How to handle mould process

Dear Sir/Madam,
My plant bulid own mould and use the mould to produce parts. How do you treat this process to use 1 mould and produce 10,000 mould shot? We need to keep track the actual costing of this bulit mould.
Currently, the mould is issued by cost center (Mvt type: 201) which the actual costing is not captured.
Please advise.
Thanks.
Rgds,
Esther chong

Hi,
I looked at this today and thought I could put my views on this.
I think most of the assets fall under this scenario only. There is a cost related to the possession of the asset. In our case, the mould is an asset which involved a cost for possessing that.
Now the same asset (read building, land, machine,electricity etc) is used for producing the finished goods. In our case also the mould is used for making the finished product. The mould has some depreciation everytime it is used, it has specific period of utility after which it reaches its salvage value, just like any other asset. This is the general understanding.
Now comign to SAP, first the mould is made/procured. This case should be handled by means of either a production order or purchase order. In either of this case, I think the cost of the material is taken care of during the goods receipt. When the mould is received, my view is that it should be received as a raw material, as this will be used during the production process.
Now, for the production of our finished product, if the mould is created as a work centre and PRTs are updated to capture the cost associated with the work centre, the cost of the mould will get allocated to all the items which are produced using this mould.
Though I  know very little of SAP-PP, i am a SD consultant.

Similar Messages

  • Service? How to handle this process in SAP?

    Hi,
    Ihave a problem
    The customer provide us his own material,
    In production process we add to it our own component. Than we have to pass it to our magazine with the same customer name but higher price.
    Is it a service? How to handle in SAP.
    Thanks in advance.
    Artur

    This is not service but internal subcontracting scenario, You can go through below link for understanding it better,
    [Internal Subcontracting   |http://forums.sdn.sap.com/thread.jspa?threadID=571772&messageID=4190422#4190422]

  • How to handle selection process in EHP4 erecruitment

    Hi,
    I am new to this forum. Can someone throw some light on the following processess in Erecruitment EHP 4
    1. Candidate selection process by recruiter
    Need the overall process flow and how to create activity, assign and complete a full process.
    Thanks

    Balaji,
    The selection process begins by creating a new requisition then creating a  job posting and publishing it - this is a standard funcitonality , any checks involved in the selection can be customised using the BADI.
    Activity as a std functionality has status - in process, completed , Rejected and to be hired.
    When a candidate applies against the open job posting in ESS , you will be able to see the candidate details under the dashborad as a recruiter.
    Click the requisition under the dash borad and it will open a new window populating all the candidated applied to that requisition.
    Activites can be created with simple task, with a status change or email (Check customizing for more details on it)
    Activities can be like-
    employee completed first interview
    Employee completed medicals. these 2 can be an example of a simple activity
    Futher documents required - This can be an example of an email activity ( Letters can be customised attached to this activity)
    employee rejected, employee selected - This can be an example of status change activity .
    The last of all would be " Data transfer" this is done when you want the employee details to the transferrd for hiring, you can find this in tcode PA48.
    Hope this helps.
    Regards,
    Regi

  • How to handle rebate returns

    hi,
    sap gurus,
    how to handle rebate returns in the normal process
    for eg:
    my given target to the customer is 1 lac and there is rebate agreement for him
    so by the end of the year he has reached the target and then
    we have settled the agreement thru automatic settlement and then
    after one month he has returned the goods and services back which are in rebate agreement and
    then how to handle that process.
    plz help me on this
    regards,
    balaji.t
    09990019711

    Hi Balaji,
      Raise appropriate debit memo  for that customer based on the client decision.
    Regards,
    kishore.

  • How to tackle long processing threads ?

    Hi All,
    I have a requirement where it will take couple of minutes to complete a process. Well, I made that method to be "synchronized" so that none of the other threads can do anything(since all other activities are dependant on this thread, the others have to wait till this important threads completes it's process).
    Now the problem is that other threads goes into problem and all of them are in MW(monitor wait) state and sometime kills/hangs the wls-instance. We are using wls6.1+sp2.
    please suggest me with some example for how to tackle these kind of problems.
    -sangita

    What is this process doing?this process gets some information from an external DB source. Basically, it does some search on a given field. We can't do anything with this DB resource as we don't have any hold on this, some legacy old crap.
    All we need to do is to handle this long runnig process through java. could you please suggest how to handle long processes, intelligently ?
    Thanks for your time on this.
    -sangita

  • How to handle multiple records in BPMN process

    Hi All,
    We are using Oracle BPM 11g.In my requirement,I am using the database adapter to get the data from table and I need to validate the each record and update the status of that record from the BPM Process.But I dont know how to handle if multiple records come at a time.Can anybody please helpout from this problem.
    Thanks in advanced.
    Narasimha Rao.

    Can you have a look at this post: http://redstack.wordpress.com/2010/09/30/iteratingtraversing-arrays-in-bpm/
    It's solving a different problem, but the key is that it's using a multi-instance subprocess to iterate over an array of "things" that need to be acted in. In your case it's the set of results from the db query rather than the set of tests in the example. But the principle is the same. You'd take collection of rows from the DB and process them in a multi-instance subprocess. The text that begins with the following would be good place to start:
    "Now let’s implement the body of our process. We will use the Subprocess object to handle the traversal of the array of tests. Drag a Subprocess from the component palette on the right into the process and drop it on the line between the Start and End nodes."
    In the loop characteristics you'd define whether you want to execute serially or in parallel.

  • How to handle the One-Time Customer Process (Customizations - Master Datas)

    How can we handle the processes of one time customers (for example sales from a store without a warranty process fort he products)? Iu2019m planning of creating a different sales document type and use a single customer number for all of the documents created. On the other hand SAP has a solution for the one-time customers but I donu2019t know its details. Can anybody explain me the standard one-time customer process of SAP (the needed customizations and the master datas to be created)?
    Thanks in advance for the answers....

    Hi..
    the one-time customer is an account group (CPDA) that is used for "walk-in" or "cash" buyers. although this account group can be used for regular sales orders, this is intended to be used with the Cash Sales type of sales documents, where no accounts receivable is created. you also need the one-time customer as a "dummy" and avoid creating many customer masters for buyers who may only do one transaction with your company.
    when you use the one-time customer account group in the Cash Sales order, you enter the one-time customer number in the sold-to party field. the system will then prompt you to enter the actual name (and address) of the buyer. you can have the option of generating SD reports with the real names of the customers.
    you create the one-time customer the same way you do with the regular Sold-to party. there are some differences, in the sense that this is a "dummy" account. you do XD01 or VD01 to create the account, choosing account group CPDA. you also make entries in the sales areas.
    Regds
    MM

  • How to handle xml message in proxy inbound processing?

    Hi Experts,
    I have a scenario that is SOAP Client====>XI===>ECC.
    But i don't need to use the XI mapping,i skip mapping
    in XI and use the generated proxy inbound processing.
    Here is a message structure as below.
    <commodityList>
    &#9632;<commodity>
    &#9632;&#9632;<detailNo>303303</detailNo>
    &#9632;&#9632;<makerName>sony</makerName>
    &#9632;&#9632;<ChargeInfoList>
    &#9632;&#9632;&#9632;<productId>aaaa</productId>
    &#9632;&#9632;&#9632;<name>bbb</name>
    &#9632;&#9632;</ChargeInfoList>
    &#9632;</commodity>
    </commodityList>
    When i sent the message without field entry of <productId>
    and <name> i got the response in soap client as below.
    <commodityList>
    &#9632;<commodity>
    &#9632;&#9632;<detailNo>303303</detailNo>
    &#9632;&#9632;<makerName>sony</makerName>
    &#9632;</commodity>
    </commodityList>
    The field tag <ChargeInfoList> doesn't display.
    But i want it to display as below.
    <commodityList>
    &#9632;<commodity>
    &#9632;&#9632;<detailNo>303303</detailNo>
    &#9632;&#9632;<makerName>sony</makerName>
    &#9632;&#9632;<ChargeInfoList>
    &#9632;</commodity>
    </commodityList>
    In case of field entry is empty,how to  let the response
    contains tag?
    As i know ,there is a CONTROLLER in proxy .
    But i don't know if it is relevant to this
    case and i don't know how to handle it.
    Brand

    Hi Mrudula,
    As far as i know there are no content conversion methodology for HTTPS as the recevier adapter.
    Also you can read through these links to confirm the same:
    http://help.sap.com/saphelp_nw04/helpdata/en/0d/5ab43b274a960de10000000a114084/content.htm
    http://publib.boulder.ibm.com/infocenter/wbihelp/v6rxmx/index.jsp?topic=/com.ibm.wbia_adapters.doc/doc/sap_xi/sapximst30.htm
    SAP NetWeaver - XML Communication Interface (CA-XML) [original link is broken]
    Regards,
    abhy
    note: reward the helpful.

  • How to handle delta failed process chain steps

    Hi All,
    I have a query regarding process chains were in processstep has delta load and there is dependency between the predeseccor and successor process steps,then
    if the delta load fails due to any one of the following reasons
    1) due to remote_icp locked the prtclr Infoobject the process step is executing .
    2) due to any psa records errors and so on
    Then how to handle delta and see that correct delta records were updated .
    Because again for the nextday loads if the previous delta is incorrect it will give pop-up message that it is not possible.
    If any suugestions pl guide me.
    thanks
    Venkat
    [email protected]

    1)Remove the lock by force from sm12 or wait till the lock is gone.Then see if the delta data has come till the PSA.Mark failed delta load RED and back it out from target.Then read everything in manually from PSA to target.
    In process chains u can go the monitor entry for the failed load by..highlight chain..click log icon..give selection..for proper selection..see the failed node..right click..display messages..click on process monitor.
    Sometimes even if infopackage is run successful manually,next steps in the chain do not kick off.
    Use Siggi's excellent blog on this..(it works really well)
    /people/siegfried.szameitat/blog/2006/02/26/restarting-processchains
    2)Make request RED and back it out from target.
    Correct records in the PSA and read everything in manually from PSA to data target.
    Then use Siggi's blog.
    If data hasnt come to PSA do a delta repeat.
    Always check yesterday's chain run about 1-2 hrs before today's chain kicks off.
    cheers,
    Vishvesh
    Message was edited by: Vishvesh

  • Parallel Processing : How to Handle Resource failure?

    Hi,
    I have implemented the parallel processing/ asynchronous rfc call in my system because we have to process millions of records and processing is important. My Program does work fine in Development and quality for small number of records but during SVT I am encountering RESOURCE_FAILURE exception. As of now I have tried to wait for more time and then process it again and also on failure I have tried to process sequential but nothing worked with second approach that is on resource_failure execute normal FM call it is resulting in terminating Parallel processing.
    Any Pointer on how to handle it is appreciated.
    Regards,
    Deepak Bhalla

    <b>Handling the RESOURCE_FAILURE exception:</b> As each parallel processing task is dispatched, the SAP system counts down the number of resources (dialog work processes) available for processing additional tasks. This count goes up again as each parallel processing task is completed and returns to your program.
    Should your parallel processing tasks take a long time to complete, then the parallel processing resources may temporarily run out. In this case, CALL FUNCTION returns the exception RESOURCE_FAILURE. This means simply that all dialog work processes in the RFC group that your program is using are in use.
    Your program must now wait until resources become available and then re-issue the CALL FUNCTION that failed. In the sample program, we use a simple, reasonably failsafe wait mechanism. The program waits for parallel processing tasks to return, freeing up resources. The WAIT also specifies a initial timeout of 1 second. If the CALL FUNCTION again fails, the WAIT is repeated with a longer time-out. You can increase the time-outs if you expect that your parallel tasks will take longer to complete. You should also add code to exit from the retry loop after a suitable number of iterations.
    Use WAIT statement.
    Hope this resolves u r issue.
    - Raj

  • How to handle exception CX_SY_REF_IS_INITIAL

    hi experts,
    im working on a test scenario for abap mapping in SAP XI im getting this error
    An exception with the type CX_SY_REF_IS_INITIAL occurred, but was neither handled locally, nor declared in a RAISING clause Dereferencing of the NULL reference
    i understand that i need to catch this exception in the abap coding but i'm not familiar with oops concepts
    can any one please suggest me how to handle this exception for the following code...
    method IF_MAPPING~EXECUTE.
      break x1149.
    * initialize iXML
      TYPE-POOLS: ixml.
      class cl_ixml definition load.
    ** Instances & Variable declaration =======================
    * instance main factory
      TYPES: BEGIN OF t_xml_line,
              data(256) TYPE x,
            END OF t_xml_line.
      DATA: l_ixml TYPE REF TO if_ixml,
    * instance input stream factory
       l_streamfactory TYPE REF TO if_ixml_stream_factory,
    * instance input stream
      l_istream  TYPE REF TO if_ixml_istream,
    * instance input document
      l_document TYPE REF TO if_ixml_document,
    * instance parse input document
      l_parser TYPE REF TO if_ixml_parser,
    * instance for elements within the nodes
      node      TYPE REF TO if_ixml_node,
    *instance of nodemap
      nodemap   TYPE REF TO if_ixml_named_node_map,
    * instance for iterator
      iterator  TYPE REF TO if_ixml_node_iterator,
      name      TYPE string,
      value     TYPE string,
    * instance main factory
       o_ixml   TYPE REF TO if_ixml,
    * instance output document
       o_document TYPE REF TO if_ixml_document,
    * instance output stream
      o_istream  TYPE REF TO if_ixml_ostream,
    * instance parse output document
      o_parser  TYPE REF TO if_ixml_parser,
    * instance fot renderer
      renderer type ref to if_ixml_renderer,
      irc type i,
      l_xml_size   TYPE i,
    *ROOT ELEMENT
    l_element_MT_DEMANDTEC_COST TYPE REF TO if_ixml_element,
    *NEXT CHILD ELEMENT FROM THE ABOVE PARENT
    l_element_DT_DEMANDTEC TYPE REF TO if_ixml_element,
    *CHILDREN1 ELEMENT FOR DT_DEMANDTEC
    l_element_DT_WHSE  TYPE REF TO if_ixml_element,
    *CHILDREN2 ELEMENT FOR DT_DEMANDTEC
    l_element_DT_DC    TYPE REF TO if_ixml_element,
    *CHILDREN3 ELEMENT FOR DT_DEMANDTEC
    l_element_DT_PLANT    TYPE REF TO if_ixml_element,
    *CHILDREN4 ELEMENT FOR DT_DEMANDTEC
    l_element_DT_QTY    TYPE REF TO if_ixml_element.
    *saving the xml document
      DATA: l_xml_table       TYPE TABLE OF t_xml_line.
      types: begin of t_source,
              whse(5),
              dc(4) ,
              plant(4),
              qty    type i,
             end of t_source.
      types: tt_source TYPE STANDARD TABLE OF t_source.
      data:  wa_source type t_source.
      data: it_source TYPE  tt_source,
            ivalue type string.
    * Procedures and business logic =======================================
    *   Creating the main iXML factory
      l_ixml = cl_ixml=>create( ).
    *   Creating a stream factory
      l_streamfactory = l_ixml->create_stream_factory( ).
    * create input stream
      l_istream = l_streamfactory->create_istream_xstring( source ).
    *  initialize input document
      l_document = l_ixml->create_document( ).
    *  Create a Parser
      l_parser = l_ixml->create_parser( stream_factory = l_streamfactory
                                          istream        = l_istream
                                          document       = l_document ).
    * parse input document
      l_parser->parse( ).
    *   Validate a document
      l_parser->set_validating( mode = if_ixml_parser=>co_validate ).
    *   Parse the stream
      IF l_parser->parse( ) NE 0.
        IF l_parser->num_errors( ) NE 0.
          DATA: parseerror TYPE REF TO if_ixml_parse_error,
                str        TYPE string,
                i          TYPE i,
                count      TYPE i,
                index      TYPE i.
          count = l_parser->num_errors( ).
          WRITE: count, ' parse errors have occured:'.
          index = 0.
          WHILE index < count.
            parseerror = l_parser->get_error( index = index ).
            i = parseerror->get_line( ).
            WRITE: 'line: ', i.
            i = parseerror->get_column( ).
            WRITE: 'column: ', i.
            str = parseerror->get_reason( ).
            WRITE: str.
            index = index + 1.
          ENDWHILE.
        ENDIF.
      ENDIF.
    *   Process the document
      IF l_parser->is_dom_generating( ) EQ 'X'.
        refresh : it_source.
        node ?= l_document.
        CHECK NOT node IS INITIAL.
    *   create a node iterator
        iterator  = node->create_iterator( ).
    *   get current node
        node = iterator->get_next( ).
    *   loop over all nodes
        WHILE NOT node IS INITIAL.
          CASE node->get_type( ).
            WHEN if_ixml_node=>co_node_element.
    *         element node
              name    = node->get_name( ).
              nodemap = node->get_attributes( ).
            WHEN if_ixml_node=>co_node_text.
    *         text node
              value  = node->get_value( ).
              if name eq 'DT_WHSE'.
                wa_source-whse = value.
              ELSEIF name eq 'DT_DC'.
                wa_source-DC = value.
              ELSEIF name eq 'DT_PLANT'.
                wa_source-PLANT = value.
              ELSEIF name eq 'DT_QTY'.
                wa_source-QTY = value.
                COLLECT wa_source INto it_source.
                CLEAR   wa_source.
              ENDIF.
          endcase.
          node = iterator->get_next( ).
        endwhile.
      ENDIF.
      loop at it_source into wa_source .
        at first.
    *       Creating a ixml factory
          o_ixml = cl_ixml=>create( ).
    *       Creating the dom object model
          o_document = l_ixml->create_document( ).
        endat.
    *       Build and Fill  root node MT_DEMANDTEC_COST
        AT FIRST.
          l_element_MT_DEMANDTEC_COST    =
    O_document->create_simple_element(
                                  name   = 'MT_DEMANDTEC_COST'
                                  parent = o_document ).
        ENDAT.
    *      Build and Fill  Child node DT_DEMANDTEC for parent
    *                                                  MT_DEMANDTEC_COST
        l_element_DT_DEMANDTEC    = O_document->create_simple_element(
                                     name   = 'DT_DEMANDTEC'
                                     parent = l_element_MT_DEMANDTEC_COST ).
    *      Build and Fill  Child node1 DT_WHSE for parent DT_DEMANDTEC
        ivalue              = wa_source-WHSE.
        l_element_DT_WHSE    = O_document->create_simple_element(
                                         name   = 'DT_WHSE'
                                         VALUE  = ivalue
                                         parent = l_element_DT_DEMANDTEC  ).
    *      Build and Fill  Child node2 DT_WHSE for parent DT_DEMANDTEC
        ivalue              = wa_source-DC.
        l_element_DT_DC   = O_document->create_simple_element(
                                             name   = 'DT_DC'
                                              VALUE  = ivalue
                                    parent = l_element_DT_DEMANDTEC ).
    *      Build and Fill  Child node3 DT_WHSE for parent DT_DEMANDTEC
        ivalue              = wa_source-PLANT.
        l_element_DT_PLANT   = O_document->create_simple_element(
                                                 name   = 'DT_PLANT'
                                                  VALUE  = ivalue
                                   parent = l_element_DT_DEMANDTEC  ).
    *      Build and Fill  Child node4 DT_QTY for parent DT_DEMANDTEC
        ivalue              = wa_source-QTY.
        l_element_DT_QTY     = O_document->create_simple_element(
                                                 name   = 'DT_QTY'
                                                  VALUE  = ivalue
                                   parent = l_element_DT_DEMANDTEC  ).
      endloop.
    * render document ======================================================
    * create output stream
      o_istream  = l_streamfactory->create_ostream_xstring( result ).
    *   Connect internal XML table to stream factory
      o_istream  = l_streamfactory->create_ostream_itable( table =
    l_xml_table ).
      renderer = o_ixml->create_renderer( ostream = o_istream
                                              document = o_document ).
      irc = renderer->render( ).
    * how do i catch the exception for type CX_SY_REF_IS_INITIAL ...?
    endmethod.
    full reward points for answers.
    Thanks & Regards,
    Uday Kumar.
    Edited by: UDAY on May 6, 2008 9:32 PM

    Hi Uday,
    Its occurs because you're trying to access a objects with null reference. Or you forgot to create an instance or an error occurs during the instance creation. So You should put all your "Procedures and business logic" inside a Try/catch block. as follow.
    " Define a class exception object to get error message......
    DATA o_exception TYPE REF TO cx_sy_ref_is_initial.
    "// Use the statment Try block to catch the error.
    TRY.
    *   Creating the main iXML factory
      l_ixml = cl_ixml=>create( ).
    *   Creating a stream factory
      l_streamfactory = l_ixml->create_stream_factory( ).
    * create input stream
      l_istream = l_streamfactory->create_istream_xstring( source ).
    *  initialize input document
      l_document = l_ixml->create_document( ).
    *  Create a Parser
      l_parser = l_ixml->create_parser( stream_factory = l_streamfactory
                                          istream        = l_istream
                                          document       = l_document ).
    * parse input document
      l_parser->parse( ).
    *   Validate a document
      l_parser->set_validating( mode = if_ixml_parser=>co_validate ).
    *   Parse the stream
      IF l_parser->parse( ) NE 0.
        IF l_parser->num_errors( ) NE 0.
          DATA: parseerror TYPE REF TO if_ixml_parse_error,
                str        TYPE string,
                i          TYPE i,
                count      TYPE i,
                index      TYPE i.
          count = l_parser->num_errors( ).
          WRITE: count, ' parse errors have occured:'.
          index = 0.
          WHILE index < count.
            parseerror = l_parser->get_error( index = index ).
            i = parseerror->get_line( ).
            WRITE: 'line: ', i.
            i = parseerror->get_column( ).
            WRITE: 'column: ', i.
            str = parseerror->get_reason( ).
            WRITE: str.
            index = index + 1.
          ENDWHILE.
        ENDIF.
      ENDIF.
    *   Process the document
      IF l_parser->is_dom_generating( ) EQ 'X'.
        refresh : it_source.
        node ?= l_document.
        CHECK NOT node IS INITIAL.
    *   create a node iterator
        iterator  = node->create_iterator( ).
    *   get current node
        node = iterator->get_next( ).
    *   loop over all nodes
        WHILE NOT node IS INITIAL.
          CASE node->get_type( ).
            WHEN if_ixml_node=>co_node_element.
    *         element node
              name    = node->get_name( ).
              nodemap = node->get_attributes( ).
            WHEN if_ixml_node=>co_node_text.
    *         text node
              value  = node->get_value( ).
              if name eq 'DT_WHSE'.
                wa_source-whse = value.
              ELSEIF name eq 'DT_DC'.
                wa_source-DC = value.
              ELSEIF name eq 'DT_PLANT'.
                wa_source-PLANT = value.
              ELSEIF name eq 'DT_QTY'.
                wa_source-QTY = value.
                COLLECT wa_source INto it_source.
                CLEAR   wa_source.
              ENDIF.
          endcase.
          node = iterator->get_next( ).
        endwhile.
      ENDIF.
      loop at it_source into wa_source .
        at first.
    *       Creating a ixml factory
          o_ixml = cl_ixml=>create( ).
    *       Creating the dom object model
          o_document = l_ixml->create_document( ).
        endat.
    *       Build and Fill  root node MT_DEMANDTEC_COST
        AT FIRST.
          l_element_MT_DEMANDTEC_COST    =
    O_document->create_simple_element(
                                  name   = 'MT_DEMANDTEC_COST'
                                  parent = o_document ).
        ENDAT.
    *      Build and Fill  Child node DT_DEMANDTEC for parent
    *                                                  MT_DEMANDTEC_COST
        l_element_DT_DEMANDTEC    = O_document->create_simple_element(
                                     name   = 'DT_DEMANDTEC'
                                     parent = l_element_MT_DEMANDTEC_COST ).
    *      Build and Fill  Child node1 DT_WHSE for parent DT_DEMANDTEC
        ivalue              = wa_source-WHSE.
        l_element_DT_WHSE    = O_document->create_simple_element(
                                         name   = 'DT_WHSE'
                                         VALUE  = ivalue
                                         parent = l_element_DT_DEMANDTEC  ).
    *      Build and Fill  Child node2 DT_WHSE for parent DT_DEMANDTEC
        ivalue              = wa_source-DC.
        l_element_DT_DC   = O_document->create_simple_element(
                                             name   = 'DT_DC'
                                              VALUE  = ivalue
                                    parent = l_element_DT_DEMANDTEC ).
    *      Build and Fill  Child node3 DT_WHSE for parent DT_DEMANDTEC
        ivalue              = wa_source-PLANT.
        l_element_DT_PLANT   = O_document->create_simple_element(
                                                 name   = 'DT_PLANT'
                                                  VALUE  = ivalue
                                   parent = l_element_DT_DEMANDTEC  ).
    *      Build and Fill  Child node4 DT_QTY for parent DT_DEMANDTEC
        ivalue              = wa_source-QTY.
        l_element_DT_QTY     = O_document->create_simple_element(
                                                 name   = 'DT_QTY'
                                                  VALUE  = ivalue
                                   parent = l_element_DT_DEMANDTEC  ).
      endloop.
    * render document ======================================================
    * create output stream
      o_istream  = l_streamfactory->create_ostream_xstring( result ).
    *   Connect internal XML table to stream factory
      o_istream  = l_streamfactory->create_ostream_itable( table =
    l_xml_table ).
      renderer = o_ixml->create_renderer( ostream = o_istream
                                              document = o_document ).
      irc = renderer->render( ).
    "   The Statement CATCH define a block that catches the exceptions of the
    "   exception class cx_sy_ref_is_initial
        CATCH cx_sy_ref_is_initial INTO o_exception.
    " If you need to get the error message text do as follow
    DATA errorMsg type string.
    " Get the message text
      errorMsg = o_exception->GET_TEXT( ).
    " Display the error information
      MESSAGE errorMsg TYPE 'I'.
      ENDTRY.
    The TRY block defines a guarded area whose class-based exceptions can be caught in the subsequent CATCH blocks. If no exception occurs in the TRY block and it reaches its end, the system continues the processing after ENDTRY. If a class-based exception occurs in the TRY block, the system searches for an exception handler in the same or an external TRY control structure.
    Font: SAP Help
    You can see a how to create and use an exception in this example [ ABAP Objects - Defining a Class-based exceptions|https://wiki.sdn.sap.com/wiki/x/19w] .
    Best Regards.
    Marcelo Ramos

  • How to handle error message during PAI?

    Hi Experts,
    Need help here.
    In my dialog screen, I have a field which is typed 'QUAN'.
    In entering different format , e.g. with non numeric value or a negative value, an error message appear and it does not process the MODULES inside the chain or FIELD MODULE ON REQUEST.
    Does anyone knows how to handle this kind of error. I need to display into a separate screen the errors I encountered coz I'm creating a new RF transaction.
    Points will be rewarded.
    Thanks in advance.

    Hai
    in your case(RF case) it is other way...
    yes you can use
    field x_currency module check_currency.
    in module check_currency.
    you have to display errors in another screen say 200.
    in that there will be 4 fields, all are display only fields.
    X_MESSAGE-MSGV1  of type sy-msgv1
    X_MESSAGE-MSGV2  of type sy-msgv2
    X_MESSAGE-MSGV3 of type sy-msgv3
    X_MESSAGE-MSGV4 of type sy-msgv4
    you populate the messages with these fields and then display it in the screen.
      method check_currency.
    *--do all your checks here....
           if error
             clear x_message.
            x_message-msgv1 = 'Enter Valid Employee Number'(004).
            leave to screen 0200.
          endif.
        endif.
    ENDMODULE.                 " VALIDATE_Currency
    in screen 200 PBO you need to format the message
    using the below logic.
           Method for formatting the message
      method message_format.
        data : lt_text type table of tline,         "text table
               lx_text type tline.                  "work area
        refresh lt_text.
        clear lx_text.
        concatenate x_message-msgv1 x_message-msgv2 into lx_text-tdline
          separated by space.
        append lx_text to lt_text.
        clear lx_text.
        concatenate x_message-msgv3 x_message-msgv4 into lx_text-tdline
          separated by space.
        append lx_text to lt_text.
    *- formatting the message
        call function 'FORMAT_TEXTLINES'
          exporting
            formatwidth = 20
          tables
            lines       = lt_text
          exceptions
            bound_error = 1
            others      = 2.
        clear: x_message.
    *- transfer the message data to screen fields
        loop at lt_text into lx_text.
          if sy-tabix = 1.
            x_message-msgv1 = lx_text-tdline.
          elseif sy-tabix = 2.
            x_message-msgv2 = lx_text-tdline.
          elseif sy-tabix = 3.
            x_message-msgv3 = lx_text-tdline.
          elseif sy-tabix = 4.
            x_message-msgv4 = lx_text-tdline.
          else.
            exit.
          endif.
        endloop.
      endmethod.                    "message_format
    Regards
    Vijay

  • Error handling in process chain-doubts

    Hi ,
    I have some doubts in error handling of process chains.
    1) I have  aprocess load infopackeage and subsequent process is update fromPSA.
    process load infopackage got failed  , so i loaded  the IP manually and repeated the next i.e process update from PSA .
    How to correct the process chain from now?
    2) I have  aprocess load infopackeage and subsequent process is Delete request in infocube .process load infopackage got failed  , so i loaded  the IP manually and repeated the next process i.e Delete request in infocube. Chain continued by deleting the right request . How this is possible ?
    Plz  help me  as this is urgent and daily i have to deal with this  issues. If any documents on error handling is greatly appreciated.
    My mail id is [email protected]
    Regards,
    Pavan

    Hi Pavan,
    Hope the following links will give u a clear idea about process chains and clear ur doubts.
    Business Intelligence Old Forum (Read Only Archive)
    http://help.sap.com/saphelp_nw2004s/helpdata/en/8f/c08b3baaa59649e10000000a11402f/frameset.htm
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/8da0cd90-0201-0010-2d9a-abab69f10045
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/19683495-0501-0010-4381-b31db6ece1e9
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/36693695-0501-0010-698a-a015c6aac9e1
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/9936e790-0201-0010-f185-89d0377639db
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/3507aa90-0201-0010-6891-d7df8c4722f7
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/263de690-0201-0010-bc9f-b65b3e7ba11c
    /people/siegfried.szameitat/blog/2006/02/26/restarting-processchains
    Errors in monitoring of process chains can be categorized into 4 different sections...
    Master data - Full Update
    Master data - Delta Update
    Transaction data - Full Update
    Transaction data - Delta Update.. in terms of loading of data which can be due to server shut down or system maintenance... errors due to incorrect entries in the OLTP system in which case you'll have to fix the errors in the PSA and manually load the data...
    Otherwise it can have errors on Attribute change run being locked by some other job... Aggregate Roll up failing because of attribute change run being run at the same time... Problem with hierarchies and save hierarchies...
    There can be problems with the data store activation if the ODS object contains any incorrect request sitting inside it... then, you need to delete the incorrect request and reload the data again...
    In case of Transaction Delta failure, you'll have to request for a repeat either manually in the infopackage or using the repeat option if available on right clicking the load event...
    For Master Data Delta failures, you need to do an Re-init by deleteing the previous initalization condition in the "initalization option for source systems" in the menu scheduler or reschedule the enitre chain... because, master data generally do not support repeat of last delta ...
    U can even look into these links:
    /people/siegfried.szameitat/blog/2006/02/26/restarting-processchains
    For common data load errors check this link:
    /people/siegfried.szameitat/blog/2005/07/28/data-load-errors--basic-checks
    ****Assign Points if Helpful****
    Regards,
    Ravikanth.

  • How to handle the exception in GP(Exception : Activity could not be read)

    Hi all
    we are getting the GP exceptions  as  1) "Activity could not be read"  2) "Action has been stopped"
    3) error while processing the item can not be displayed
    Please let me know how to handle these exceptions in GP .
    currently i got some documents in SDN on GP exceptions but those are related to manual exceptions for example if you enterd wrong data in the inputfield then we can handle those exceptions then it will allow to enter the new value but the exceptions which i mentioned above are new it seems
    can you please let me know how to handle or solve those 3 exceptions
    Thanks
    bindu

    Hi Shikhil
    Thanks for your reply
    Please have a look below for exceptions which i am getting in GP and let me know how to handle these exceptions.
    1) "Activity could not be read"
    2) "Action has been stopped"
    3) error while processing the item can not be displayed
    if you give any idea/clue how to handle these exceptions then it would be great help to me
    Thanks
    Sunil

  • Drive Utility Help Viewer "does not know how to handle selected URL"

    I have Drive Utility 10.5.6, according to . I'm trying to reformat a FAT32 partition on an external drive to Mac OS X Ext. Journaled in preparation for using SuperDuper to back up my Mac HD boot partition. For a time, which seems to have passed, now that erasing the partition has been done. The Disk Utility Help wouldn't work. Instead of putting up topic information, I got a message saying "Help Viewer does not know how to handle selected URL", followed by an reference to an html file that allegedly existed inside a set of folders inside the app. Where, of course, Finder cannot see. Once the erasing was done, Help seems to have come back. I tried Apple Support, but could only get a reference to OS 9 Appleworks macros not working in OS X. No help at all. Is this a question? I don't know. Help is working now. But for a while it was very annoying. It must be one of those little windows glitches that no one ever bothered to fix.

    In order to change a FAT or NTFS formatted drive for use with OS X you will need to do the following:
    Extended Hard Drive Preparation
    1. Open Disk Utility in your Utilities folder.
    2. After DU loads select your hard drive (this is the entry with the mfgr.'s ID and size) from the left side list. Click on the Partition tab in the DU main window.
    3. Under the Volume Scheme heading set the number of partitions from the drop down menu to one. Set the format type to Mac OS Extended (Journaled.) Click on the Options button, set the partition scheme to GUID (for Intel Macs) or APM (for PPC Macs) then click on the OK button. Click on the Partition button and wait until the process has completed.
    4. Select the volume you just created (this is the sub-entry under the drive entry) from the left side list. Click on the Erase tab in the DU main window.
    5. Set the format type to Mac OS Extended (Journaled.) Click on the Options button, check the button for Zero Data and click on OK to return to the Erase window.
    6. Click on the Erase button. The format process can take up to several hours depending upon the drive size.
    If you have an Intel Mac and can partition the drive using GUID then you can have FAT32 and OS X partitions on the same drive.
    As for problems with the Help viewer see:
    In most cases doing the following will restore the Help Viewer:
    1. Trash the following three files, if extant:
    /Home/Library/Preferences/com.apple.help.plist
    /Home/Library/Preferences/com.apple.helpui.plist
    /Home/Library/Preferences/com.apple.helpviewer.plist
    2. Trash the /Home/Library/Caches/com.apple.helpui folder.
    3. Empty the Trash and Restart.
    Visit The XLab FAQs and read the FAQ on the Help Viewer for additional suggestions.

Maybe you are looking for

  • The "send" arrow on my new messages has disappeared. How do I get it back

    The send arrow on my new e-mail messages has disappeared. How do I get it back?

  • Is there a conflict with latest version of Zone Alarm Extreme Security?

    Every time I try to open Firefox, I get an error message and nothing further happens. If I close down Zone Alarm, everything is just fine. I am running Firefox 3.6.19 as later versions mess up my password software. Error message reads: Platform Versi

  • Simple select query output-

    Hi Guys,      I have the following select statement- SELECT * FROM (SELECT '111', '222', '333' FROM dual) Output      '111'     '222'     '333' 1     111     222     333 But the output I was looking for was,      my_col 1 111 2 222 3 333 Can someone

  • Column Header Display

    Hello, I have a requirement where the columns need display as given below: When a Material is displayed with key then the header reads as "Material". Whe both Key and Text are display the Key column has the header as "Material", whereas the Descripti