How to ignore Assembly Scrap of MRP during Production order Creation

Hi All,
We want to ignore the Assembly Scrap maintained in MRP View during production order creation.
We are maintaining assembly Scrap for planning so we do not want to remove that.
Please let us know if any User exit is there during Production Order Creation.
Thanks,
Amit

Dear Amit,
Assume in CO01,once after entering the total order quantity the system proposes the scrap quantity field separately,now
remove this quantity for scrap field and press enter and once again adjust the total quantity and check for what quantity the
system is proposing the BOM components.
check whether this works for your requirement.
Regards
Mangalraj.S

Similar Messages

  • How to make material availability check work during Work Order creation

    Hi Experts,
    Kindly advice about these matters:
    1. How to make material availability check work during Work Order creation?
    My requirement is Work Order can not be created when it has missing parts. I have set the config to '3' can not created when is has missing parts, but it still does not work.
    I have implemented SAP Notes 1148139 on my system (SAP ECC 6 Ehp 5) also, but still does not have any effect.
    I must not set the config Res./Purch Doc creation to 'immediately', because it does not fit to my user requirement. Is there anyone knows how to solve this requirement?
    2. How to make information message/ Availability check screen appear when sparepart is missing, without clicking Availability Check button? for example: appear when clicking Save button.
    Thank you
    -amoonra-

    Hi Maheswaran,
    I have implement the prerequisite notes. (Notes 790219 and 1034962). Do you know why it is still does not work?
    Thanks
    -amoonra-

  • Batch no assigning during production order creation

    Sir,
    We are manitaining the batch management for inut raw materials. During production order creation it is mandatory to assign the batch no for raw materials then only production order releasing is possible.In our case due to batch assignement to production order while order creation,we are facing the lot of problems like batch no not assign for full req qty and also if unavailabilty of stock for particular batch no it will come to COGI.hereby i need experts help for,
    1.I want to determine the batch no during confirmation instead of order creation and also allow to release the production order even batch should be in blank.
    Kindly help
    Regards,
    PS

    Hi
    For Rawmaterials why cant'n you assign Batch nos buring GR of purchase order.
    Then you can do automatic batch determination during confirmation of order for mvrmt type ;261...
    This is  easy  to handle.
    Please check and come back
    Regards,
    srihari

  • Error during Production Order creation

    Hi All,
    Our's is MTO scenario. We have maintiain Account Assigment Category as 'M' in Requirement Type. During creation on production order with ref to sales order system gives error "Account assignment cannot be carried out because of different origin no."
    If I create the production order with ref to quotation system does not gives any error. But my requirement is to create the prod order with ref to sales order.
    Please guide
    Regardsd

    Hi Bala,
    In SPRO goto>Sales and Distribution> Basic Functions-->
    Availability Check and Transfer of Requirements
    -->
             Transfer of Requirements
    -->
                 Define Requirements Classes
                 Define Requirements Types
      -->      Determination Of Requirement Types Using Transaction
    Determination Of Requirement Types Using Transaction
    In the standard system, requirements types are determined according to a specific search strategy beginning with the material strategy group.
    Strategy for Determining the Requirements Type
    1. First, an attempt is made to find a requirements type using the strategy group in the material master.
    2. If the strategy group has not been maintained, the system will determine it using the MRP group.
    3. If the MRP group has not been defined, the system uses the material type instead of the MRP group when accessing the corresponding control tables.
    4. If no requirements type is found here, the system assumes a special rule and attempts to find a requirements type with the aid of the item category and the MRP type.
    5. If this is not possible, a last attempt is made to find a requirements type with the item category only.
    6. If the last attempt fails, the system declares the transaction as not relevant for the availability check or transfer of requirements.
    Note
    You can select an alternative search strategy in the 'Source' field, for example a transaction-related procedure for determining requirements type (source = 1 or 2). 
    Example
    There are business transactions, such as consignment stock processing, in which the material with its planning characteristics is not important, rather the transaction itself. An issue from the customer's consignment stock should not trigger an availability check against planning at the plant as layed down by the planning strategy but rather against special stock.
    Actions
    1. Assign the item categories and MRP type to the requirements types.
    2. Select an alternative search strategy in the 'Source' field if necessary.
    By assigning the 1 or 2 to the Source you can have the requirements in MD04 refered to order instead of the initial source document which is usually quotation. If we don't assign this then the system by default refers to the initail document created i.e. Inquiry or Quotation whichever is the first document.
    Regards,
    Karthik.

  • BOM and routing selection during production order creation

    I am having a material which is having only one BOM and one routing. Now for this material in the material master in the selection method indicator i have put as 3 as selection only by production version. But i have not maintained any production versions in the work scheduling view for checking purpose. now when I am creating a production order for this material manually through CO01 system is allowing to create production order. when is the selection is only by production version how system is allowing to create production order when there is no version is maintained.

    Hi Kumar,
    Looking into scenario as u have maintained,if you have define the selection id and not maintained the production version then it should ask for the production version and show the following
    Since the production version is missing, you cannot execute the desired processing step.
    As well as pls look into OPL8 ,what Production Version is maintained.
    Thanks,
    Mohit
    Edited by: Mohit Sharma on Feb 4, 2011 5:35 PM

  • Component Availabity Check during production order creation

    Hi All,
    During production creation, I donu2019t want to include/ check the reserved stock of component (stock which has been assigned for other prod order)
    Where I required to make the changes in config.
    Regards,
    Shailendra

    Hi,
    Deactivate Include Reservation in T.Code OPJJ. But make it sure you are doing it for correct Checking Rule which you have maintain in your checking Control OPJK for Order Type and Plant Combination.
    Regards,
    Dhaval

  • Availability check during production order creation - Missing parts details

    Hai Gurus,
    I have one problem during Availability check when converting Planned order to production order.
    1) A- is the finished material, which has A1 to A7 components.
    2) A2 is the procured item with safety stock and it has safety stock also.
    3) When sale order is created , the material A2 is reserved against the planned order for finished material - A.
    4) so when availability is checked during planned order stage , system says no missing parts, when planned order
         is converted to production order system says missing parts for component A2, which is stock and reserved against
         planned order
    5) Checking rule for Production order is maintained as follows,
         a) Include safety stock.
         b) Include reservation.
         c) Include sales requirement
         d) Include deliveries.
         e) Include dependent reservations.(x)
         f) Include production orders.(X)
         g) Check release for stock transport orders only.( A)
    So now i don't know where I went wrong , so that the system could consider the safety stock of Component A2 which is in stock and already reserved against planned order and it does not show missing parts when planned order is checked.
    Waiting for your positive feed back.
    Regards,
    Sekar chand

    Dear,
    What checking rule you have maintained for planned order.???
    As what i can understand by your question that you have maintained to check reservation only in production order not in planned order. Or one important thing mostly people configure to reserve material only after release or creation of production order. Are you reserving material at planned order stage.?
    Check these things. you will automatically find the answer. Hope it will help you. Revert back for more clarification.
    Regards,
    Alok Tiwari

  • Routing cannot be determined during production order creation

    Hi,
    I am puzzled as to why the system cannot determine the routing data when i create the order against a material. I have confirmed the following that :-
    1) Order type refers to the correct routing selection id and routing type, rate routing in this case in OPL8.
    2) The rate routing is already created for the validity date with the correct usage and release status.
    Please check the screen shots attached :- http://wikisend.com/download/509556/routing.zip
    Can someone please help on this peculiar problem

    Hi,
    Are you using any production version. Check your production versions date range, lot size, also check if your production version is locked.
    Also check whether you have assigned the selection ID in OPU3 for the order type.
    Also check OPEB setting.
    Hope it will help you.
    Regards,
    Alok Tiwari

  • How to Overrride ATP values during sales order creation

    Hi all,
    How i override ATP values during sales order creation.
    The scenario is that we need to migrate open orders from an existing legacy system to SAP.
    While migrating these orders, we need to make sure that dates on the schdule lines are same as they are in the old system. Hence we need to override ATP.
    Any suggestion welcome..
    Regards,

    Hi Kantur Shekar madhuri,
    Would you confirm the whether in your schedule line category is activated for "Product Allocation" or not.
    if not please activate and re run your scenario.
    Regards
    Arun

  • How do I insert a document in a production order?

    Hi
    Does anyone know how I can insert a document in a production order on the "Document Links"?
    I have a assembly drawing that I would like to be printed on release.

    Hi,
    As rightly said you can have the documents or document links in material master or in BOM. But if you prefer to have the documents attached to Document links in production order, you can assign those documents to the operation of production order and remember to maintain the document link activated for production order (PORDER) for the document type.
    Thanks.

  • Run MRP for production order/maintenance order has been release

    Hi all,
    please tell me how to configure for running mrp for production order/maintenance order has been release. as you know, i want production order has not release will not appear in MD04. I think that is the way for running mrp will not take care about this production order has not release
    Thanks all

    Hi Hoai,
    It is impossible to exclude production order from net requirement calculation in MRP run. You may take a look at the online documentation under the PP-MRP area.
    Material Requirements Planning (PP-MRP)
       Planning Process
         Net Requirements Calculation
           Net Requirements Calculation for MRP
    But there is a way to temporarily exclude production order from MRP. That is you can set the 'delivery completed' indicator in 'Goods receipt' Tab in in production order. Please note that this order will not appear in MD04. Actually to some degree, this order could be considered as completed because ticking the indicator could set status 'DLV' for the order. But you still can execute confirmation, goods issue and goods receipt activities. This way is just a workaround. You may
    consider it.
    Or maybe you can consider the useage of BADI: MD_CHANGE_MRP_DATA to change the MRP run data to see if this could fulfill your requirement.
    Regards,
    Rachel

  • Equipment as PRT's during Production Order Confirmation

    Hi Gurus,
    During Production Order confirmation I cannot see whether I have consumed equipments as PRT which are attached to operation.
    The operation is showing CNF status as well the Order.
    How can I see whether which Equipment was used for each operation since there can be more than one equipment as a PRT's for a single operation.
    Regards
    Nilesh

    I use Production Order confirmation hence saw it in CO14 and checked that PRT's are in PRT REL status..I guess this is what you mean to say right??
    Thank you so much for your response.
    Regards
    Nilesh

  • Capacity check during sale order creation

    hi,
      i have the following doubts,
    1. During sale order creation i need capacity availability check for that i make settings, its working good,if i put the order in the evening time but system take the start time as morning shift starting time.can any one guide me to take the time as the order creation time. and also help me how the system check the capacity.
    2. During sale order creation , if suppose capacity is loaded means it will show a pop up with the name capacities with overload,
      Here i need the clarification how the system calculate the requirements and requirements order, capacity load, from where the system get the information for these calculation.
    Muthamil

    Hello, you are working with a make to order scenario, that means that a planned / production order must be created to address specifically your customer requirement ??
    By standard SAP you can have a capacity availabily check once the production order is in the creation phase....but this should be too late for you.....

  • Update error in  RV_SALES_DOCUMENT_ADD during Sales order creation

    I get an Update/ ABAP runtime error during Sales order creation. The error occurs during processing of the update module -RV_SALES_DOCUMENT_ADD.
    This error does not occuring always, as I am sometimes able to create a Sales order without getting update error. I am getting the error of all types of Sales orders and even contracts.
    Am I missing any configuration parameters?
    Thanks,
    Chitra

    Yes , I can see the error in ST22.
    While exceuting VA01 (Oder type OR, Entering Sold-to-party, Purchase order NO, Material, Qty, Plant),
    - I get run-time error "Run-time error "GETWA_NOT_ASSIGNED" occurred".
        Analysis of error shows:
         Update terminated in "Update module: RV_SALES_DOCUMENT_ADD"
          Fails in the Read table in one of the form
            Termination occurred in the ABAP program "SAPLV45U" - in "VBAP_BEARBEITEN"
    The main program was "RSM13000 ". In the source code you have the termination point in
    line 147 (READ TABLE FYVBAP WITH KEY VBAP_KEY.)
    of the (Include) program "LV45UF0V".
    The ABAP's say the functional module is trying to do an 'UPDATE' instead of 'INSERT" in the internal table FYVBAP.
    Thanks,
    Csuman

  • Change Work Center during production order confirmation

    Dear All,
    I must to modeling this situation:
    I created an production order. In routing I used an work center A.
    After I confirmed a half of quantity, the work center A was damaged and I must to change it, with the work center B.
    The system allow this change, but when I checked the costing, the situation isn't real. The system counted the costs just for the work center A, and no for work center B.
    My question is: it's possible to change the work center, during production order confirmation and the costs updated with new cost?
    Thank you for your answer!
    Regards,
    Marian

    once a Order is released, the Process order detaisl for that order is frozen.
    however if you want to do it, change the order status to CRTD after reversing the Movements done.
    Do READ MAster data , this will copy the new Work center , redo the previously done Moevements.
    if the change is long term.
    or
    Just manually add the new work center and do the processing. if the change is temporary.

Maybe you are looking for

  • Loss of photos in iPhoto

    I will give you the background story. I have been working on an iMovie, which I then finished with iDVD. My superdrive is non functional due to an "accident" by my children. So, I went to a local Apple Reseller. We tried several things, including put

  • Oracle 10g - Chinese Charecter issue

    Hi All I have the following scenario and I need your valuable inputs solve my problem I am using Oracle 10g version and I have a database created and it contains around 9 tables and 25k records, as per my current requirement I need to add few more co

  • E3000 - Possible to see list of wirelessly connected PCs?

    Hello, I just bought a Linksys E3000 and I have a quick question I hope you can answer. My old wireless router (Zyxel P334WT) that I bought the E3000 to replace, had a page in the web interface that allowed the admin to view who was connected to the

  • Reload archived Purchasing orders or reference archived PO's in MIRO

    Hi Colleagues Is there a way to Reference an archived Purchase order in a MIRO posting? or alternatively reload archived purchase orders? I hjave reviewed SAP note 456129 and this states that RM06ER30 can be amended by SAP as remote consulting Any th

  • Problem with validation of selection screen

    I am creating session process for BDC For that i am taking the flat file at runtime.i want check whether the entered file is valid or not..that means it exists are not? how to do that..