within the batch (ex: load_data.bat) that if you do not have the full maxl script path with a batch when running it through event task scheduler the task will work but the log and/ or error file will not be created. Meaning the batch claims it ran from the task scheduler although it didn't do what you needed it to.
    If you are using maxl use this as the batch
    "essmsh C:\data\DataLoad.mxl" Or you can also use the full path for the maxl either way works. The only reason I would think that the maxl may then not work is if you do not have the batch updated to call on all the maxl PATH changes or if you need to update your environment variables to correct the essmsh command to work in a command prompt.

  • How can I use MS Windows 7 Task Scheduler to start Cisco Jabber?

    Hello Jabber community,
    I have a need to automatically start Cisco Jabber client on my Desktop and have it connect to a SIP address of our CTX, then followed by the running of a recording application. The problem is I don't know the Jabber CLI to use to start it up and connect to the SIP address.
    Can anyone please advise how to do this?
    cheers,
    -guy                  

    Hi Guy,
    I think you should probably open up a TAC case and get the TAC engineer to walk you through how to deploy Jabber.
    When you say "SIP url", I presume you mean the CUPS/Webex server address. This address can be added to Jabber in 3 ways:
    1. Transforming the MSI using the Orca tool.
    2. Using msi install parameters
    3. Entering the value when you run Jabber first.
    Using a bat file in conjunction with task scheduler will not work and is not a supported way of doing. The 3 other options are also much easier to implement.
    Thanks,
    - Colin

  • Can I disable These In My Task Scheduler?

    Could someone tell me what these are in my task scheduler and if I need to them or can I disable them?
    PCDEventLauncher -- On event -Log:Application, SourceC-Doctor Launcher, EventID:1
    PCDoctorBackGroundMonitorTask -- At 10:00AM on day 5 of Jan, Feb, Mar, April etc
    PMTask -- When Computer is idle
    SystemToolsDailyTest -- At 10:00 AM every day User Feed Synchronization -- At 4:37PM every day
    I have a T400 with Windows 7 Home Premium Thanks

    Hi,
    PCDEventLauncher -> this is the PC Doctor file, which is used by ThinkVantage Toolbox. So in case you don't want to use any feature of the Toolbox, then you you can just disable this one
    PCDoctorBackGroundMonitorTask -> this is a monitoring part of the Toolbox and is mostly responsible for the automatical/scheduled system monitoring.
    PMTask -> This is usually application, that is responsible for the lowering of the display brightnes, when you configure Power Manager so. In case you dissable this option, then this service/job is not needed to run
    SystemToolsDailyTest -> this is relative to the "PCDoctorBackGroundMonitorTask" as this is also responsible to the automatical/scheduled system monitoring. So once you disable this one, make sure, that also the second one will be disabled (or vice versa)
    In case this helps, please mark this thread as closed.
    Cheers

  • DirectAccess multisite on Server 2012 R2: 'The remote access configuration task (raconfigtask) in Windows Task Scheduler cannot be disabled"

    Dear all,
    I'm an experiencing an issue when configuring 2012 R2 DirectAccess multisite.
    The initial configuration of the first site in a multisite setup works fine, however when i try to add ANY other server on another site, i see the below screenshot, the full text of which is: "The remote access configuration task (raconfigtask) in Windows
    Task Scheduler cannot be disabled" while the entry point is added.
    THere are no logged events on the remote server, but on the controlling server i see this in the event log:
    Log Name:      Microsoft-Windows-TaskScheduler/Operational
    Source:        Microsoft-Windows-TaskScheduler
    Date:          10/15/2014 12:55:58 AM
    Event ID:      140
    Task Category: Task registration updated
    Level:         Information
    Keywords:      
    User:          SYSTEM
    Computer:      WWCLORAS01.apco.net
    Description:
    User "S-1-5-18"  updated Task Scheduler task "\Microsoft\Windows\RemoteAccess\RaConfigTask"
    Event Xml:
    <Event xmlns="http://schemas.microsoft.com/win/2004/08/events/event">
      <System>
        <Provider Name="Microsoft-Windows-TaskScheduler" Guid="{DE7B24EA-73C8-4A09-985D-5BDADCFA9017}" />
        <EventID>140</EventID>
        <Version>0</Version>
        <Level>4</Level>
        <Task>140</Task>
        <Opcode>0</Opcode>
        <Keywords>0x8000000000000000</Keywords>
        <TimeCreated SystemTime="2014-10-15T07:55:58.432317300Z" />
        <EventRecordID>1738</EventRecordID>
        <Correlation ActivityID="{D4236B4E-E841-0003-E5BA-23D441E8CF01}" />
        <Execution ProcessID="840" ThreadID="3852" />
        <Channel>Microsoft-Windows-TaskScheduler/Operational</Channel>
        <Computer>WWCLORAS01.apco.net</Computer>
        <Security UserID="S-1-5-18" />
      </System>
      <EventData Name="TaskUpdated">
        <Data Name="TaskName">\Microsoft\Windows\RemoteAccess\RaConfigTask</Data>
        <Data Name="UserName">S-1-5-18</Data>
      </EventData>
    </Event>Log Name:      Microsoft-Windows-TaskScheduler/Operational
    Source:        Microsoft-Windows-TaskScheduler
    Date:          10/15/2014 12:55:58 AM
    Event ID:      140
    Task Category: Task registration updated
    Level:         Information
    Keywords:      
    User:          SYSTEM
    Computer:      WWCLORAS01.apco.net
    Description:
    User "S-1-5-18"  updated Task Scheduler task "\Microsoft\Windows\RemoteAccess\RaConfigTask"
    Event Xml:
    <Event xmlns="http://schemas.microsoft.com/win/2004/08/events/event">
      <System>
        <Provider Name="Microsoft-Windows-TaskScheduler" Guid="{DE7B24EA-73C8-4A09-985D-5BDADCFA9017}" />
        <EventID>140</EventID>
        <Version>0</Version>
        <Level>4</Level>
        <Task>140</Task>
        <Opcode>0</Opcode>
        <Keywords>0x8000000000000000</Keywords>
        <TimeCreated SystemTime="2014-10-15T07:55:58.432317300Z" />
        <EventRecordID>1738</EventRecordID>
        <Correlation ActivityID="{D4236B4E-E841-0003-E5BA-23D441E8CF01}" />
        <Execution ProcessID="840" ThreadID="3852" />
        <Channel>Microsoft-Windows-TaskScheduler/Operational</Channel>
        <Computer>WWCLORAS01.apco.net</Computer>
        <Security UserID="S-1-5-18" />
      </System>
      <EventData Name="TaskUpdated">
        <Data Name="TaskName">\Microsoft\Windows\RemoteAccess\RaConfigTask</Data>
        <Data Name="UserName">S-1-5-18</Data>
      </EventData>
    </Event>
    And this in the taskscheduler:
    Log Name:      Microsoft-Windows-TaskScheduler/Operational
    Source:        Microsoft-Windows-TaskScheduler
    Date:          10/15/2014 12:55:58 AM
    Event ID:      140
    Task Category: Task registration updated
    Level:         Information
    Keywords:      
    User:          SYSTEM
    Computer:      WWCLORAS01.apco.net
    Description:
    User "S-1-5-18"  updated Task Scheduler task "\Microsoft\Windows\RemoteAccess\RaConfigTask"
    Event Xml:
    <Event xmlns="http://schemas.microsoft.com/win/2004/08/events/event">
      <System>
        <Provider Name="Microsoft-Windows-TaskScheduler" Guid="{DE7B24EA-73C8-4A09-985D-5BDADCFA9017}" />
        <EventID>140</EventID>
        <Version>0</Version>
        <Level>4</Level>
        <Task>140</Task>
        <Opcode>0</Opcode>
        <Keywords>0x8000000000000000</Keywords>
        <TimeCreated SystemTime="2014-10-15T07:55:58.432317300Z" />
        <EventRecordID>1738</EventRecordID>
        <Correlation ActivityID="{D4236B4E-E841-0003-E5BA-23D441E8CF01}" />
        <Execution ProcessID="840" ThreadID="3852" />
        <Channel>Microsoft-Windows-TaskScheduler/Operational</Channel>
        <Computer>WWCLORAS01.apco.net</Computer>
        <Security UserID="S-1-5-18" />
      </System>
      <EventData Name="TaskUpdated">
        <Data Name="TaskName">\Microsoft\Windows\RemoteAccess\RaConfigTask</Data>
        <Data Name="UserName">S-1-5-18</Data>
      </EventData>
    </Event>
    Any ideas what might be causing this? All servers are in the same domain, firewalls don't seem to be dropping anything, SCCM client is installed, but thats it.
    Appreciate any feedback.
    Jim

    Dear all,
    I'm an experiencing an issue when configuring 2012 R2 DirectAccess multisite.
    The initial configuration of the first site in a multisite setup works fine, however when i try to add ANY other server on another site, i see the below screenshot, the full text of which is: "The remote access configuration task (raconfigtask) in Windows
    Task Scheduler cannot be disabled" while the entry point is added.
    THere are no logged events on the remote server, but on the controlling server i see this in the event log:
    Log Name:      Microsoft-Windows-TaskScheduler/Operational
    Source:        Microsoft-Windows-TaskScheduler
    Date:          10/15/2014 12:55:58 AM
    Event ID:      140
    Task Category: Task registration updated
    Level:         Information
    Keywords:      
    User:          SYSTEM
    Computer:      WWCLORAS01.apco.net
    Description:
    User "S-1-5-18"  updated Task Scheduler task "\Microsoft\Windows\RemoteAccess\RaConfigTask"
    Event Xml:
    <Event xmlns="http://schemas.microsoft.com/win/2004/08/events/event">
      <System>
        <Provider Name="Microsoft-Windows-TaskScheduler" Guid="{DE7B24EA-73C8-4A09-985D-5BDADCFA9017}" />
        <EventID>140</EventID>
        <Version>0</Version>
        <Level>4</Level>
        <Task>140</Task>
        <Opcode>0</Opcode>
        <Keywords>0x8000000000000000</Keywords>
        <TimeCreated SystemTime="2014-10-15T07:55:58.432317300Z" />
        <EventRecordID>1738</EventRecordID>
        <Correlation ActivityID="{D4236B4E-E841-0003-E5BA-23D441E8CF01}" />
        <Execution ProcessID="840" ThreadID="3852" />
        <Channel>Microsoft-Windows-TaskScheduler/Operational</Channel>
        <Computer>WWCLORAS01.apco.net</Computer>
        <Security UserID="S-1-5-18" />
      </System>
      <EventData Name="TaskUpdated">
        <Data Name="TaskName">\Microsoft\Windows\RemoteAccess\RaConfigTask</Data>
        <Data Name="UserName">S-1-5-18</Data>
      </EventData>
    </Event>Log Name:      Microsoft-Windows-TaskScheduler/Operational
    Source:        Microsoft-Windows-TaskScheduler
    Date:          10/15/2014 12:55:58 AM
    Event ID:      140
    Task Category: Task registration updated
    Level:         Information
    Keywords:      
    User:          SYSTEM
    Computer:      WWCLORAS01.apco.net
    Description:
    User "S-1-5-18"  updated Task Scheduler task "\Microsoft\Windows\RemoteAccess\RaConfigTask"
    Event Xml:
    <Event xmlns="http://schemas.microsoft.com/win/2004/08/events/event">
      <System>
        <Provider Name="Microsoft-Windows-TaskScheduler" Guid="{DE7B24EA-73C8-4A09-985D-5BDADCFA9017}" />
        <EventID>140</EventID>
        <Version>0</Version>
        <Level>4</Level>
        <Task>140</Task>
        <Opcode>0</Opcode>
        <Keywords>0x8000000000000000</Keywords>
        <TimeCreated SystemTime="2014-10-15T07:55:58.432317300Z" />
        <EventRecordID>1738</EventRecordID>
        <Correlation ActivityID="{D4236B4E-E841-0003-E5BA-23D441E8CF01}" />
        <Execution ProcessID="840" ThreadID="3852" />
        <Channel>Microsoft-Windows-TaskScheduler/Operational</Channel>
        <Computer>WWCLORAS01.apco.net</Computer>
        <Security UserID="S-1-5-18" />
      </System>
      <EventData Name="TaskUpdated">
        <Data Name="TaskName">\Microsoft\Windows\RemoteAccess\RaConfigTask</Data>
        <Data Name="UserName">S-1-5-18</Data>
      </EventData>
    </Event>
    And this in the taskscheduler:
    Log Name:      Microsoft-Windows-TaskScheduler/Operational
    Source:        Microsoft-Windows-TaskScheduler
    Date:          10/15/2014 12:55:58 AM
    Event ID:      140
    Task Category: Task registration updated
    Level:         Information
    Keywords:      
    User:          SYSTEM
    Computer:      WWCLORAS01.apco.net
    Description:
    User "S-1-5-18"  updated Task Scheduler task "\Microsoft\Windows\RemoteAccess\RaConfigTask"
    Event Xml:
    <Event xmlns="http://schemas.microsoft.com/win/2004/08/events/event">
      <System>
        <Provider Name="Microsoft-Windows-TaskScheduler" Guid="{DE7B24EA-73C8-4A09-985D-5BDADCFA9017}" />
        <EventID>140</EventID>
        <Version>0</Version>
        <Level>4</Level>
        <Task>140</Task>
        <Opcode>0</Opcode>
        <Keywords>0x8000000000000000</Keywords>
        <TimeCreated SystemTime="2014-10-15T07:55:58.432317300Z" />
        <EventRecordID>1738</EventRecordID>
        <Correlation ActivityID="{D4236B4E-E841-0003-E5BA-23D441E8CF01}" />
        <Execution ProcessID="840" ThreadID="3852" />
        <Channel>Microsoft-Windows-TaskScheduler/Operational</Channel>
        <Computer>WWCLORAS01.apco.net</Computer>
        <Security UserID="S-1-5-18" />
      </System>
      <EventData Name="TaskUpdated">
        <Data Name="TaskName">\Microsoft\Windows\RemoteAccess\RaConfigTask</Data>
        <Data Name="UserName">S-1-5-18</Data>
      </EventData>
    </Event>
    Any ideas what might be causing this? All servers are in the same domain, firewalls don't seem to be dropping anything, SCCM client is installed, but thats it.
    Appreciate any feedback.
    Jim

  • How to disable the "Connect to Second Node" task of the Windows Server 2012R2 and run a customized verision of this task?

    I am running a customized ICT. When I am running the ICT on a single node cluster, it is automatically detecting the if remote node is present? I need to disable this feature of ICT and tweak it to have a customized version of this. How to disable this
    task?

    Hi Sounak Ghosh,
    You can customize the ICT by the following KB:
    Windows Storage Server 2012: Planning and Deployment
    https://technet.microsoft.com/en-us/library/jj643306.aspx?f=255&MSPPError=-2147217396
    Server Manager Extension Schema
    https://technet.microsoft.com/en-us/library/hh825683.aspx
    I’m glad to be of help to you!
    Please remember to mark the replies as answers if they help and unmark them if they provide no help. If you have feedback for TechNet Support, contact [email protected]

  • How to disable an out of the box disable User process task  from resource?

    How should I disable the out of the box disable User process task that is assigned to a particular resource? If I disable this disable User process task, when the user is provisioned to the same resource will I be able to stop this disable User process from running?
    My requirement: I need to disable the disable user process task from three resources x, y and z. Whenever a user is provisioned to one of these resources I should stop this disable user process task an out of the box process task from running. How can this be accomplished?? Please help me out on how to configureto remove the process task in the OIM Admin console to stop the process task.

    You can avoid the disable task from triggering by removing the Disable Process Or Access to Application from the task effect drop down in the process task. But this task is triggered once the user is disabled. But still I didn't understand the exact scenario.
    By the way the disable task is triggered when the user gets disabled and not when the user is provisioned.
    Edited by: vindla on Aug 1, 2011 10:26 PM

  • Disable all scheduled tasks?

    We have around 40 scheduled tasks, many running every 10 to 20 minutes.  I want to import a CAR file of these scheduled tasks to a new server, but I don't want them to execute on the new server until I can disable the task on the old server.  I would rather use a CAR file than create each one manually.  Is there a way to disable all scheduled tasks on the new server?
    Thanks,
    Steve

    Hi Florian,
    Adobe Acrobat Reader DC is set up for continuous updating.
    You can modify those settings via the Adobe Customization Wizard DC or the Windows Registry
    For the Windows Registry setting please check: Windows Updates
    Regards,
    Rave

  • How to schedule the Batch file to run from task scheduler

    Hello Everyone,
    I have a batch file which kills the wscript.exe process, I am doing this manually, I need to schedule this batch file to run from task scheduler whenever the process wscript.exe reaches to specific numbers,  i.e if the wscript.exe process count in task
    manager reaches to 30,  the task schedular should execute this batch file,
    Is there a way to do so.
    dibu

    Hi,
    àI need to schedule
    this batch file to run from task scheduler whenever the process wscript.exe reaches to specific numbers.
    As I know, it will not help you to achieve this target via Scheduled Task. When configure Scheduled Task, there
    seems no Trigger option that help you specify this condition (process counts reaches to specific numbers) to trigger the batch file.
    You could consider that improve this batch file. Adding the
    Check function to the script will be a better option. For script issue, you can post it in the
    Official Scripting Guys Forum. I believe we will get a better assistance there.
    If any update, please feel free to let me know.
    Best regards,
    Justin Gu

  • How disable ALL scheduled reports?

    We have several scheduled reports (BO Enterprise XI R2) that run throughout the day. Is there a way that I can just disabled ALL scheduled reports? (Is there a service or something I can stop?)
    I know I can manually change each one to "On Demand", but that is a lot of work, then when I want to re-enable them I have to manually turn them all back on.
    Any ideas?
    Thanks!
    Shayne

    Please re-post if this is still an issue to the Business Objects Forum or purchase a case and have a dedicated support engineer work with your directly

Maybe you are looking for

  • Shell script for cpu governor toggling [SOLVED]

    I am fairly new to shell (bash) scripting, but i thought i would at least manage an if test, though i was proven wrong :/ I have been looking at this for way to long by now, and i am positive i am just missing the obvious, though I just cannot see wh

  • Can I embed web page in Keynote presentation?

    I am working on a Keynote presentation, I am a novice, but this is for a very important presentation. Whatever way possible, I need to show current, active webpages in my presentation. Can a webpage be embedded in Keynote? If absolutely not, can i ta

  • Help me sign on to iTunes from my i5 phone.

    Help me sign on to iTunes on my i5 phone.

  • Error : Invalid/unknown SSL header was received from peer

    Hi, I am having Weblogic 8.1 (SP5) Application Server running in US. I have a GUI application which is talking to this application server using SSL protocol. We have same SSL certificates installed machines from where this GUI application is executed

  • IPad and iTunes problems

    I just downloaded a tv session and it won't let me put it o my iPad without deleting all my music and the bar pops up and Amy's erase and synce or cancel. Help