How to handle the interfaces in upgradation from 4.6c to ECC6.0

we are going for the upgrade from 4.6c to ECC6.0
actually we are using n number of interfaces like webmethods, informatica powercenter, ALE, EDI....
powercenter was created some programs in SAP R/3, when we are upgrading from 4.6c to ECC6.0, what kind of issues we will face regarding this informatica. what is strategy we have to follow to upgrade this informatica in SAP, if anyone have the documents regarding informatica powercenter please help me and guide me
if anyone have documents regarding this interfaces upgradation or procedures bestpractices, common issues please forward me
thanks,
chandra

thanks

Similar Messages

  • How much is the price of upgrading from CS5.5 Design and Web Premium to CS6 Design and Web Premium?

    How much is the price of upgrading from CS5.5 Design and Web Premium to CS6 Design and Web Premium? 
    And why is this price not on the Web site?
    And when will this price be added to the Web site?  It's long overdue.

    Sorry.  After downloading required Adobe CS6 Design and Web Premium files and attempting to install, the error message "
    The file archive part of Adobe CS6 Design and Web Premium is missing. You need all parts in the same folder in order to extract Adobe CS6 Design and Web Premium. Please download all parts" appears.  Using Window 8.  This happens on the Adobe Design and Web Premium CS6 installer file.

  • How to Send the material master data from sap4.6c to ECC6.0

    Hi
        Friends this is shalini Shah, i got one requirement that is
    how to send the materail master data  from SAP 4.6C to ECC6.0 using XI.
    i  know the file to idoc and idoc to file scenarios but i don't know this one.
    please help me friends, Thanks in advance.
    Regards
    Shalini Shah

    Hi Shalini,
    To trigger IDoc these configurations should be done in the SAP 4.6, XI and ECC 6.0.
    SAP XI
    1) RFC Destination (SM59)
    a) Choose create.
    b) Specify the name of the RFC destination
    c) Select connection type as 3 and save
    d) In the technical settings tab enter the details SAP SID/URL and system number#.
    e) Enter the Gateway host as same details above SID/URL.
    f) Gateway service is 3300+system number#.
    g) In the Logon /Security tab, enter the client user & Password details of Destination system.
    h) Test the connection and remote logon.
    2) Create Port (IDX1)
    a) Select create new button
    b) Enter the port name as SAP+SID (The starting char should be SAP)
    c) Enter the destination client.
    d) Enter the RFC Destination created in SAP R/3 towards other system.
    e) Save
    3) Load Meta Data for IDOC (IDX2)
    a) Create new
    b) IDOC Message Type
    c) Enter port created in IDX1.
    SAP R/3 (4.6 and ECC 6.0)
    1) RFC Destination (SM59)
    a) Choose create.
    b) Specify the name of the RFC destination
    c) Select connection type as 3 and save
    d) In the technical settings tab enter the details SAP SID/URL and system number#.
    e) Enter the Gateway host as same details above SID/URL.
    f) Gateway service is 3300+system number#.
    g) In the Logon /Security tab, enter the client user & Password details of Destination system.
    h) Test the connection and remote logon.
    2) Create Port (We21)
    a) First Select Transactional RFC and then click create button
    b) Enter the destination port name as SAP+SID (The starting char should be SAP)
    c) Enter the destination client.
    d) Enter the RFC Destination created in SAP R/3 towards other system.
    e) Save
    3) Create Partner Profile (WE20)
    a) Create New
    b) Create the Partner no. name as same the logical system name of the destination system.
    c) Select Partner type LS
    d) Enter details for Type: US/USER, Agent, and Lang.
    e) Click on the + button to select the message type.
    f) Select Partner no. and LS which ever create above.
    g) Select Message type
    h) Select Process code related to the Message type.
    I) save.
    Also go ther the Blog <a href="/people/swaroopa.vishwanath/blog/2007/01/22/ale-configuration-for-pushing-idocs-from-sap-to-xi Configuration for Pushing IDOC's from SAP to XI</a> By Swaroopa Vishwanath
    U need to import the IDoc types both inbound and outbound to XI.
    1. Create Inbound and Outbound Message interface.
    2. Do one to one message mapping.
    3. Define an Interface mapping.
    ID:
    1. Create 1 Sender aggrement.
    2. Create 1 Receiver aggrement.
    3. Define 1 RD and ID.
    4. Only create an receiver IDoc CC.
    Regards
    San
    <a href="Remember to set the thread to solved when you have received a solution to set the thread to solved when you have received a solution</a>
    Where There is a <a href="https://www.sdn.sap.comhttp://www.sdn.sap.comhttp://www.sdn.sap.com/irj/sdn/weblogs?blog=/weblogs/topic/16">blog</a> there is a Way.

  • How to handle the more than once from the same jsp files

    Hi,
    i have a one jsp file with three buttons.each one having for different functionalities. like one for cancel, second for edit the values and third for save the values in databse. so i want to handle all these 3 buttons. how can test that which button is coming for action..
    Is there any validation necessary for buttons....
    give me the suggestion to do this.......
    help meeeeeeee
    thanks
    123

    Hint: Its something you need to handle using javascript by setting the hidden variables during submit.
    I would expect you to think on this and reply the simple solution.

  • How to handle empty Dats field received from SAP RFC response

    Hi All,
    I am invoking a SAP RFC which gives me a Dats field in response.
    A valid dats fields is successfully received by my pipelines.
    But when an empty Dats field is received, My pipeline fails and i get error.
    How to handle the empty Dats field from SAP

    Hi Anant,
    This is because the legacy SAP adapter accepted RFC messages with date field empty. In the new version, the same call results in an error. WCF-SAP adapter doesn't allow blank XML nodes.
    You need to use the below custom pipeline component as a workaround.
    Refer:
    Pipeline component for enabling legacy behavior in WCF-SAP adapter.
    Rachit
    Please mark as answer or vote as helpful if my reply does

  • ABAP Query in Upgradation from 4.7 to ECC6.0

    Hi there,
    We are upgrading SAP system from 4.7 to ECC6.0. We have s/w component SAP_BASIS = 700.
    It would be of great help if anybody share their thought on handling ABAP queries after upgradation from 4.7 to ECC6.0.
    We have refered SAP notes 132813 and 672784 where in we need to change the default query area.
    Also, do we need to re-genarate the queries? If yes then how can we achive the same.
    Thanks in advance.

    Hi,
    It may happen that some times, the queries are not generated after the upgrade.
    Hence call the FM: RSAQ_GENERATE_PROGRAM
    Pass the Query name and user group.
    For all global queries: refer table AQGQCAT and local/client specific queries: Refer to AQLQCAT.
    This can help to regenerate the queries.
    You can also write a small program to generate using the above FM(one time program) that runs after upgrade
    Hope this helps
    Regards
    Shiva

  • How to handle the master data when we are loading the from multiple clients

    Hi,
    We are loading HR data from two different clients 101 and 102 of same source system.
    Here we are facing the problem with msater data maintenance for employee in BW, whose employee numbers are same.
    For example client 101 employee range is 10001 to 10100.
                      In client 102 also same employee range.Then how to handle the above scenario
    Is there any solutions apart from compounding of infoobjets with logical system.
    Thanks in advance for your sugessions.
    Thanks.
    Maria.

    Hi ,
    you  can create copy of 0EMPLOYEE Object.
    Load one client master data to the copied object.
    Example:
    1. Create ZEMPLOYEE copy of 0EMPLOYEE.
    2. create the transformation or rules
    3.  You have to follow same for remaining objects
    regards,
    HREDDY

  • I lost my logic 8 pro serial number. I can't find the booklet that comes with the serial number. How can retrieve this? I upgraded from logic pro 7. I changed hard drives and now it keeps asking for the serial number. But I can't find it. Where can I requ

    I lost my logic 8 pro serial number. I can't find the booklet that comes with the serial number. How can retrieve this? I upgraded from logic pro 7. I changed hard drives and now it keeps asking for the serial number. But I can't find it. Where can I request it? Thanks!

    If you still have the receipt or other proof of purchase, you can ask Apple to send you the serial. Otherwise, bad luck mate.. Good news is, you can now buy Logic Pro 9 from App Store for just 199 USD

  • How to handle the Timestamp datasource while migration

    Hi All
    " I tried searching the forum,but didnt get the relevant one,hence posting this question".
    While migration from 4.7 to ECC in R/3 system,
    how to handle the Timestamp datasources( especially FI like COPA and other ) while extarcting the data from source to BW during source system migration.Since we need to empty the delta queue and should make sure that there are no delta records exists in delta queue.
    Like for sales datasources using LO,we will be executing the V3 jobs for execting the LUW's from LBWQ to RSA7?  In the same way is there any particular way for this also.
    Anyone whi knows abt this pls share your views
    Regards
    Shankar

    Hello Shankar.
    Before the upgrade (import of a queue), all extraction queues and open
    update orders in all clients must be processed. The content of the setup
    tables must be deleted. To avoid problems during the upgrade or to
    correct them, carry out the following steps:
    1. Call transaction SMQ1 and check whether all queues in all clients
    (client = '', queue name 'MCEX') have been processed. To process the
    queues, start the collective run report for each application in the
    displayed clients. If you no longer need the data in the BW system,
    deactivate the relevant extraction queues and DataSource in the LO
    cockpit (transaction LBWE) and delete the queue entries in transaction
    SMQ1.
    2. If you use the V3 update that is not serialized (usually only for
    application 03): Start collective run report RMBWV303. Then check the
    update orders in transaction SM13. If there are incorrect update orders
    in transaction SM13, correct the orders and then start the collective
    run report again. If you no longer require the update orders, you can
    delete them. There may be inconsistencies between tables VBMOD and
    VBHDR. For further information about this, see Notes 652310 and 67014.
    3. Before the upgrade, delete the contents of the setup tables. Execute
    report RMCEX_SETUP_ENTRIES to find out which setup tables still contain
    entries. You can use transaction LBWG to delete the contents of the
    setup tables for all clients.
    Unfortunately the check that the system carries out during the upgrade
    or when you import a Support Package does not display all affected
    applications. Therefore, Note 1083709 provides a check report that you
    can use to determine all affected applications and tables or queues.
    More detailed information please check these following notes:
    1083709-Error when you import Support Packages
    1081287-Data extraction orders block the upgrade process
    I hope I can be helpful.
    Thanks,
    Walter Oliveira.

  • How to handle the VISA Name Menu

    Well, I am trying to handle the interface for a VISA name control menu. The menu button is way too small for my app, and I would really like not to have to build my own from scratch. I want to show it on mouse over (a status button), then hide it when the mouse leaves. Works great, except, when you open the selection menu, and enter it, mouse over leaves the VISA control and it vanishes (I hide it after I get a mouse leaves). This leaves the menu floating in space until the user finishes. How can I tell the user is still in the menu so the control will not be hidden? If the answer is too messy I can just build my own selection menu, but that seems a bit harsh. Any suggestions?

    FredM wrote:
    The events passed to the VISA resource name control do not seem to include anything regarding the right button resource list menu selection box. The left button menu is there, but the right button is not. The mouse leave event is generated for the control when the mouse enters this menu box, so it is not dealt with as if it were a part of the control. I suspect there is some way to get this info from the SubObj but I have not figured out how to get this. The details of the program are really nonsequiter. I just need to select an action based on the mouse pointer leaving the combined space of the control and it's open menu box. Thanks.
    An example is needed because without knowing how you are trying to accomplish this, we can only make very general comments.  Maybe the method you are using is inappropriate, for example - we'll never know unless you can serve up an example VI.  It doesn't have to be the whole VI in question, but just a bare-bones mockup that demonstrates the problem. 
    Bill
    (Mid-Level minion.)
    My support system ensures that I don't look totally incompetent.
    Proud to say that I've progressed beyond knowing just enough to be dangerous. I now know enough to know that I have no clue about anything at all.

  • How to handle the OK button of the parameters prompt of a crystal report

    Hi,
    how to handle the OK button of the parameters prompt of a crystal report in vba.NET?
    I want to use the parameter prompt from the crystal report itself and I want to know when the report is ready. I need to export programatically by sending email to a list of employees after the parameters has been set. The emails I send depends on the results of the report.
    Im using a CrystalReportViewer control  in VS2010 and Crystal Report for VS2010 v13.0.1.220.

    Right. But the parameter screen is driven by the viewer. Unless you create your own parameter screen and pass the parameters to the report via code.
    Another thing I am not sure about:
    "Then by code I want to read all the employees id from the report and send email to them with specified pages of the report. (1 page per employee)"
    How do you plan on reading the employee ID from the report? I am not aware of any API that will read a value in a report so that you can then decide what page to send to whom.
    I think you're approaching this kinda backwards. A question to ask is; can you do what you are trying to do in code in the CR designer? If not, using APIs will not work either. I suspect your approach should be a report that uses an employee filter. Run the report for employee x, get the report populated with the data for that employee and email it. Repeat for employee x1, employee x2, etc.
    - Ludek

  • How to handle the control records in case of file to idoc scenario.

    Hi All,
    can you please clarify me how to handle the control records in case of file to idoc scenario.

    Hi,
    In File to Idoc scenario even though you selected apply control record values from payload and you are not getting those correct values which you have provided in the mapping.
    Also check the checkboxes Take sender from payload and Take receiver from payload along with the Apply control record values from payload checkbox
    Regards
    Seshagiri

  • How to consume the Calendar Exception details from Project Server 2013 to an SSRS report using PSI ?

    Hello,
    Can anyone guide me how to access the calendar exception details from Project Server using PSI?
    I need to extract calendar details of enterprise resources , like exception name, exception type, exception start date and exception end date into my SSRS report hosted in SharePoint 2013 and 2010.
    I would be helpful if I can get a sample of this. I have read through many PSI documents in fact still going through ,what  PSI does and doesn't ,  PSI methods etc. from Project Server SDK and MSDN . Moreover, I
    am a beginner in .NET programming. I am confused and have lots of questions in my mind, like which PSI service should be used in my report(is it  just Calendar.svc), can we pull the details as XML type data source my SSRS report ,are
    there any other configuration settings apart from " setting up an event handler by installing an event handler assembly on each Project Server computer in the SharePoint farm, and then configuring the event handler
    for the Project Web App instance by using the Project Server Settings page in the General Application Settings of SharePoint Central Administration" (as per prerequisites for PSI in SDK) , how can I implement authentication settings
    -(when user with proper SharePoint permission
    can accesses the SSRS report  )
    Kindly bear with me if my questions are not appropriate .
    Please do guide me, and .
    Thanks in Advance!!
    Mridhula
    Mridhula.S

    Hi Brendan,
    Project server reporting database doesn't contain the calendar info. The only supported way to use the PSI to read the calendar info from Published database.
    See this
    reply from Amit.
    Hope this helps,
    Guillaume Rouyre, MBA, MVP, P-Seller |

  • How to handle the extended vo in the extended controller

    Hi,
    I want to know how to handle the extended vo attributes in the extended controller.
    I extended CompetenceElementsVO as 'CompetenceElementsEx' with 2 transient attributes called col1 and col2.
    Here i want to pass value according based on some condition. for this i want to know how to handle these attributes.
    I tried by using the extended vo name in the controller, if i use means then it is throwing error after the extended controller is implemented.
    Same time if i try to refer this attributes from the original vo definition, jdev itself showing error.
    please tell me how to handle this?
    Thanks in advance,
    SAN

    Hi San,
    You have to extend the controller where your region is associated with,
    And in that controller you get the AM(if there is more than one AM and your VO is associated with a child AM, first you have to get your required AM) and then
    get the ViewObject(standard).
    Then you should be able to get your newly added attributes.
    Please find the below sample code to get the AM handle and VO from there, update the code according to your requirement,
         Get all the VOs under the Root AM
         writeLog(pageContext, "Room AM"+ pageContext.getRootApplicationModule());
    String[] rootViewNames = pageContext.getRootApplicationModule().getViewObjectNames();
    /* writeLog(pageContext," Length of the VOs from Rootm AM "+rootViewNames.length);
    for (int j =0 ;j<rootViewNames.length ;j++ )
    writeLog(pageContext,j +" Value "+rootViewNames[j]);
         // Get requested AM from Root am
    public OAApplicationModule getRequestedAM(OAPageContext pageContext, String requestedAMName)
    writeLog(pageContext,"Requested AM called to check the AM "+requestedAMName );
    String amName = "";
    String objectivesAMName = requestedAMName;//"ObjectivesAM";
    String nestedAMArray[] = pageContext.getRootApplicationModule().getApplicationModuleNames();
    pageContext.writeDiagnostics(this,"Root AM=>"+pageContext.getRootApplicationModule().getName() + " Child AMs=>"+ nestedAMArray.length,1);
    OAApplicationModule currentAM = null;
    currentAM = (OAApplicationModule)pageContext.getRootApplicationModule();
    for(int i = 0; i < nestedAMArray.length; i++)
    amName = nestedAMArray;
    pageContext.writeDiagnostics(this,"Nested AM Name=>"+amName + "and amName.indexOf(objectivesAMName) "+amName.indexOf(objectivesAMName),1);
    currentAM = (OAApplicationModule)pageContext.getRootApplicationModule().findApplicationModule(amName);
                        //Get the view names
                   String[] viewNames = currentAM.getViewObjectNames();
    for (int i =0 ;i<viewNames.length ;i++ )
    writeLog(pageContext,i +" Value "+viewNames[i]);
    if(!(amName.indexOf(objectivesAMName)==-1))
    pageContext.writeDiagnostics(this,"Found Handle to My Nested AM " + amName ,1);
    break;
    return currentAM;
    Get the VO from the AM
    OAViewObject objAssessmentVO = (OAViewObject)yourAM.findViewObject("yourVO");
    Thanks.
    With Regards,
    Kali.
    OSSi.

  • How to handle the call transaction in method of a custom business object

    Hello all,
    There is a custom report " RPTCORAPP" for approving leaves . As per my requirement i have develop a copy of leave workflow and for approval process i have call  "RPTCORAPP" in Custom method of custom object. i have made a transaction for this custom report for approving attendances. I am calling this method though call transaction statement within method.
    Problem: while approving the attendance workitem is not disappearing from the portal. Problem is due to call transaction statement.
                   once workitem come to the user, user click on it. control goes to the report, which display all the leave to approve on
                   the portal.
                   If after approving/ rejecting attendance user close the screen.workflow remain in the "process" status.Control wont come  back after call transaction statement in the method.
                 At the same time if user clicks on back button inspite of closing the screen. it is working fine. workitem disappears from the portal.
    How to handle the scenarion. if after approving/rejecting, i want the control to come back to the NEXT STATEMENT after call transactionstatement in my method.
    Please help it out........:)

    Hi swami,
    thanks for reply. but i am not using BDC in my method. iam just calling a custom transaction thriugh statement
    Call transaction 'ZHR_APPROVE_CLINOUT'. This transaction directly run the report RPTCORAPP and display all the request.

Maybe you are looking for

  • How to deploy EAR on CE server using Java Support Package Manager

    Hello, I am using CE server where I want to deploy EAR file by using JSPM. I run this program in Drive:\usr\sap\CE1\J00\j2ee\JSPM\go.bat I have also put the EAR file into the inbox folder Drive:\usr\sap\CE1\SYS\EPS\in but still It does not show me an

  • WBS element changed into an account assignment element

    Hi Gurus, Please let me know that how to get WBS element changed into an account assignment element. regards mohan

  • Several smartform outputs are included in an output request

    In SAP help there is an example : SF_EXAMPLE_03 whereby several customers are selected in the application program; the  form is called for each customer and all form outputs are included in an output request. But there is no print-program given.  Wrt

  • Charge the material cost to another activity

    Hi all, How it is possible to charge the material cost to another activity? The material has GR for the activity A but we require the cost in the activity B (Activities are in same network) Is it possible to charge the material to this activity (With

  • Game recording issues with ffmpeg

    Hello, I'm trying to create a script to record windowed games with ffmpeg. This is what I have so far: #!/bin/sh INFO=$(xwininfo -frame) WIN_GEO=$(echo $INFO | grep -oEe 'geometry [0-9]+x[0-9]+' | grep -oEe '[0-9]+x[0-9]+') WIN_XY=$(echo $INFO | grep