How to import corrections in to DEV system ?

Hi All,
I have to apply the corrections for FI module to my DEV system.
FI Consultant has downloaded that SAP NOTE in to DEV system thru SNOTE, and its status = can be implemented.
NOTE = 1015410 has SAR files as attachements and I have downloaded the corrections [SAR files].
The correctin is for = "Additional Field added for withholding tax codes"
It has 3 SAR files which contains some new Screens and Screen Elements introduced in the Program = J_1IEWT_PROVISIONS.
In the Note = 1015410, it is mentioned that " to apply SAR files, refer to Related notes=  480180,13719. "
Note 480180 says that if it is a correction, " you must follow the installation instructions in the long text of the
respective SAP note in order to implement the correction in your system ".
In the NOTE - 13719, it says we need to open the ftp connection to sapservX [userid/pswd=sapservX] and download the data,
cofiles ?
Iam not sure how we can do this.
And i have Uncared the 3 SAR files and i got the following files :
k003805.CVD - cofile
R003805.CVD - datafile
K087494.P7D
R087494.P7D
K906169.Q3A
R906169.Q3A
In the R/3 DEV server, in /usr/sap/trans,i have a old SAR file = TDS_SAPScript_470.SAR. It had 2 files in it =
K209581.P6B - cofile
R209581.P6B - data file
And K209581.P6B is found in /usr/sap/trans/cofiles/
But R209581.P6B is not found.
Does this means that i have to copy the files of the SAR files to /usr/sap/trans/cofiles/ and /usr/sap/trans/data/ ???
Do i have to copy these files to /usr/sap/trans, and then " tp ADDTOBUFFER ","tp Import ".
And if i go to correction instruction in the SAP NOTE, i have a Transport Request = CVDK003805 in it. Now what do i have to
do with that ?
I have access to OS [hp unix] as root user and also i got access SAP in 000 client.
Please guide me how i can apply these corrections.
sap - mySAP ERP ECC 5.0
Kernal - 640 patch # - 155
Basis - Package level - 19.
db - ora 10.2g
os - hp ux 11.23b ia64
FI component = SAP_APPL
LEVEL - 14
RELEASE - 500
Regards,
Shyamsundar G C

Hi Hariprasad,
i copied the files to cofiles and data files in my DEV system.
i tried to do this, iam getting err msg...wht shud i check now.
tp ADDTOBUFFER K087494.CVD GRD pf=/usr/sap/trans/bin/TP_DOMAIN_GRD.PFL
ERROR: Parameter for transport request (K003805.CVD) is invalid.
       Either use "ALL" as transport request or
       make sure the fourth character of the transport request is a 'K'.
ERROR: : transport request parameter is invalid [tp.c,10528]
tp returncode summary:
TOOLS: Highest return code of single steps was: 0
ERRORS: Highest tp internal error was: 0203
tp finished with return code: 203
meaning:
  wrong syntax in tp call
tp ADDTOBUFFER ALL GRD pf=/usr/sap/trans/bin/TP_DOMAIN_GRD.PFL
ERRORS: Highest tp internal error was: 0247
tp finished with return code: 247
meaning:
  addtobuffer has problems with data- and/or cofile
If i go the STMS_IMPORT in my DEV system, i can see that there is  TR - P6DK105630 which has been imported to my DEV system from a system = P6D. Plz let me know how it is done ?
Also i have a cofile which i got after UNCAR, which has the same number as that of an existing one....how to copy it now with out overwriting ?

Similar Messages

  • How to Import Transport Files to SAP System

    Hi Experts,
    I have installed BO XI R3.1 SP3 Integration tool kit for SAP Solutions with Java Connectors.Now i can able to see SAP after login into the CMC. I have installed prerequisites like SAP GUI,Xcelsius,BO XI 3.1 Enterprise.
    1)Can you please tell me how to import transport files to SAP System?So that i can connect to BW to Bo environment.I am unable to understand the process to do above task form pdf.

    Hi Venkat,
    in case you have never done that before I would suggest you talk to the basis admin person and let him do it.
    ingo

  • How to Import DaRT into SAP CRM System

    Hi Everybody,
    Can some body help me in knowing how to import DaRT ( Data Retention Tool) into SAP CRM system. This is an urgent requirement. Your early reply will ab appreicated.
    Thanks in Advance
    Sirfraz

    Hi Kaustubh,
    Use the FM ARCHIVFILE_CLIENT_TO_SERVER.
    Give Filename + path for both the source and destination and your file will get transferred to the specified directory in AL11.
    But I am not sure about creating your own directory in AL11.
    Reward if helpful.
    Regards
    Hemant Khemani

  • How to Purchase group configer in dev system and how to traverse quality

    Hi All
    I need ur help regarding for how to configer the Purchaseing  group in dev system and how to traverse to Quality and production.
    Thanks
    Happy

    Hi,
    You can create the Purchasing Groups using the following settings.
    SPRO-MM-Purchasing-Create Purchasing Groups.
    Create a new entry for Purchasing group & save it in a Transport request & transport it to QAS & PRD.
    Note: We define the Purchasing Groups @ client level
    Thanks & Regards,

  • How to import correctly into audacity

    I have a .mov file that i want to use noise removal on and i've been told audacity can do it. I've been told how to import it and I can import it in but it when you hit play it goes through the whole thing in fast forward or something. how do i import it in so it doesn't do that?

    HI,
    Not sure how to do that with Audacity but QuickTimePro I believe can do this also. Check out the QuickTime forum here http://discussions.apple.com/forum.jspa?forumID=932 perhaps someone can offer some help there also.
    Carolyn

  • How to Import ifo cube into BW system

    Hi Experts,
    I have issue regarding to cube import.
    The cube is  available in DATA WAREHOUSING system, We have any mechanism to import the cube format into SAP BW system.
    If the InfoCube is available into another BW system, simple transport InfoCube into BW system. Other than this situation how it's be possible.
    Please let me know the details.
    Thanks in Advance,
    Chandra

    Hello Chandra Sekhar,
    How r u ?
    I believe it is not possible, may be data could be pulled from ur other Data Warehousing system, but not the objects. You have to use only BW objects (InfoCube). Bw follows a different architecture.
    Best Regards....
    Sankar Kumar
    +91 98403 47141

  • Integrate GRC 10.1 with CUA and how to import roles from CUA & Child systems into GRC for provisioning

    Hello,
    I am trying to integrate CUA into our GRC 10.1 system through the below steps and so far I have completed the below steps following SAP Notes 1680108 and 1616121:
    1. Connected CUABOX to GRCBOX like a plug-in system.
    2. Updated CUA Global System and CUA Model Distribution in Maintain CUA settings under User Provisioning.
    3. Next I am trying to import the roles from CUA(CUABOX) into GRC(GRCBOX) to be able to provision roles in CUA Child Systems(ECCBOX).
    After reading few discussions in SCN, I have figured that we have to download a template in Role Import and populate it accordingly to upload the CUA child system roles into GRC system for provisioning in CUA Child Systems.
    Unfortunately, this template has multiple fields and I am unable to determine the fields that should be populated as CUA Global System and CUA Child System to import into GRC. Also, when we upload CUA Child System Roles template what selections should be made in Role Import window.
    Any help in this regard is very helpful.
    Thank you,
    Pawan

    Hi Alessandro,
    I have "Create user if does not exist" setting checked for both change action and assign role action and also have CUA enabled. Here is the list of steps that I am performing:
    1. Create an access request for new account, T-CUA_CHILD and select a role from a child system ECC Z_ECC_ROLE_IN_CHILD_SYSTEM.
    2. Approvals provided to assign the ECC role.
    3. I see the following in GRFNMW_DBGMONITOR_WD.
               Auto provisioning activity at end of request at Path GRAC_DEFAULT_PATH and Stage              GRAC_SECURITY
                   New User:T-CUA_CHILD created in System(s): ECC (created without role assignments)
                   T-CUA_CHILD User does not exist in target system CUA
    GRC created an account without role assignment in ECC but also throwed me an error that the user does not exist in CUA.
    However, if I select roles from both CUA and ECC it creates the account in both systems with the selected role assignments.
    So I am wondering if there is way to provide CUA access to users by default for new account requests types. I have tried setting up default roles for CUA but it does not assign the roles by default until I select the CUA system.
    Thank you for your help!
    Pawan

  • How to transport changes done in dev system to quality system.

    HI ALL,
    Can any one give the procedure to transport the changes done to a parameter group in Dev syystem to Quality system through solution manager.
    Thanks & Regards,
    Virinchi.

    Hi,
       once you saved all objects in TRtransport requests then goto SE01 or SE09 or SE10 seelct u r TR .in the seleted TR release sub task of the TR thn the main one.
    SE09 and transport connection
    if you need some docs on transport
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/3010ba90-0201-0010-2896-e58547c6757e
    http://help.sap.com/saphelp_nw2004s/helpdata/en/0b/5ee7377a98c17fe10000009b38f842/frameset.htm
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/e883de94-0501-0010-7d95-de5ffa503a86
    http://help.sap.com/saphelp_nw2004s/helpdata/en/b5/1d733b73a8f706e10000000a11402f/frameset.htm
    http://help.sap.com/saphelp_nw2004s/helpdata/en/57/38e1824eb711d182bf0000e829fbfe/frameset.htm
    Re: Transport Organizer---
    transport query (bex objects)
    http://help.sap.com/saphelp_nw2004s/helpdata/en/38/5ee7377a98c17fe10000009b38f842/frameset.htm
    hope this helps.
    Note if u founds useful reward points
    mahesh

  • How to Transport iViews from Portal Dev system to Prod system?

    Hello friends,
    This is an urgent request and it would be of great help if you can give me a solution to this.
    We have a Development Portal and a Production Portal. There is no QAS Portal. We are on EP 5.0 and BW is 3.5. Coming to my question, I have created an iView on a Web Application Designer template and assigned it to a role on the Development Portal. The report displays well on the Portal. Now I want to move this newly created iView to Production Portal. I absolutely have no idea how to do this as it is generally a Portal person's work and I have been asked to do this as the Portal person is currently on leave. I need to move the iView to Production as quickly as possible and I would really appreciate if any of you can send me detailed steps on how to do this.
    The best way to say thanks in SDN is to assign points to helpful answers and I will not forget that.
    Thanks,
    Deepthi.

    Hi Deepthi,
    observe these links:
    Here is some material:
    How to Transport Models Within SAP Analytics
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/035be5d4-0a01-0010-b48a-d4c8c9b020b5
    Actually, those pieces are also included in my book "SAP NetWeaver Visual Composer" which is already available from SAP-Press ( http://www.sap-press.com/product.cfm?account=&product=H1932 )
    If Usefull Asain the points.
    Thanks,
    kiran.
    Message was edited by:
            kiran manyam

  • How to import correctly  with good configurations a AVCHD video ?

    Hello ! I want to import a video turned with my Sony Nex-VG 20 to adobe premiere pro but there is not the sound. Can someone explain it ? I didn't do the right configurations, so what i have to do ? Thanks.
    Fred

    Metadata contained in folder http://forums.adobe.com/thread/1015001?tstart=0
    -and http://helpx.adobe.com/premiere-pro/using/transferring-importing-files.html
    -http://helpx.adobe.com/premiere-pro/using/importing-assets-tapeless-formats.html

  • How to import payroll result from 3rd party system to SAP

    Hi Experts,
    May i know how to import payroll result from legacy system / 3rd party payroll system into SAP.
    i need to import the payroll result from Jan - April (from 3rd party payroll system) and system go live on May. I using payroll malaysia.
    Thanks.

    check this link
    http://help.sap.com/saphelp_40b/helpdata/en/91/80e9087834d111a4620060b03c3b0e/content.htm

  • Long time to import SCA into DEV System

    Hi Experts,
    I have done a system upgrade from NWDI 7.1 to NWDI 7.4.
    Now i am having a problem when import SCA in DEV system. This process run forever...
    The log is:
    20140729101501 Info :Starting Step CBS-make at 2014-07-29 10:15:01.0294 -3:00
    20140729101501 Info :wait until CBS queue of buildspace DN1_TRAF2P_D is completely processed, before starting the import
    20140729101501 Info :waiting for CBS queue activity
    20140729101533 Info :build process already running: waiting for another period of 30000 ms
    20140729101603 Info :build process already running: waiting for another period of 30000 ms
    20140729101633 Info :build process already running: waiting for another period of 30000 ms
    20140729101704 Info :build process already running: waiting for another period of 30000 ms
    20140729101734 Info :build process already running: waiting for another period of 30000 ms
    20140729101804 Info :build process already running: waiting for another period of 30000 ms
    20140729101834 Info :build process already running: waiting for another period of 30000 ms
    20140729101904 Info :build process already running: waiting for another period of 30000 ms
    20140729101934 Info :build process already running: waiting for another period of 30000 ms
    20140729113122 Info :build process already running: waiting for another period of 30000 ms
    20140729113152 Info :build process already running: waiting for another period of 30000 ms
    20140729113152 Fatal :build processing for buildspace: DN1_TRAF2P_D is not enabled, cannot continue without NWDI administrator action
    20140729113152 Info :Step CBS-make ended with result 'fatal error' ,stopping execution at 2014-07-29 11:31:52.0295 -3:00
    I have found a lot of threads here, but no one help me.
    The parameter idleStart is configured to false.
    I try to keep BUILD_TOOL_JDK_HOME and JDK_HOME_PATHS as default, and try to set to java 6.
    The build variant in CMS was configured too.
    After the changes i restated the CBS service and try to import again in DEV system. But nothing happens.
    If i import just one or all the components, it get a long time and catch the error showed above.
    I have restarted the server a lot of time too.
    Can someone have any idea how to fiz it?
    Best Regards
    Marcos Brandão

    Hi Marcos,
    changing the domain user might have consequences, please take a look at the note:
    #896427 - NWDI Admin User/Password update
    What I suggest in short is this:
    1. restart the server
    2. once the server is up and running, re-save the track in question in cms webui
    3. restore system state on dev and cons tabs of cms webui
    4. trigger first re-import of SCs on dev tab (import SCs one by one, and do not care of broken DCs until everything is imported).
    When I mean one by one I mean that you select an SC on developent tab of the cms webui, press Import, wait what happens to it, and if it failed, let me know. If not, then select the next SC for import.
    5. wait until it finishes (depending on the size of your development it can be hours, even up to 4 hours).
    If you still got long import and broken DCs, then let me know, this case also take a look at the
    1. Import logs which is usually at /usr/sap/JTrans/CMS/log/*
    Notice, this can be different in your case, check the location of the transport folder under the CMS WebUI (/devinf – Landscape Configurator – Domain Data Tab)
    2. the latest defaultTrace you find at
    -...\j2ee\cluster\server<n>\log\defaultTrace.<n>.trc
    I also send you another guide for Broken DCs, here you go:
    (NWDI)(CBS) the CBS-make log and-or CBS Web UI report broken DCs - Technology Troubleshooting Guide - SCN Wiki
    Regards,
    Ervin
    Message was edited by: Ervin Szolke

  • How to import transport of copies to productive systems

    Hello,
    I have been experiencing a problem that even the guys from admin could not solve (yet). I should say I work in a development team.
    Imagine you have two landscapes, one DEV-QAS(1) to develop big projects and a normal DEV-QAS-PRD(2) landscape where my objects will be imported. After a new group of objects is finished in (1), we ask to import the workbench request in the STMS queue of DEV(2). After this, and after some small test, we create a transport of copies in DEV(2) where we include the first transport, release it and import it to the QAS(2) queue. After the tests in QAS(2) the idea would be to import the transport of copies to productive system PRD(2). But it does not work...
    In STMS queue for PRD(2), there is no entry for the transport of copies. Also, when I tried to add the transport request to the import queue (via menu -> Extras -> Other requests -> Add), I get an error message stating that no co-files where found for the transport.
    Does anyone know this problem? I suspect it can have sothing to do with the use of a transport of copies, but, if I don't use this kind of transport, how can I get objects from other systems to production?
    Thanks in advance.
    Davide Sepanas, Portugal

    Davide,
    Re your latest questions:
    > 1) Why this problem with transport of copies doesn't happen from DEV(2) to QAS(2), since these systems are also not in the same transport directory?
    >
    I think the answer is in your original problem description:
    we create a transport of copies in DEV(2) where we include the first transport
    >
    When you create a transport of copies you must indicate a terget system and I suppose you enter QAS(2) there. In that case the TMS will add the request to the import buffer of the target system when you export the request from DEV(2). I understand that you never have to add transports of copies to the import buffer of QAS(2) manually, which proves the TMS does this for you. However, for further imports into systems that are not designated as target system of the transport of copies, like PRD(2), the TMS will do nothing of the sort and you must add the request to the queue yourself - which in your case also means you have to forward the transport files first.
    > Can we assume, then, that, where I was working before, all three systems were configured in the same transport directory, avoiding thus the problem with the transport of copies requests?
    Yes, and that is the most common way of setting up the transport system. Having separate transport systems really only makes sense when sharing the transport directory between the dev, qas and prd systems (via NFS for UNIX, via network shares for Windows) is not possible, either because there is no local network between the servers or because some security policy forbids it. I'd advise you to certainly ask the question to your system admin.
    Regards,
    Mark

  • How to View Transport Log in DEV SAP Portal System

    Hi All,
    Kindly help me by giving me the path of where is the Import, Export and Transport Log maintained in SAP Portal.
    And is it posible to view the Log of other systems from DEV system? If yes then how.
    Thanks in Advance.
    Regards,
    Disha.

    Hi,
    Please navigate to usr/sap/trans/CMS/log to view logs.
    Alternatively in the CMS, you can click on "Go to History" which will display all previous transports. You can see the details from there.
    Thanks

  • How can eCATT used for testing of z program on DEV system &data on Quality?

    Hello All,
    Background - Custom object is (for e.g. any report program) which I want to test is present on DEV system  and required data (e.g. data that will be passed to selection screen fields of program) on Quality system.
    Question -How to do testing of program using eCATT without transporting my program to Quality box? Please anyone can give me any insights on this to fix the data availability issue. 
    My efforts - Created System data container specifying RFC connection for Quality system. Created Test Data Container with data available on Quality box. Here, I specified target system as 'Quality' for the data.  Created Test script (for SE38 tcode ) and did the parameterization(giving program name as parameter , other selection screen fields) and set the Target system for each parameter to QUALITY.  Created Test Configuration specifying with all required parameters .
    When I ran the test script from Test Configuration, test script started to run on Quality system. But failed saying program/object does not exist on quality box.
    Importance - This is required as no data available on DEV box, need to move program/object to Quality system. Hence, multiple transort requests are created.
    Edited by: Tripti on Feb 26, 2012 9:29 AM

    Thank you for your quick response, BalusC. I really appreciate your answer.
    Yes, you are right. If I manually code the same amount of those components in the JSF pages instead of generating them dynamically, the server will still run out of memory. That is to say, JSF pages might not accommodate a great deal of concurrent visiting. If I upgrade the server to just allow 1,000 teachers making their own test papers at the same time, but when over 2,000 students take the same questionnaire simultaneously, the server will need another upgrading. So I have to do what you have told me, using JS+DOM instead of upgrading the server endlessly.
    Best Regards, Ailsa

Maybe you are looking for