How to include field Internal order in the material master for SD orders

Hello,
I would like to know how I can bring the field "Internal Order" to the material master, so I can create materials with assignments to internal orders.
We want to create Sales Orders where when we enter on order item with a material, the internal order is derived automatically from the material master.
Thank you in advance!
Jose Eximeno

Hello,
I am not familiar with the field "product attributes" in relation with entering the field "internal order"...
Could you be a little more specific on how product attributes can be used to enter the internal order number in the material master?
Best regards,
Jose

Similar Messages

  • Availability Check Changed on the Material Master Update Existing Orders

    I need to know if there is a way to update existing orders once changes have been made to the material.  Currently the only way that I know of is to go into individual orders change the plant save then change it back to the original plant on the order then the changes take effect.  How can I achieve this without touching every order individually.  Is there something to mass update existing orders to take a new snapshot of the material master settings for a material.

    Try with t.code VA05 - Open sales order list.
    Execute this list. In the output, sort the data by plant. Then go to menu Edit -> mass change -> new plant. Change the plant for group of sales orders that have similar plants. Then again do the same thing to bring the previous plant in the sales orders.
    This can help reduce the time instead of going one by one.
    Regards,

  • Plant specific fields in the material master for product move

    Hi, SAP gurus,
    My scenario is we are moving a existing product in US plant to Brazil plant. What are the fields in the material master that are specific to a plant that will change. For ex MRP controller will change from plant to plant. Like that can anybody please provide me a list of fields that i need to be looking at?
    Thank you
    Anusha

    Hi Anusha,
    First of all, list down all your materials those you want to extend to new plant.
    a) Secondly, pay attention to those fields you will find "filled" in those materials at plant level.
    b) MARC comes handy for you to analyse which fields are at plant level.
    Intersection of fields with values between a and b are the ones you need to work out.
    Good luck,
    Regards

  • Assignment Profit Center to Plant on material master for Production Order

    Hi Experts
    Can you help me !
    Now I'm trying to lock a profit center to the plant.I've tried searching on the standard menu and customizing but do not get it ?
    How to assignment profit center to plant or plant to profit center.
    Regards
    Dodo M

    Hello Dodo,
    1.
    You can make an assigment between the profit center and the plant in Customizing (SPRO) in two steps (through the company code), under the following menu path:
    Step 1:
    Enterprise Structure
    Assignment
      Financial Accounting
       Assign Profit Center to Company Code
    Step 2:
    Enterprise Structure
    Assignment
      Logistics - General
       Assign plant to company code
    So, first you assign the profit center to the company code, then you assign the plant to the company code.
    2.
    Or you can use the Enhancement MGA00001 for implementing your own check in function module EXIT_SAPLMGMU_001.
    You can also check the following help to understand the relationships in details:
    Controlling (CO) - SAP Library
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/02/30793485231774e10000009b38f83b/frameset.htm
    Best Regards,
    Dora

  • Discontinuation process of the material master for archiving

    Hi,
    The material(ex:100) has the stocks in the Inventory.There is a PO  with open quantity for the material(ex:100).In such case we can not archive the material.
    So we have to do the discontinuation process.Is it right! or the discontinuation process is only for the retail industry (fashion).
    Please let me know discontinuation process in detail.
    Once the discontination process is done ,we can archive the material.
    Note:I know the Archiving process using the Transaction SARA.I want to know only about the discontinuation process.
    thanks,
    sasi

    Hi Shankar,
    Did you run MRP already, so that system can transfer the remaining dependent requirements (after available for planning stock of discontinued material is set to 0) to the follow up material?
    Br,
    Petros

  • Fields to be activated from Material Master for product costing.

    hi guys.
    our MM person is creating BDC for uploading master data.
    we have to do product costing in second phase.
    what fileds we have to activate now, from accouting & costing view???
    is it  necessory to activate LIFO/FIFO relevancy indicator for product costing??
    will it affect to inventory valuation directly???
    can we actiavte the fileds afterwords???

    Dear Mr.Taj,
    Where's the quantity structure field in Accounting 2 view?
    Do u mean which's in Costing 1 view?
    <b>Dear MR.Patil,before doing cost roll up & release all the fields should be having proper values (inputs).</b>
    Later on also u can activate.I mean during material creation itself if u ensure these checks,this will help you in taking the cost rollup smoothly.
    Or else you have to correct those errors at the time of costing.
    If useful reward points.
    Regards
    Mangal
    Message was edited by:
            Mangalraj

  • From which table field could we find the 'material type' of delivery items.

    Hi,
    Please kindly advise from which table field could we find the 'material type' for one delivery items??
    Thank you.

    Hi,
    You cant get the material type directly from delivery item. Pls make a joint between LIPS and MARA tables to get the same.
    In LIPS, get the material numbers of the delivery document.
    Give them in MARA to get their material types

  • How to change the base UoM in the material master?

    Hi,
    I want to change the base UoM in the material master for a particular material but I can't change irt with MM02 as system says it has open routings for this material.
    I have set the deletion flag on the routings but still system shows open routings while changing UoM.
    Is there any standard SAP program by which UoM can be changed if open POs, stock etc. are present in the system?
    Thanks,
    Input

    HI
    It is possible to change the Base unit of measure in the following cases:
    1) If there are no stocks of the material in the syatem
    2)If there are no purchase requisitions, purchase orders, or scheduling agreements for the material.
    3)If a purchase order or purchase order item is not being created or changed.
    Procedure for changing is:
    Access the material master record in Change mode.
    Overwrite the old base unit of measure with the new one on any departmental data screen.
    Save the change.
    Thanking you.

  • Extending the Material Master

    Hi all,
    I've extended the material master for mara with 3 ZZ fields. I've added these fields to BAPI_TE_MARA/X and am using EXTENSIONIN/X with BAPI_MATERIAL_SAVEREPLICA to create the material.
    This has  been unit tested and until recently this was working OK, the MM was created  along with the mara being popluated with the ZZ fileds and these were showing on the basic data 1 tab of the material master.
    Nothing has changed. I can see the data in extension/x for the ZZ fields being passed to BAPI_MATERIAL_SAVEREPLICA, the MM is created OK still but no ZZ fields are populated in mara and no data displayed in MM03.
    A bit vague I know but has anyone any suggestions?
    Thanks, Mark

    Hi Mark,
    You need to modify internal table TMARA_UEB. When you enhance MARA table with Zfields, you can't use standard SAP BAPI. I copied Bapi_material_save data and modified internal table TMARA_UEB. this internal table will have all zfields, you added in MARA. but not BAPI_MARA. you have import MARA append structure to the BAPI.
    At the end it calls SAP standard function "Material_maintain_dark".
    I enhanced Material master extensively and it worked for me. give a try.
    Thanks
    Hari

  • Change Special Procurement in the material master?

    Hi,
    How can I change Special Procurement in the material master? Right now Special procurement field is greyed out and would not allow me to change it?
    Sincerely,
    Ketan

    Hi,
    Have you used any MRP profile.
    If so in transaction MMD2 for MRP profile, choose the special procurement type field & change the selection from display mode.
    Now in transaction mm02 the spl procurement field can be entered/changed.
    Regards,
    Senthilkumar SD

  • Units of Measures found in the material master.

    Hi,
    What is significance of different Units of Measures found in the material master.
    Ajay

    Hi,
    Order unit
    Unit of measure in which a material is ordered. It is the default unit in purchasing functions.
    Order price unit
    Unit in which the vendor invoices you. The order price unit is defined in the purchase order or in the purchasing info record. If you have defined an order price unit in the PO, the goods receipt will be recorded in both the order unit and the order price unit.
    Sales unit
    Unit of measure in which a material is sold. It automatically appears as the default in a sales order and can be changed there.
    Unit of issue
    Unit of measure in which a material is issued from the warehouse/stores. You can use this unit of measure in conjunction with goods issues and physical inventory activities.
    Any quantities that you specify in a unit of measure other than the base unit are automatically converted into the base unit by the system. To make this possible, you must enter the ratio for conversions between alternative units and the base unit (the conversion factor) in the material master record. You can enter this information when specifying the alternative unit of measure
    Regards,
    Santosh

  • Default inspection Type In the Material Master

    Hello
    We have to assign two -three inspection types in the material master. How to default this inspection types in the material master always .
    Thanks
    JJ

    Dear JJ
    This you will have to do by putting validation in the material master. I dont think you have a standard solution for that.
    Or esle you can run QA08 wherein you can assign inspection type enmass.
    Please let meknow your feedback
    Regards
    Gajesh

  • Auto PO indicator in the material master

    Hi there,
    How can we activate PO indicator in the material master?
    Pls guide,
    thank you.

    at mm02, check the autom.PO.

  • MRP TYPE for  Periodic planning in the material master.

    Dear gurus,
    i need planned the materials in the periodic modality, are there the type MRP in the material master for create the planned file ( table MDVM) one once a month or in the specific period chose ?
    Example :
    I need that the material master don't create a file planned ( MD20- TABLE MDVM) for a change of the requirement situation new , but i would like that the flag in the table ( MDVM) or file of the planning MRP created when the today date is in the period specific.
    31.3.2011  (or period 1.4.2011- 10-4-2011)Date for the create a file MRP and after when run MRP planned the material, for others scenary the system must not planned the material.
    Are there the MRP type for my problem? Or the customizing setting?
    Thanks a lot
    Dani

    Dani,
    Not sure if MRP type or customizing can help here. And even if we are able to achieve this requirement it will be applicable at plant level.
    However, try exploring option of periodic lot size (weekly, monthly, etc). This will work according to period you've set and should give you the results you are looking for.
    Regards,
    Himanshu

  • Accounting & costing view in the material master

    hi
    my client wanted to block the accounting & costing view in the material master for the end users
    what i need to do

    Hi,
    You can (Authorization material master by views of accounting & costing ) achieve this by way of authorization control. In transaction PFCG, select your role for creating / changing the material master. Select option Maintenance statuses. Then at change status option select views that you want to give the authorization to the users. Create profile & save the role. Now assign the role to the users. They will get only those views you have selected. You have to select those views in all the roles related to material master (create, change, display).Better Consult Basis Consultant,
    Regards,
    Biju K

Maybe you are looking for

  • SharePoint 2010 TechNet Guru News: October Winners Announced

    All the votes are in!  And below are the results for the TechNet Guru Awards, October 2014 !!!! For a full list of winners, see the full blog post, as runners up had to be removed from this post to fit the forum max length restrictions.  BizTalk Tech

  • LED tv and glare

    I just purchased an LED tv and we placed it directly across from a picture window.  Needless to say, there is tons of glare.  Would I have the same problem with an LCD or are they much better for glare?

  • Broken iMac with Music/Video

    My friend has an iMac G5, just like mine, and his logic board has broken. He has many songs and videos downloaded onto it, usually from either torrents or limewire. he is scared that Apple(he has applecare) will arrest him for this. I am telling him

  • Coverflow not working

    I had to reset my computer back to the factory settings and had to download Itunes again. It now says Itunes is unable to browse album covers on this computer. Any ideas??

  • Obsolete User Names appearing

    I cannot seem to get rid of some account names: when I view activity manager I see mdworker with user names that I have deleted (accounts deleted) One was a non-admin account and one was an old admin account. The non-admin account shows up on other t