How to get automatic plant and shipping point and storage location

hi,
sap gurus,
how to get automatic plant and shipping point and storage location automatically into the sales order
i have done all the config settings for that
but its not appearing automatically.
regards,
balaji.t

Hi
Balaji...
U can get the plant in sales order,  by doing the default the same in customer master or in  material master. In customer master -- sales are data--shipping tab delivering plant there u can assign and get the same in order for that customer. it is better to do in customer master rather than in material master.
Shipping point is getting determine in sales order and u can not make it default like plant. Shipping point is determine in the basis of Shipping condition of customer ( ship to party)+ loading group of material + Deliverying plant there u have to assing the shipping point and it will flow in the sales order. Tcode OVL2
For S loc u have to enter manually in the sales order u can not get it automatically.
Hope this will help you.
Thx.

Similar Messages

  • Shipping point at storage location level in ME2O

    hi Guys,
    I am using stock transport orders at storage location level, and it works fine, we have a customizing point to configure shipping point at storage location level.
    My doubt is if we can use also shipping point det. at storage location level for creating Deliveries for Subcontracting process in ME2O.
    It works only If I customize the shipping point det. at plant level, not considering the customizing at storage location level.
    kind regards
    Brian

    Dear Ram,
    Can you please specify the configuration that you have made? And which storage location determination rule are you using for your Delivery Type?
    Regards,
    Amitabha

  • How to Avoid the Tax and Shipping point and plant redetermination

    Dear experts
    my business requirement is to change the Ship- to address while creating the sales order . Due to this my taxes and shipping/plant data get re determined . The order type i am using triggers to planned order and availability check .
    When i change the address of ship to the proposed date gets changed and effects the delivery planning ,
    Please suggest a way  if i chnage the address of SH during sales order creation or change ( VA02) . my shipping data should not determined  and the availability check wont carry out
    Regards
    Vinay Kr  Joshi

    HI,
    if you change the ship-to-adress, in my oppinion it is right, that there is a new planning.
    if you wont have this planning, you should set the dates fixed in the availability check.  sign date and quantity fixed.
    Hans

  • How to get delivery address in STO for the storage location

    Hi All,
    We have to create STO from the reservation using MRP run. While system is creating the STO we need to populate the storage location address as delivery address (not the plant address ). How we can do that? what are teh settings required for this setup? please hlep in that.
    Regrads,
    Khan

    Hello...
    You can select the storage location in the line item itself which is adjecent to Plant for the line item.
    Regards
    Suresh

  • Plant and Shipping point assignment

    Dear All,
    As a standard process we have copied the plants and shipping points in the development client and i have deleted the default shipping point and assigned the newly defined shipping point.I have forgotten to assign one plant and shipping point and i have even deleted the default shipping point.Now i have to assign the plant x to the shipping point x where i am not able to find the plant in the  ovxc screen.Is there any way to find the missing plant or i have to delete all the assignments and reassign again.
    Help required as early as possible.
    Thanks in advance,
    Ramesh.

    1)  Check in OX10 whether you could see that plant
    2)  Check in OVXD whether you could see that shipping point
    If the answer to both is yes, then you should be able to see in OVXC also.  If not, better try to delete in the above areas also, recreate and then check in OVXC
    thanks
    G. Lakshmipathi

  • Very urgent : shipping point and delivery creation date

    Hi :
    I have a custom table with fields :
    belnr, posnr, btyp, aufnr, ebeln, ebelp, livbeln, liposnr,matnr,wadat,kunnr,werks,bmeinh,getri,inaktiv,wabukz,erdat,aedat,loekz.
    Custom Transaction with fields :
    vbeln (field name belnr) , aufnr, delivery vbeln ( field name livbeln ),werks, mat .avail.dat ( mbdat ), transport.plan date(tddat),
    matnr, and sales order item (posnr).
    I have to select sales order , item from custom table based on plant (werks) shipping point , and delivery creation date.
    how can i relate shipping point and delivery creation date to my query.
    For delivery creation date, it should be selected based on current date+-2 and should choose MBDAT OR TDDAT which ever is earlier based on current date.
    I would appreciate if anyone can give me som idea and full points r rewarded.
    Thx.
    Rag

    Hi,
    Try this:
    select a1belnr a1posnr vbep~etenr into corresponding fields of table itab from a1 inner join vbap
    on a1belnr = vbapvbeln
    inner join vbep
    <b>on vbapvbeln = vbepvbeln and vbapposnr = vbepposnr</b>
    where a1~werks = p_werks
    AND vbap~vstel = p_vstel
    AND vbep~edatu = p_edatu
    AND (vbep~mbdat <= p_edatu OR
    vbep~tddat <= p_edatu ).
    regards,
    Anji

  • How are shipping point and delivery note connected ?

    I wanted to understand how is shipping point connected to process of creating delivery notes....can we configure sap using SPRO such that the delivery note creation happens automatically for certain shipping point once the order is created and saved ....and for certain shipping point the delivery note is not automatically created ( assuming we are using the same order type) but the determination of automatic DN creation is done by the value of the shipping points ??

    Actually what is shipping point?
    Shipping point is an independent org.unit which is linked to the plant and represent the point of departure or receipt of materials.
    Normally lot of shipping points are assigned to the plant.
    Relation:
                   Actually a delivery is created from a single shipping point only.. That is the reason when u complete the sales order, at the time of creating the delivery note, u are forced to enter the shipping point, without that the system willn't proceed further.
    Determination:
    It is determined with the formula of shipping conditions + loading grp + deliv. plant
    Answering to ur 2nd query,
    when u are creating the delivery from the sales order screen (by going to menu bar and click delivery), the system automatically assumes the shipping pt is from the sales order.
    But if u enter the different shipping point in delivery note creation, the system will thro an error that delivery split due to diff. shipping points.
    Hope i clarify ur queries, ur further queries are welcomable.
    Reward points if useful...
    regards
    Kaleeswaran

  • 2LIS_12_VCITM populates the same Shipping Point and Receiving Plant

    Hi Gurus,
    We are using 2LIS_12_VCITM extractor which answers all delivery-related requirements. However when I checked the data in RSA3, Shipping Point and Receiving Plant are the same. So I checked some sample deliveries in table LIKP and it shows the correct shipping point and receiving plant (which are different to each other). I checked VL03N and table LIKP is giving the correct shipping points and receiving plants. Receiving Plant or LIKP-WERKS and Shipping Point or LIKP-VSTEL. My question is how this happened? Consequently, when I initialized in BW, shipping point and receiving plants are the same which should not be.
    Thanks for all the help.

    The data for the 2LIS_12_VCITM is not just sourced by LIKP (Delivery Header), but by LIPS (Delivery Item) too.
    Plant, in this extractor, is sourced by LIPS-WERKS instead of LIKP-WERKS. The receiving plant is LIPS-UMWRK. If you require this data, you will have to enhance the structure and create the User Exit code in tcode CMOD to extract that particular data.

  • Shipping point and plant

    Hi experts,
    In VL01N, the system pops up the message below when entering storage location, picked qty & batch. Pls help to solve. Thx.
    "Shipping from shipping point 2000 and plant 1001 is not possible.   Message no. VL027".
    Acutally, shipping point 2000 has been assigned to plant 1001 in OVXC. In shipping point determination, shipping condition 20 - loading group 1000 - plant 1001 - proposed shipping point 2000 has been maintained. Shipping condition & shipping point between the sales order & delivery match.

    Hi Cathy
    Please make sure that your plant 1001 and shipping point 2000 is assigned  properly
    Then your OVL2 shipping point determination settings
    As you are getting this error while entering the storage location
    That means your OVL3 is not maintained properly
    OVL3 is storage location determination settings
    It is determined thro
    1.Shipping point
    2.Delivering plant
    3.Storage conditions from MMR (optional)
    In t code OVL3 maintain for Shipping point 2001 and Delivering plant 1000 and storage conditions of material maintained in MMR (plant data/storage location data 1 ) or you can keep  this as blank also
    For this combination maintain your storage location the key which you are manually entering in VL01N
    Regards
    Raja

  • Shipping point and Plant in CRM 4.0

    Hi experts,
    Where do i find Plant and Shipping point in CRM Sales transaction? of CRM 4.0 version.
    Thanks in advance.
    Regards,
    DV.

    Hi DV,
    For sales order exchange scenarios please check the following notes:
    541113 - Data exchange scenarios for orders (CRM-R/3)
    511074 - Change of CRM documents in R/3 Backend System, part 1
    520045 - Change of CRM documents in the R/3 Backend System, part 2
    705200 - Data exchange - Scenario X, Y and Z (old version)
    889051 - Scenario A: Overview and settings (new version of 705200)
    620139 - Scenario A: Interdependent changes in sales documents - R/3
    Kind regards,
    KZ

  • Plant and shipping point have no connection but still order got created.

    Hi All,
    An order was created and subsequenty delivered and invoiced. Later on the goods were returned.
    The problem which occured is that the return order have plant A  and shipping point B, which are in no way connected to each other. There is no configuration done to attach this two, still the order got created.
    I wanted to know even if plant and shipping point is different, can a order be created and saved.
    Please giude me.
    Regards,
    Satish.

    yes Satish
    this is possible, take a scenario, suppose one company is having 3 plants A,B,C with shipping point A1,B1,AND C1 respectively. But the requirement is such that they will collect the material from plant A and deliver it form B1 shiiping point which is linked with plant B.
    so it is possible to create and save order if plant and shipping point is different.
    bye

  • Relation between plant and shipping point

    Hi all,
    my simple question is,  what is the relation between plant and shipping point ?
    in book i read, it is                      many to many,
    but in some web link it is showing 1 to many
    what is the logic behind these two ans.
    pls tell me the ans...
    Regards
    Avinash

    Hi Hegal . K . Charles,
    it is correct,  as we discussed above it may be MANY to MANY .
    Suppose, we hv 2 plant 1 in delhi and 2nd in nagpur. and this company want to export via inland water ways, in this case we can assign mumbai port to delhi and nagpur plant as well.
    as you said it is correct, It is just  not to overload the master data maintenance 
    Ex- In case of Sales Org. Its is always advisable to keep it minimum to per company code. Because master data records are multiplied by each additional org. element.

  • Available plants & redetermine shipping point

    Hi experts, i have two problems. First, i will describe the situation and then the problem.
    in our system , we maintain delivery plant field into customer master. From this reason, when i create a sales order, SAP copy this plant as default value in sales order.
    Let's assume that we make a sales order for customer 10 which has plant P1 as default delivery plant.   And material M1 with following available stock:
    - in M1 plant 0 qty
    - in M2 plant 10 qty.
    First problem:
    In this case , when i create a sales order, SAP will propose automatically P1 as delivering plant, but in P1 there are no stock (0 qty). Is there any way to propose automatically another plant  when in proposed plant there are no available stock ?
    Second problem:
    In our system we have some generic materials which always will be delivered and shipped from one plant. So, let's assume that this plant is P1. If a customer has default plant P2, then in sales order will copy default plant from customer master. I solve this problem from a user exit (userexit_move_field_to_vbap) -- i make some modifications-- but the real problem is that, when i do this forced change, shipping point is not redetermined. 
    Is there any way to redetermine shipping point in this case (forced change of delivery plant) ?
    I give you an example:
    -customer 10, default plant P1
    -material MG01 (this material should always deliver from plant X1, shipping point X1)
    - two shippping points: P1 and X1
    When i create the sales order, SAP propose automatically P1 as default plant...but in background, in user exit userexit_move_field_to_vbap i have some modifications: if material is MG01 then plant would be X1. But , in this case, shipping point will be determined based on old plant (P1) not based on new forced change plant (X1) so shipping point will be P1 instead of X1. So, is there any way to redetermne shipping point ?
    Thanks in advance.

    Hi,
    Is there any way to propose automatically another plant when in proposed plant there are no available stock
    As fara s my understanding there is no automatic replacement of plant.you can do it manually
    For determining shipping point as you used userexit for plant as like this you can force to change shipping point.
    Kapil

  • "shipping point" and "loading group" in SAP SD/MM

    Hi experts,
    Could somebody explain me the difference betwen "shipping point" and "loading group" in SAP SD/MM.
    best regards,
    Hermann

    A delivery is always initiated from a shipping point. The shipping point can be proposed automatically during order processing depending on the plant, loading group and shipping condition.
    Its plays a vary important role as without a shipping point you really cant create a delivery document
    Loading groups are defined in Material master Record , which specifically means which group will load the material for the transportaion, is it done by Crane, or on pellets, etc ...
    Hope this helps
    Cheers

  • How to get classification for a given material and material type in MM

    Hello Friends,
    One of my developer colleagues is struggling to find out : how to get classification for a given material and material type in MM?
    He is looking for probable table and table fields to Select from.
    I would appreciate seriously any help in this regard.
    ~Yours Sincerely

    Hi
    Below given the flow and table details for a given class and class type.
    - Table KLAH --> This contains the "Internal class no" [ for the given Class & Class type ]
    - Table KSML --> This contains the " internal character numbers " [ nothing but characteristics attached to the class ] , which can be fetched with the above fetched internal class no
    - Table AUSP --> This table contains the objects ( material ) attached to the internal characters of that class
    - Table CABNT --> This table contains the "Description" for the internal character numbers.
    - award points if this is ok

Maybe you are looking for