How to have a default generated operation in a Planned Order

Dear Sir,
We execute MRP run to generate dependent Planned Orders for a FERT having multi-level BOM . In the BOM there may be few components against which the Routing has not been defined .
So we desire that generated Planned Order should have a default operation against those components which have no routing available .
Kindly guide us as how can we achive the same .
With Thanks & Rgds
B Mittal

Dear Mittal ,
I will be interted to know about your material structure based on the BOM Level :
For an exmaple : FERT-HALB-RAW .There may be as many HALAB , RAW as per your business process.
For any FERT/HALB if this has to be produced in-house , generally , it should have valid BOM as well valid routing with sequence of operation and BOM compoenet assinged to those operation because , when you will run MRP-MD02 , it will generate Planned Order for both and subsequncelt it will allow you to convert the planned Order to Production Order .In case , routing is missing or BOM is mssing , while converting planned order to PO ( FERT/HALB) , it will flag you exception masg and ask you to create the same before proceed farther  or you can generate Operation based on the Option refelected while productioin order conversion .
we desire that generated Planned Order should have a default operation against those components which have no routing available -As you stated , if there is no routing avaliable for those component ( must be HALB /FERT) , there will not be any Routing copied to Planned Order in Master Data Tab  when running MRP in MD02.Basically  , in your case , Planned Order of FERT will be having routing with operation where as Planned Order for BOM compoenet which are HALB  , will not be having any routing master data .U have generate operation or create routing beofre conversion of production order .
Hope it is clear
Regards
JH

Similar Messages

  • How to make default account assignment category in planned order?

    Scneario Description:
    1. Sales order for a configurable parent item is created in ERP & order BOM is changed & transferred to APO. In APO MRP run takes place for that parent item, which creates a planned order with account assignment category "M" (M:Individual Customer w/o KD-CO.
    2. Now based on the dependant requirement generated for parent item, MRP takes place for one of the child item in ERP & purchase requisition gets created for child item.
    Question:
    1. Can anybody help me how i can make default account assignment as "F" (F:Order) in the planned order of parent item?
    2. PR created for child item also has default account assignment category as "M". we wish to change that to "F".
    Thanks & best regards
    Hemchandra & Sandeep Mandhana

    Hi V. Suresh,
    The account assignment category maintained in the requirement class for parent item is 'M'.
    No account assignment category maintained has been maintained in the requirement class Semi-finished component (this component is sent for subcontracting).
    The business process is as follows:
    1. Create Sales Order for Parent say ME_PARENT.
    2. Order BOM for ME_PARENT is created and subsequently cifed to APO.
    3. PP/DS heuristic is run for ME_PARENT.
    4. MRP for component ME_COMP is run in ERP.
    It can be seen that purchase requistion for ME_COMP has a/c assgn category as 'M'. It seems that the ME_COMP has inherited 'M' from ME_PARENT.
    We would like to have no a/c assgn category for ME_COMP.
    Any pointers?
    Regards,
    Sandeep

  • How Can i Calculate The shortages against production or planned Order

    Dear All
    how can i get the shortages against production or plan order .
    condition is Egg.----ITEM  <b>X (available qty is 6000)</b>is using for three assembly .A,B,C
    I have created one order For <b>A--5000 qty</b>. At this time <b></b> item x is reserve for Order Created Of A.
    Now i have created one another order for<b> B--4000 qty</b>. then it would showing the shortage of  3000 Qty.
    And same Order of <b>C Qty 5000</b> Material x would be showing the shortage
    5000.
    <b>Bcoz Shortage of 3000 is for B And Now i want only Shortage Of C.</b>
    How can this procedure done.
    Rgds
    Pankaj Agarwal

    Hi Prasobh
    Don't mind
    Points is not so major issue for me.Till i m not getting right answer or near by sothat i cant concentrate on point .almost all answer was clarify by me already . then if i cant get the right solution then  i will take help from experts like u.nothing more.and  point of view we have already touched with this community and i have given points more of them.so don't mind . take it as a challenge definitely u will get superior point from me.
    Rgds
    Pankaj Agarwal

  • ASCP: How do I get the list of 1st level planned orders using msc_full_pegging table

    How do I get the list of 1st level planned orders using msc_full_pegging table, is any one having the script.

    Do you mean supply_type? If so, yes it will be in pegging table as supply_type or otherwise you can join this table with msc_supplies by joining transaction_id column and get the order_type from that which will be the supply type.
    Thanks,
    Abhishek Sharma
    P.S:- Try opening the discussion in a separate window and see if you get the option to mark it correct or helpful,

  • How to override the default delete operation

    Hi,
    I am new to Jheadstart, java coding for that matter.
    Here's my situation,
    I have a view which is based on a function (function returns a collection).
    I have created instead of triggers on this view to perform insert/update/delete operations.
    All these DML operations work as expected in Oracle database.
    Now, I created an Entity object and a view object on this view in my jheadstart project.
    When I run this Jheadstart application my insert and search operations run fine but update and delete operations fail with JBO-26080 error.
    The underlying oracle error is "ORA-02014: cannot select FOR UPDATE from view with DISTINCT, GROUP BY, etc."
    I know that delete and update operations work fine in Oracle and hence I would like to override the default Jheadstart operations. Can any body tell me how can I do it or point me in right direction?

    Hi,
    From the JHeadstart Developer's Guide, chapter TroubleShooting - Problem Assessment:
    If you are getting a JBO error (Business Components for Java error), try to perform the same data retrieval or data manipulation action using the BC4J Tester. You can
    invoke the tester through a right-mouse-click on the BC4J application module. If you get the same error using the BC4J tester, the problem is in the BC4J object definitions. If you added business rules, or other custom code to your BC4J objects that executes during your data retrieval or data manipulation action, you can debug this code line-by-line by running the tester in debug mode. You can also look up the JBO error in the JDeveloper online help, for each error possible causes and how to solve them are described.
    It sounds to me like you will also get this error in the BC4J Tester. This means that the problem is not related to JHeadstart. You can go to the JDeveloper discussion forum http://otn.oracle.com/discussionforums/jdev.html and ask your question there without mentioning JHeadstart. Maybe there is some switch you can set in the BC4J object to let BC4J not use SELECT FOR UPDATE.
    Hope this helps,
    Sandra Muller
    JHeadstart Team

  • How to insert override default create operation UIX ADF STRUTS

    Hi dear forum:
    How can I customize the default create operation?
    I need to calculate a value and put it into the new row created.
    Please help me!!!

    See How can i override the default create operation UIX ADF STRUTS

  • How to customize standard text in operation tab of PM order

    Hi everybody,
    I am Rajat.
    I have question in SAP PM:
    In operation tab of PM order we have standard text, rt now i m using fresh system...kindly let me know how to enter values in that so that when i take drop down i'll see those values.
    Kindly reply with the path, for customization and t-code or path for master data both.
    Thanks
    Warm regards
    Rajat

    and IMG path - plant maintenance and customer service - maintenance and service processing - Assign standard texts for short message to order types
    Thanks
    S.N

  • Default PR type for MRP (planned order -- PR)

    Hi Expert,
    Is there any posibility to set default PR type for planned order - PR conversion from MRP?
    in SAP standard, PR type is NB, we have configured specific PR type, let say PRM. The purpose is we do not need to change NB to PRM while converting the planned order into PR.
    Pls help.Thanks
    Rgds,

    Hi Gurus,
    This is my first post in this forum. Have been trying to search this forum for my case all day and found some answers but when i implemented it in my SAP , the answers didn't work.
    The case is:
    When i try to convert Planned Order to PR through tcode MD15/MD16, the system will propose PR Document Type NB as default. In my company we don't use that NB PR type. We have another 10 customized PR Type and one of them is for Replenishment. I'd like to set this ZR09(Replenishment) PR Type as default and it's not possible to choose another PR Type.
    I have read several answers and implemented them, for example:
    1. OPPR with MRP Group 000, and I found no indicator except Scheduling/Doc Type. I typed ZR09 in field Doc Type SPO but in MD15/MD16 other PR Types still appear with NB as default.
    2.  SPRO-MM- Consumption based planning u2013Procurement Proposal u2013 Define Order Profile or SPRO-PRoduction - MRP- Procurement Proposal - Planned Order - Define order Profile, when creating new entries with Object Type Planned Order/PR still canu2019t find my customize PR Type in field Order Type. Field Order Type only consist of 2 digits order type such as NB,LA,RS,KD,KB,PE,PR,VP. No place to choose PR Type ZR09 or other customized PR Type.
    Can anyone help my case?
    Thanks and regards,
    IC BUMA

  • Pur req not generated for MRP element Planned order in stock reqmnts list

    Hi SAP Gurus,
    I have a problem where in MD04, pur req is not generated for the MRP element Planned order for a future date (about two months from now). Is there a specific reason? why is it not being generated? The MRP type is PD. The procurement type is F - external procurement. Can anybody please help me on this?
    Thanks
    Anusha

    Anusha,
    ??  Not sure I understand the question.  Are you saying MRP is creating planned orders instead of  purchase reqs?  Or, are you saying that no proposals at all are being created outside of two months?  Or, are you saying that the system is creating purchase reqs inside of two months, and planned orders outside of two months?
    Regardless, these problems are probably related to your MRP settings.  Try the following settings:
    NEUPL   Regenerative planning             
    1       Purchase requisitions             
    3       Schedule lines                    
    1       MRP list                          
    3       Delete and recreate planning data 
    2       Lead time scheduling and capacity planning
    on your MDBT screen.
    Regards,
    DB49

  • How to have multiple default dimension members

    Hi There
    I am using AS2008, when editing a role, under the dimension data tab, under advanced, you can define a default dimension member.
    However i need my default dimension member to be members, i have tried using a attribute set to true for many members and creating a hierarchy.
    But neither works, it seems to randomly pick one Key for a set of members and you cannot use a hierarchy to define members.
    How can i define multiple default members ? what i really want is all members except one.
    Thanx

    We're going to need some more details about exactly what you did because it really sounds like you're making a mistake. This extra attribute should work.
    The only situation I can think of where it might not work as intended is if your new attribute is a property of the state attribute... when you slice by the state attribute, it will override the default member on the new attribute.
    What are your attribute relationships in that dimension? What do you get when you run the following MDX queries?
    with
    member test1 as [Geography].[State].DefaultMember.UniqueName
    member test2 as [Geography].[NewAttribute].DefaultMember.UniqueName
    select {test1,test2} on 0
    from YourCube
    select {} on 0,
    [Geography].[NewAttribute].[NewAttribute].Members
    *[Geography].[State].[State].Members on 1
    from YourCube
    As for the calculated member [Geography].[State].[All].[West], you can add to that to the MDX script (the Calculations tab in the cube designer) and it will be available to all sessions.http://artisconsulting.com/Blog/GregGalloway

  • How to make the default shutdown operation to be a forced one?

    Just recently I clicked on shut down and went with my business, only to find out on return that OS X didn't shutdown the laptopt because "firefox prevented" it from doing so. What a BS.
    Is there a way to change the default parameters for the shutdown execution?

    No.
    You could go into the Terminal and use the "sudo shutdown -h now"

  • How to have confirmed quantity 0 for credit blocked sales orders

    Hi!
    I have the following problem. I have one sales order blocked because credit. Using material A the quantity confirmed is 0 but using other material B the quantity is confirmed. All the materials have no avaliability check group no arelevant for vailability .
    How can I customize in order to always have quantity confirmed in 0 for sales orders bloked because credit check?
    Thanks in advance for your help!
    Regards,
    Marina.

    I resolved the issue

  • How can I set a fixed scrap qty on planned orders created by MRP?

    During production of some specific subassemblies, destructive testing is done that requires us to scrap two pieces per production order.  I know I can set an assembly scrap percent, but what I need instead is a way to set a fixed assembly scrap quantity that will get loaded onto every planned order created by MRP for these subassemblies.  If we can't do this, we can't plan the correct order quantity and eventually end up being short of parts.  I know we can set a safety stock or safety time, but I'd rather just plan the right quantities if possible.
    Is there a user exit, configuration option, or master data setting that will allow me to do this?
    Thanks,
    Randy

    Hi Randy
    This can be solved by one solution. _You can try this._
    You define the same item in BOM again with qty 2 nos. Double click on the item no. Then it will take you to item detail. There in Basic data tab page at quantity data  ( Tick the fixed quantity. ).
    When ever BOM explodes for the header material automatically The item will be exploded 2 nos extra.
    Ex
    The header is Mat X and items is Mat Y. While creating BOM for X give item Mat Y in item no 10. give the quantity as per the requirement.
    And again give item Mat Y in items no 20. give quantity 2 nos and activate the fixed quantity tick as instructed above.
    When ever requirement for Mat X is 100 nos. The plan order for Y will be 102 nos .
    Hope this will clear.
    Regards
      J .Saravan

  • After firming planned order, new planned order is generating in MRP run

    Hi Experts,
    I am using SAP AFS. Planning strategy is 21- MTO with Project settlement. MRP type is PD. Lte size is EX. Procurement type is X.
    We are using the production versions. Individual / collective reqmts is 1. Planning time fence is not maintained.
    In sap AFS T.Code for MRP run is /n/afs/md02. After receiving the Sales order, MD04 screen gets updated accordingly and I am running the MRP.Planned orders are generated accordingly. I am firming the planned order manually through MD04. The satr mark is also appearing.
    My problem starts now. If I am running  the MRP again for the same requirements another planned order of the same qty. is getting generated. That means after the second MRP run, I am having two planned orders (one firmed plnd order) and second is the new planned order. My requirement is that MRP should not generate any new Plnd. order / PR's if there is no new Sales order.
    The parameters for MRP run are "1" for "Create PR's", '1" for "Plng Mode" and '"1" for "scheduling ".
    I have tried in all the possible ways, but of no use. Still new plnd order is generated after firming the 1st plnd. order in MRP run.

    Thanks all for your feedback..
    @ Vishal
    1. Yes, Both Old firmed planned order and newly generated planned order have the same grid value
    2. For both the planned orders :
    Special Stock is E u2013 Orders on hand,
    Consumption is V,
    Sales order is the same (As we are using MTO , Strategy 21) and same WBS element.
    3. First planned order is not in the assigned tab of MD04. This means that has been allocated to some object. u2013 I didu2019nt got this point. Can u please elaborate?
    @ Nikhil
    1. Quantity of sales order is not reducing after firming the sales order
    2. Account assignment category for both the planned orders is u201CZu201D - Indiv.cust./project
    I have made some more observations and found the following differences between the two planned orders
    From  MD04 , keep the cursor on corresponding planned order
    & click on upward arrow ( available on bottom side of the report).
    It will show what will be the originating requirements i e. for which requirements this planned order generated.
    For Firmed planned order it is taking me to screen u201CPegged Requirements
    u201D*And the following data is present:
    Planned dates: 04.07.2010
    MRP element No. 3100001185 (Sales Order No.)
    MRP element item 100
    Scheduling No. is 1
    MRP element indicator - VC u2013 Order
    MRP element data- 3100001185/000100/0001
    Plng segment u2013 3100001185000100000
    P.O / Order Type u2013 ZX
    Rec/reqd Quantity 10
    MRP element u2013 Order
    For new planned order generated, I am going to Screen *u201CProcurement without Requirementsu201D
    *The following data is present
    Planned date 03.07.2010
    MRP element No. 0000123522 (Planned order No. of the newly generated after MRP Run)
    MRP element Ind. u2013 PA
    MRP element data 0000123522/SO
    MRP element item 1
    Scheduling No. 1
    MRP segment 20
    Plng segment u2013 3100001185000100000
    Rec/reqd Quantity 10
    P.O/Order type- KD
    MRP element u2013 Plnd Order

  • Change planned order operations

    Dear guru ,
    i must develop an abap program that must change the operations of a planned order.
    I can insert or delete the operations of the planned order.
    Which best solution (BAPI,user exit ..) can you suggest ?
    Thanks

    Hi
    there is no solution to this answer. you can't change operations in a PLANNED order. planned orders only refer to the master data (BOM, Routing, master recipe, task list, ...).
    You have to either change the operations in the routing, recipie, task list, ... (if it is a change for all new orders) or convert the planned order to a PRODUCTION/PROCESS order and manipulate the operations there (if it is a one-off change)
    Other options include the use of production versions as setup in MRP-4 of the material.
    Björn

Maybe you are looking for

  • How to connect a second monitor/TV to HP ENVY Beats All-In-One

    Hi, I was wondering if anyone could tell me if it is even possible to connect a second monitor to the HP ENVY Beats All-In-One Desktop PC, because I'm trying to connect my TV as the second monitor through HDMI and I've tried everything that I could,

  • Few Questions Please answer

    Hi all, I have a couple of Questions Please answer what is the basic principle inwhich lsmw was developed Can we transfer standard text between diffferentclients Difference between Session and call transaction In domanin we have lower case key. If we

  • Weird Lines during Playback??

    I just got a 2.4 MBP with 4 gigs of Ram, and Final Cut Studio 2 Full Version. I shot some footage for a class project with my DVX-100a on the 30p recording setting. I captured the footage and started going through it and noticed these weird lines, I

  • Screen problems, need info

    A horizontal grey bar has appeared in the center of my ipod that spans nearly the entire length of the screen. The bar is visible even when the ipod is off but it is not lit up so it is harder to see. I have observed it grow in size and shrink little

  • Creation of cheque numbers

    Hi gurus,     i want to create the same cheque numbers year wise for eg:    year              no's               2006          1-1000               2007          1-1000 can any one tell me is it possible. if it is tell me the procedure most urgent