How to explode engineering BOM

Hello,
I have created one engineering BOM with BOM Usage "2"
How to explode this engineering BOM. I am not able to explode same in CS11, CS12 OR CS13.
Kindly suggest some other method

Dear,
In CS11 transaction, click on view button(button next to Execute)or F5. In Restrict view data area, check Engineering.
click on back button. specify BOM application(you can try with PP01) and Execute.
Please refer this link
http://help.sap.com/saphelp_45b/helpdata/en/4c/227ad246e611d189470000e829fbbd/content.htm
Try with CN33
Or try with these FM
CS_BOM_EXPLOSION "for BOM´s
CS_BOM_EXPL_MAT_V2 "for materialBOM´s
Regards,
R.Brahmankar
Edited by: R Brahmankar on Nov 19, 2008 1:23 PM

Similar Messages

  • How to explode a BOM in sales order

    Hi,
    We have the following scenario.
    Product 999 is made by putting together cases of the products 12345 and 8888. The packaging for 12345 and 8888 is not altered but they just take 4 CAR of 12345 and 8 CAR of 8888 and put them on one pallet and that makes a 999.
    We get a sales order from customer only for 999 and we would like to have something happen automatically like BOM explosion ( this could be also a trigger when a background job is run) and the sales order should get the relevant qtys. of 12345 and 8888 in the same sales order along with 999.
    I was searching in internet and I found that we can use item categories to achieve this. Can some body advise how to do that?
    main questions around this are what are the item categories I need to use, what is the BOM type to be created etc...?
    Thanks.

    Hi,
    Maintain iteam category group in material master as per u requirement
    ERLA - Structre Material above (Price at main item level)
    or
    LUMF - Structure material below(Price at each item level).
    Now in t-code VOV7,
    Select higer level item category which you are dtermining mostlt
    TAP or TAQ, go in details of item category
    under bill of material tan/configuration maintain APLLICATION - SD01
    Now create Material BOM by CS01.
    It will explode in sales order.
    kapil

  • Engineering bom explosion

    Hello team,
    My client's purpose is he should be able to explode multi level engineering bom with all the details and pull the same to the excel this will be just for his information purpose.
    I am not sure whether using of CS11 and CS12 is correct for this purpose, but some how when i used these T codes i was able to explode only production boms but not engineering bom.
    So how to achieve my purpose of extracting multilevel engineering bom details in to excel.
    Regards,
    sai

    Hello Team,
    Thanks a lot for all the guidance, and very helpful answer from Jeevan Sagar.
    As stated earlier i need this explosion only for reporting purpose and it should not affect any planning or production.
    Hence i have done below settings, please confirm me on the same.
    1) I have not done any settings in OS31 as the below setting was already available
    SelID    Selection Priority   BOM Usage
    02                1                    2  
    02                2                    3
    2) I went to OS30 or OPJM both took me to the same screen and defined the below new entry.
    Application - EN01,  SelID - 02,  did not select any other check boxes as i dont need any planning or production activities with that.
    My clarification : Hope the above setting will not affect production/planning and any others. It will just explode for reporting purpose.?
    Regards,
    sai

  • Problem related to exploding of BOM?

    Hi All,
    I wanna know how the  BOm explode in Me21n also what do I do likewhat to select or where to enter what to enter in me21n to explode BOm

    Hi,
    Craete PO in ME21N with item category L.
    enter the matl , plant and qty etc..
    In item details choose material data and cick on BOM icon  system will explode the BOM if it is maintained otherwise u can maintain the components manually.
    Pl reply 
    Thanks
    A.Gururajan

  • Engineering BOM and production BOM-very critical help

    Hello All,
    I am working for a client and below is the requirement, please guide me.
    1) Customer has 2 department here one is engg and other is production as usual.
    2) He needs BOMs only for 2 purposes a) For R and D  b) Production.
    3) He needs any changes in engineering and production to be reflected from certain specified date.
    4) He says he will raise ECN for every change.
    Now my questions are:
    1) How to copy any changes done at later stages from engineering bom to production bom at specified date. Can ECN automatically do this?
    2) what are methods  to copy any fresh E bom to Production bom also?
    3) Can ECN once approved automatically update changes in BOM by itself or does customer cumpolsarily need to take ECN and manually change E bom and then P bom.
    Please suggest if any better model can help.
    Regards,
    satish

    Hello Adler,
    That was good response. Here any of both situations can appear. So can you help me in knowing the procedure how to do the same in both cases
    Also below are my pending queries, any one please help
    1) He needs any changes in engineering and production to be reflected from certain specified date as per date he mentions
    4) He says he will raise ECN for every change.
    Now my questions are:
    1) How to copy any changes done at later stages from engineering bom to production bom at specified date. Can ECN automatically do this?
    2) what are methods to copy any fresh E bom to Production bom also?
    3) Can ECN once approved automatically update changes in BOM by itself or does customer cumpolsarily need to take ECN and manually change E bom and then P bom.

  • CU50 difference in Engineering BOM cost and Sales BOM cost

    Dear All,
    I have material  BOM    M0001 --configurable...finished prodcuct (spe procuremt 52)
                                                 M2100-- confifurable --- Phontam (semi finished)
                                                           M8600---- configurable (semifinished) specP 52                                                       R7000---
                                                           R7000--non configurable material
                                                           R7000--non configurable
                                                           R7000-- non configurable.
    Now in T-code Cu50  under configuration tab simulation
    1.  when i am selecting Engineering Tab and then costing  tab   all materials are picked for Engineering BOM costing.
    2. when i am selecting only costing tab (Sales).. then the material R7000--non configurable  qty 54
                                                                                    R7000--non configurable  qty 27
                                                                                    R7000-- non configurable. qty 18
    are not costed.
    What could be the reason for not picking the cost for the material R7000
                                                                                    R7000
                                                                                    R7000
    Please help me..
    Thanks in advance.
    regards
    janardhan

    Hello Janardhan,
    This is standard SAP behaviour. As per details given by you, it seems that material's consfiguration profile have settings of "Order BOM" and "multi-level" in CU43 transaction. So for such settings, system behaves differently for Engineering BOM and sales order cost estimates as given below.
    1. Click on u201CEngineeringu201D Button and then click on u201CCalculationu201D  Button : System simulates the cost estimates through transaction CU51. And in CU51 BOM explosion for cost estimate is multilevel. So system will show all the components in the BOM of header material. So you will find all the components listed in Cost estimate simulation.
    2. Directly click on u201CCalculationu201D  button : System simulates the cost estimates as it use to simulate in VA01 transaction. Becasue of this, there is NO BOM explosion till last level. System will only simulate the Cost estimate by exploding the BOM till 1st level. So system will show only 1st level BOM components. So you will find only 1st level BOM components listed.
    So dont try to check anything in it, as its standard SAP behaviour.
    Regards,
    Nachiket.

  • How to transfer sales bom from SAP R/3 to APO?

    Hi Experts,
    I just want to ask how to transfer sales bom from R/3 to APO? if i change my bom usage to 5 and use this BOM in my Production version be enough to send it to APO?
    Also, this is my first time using sales bom, could you please help me understand how sales bom work in APO planning?
    Thanks so much.
    Mylene

    Hi Senthil,
    Thanks again for your reply. I was trying to CIF sales BOM in APO but only the header material are being created in APO. The component are not added in PDS. This is how I create it in SAP R/3:
    1. transaction cs01 -->  enter header material, plant and BOM USAGE =5
    2. inside cs01, i entered components, quantity for each components and ITEM category = L (stock item)
                            i also eneterd base quantity for header material
    3. create production version for header material with routing and this BOM
    4. create and activate material CIF model for header and components
    5. create and activate PDS CIF model for header and components.
    After doing all these steps, PDS is created in APO but I only have the header material (no components)
    I tried changing BOM to other bom usage and components were populated in PDS.
    Am i missing nay steps?  Thanks.
    Regards,
    Mylene

  • GRR1 report painter how to explode at GL account level ?

    Dear Experts,
    I am preparing a balance sheet using report painter GRR1. in the characteristic i assigned the group account number and set as explode. however when i see the report it is exploded at group account number only asterisk level i set is 01. do you guys have any idea how to explode at GL account level? do i need to define asterisk level upto 03 ? if yes how to create asterisk level ?

    Hi,
    For each head like Trade Receivables, Trade Parables, etc, Did you explicitly maintain the GL acct. range by selecting 'Account Number' as Characteristics in that line?
    Thanks,
    Nirav

  • How to create  the BOM for co product

    Dear friends,
    How to create the BOM for Co product  and How the production will create and  how the costing will capture for that.
    Regards,
    Sabhapathy R

    Dear Umesh,
    How Bom created for co product
    By product
    Header
    xxx
    101
    mvt
    mvt
    qty
    item
    yyy
    261
    1
    zzz
    531
    0.5-
    By product
    Same way how we create co product for BOM. pl explain with simple example.
    Thanks &regards,
    Sabhapathy R

  • How to get costing BOM from R/3

    Hi friends,
    How to get costing BOM from r/3 with levels into bw.and the transaction in r/3 is ck13n

    Hi,
    You'll need to go in for a generic DS in this case.
    Cheers,
    Kedar

  • How to create Alternative Bom by given inputs

    Hi to all,
    I need to create BOM with alternative number.
    my inputs are
    BOM Header
    Material, plant, BOM usage, Alternate BOM, BOM status, Base Qty, Valid From, valid to
    BOM Item
    Item number, item category, component, component description, UOM, valid from, valid to, item ID, QTY
    if i use CSAP_MAT_BOM_CREATE to create BOM , it will not create alternative number
    if i use BAPI_MATERIAL_BOM_GROUP_CREATE , does my input value are enough to create alternative bom.
    please can any one, put some light on it, i search SDN ,but i dont know how to create alternative bom with input provided.
    i shall be thankful to you for this.
    Regards
    Pavneet Rana

    Try the program-RCSBI010

  • Production BOM and Engineering BOM

    Dear Gurus ,
                          I want to know difference between Eng BOM and Prod BOM . We have standard multilevel engineering BOM but if I use that BOM for routing assignment I can only see 1 st level components . Can I put all components in single level so that I can assign them in FG routing and pick list will have all the components ?
    We are thinking of considering all assy as phantom so that there would be only one prod order for FG .
    Neal

    Hi,
    The engineering BOM is as designed material BOM. It may include all the part upto the level of nuts & Bolts & also the engineering drawings. But in Production BOM you may not include the engg drawings & the C class material like nut & bolt, which may be planned on Reorder point planning.
    I hope the answer is clear.
    Regards,
    Prashant

  • How to import engine.security.facade software component in CE 7.1 SP3

    Hi experts,
    When I used com.sap.security.api.sda, there is a warning that it has deprecated. However, know that engine.security.facade (public part default) in software component ENGFACADE is the new component, I cannot find it in the CE environment.
    Where to locate engine.security.facade and how to import engine.security.facade into the infrastructure component?
    Thank you.

    Hi experts,
    When I used com.sap.security.api.sda, there is a warning that it has deprecated. However, know that engine.security.facade (public part default) in software component ENGFACADE is the new component, I cannot find it in the CE environment.
    Where to locate engine.security.facade and how to import engine.security.facade into the infrastructure component?
    Thank you.

  • How to Make a BOM as Configurable BOM ?

    Hi,
    Please answer my question , How to Make a BOM as
    Configurable BOM ?
    Regards,
    Abhilash

    Dear Abhilash,
    Please refer to the following link:
    http://sap-img.com/sap-sd/sales-bom-implementation.htm
    I will suggest you to visit http://sap-img.com/sap-sd.htm. It will give you the overview of SAP SD module.
    Moreover there is a separate section of FAQs with answers which will help you in great deal.
    Do let me know in case of any queries.
    Hope this helps you.
    Do award points if you found them useful.
    Regards,
    Rakesh

  • Exploding of BOM by using ALV Report

    Hi,
    Can any one help me to build a report which explodes the BOM as in CS11 level by level
    Thanks
    Bobby

    Hello
    u first place some dictionary input/output fields in your screen and
    below that u place ur custom control,
    so what ever input u are giving in those fields  , u seelct data accordingly,
    for example.
    in screen there is one icon 'dictionary/program fields, click that and give some table , suppose u want to extract data from kna1 table using kunnr, select kunnr and press enter, then along withn cursor u get one frame, take that on to screen and place it ,
    now in the program write
    tables: kna1.
    select  *  from kna1 into it_kna1  where kunnr = kna1-kunnr. 
    now u get the data into it_kna1.
    it will work , try this.
    bye.

Maybe you are looking for

  • USB Printer Sometimes Not Recognized on Reboot into OS X from Windows XP

    Thanks in advance for any help. Here's the situation: Everything works fine in OS X (10.5.2). In particular I have a USB laser printer that works find (Brother HL 2040). Then I boot via Boot Camp into Windows XP and play a few games. Then I reboot ou

  • Floating Licence

    Does Adobe Acrobat offer any type of floating licence? We are trying to incorporate digital signatures that can only be done in reader if the pdf is saved in Acrobat with the "extend features in adobe reader" function turned on. We don't/aren't going

  • Calling an Applet from a JSP

              Hi,           I need help with this, I want to invoke an applet from a JSP page. The applet code           is compiled and resides in a separate jar file. The question is, how do I deploy           this applet in weblogic 6.1 and then have

  • User making direct changes to PRD system

    My enviroment is ERP 6 ABAP /Oracle 10G/Solaris 10 Some of my superusers are fond of making direct changes to PRD (as opposed to DEV & then transport via the landscape) though changes in  PRD system  have been restricted through  client change option

  • Where is jrmc 4.1.0 experimental site?

    I installed Oracle® JRockit Mission Control 4.1.0. I try to install the Weblogic plugin for JRockit. However, when I go to jrmc Help -> Install Plug-ins ..., it tries to access the following jrmc 4.1.0 experimental site, and fails with the following