How to eliminate assembly scrap in costing

We have the problem, that the costing considers the assembly scrap which we don't want to be included.
Is there a way to eliminate the assembly scrap only within the costing via customizing, user-exit or modification?
We would be pleased, if someone could give us a hint for a solution.
Thank you
Ignaz

Hi,
   To use a user exit in validations, you have to perform following steps;
- copy SAP standard program GGBS002 to ZGGBS002
- create a user exit in this program (such as U902, U903 etc)
- the user exit you defined in the above mentioned program will be visible in validations on screen tab 'Exits'
- configure your validation with 'User exit' as option
       This can help u.But see this is not the right place to post.You need to post in a different forum.
PS:If this helps you please award Points.
Regards,
Raja Akella.

Similar Messages

  • CK11N - How to exclude assembly scrap factor from Cost estimate

    Dear Experts,
    We have assembly scrap maintained in the material master. We also have operation scrap in the routings.
    During the Cost estimate runs, we just want the system to consider the Routing operation scrap. I know one solution is just to remove the assembly scrap from the material master. However, we can't do this since it can adversely impact our MRP runs.
    Does anyone has any idea on this?
    Thanks and regards,
    Vishal Thakur

    hi vishal,
    if you want to exclud the material fromt the cost estimate here is the short cut .
    go to the material master of the material which you dont want to be costed
    go to the costing views and flag the dont cost check box in that views
    Best Regards

  • How to ignore Assembly Scrap of MRP during Production order Creation

    Hi All,
    We want to ignore the Assembly Scrap maintained in MRP View during production order creation.
    We are maintaining assembly Scrap for planning so we do not want to remove that.
    Please let us know if any User exit is there during Production Order Creation.
    Thanks,
    Amit

    Dear Amit,
    Assume in CO01,once after entering the total order quantity the system proposes the scrap quantity field separately,now
    remove this quantity for scrap field and press enter and once again adjust the total quantity and check for what quantity the
    system is proposing the BOM components.
    check whether this works for your requirement.
    Regards
    Mangalraj.S

  • CK11N - How to exclude assembly & Operat scrap factor from Cost estimate

    Dear Experts,
    We have assembly scrap maintained in the material master. We also maintained operation scrap in the routings.
    Now the requirement is to create a costing of the material without scrap. We already working with Three costing variants one with legal valuation (inclusive of Scrap) other for profit center valuation now this one we need to do the comparision. I can do it by changing the material master and routing master data but this is not possible due to impact on MRP.
    Thanks in advance
    SK

    Dear SK,
    As explained by Ajay,either you have to remove the scrap related data in the material master/BOM before costing in
    CK11N/CK40N and then include the same before MRP.
    If my understanding is correct this is the standard SAP behaviour.
    Check whether can you use a separate BOM for costing purpose or else check with this BADI - QUANTITY_STRUCT_CK
    (Enables Quantity/Structure Changes in Costing) using the method --Item Data Manipulation Before Transfer into
    Itemization and the other methods,whether can you exclude the same.
    Check and revert back.
    Regards
    Mangalraj.S

  • Report for the list of materials with component & assembly scrap

    Dear Experts ,
    I have been told to generate a report for the materials which are subjected to component and assembly scrap . Please guide me for the same . Many thanks in advance.
    Yours
    Aman Khan

    Dear Aman,
    It you are maintaining both assembly scrap  & component scrap both in MM you can read MARC table by creating simple query.
    Read Field MARC-AUSSS & MARC-KAUSF.
    If you are maintaining component scrap in BOM item read STPO-AUSCH.
    [Query Creation|How do create query in SAP?]

  • How to eliminate the thumbnail picture from a .TIFF picture?

    I apologize but could not think of a more suitable forum to ask the question - if someone has an idea for a better place, I will appreciate.
    When I create a picture with my (Nikon) camera in the TIFF format, it appears that the picture file contains in addition to the full blown picture, a reduced version of the picture, something like a large thumbnail vrsion of the picture. I found it by trying to create a PDF file of the .TIFF file - Acrobat created a two page file, one with the full picture and one with the reduced picture. It looks that I can't tell the camera not to embbed the thumbnail version.
    So my question is, from someone who is familiar with the .TIFF file format, how to eliminate that thumbnail version from the .TIFF file. Must be somewhere (hopfully one) location in the file that when modifying it it eliminates the thumbnail picture from Acrobat's view into the .TIFF file.
    As to the question why not simply erase that undesired page from the PDF file - the answer is that I actually going to assemble many (hundreds) such pictures into one PDF file. Acrobat will put all those pictures such that each main picture will be followed by its own thumbnail and therefore I will have to select manually each single thumbnail page before erasing them, extremely tedious. If I could process it at the individual .TIFF file as describrd above, I could easily write a program that does this modification to all my .TIFF files with one invokation.
    Many thanks,
    David

    Try ExifTool
    http://www.sno.phy.queensu.ca/~phil/exiftool/

  • What is BOM? Steps Needed. How is it Related to Product Costing

    Gurus,
    What is BOM?
    How is it related to Product Costing and Profitability Analysis and CO?
    Technical help and steps would be appreciated.
    Thanks.
    Points available.

    Hi,
    BOM (Bill of Material) is a structured list of components (with the object number, quantity and unit of measure) that go into making of a product or an assembly.
    Bill of Material can be simple or complex depending upon the structure of the product. And, a collection of BOMs that lets you describe a product or a number of similar products is known as BOM Group.
    T code is CK51.
    In product costing BOM is used to estimate the cost incurred for the creation of a finished product.
    Technically, when u do a product cost run for particular material and if you don't have BOM for the material, the system will give an error.
    If useful, assign points.
    Regards,
    Manju

  • Dynamic Assembly Scrap

    Hi,
    Our client is having an agreement with customer that goods can be delivered more than order quantity on certain percentage (based on lot size)
    order is 1 to 100 then 10% extra can be delivered
    If order is 101 - 500 then 5% extra can be delivered
    and 501 to 1000 then 3% extra can be delivered.
    But in standard we cannot able to define assembly scrap based on lot size to get extra requirement.. I have gone through many links but it seems there is no solution from standard need to how this can be achieved through user exit. if anyone has done this before then let me know how it can be achieved.
    Regards / US

    Hi US,
    I don't think is possible to manage assembly scrap based on lot size.
    Also, noted that the assembly scrap can not be enter at BOM level.
    I think the solution to your problem is to create three different BOMs:
    - BOM1 from 001 to 100 and enter a component scrap of 10% for all the items
    - BOM2 from 101 to 500 and enter a component scrap of 5% for all the items
    - BOM3 from 501 to 1000 and enter a component scrap of 3% for all the items
    Then you will need to create the production versions:
    - ProdVersion 01 for BOM1   -->  from 001 to 100
    - ProdVersion 02 for BOM2   -->  from 101 to 500
    - ProdVersion 03 for BOM3   -->  from 501 to 1000
    This way the MRP will assign the corresponding BOM base on the size of the planned order.
    Kind Regards,
    Mariano

  • Assembly scrap in REM scenario

    Hi Experts,
    My scenario is relevant to REM, during back flush in transaction MFBF am posting the assembly scrap by selecting assembly scrap radio button and in the scrap posting screen with reason of variance, as per logic the quantity of the plan order should be reduced by scrap quantity, am able to see the goods issue document but the plan order quantity is not getting reduced.
    Are there any specific setting needs to be done for posting of assembly scrap?
    Please help to explain the complete process of assembly scrap in case of REM.
    Regards
    cs

    Hi Anupam,
    I have checked the process as per your advise and it is working fine, but here am having an issue as if am scraping through quality it is scrapped with movement type 553, which is booked as loss.
    But actually we are retrieving the components from these 5 units and reusing them in another FG.
    As we are working with REM we are using CO07 production order without material for rework purpose in that case the scrapped assembly is issued to production order and components are retrieved with 531.
    Is there any possibility that the scrapped assembly can be shown as stock and issuance can be done?
    Or how can we address this scenariou2026
    Regards
    Chandan

  • Set TECO automatically when assembly scrap is used

    Hi Experts,
    could any of You help me pls with a mass processing of TECO status, when using assembly scrap at material master?
    In my scenario we use COHV / PPIO_ENTRY as a background job for mass process and set TECO each night - worked well till no assembly scrap was set and used.
    When assembly scrap is maintained at material master, we have a total order qty, a planned scrap and the output qty in prd order.
    When cnf is made for prd order, and reached the planned output qty I expected the same as before: automatic TECO set  - but it is not. The system still expect the total order qty to be reached - but we only go for the output qty. So when  cnf qty = to output the status should be set - if scrap is lower than the planned scrap figures the order is not technically closed by the PPIO_ENTRY backgroung job.
    Anyone pls support me with an idea, how to handle this situation, and set TECO automatically when cnf qty equals to expected output, pls?
    Answers will be appreciated

    dear friend,
    can you please look at checkbox "Generated Confirmations w/o Quantity Adjustments" in OPK4 for your plant/order type?
    do you have it 'ON' ?
    regards,

  • BOM is with Assembly scrap

    Hello
    When we create BOM , CS01 and Expolde in CS11
    then i want the scenario like Components 10% scrap and assembly is 25% scrap
    these Copmponents scrap field is in MRP 4 view and assembly Scrap field is MRPview
    what is the use of these field and when we will use these field s
    plz explain me with one exapmle.
    iam very greatful to those persons who give me answer.

    Suggest you take help by pressing F1 on the Components scrap in MRP4 view of material master and follow the example given in the help, there is also a hyperlink to the documentation for this indicator. I am copying the same for you ref:
    <b>Indicator: Net scrap    </b>                                                                               
    <b>Definition     </b>                                                                               
    <i>This indicator determines whether scrap for the component is calculated on the basis of the net required quantity (the required quantity without assembly scrap from the material master record).    </i>                                                                               
    <b>Procedure   </b>                                                                               
    -   You must set this indicator if you want assembly scrap to be ignored.                                                                               
    -   You must set this indicator if you enter operation scrap      .            
          -   You can set this indicator if you only enter component scrap, to     
               calculate scrap on the basis of the net required quantity for the
               assembly.                                                                               
    <b>Examples   </b>                                                                               
    Bill of material:                                                                               
    -   Assembly MAT-1:                                                                               
    -   Required quantity 100 pieces                                                                               
    -   Assembly scrap 2%                                                                               
    -   Component MAT-2:                                                                               
    -   Component quantity 100 pieces                                                                               
    Depending on the applicable scrap and the net indicator, the following 6 
          quantities are required for component MAT-2 for a required quantity of   
          100 pieces of MAT-1:                                                                               
    1           2           3         4          5          6                        
          Comp       5%         -          5%      5%         -          -                        
          Op.          6%       6%          -          -           -          -                        
          Net ind     X           X           X          -           -          X                                                                               
    Qty        11130   10600   10500   10710   10200   10000                                                                               
    <b>Key</b>                                                                               
    Comp         Component scrap                                              
          Op.            Operation scrap                                              
          Net ind       Net indicator                                                
          Qty            Quantity calculated for component MAT-2 in pieces            
    Hope this will provide you a complete insight on how the scrap indicators in material master and Bill of Material work in relation to planning of the materials

  • Assembly scrap....

    hi there...
    Can somebody explain me assembly scrap,component sccrap issue.........
    plz give an example to  support it.
    like If I am having an assemble to create from A,B,C,D....From operation10,20,30,40.
    my FG gets created at stage 40.
    my question is how to map a scrap if it gets created 1t stage 30 or 20 or10....

    Krish,
    Examples given below
    1.Assembly scrap : Material A to be produced has assembly scrap say 10% in material master.
    Then if prodcution order created for 10 will automatically be increased to 11 by system. System assumes 1 will be scrapped out of 10 & creates order for 11.
    2. Component scrap : Say Material B is component of Material A.
    BOM of A has B=10. That means to make 1 of A you require 10 of B
    Define comp scrap in MM of B say 10%.
    then system automatically plans qty for B=11 when you require to make qty A =1
    3. Operation scrap : is for routing steps 10, 20, 30.
       Say material A has routing steps 10= 2% scrap, Step 20 =1%
    then when production order for A requires qty = 100, system assumes Yield = 98 at step 10, Yield = 97 at  step 20 & so on...
    I hope this explains the concept to you.
    You can find more details on SAP help on this under : http://help.sap.com/saphelp_470/helpdata/en/ea/e9b30e4c7211d189520000e829fbbd/frameset.htm
    Thanks,
    Ram

  • How to delete the one of cost centers in Splitting Structure(OKEW)?

    Dear All,
    I have a question about Splitting Structure as below? Could I get favor from you? Thanks a lot.
    How to delete the one of cost centers in Splitting Structure(OKEW)?
    Jocha

    Hi Chang
    Welcome to SDN! Its our pleasure to help you here
    Step 1: Select your Cost Center in OKEW which is assigned to the Splitting Str
    Eg: Cost Ctr 1001 is assigned to Splitting Str Z1... Tick the Check box against 1001 under Z1 Splitting Str
    Step 2: Do a Single Click on the text "Non Assigned Cost Centers"
    Step 3: Press Shift +F6 (Or Click on the Assign Button, next to the Pencil icon)
    Br, Ajay M

  • Multiple copies of podcasts appear in iTunes on my computer, but correctly on my iPhone 4S.  How do eliminate multiple copies in iTunes on my PC?

    Multiple copies of podcasts appear in iTunes on my computer, but correctly on my iPhone 4S.  How do eliminate multiple copies in iTunes on my PC?

    Hi AkMat.
    Have you actually opened these files to see what they are yet? The few Apps I've downloaded (not from iTunes) typically come with a few files. The actual app, the instructions/help/TOU and sometimes an uninstall.
    mwn
    Message was edited by: much wiser now

  • Creating Web Service from Java Class-How to eliminate nillable="true"

    Does anyone know how to eliminate the attribute, nillable="true", from the element tags which describe the parameters in the WSDL created when creating a web service from a Java Class? It does this only for the string types. Is there something I need to set when creating the web service or before creating the web service? Or the only way is to modify this WSDL then recreate the web service from the WSDL.
    example part of wsdl:
    this is in the <types> tag:
    <complexType name="getData">
    <sequence>
    <element name="schema" type="string" nillable="true"/>
    <element name="table_or_view_name" type="string" nillable="true"/>
    </sequence>
    </complexType>
    <complexType name="getDataResponse">
    <sequence>
    <element name="result" type="string" nillable="true"/>
    </sequence>
    </complexType>

    I did do this and I got the following error when deploying to the Stand-alone OC4j:
    Operation failed with error:
    Error compiling
    :D:\h\cots\Oracle\JDeveloper10g10.1.3\j2ee\home\applications\DBOperationsWSApp-DBData-WS\WebServices: Error instantiating compiler: webservice artifact generation failed :oracle.j2ee.ws.common.tools.api.ValidationException : Exception declaration mismatch between Implementation: dbdatapackage.DBDataOperations and Interface: dbdatapackage.DBDataWS. Impl class Method: getData declares exceptions not declared by the interface (java.lang.Exception)
    I am quite sure what it is saying. It generated the code for the Interface: dbdatapackage.DVDataWS. Impl class. Why would it not do it right? What expection is it complaining about? java.lang.Exception?

Maybe you are looking for