How to include process lead time in an outside processing amount resource

Problem:
We have a two operation routing where the first operation is time based and the second operation is an amount based outside processing resource. The outside processing resource has an outside processing item associated with a fixed lead time. When we run an ascp plan, the generated planned orders only consider the first operation (the time based one) to calculate order completion date and excludes second operation lead time (the amount based one).
Any ideas?
Edited by: 785198 on 14-ene-2013 1:05

This is fine if you raise exception from your code. It will be raised as a server fault only.

Similar Messages

  • How to include processing time in the  LogFormat in httpd.conf of OAS

    Hi,
    I want to add processing time parameter in the LogFormat of the HTTP requests in Application server logs file.
    i tried to edit the httpd.conf file which orginally is as below
    LogFormat "%h %l %u %t \"%r\" \"%{Cache-Control}i\" CC \"%{Cache-Control}o\" %>s %b" common
    to
    LogFormat "%h %l %u %t *%T* \"%r\" \"%{Cache-Control}i\" CC \"%{Cache-Control}o\" %>s %b" common
    But doing so, did not add the Processing time in the GET and POST requests.Although same works for Apache HTTP server.
    I want to know how do i add the Processing time attribute in the LOGFormat.
    By Default the LogFormat is Common, what are the other possibilities fpr LogFormat.
    Please revert.
    Regards
    Ak

    Hi,
    1. To reduce the processing time for JMS -> IDOC scenario, try to get the Average processing time taken by JMS adapter, IE, IDOC adapter for the messages that are processed so far by going thro the Adapter Audit logs, SXMB_MONI race and Time in WE02 in R/3 system. Calculate this for 5 - 10 messages at different time to get the clear idea of which step is consuming more time. Then it will be helpful to focus on tuning that specific step.  If you are using BPM, check the processing time taken by PE.
    2. Check the Inbound and Outbound queues used by this interface, if required try to configure Prioritized Queue with more time allocated for this interface in Integration Engine.
    3. Check the load on the Integration Server when this Interface messages are getting processed, to understand/ isolate the interfaces which are consuming more processing time and system resources.
    4. If this is not in Production try to perform the Mapping/ transformation in graphical mapping itself, it will be helpful to minimise use of XSLT mapping to get better performance.
    5. Check if the Archive and Delete jobs are running successfully in the Integration Server, since this will free up the occupied resources in the system.
    6. If possible post seperate Forum questions for issues in different Interface scenarios, it will be easy to understand the problem for all of us.
    Hope this will be helpful,
    Regards,
    S.Santhosh Kumar

  • How to include LabVIEW Run-Time in executable file ?

    Hello folks,
    I have an application that need the user to simply calling executable file without setting up LabVIEW run-time because my executable file will be posted in LAN and anyone can run it remotely. What should I do? Any help very appreciate...
    Thanks so much

    You have to have labVIEW run-time installed on your computer in order to run a LabVIEW programs (vi or exe). What you can do when you distribute an exe file is to create an installer which lets you install LabVIEW run-time and create a menu item (in Windows) in the Start>>Programs menus. Then you can distribute the whole package and after running the installer, LabVIEW run time as well as the exe is installed.
    You can do this in the installer settings of the Application builder (when you create the .exe file). Go to the "Advanced" section. There you can add the LabVIEW run-time Engine to the installer.
    One other possibility you can do if several people want to use the programm over Lan is to use the LabVIEW webserver. You can run a programm somewhere on the
    network and other people can open the front panel in their Webbrowser. But maybe that's not exactly what you want. ??

  • How do i connect my time capsule from outside my home? i dont have static ip

    sorry about my english...
    its been 4 months now and still I am not able to connect my time capsule via internet from outside . i have read enough forums and discussion but i am confused because every discussion has different answer. please anyone can explain me the simplest way to configure my time capsule so i can connect it from other computers. i am using windows 7 64bit os.i am not advance user of networking so please explain me in detail.
    some questions.
    1. is it possible to use time capsule as nas using dynamic ip address?
    2. if yes how and where can i get exact detail about this.
    3. how to connect my time capsule form my iphone,ipad or other computers . connect through ip address or something else?
    4. is it any simple installation way to do this? i heard about bonjour and icloud but dont know how to connect through this.
    please help me
    thank you
    sachin

    i am using windows 7 64bit os.i am not advance user of networking so please explain me in detail.
    Here is your primary issue.. you cannot connect with win7 ..
    Windows only offers SMB protocol which just about every ISP.. all responsible ones ...block..
    Time Capule offers AFP to internet and only AFP.
    You need to use a Mac to connect.. then use BTMM and iCloud as there is no dyndns in the TC anyway. (Actually there is a dyndns but only for apple btmm use...  you cannot access.
    If you want to or have to use windows.. then get a proper vpn router that offers vpn endpoints to windows and has dyndns.. setup the TC in bridge behind the vpn router and access via vpn .. this is the only safe way of connecting using SMB.

  • How to include a static file which is outside Applicaton Context in JSF?

    I need to inlcude lot of static contents which are residing in outside Application Context root in JSF.? is there any better way to do include static files which are outside the Context root?

    The total no of static content files will be around 20000 to 30000 and i will only know the file name at run time from the user input.

  • What is the maeaninf of lead time offset in BOM

    Can anybodye xplain me the maeaning of lead time offset in BOM

    Hi,
    In situations where orders have long lead times, this scheduling procedure can result in components being provided much earlier than they are actually needed in the production process. To avoid this situation, the dependent requirements date of the subordinate component can be rescheduled by the follow-up time. With the follow-up time the dependent requirements date of the components is displaced from the order start date further into the future.
    The lead-time offset (in workdays) for the component in relation to the start date for production of the superior assembly. This value is not included in lead-time scheduling for a task list.
    Displacing the Dependent Requirements Date in the Future
    If you have entered a positive value in the bill of material, the dependent requirements date of the component is displaced in the future, starting from the order start date of the assemblyu2019s planned order.
    Order start date of the assembly: 11.30.1999
    Lead-time offset: 2+
    Dependent requirements date of the component: 12.02.1999
    Bringing Forward the Dependent Requirements Date
    If you have entered a negative value, the dependent requirements date will be brought forward.
    Order start date of the assembly: 11.30.1999
    Lead-time offset: 2-
    Dependent requirements date of the component: 11.28.1999
    Regards,
    Alok Tiwari

  • Different lead times

    hi, we are having different times for shipping lead time, customes lead time, delivery lead time etc. how to map these type of lead time for materials to plan properly. as i know we have only pland delivery time, gr processing time,in-house prod time, pr processing time in mat masters.pls advise how tomap above said lead times for roh materials?

    Shipping, delivery and customer lead times are not maintained in PP master data.
    Check with your MM/SD Concerned guys to check where they are maintained.
    Regards
    Ratan

  • ASCP Yield and Resource Lead Times

    Hi,
    I am working on Advanced supply Chain Planning on R12. Both ERP Source and Planning are on different instances. We are also using Oracle Shop Floor Management. In the Network Routings we have included a lead time resources at step 10, 20, 30. The resources are as follows:
    These resources are defined as 'Machine'
    Resource for operation 10: ASSY-LT, 112 hours, Schedule 'yes'
    Resource for operation 20: TEST-LT, 64 hours, Schedule 'yes'
    Resource for operation 30: PACK-LT, 48 hours, Schedule 'yes'
    We also have only one shift with 8 hours. The resources are not available for 24 hours.
    We also have yield at each of the above operations.
    Lead time rollup calculates 28 days for the item correctly.
    We are encountering a problem with ASCP Plan. The start dates and yield calculations using constrained plan with Enforce Demand Due Dates constraint seems problematic. If we check 'Calculate Resource Requiremnents' option, the plan calculates yield but the lead time gets reduecd by one third and start and completion dates for a planned order (and ATP etc.) are not accurate.
    If we uncheck 'Calculate Resource Requiremnents'option in the plan, lead times are accurate but plan does not calculate yield.
    We are not sure what is causing the problem.
    Does anybody know what options or profiles control this behaviour?
    Your help is highly appreciated.
    Thanks.
    Vijay

    Hi Vijay,
    important for your lead time calculation is the setup of the calendar and shifts and what shifts are assigned to the resource.
    You say you do not have enabled the 'Available 24h' option. We are also using leadtime resources in certain cases, for example LT for Assembly. But in these cases we enable the 24H option. Next to this we set the Resource capacity to 'unlimited' by setting units to a very high number (1000 etc.) on resource level, to prevent that the system gets into capacity conflicts here.
    And the yield calculation indeed should be quite independent of the leadtime resource.
    best regards,
    David.

  • How to include install date and time in registry keys

    Hi All,
    Hopefully someone can help me. I am creating an installer which includes some properties in the build specs. I also wannt to include some registry keys to be added upon installation:
    1. I include the install directory of the application by providing the key with the value [INSTALLDIR]. This seems to work well and I have no problem with this.
    2. The other key I would like to include (but I do not know how) is the date and time of installation. Is there a way of automatically including this in a registry key (similar to INSTALLDIR)?
    I look forward to your expert advice!
    Kind Regards,
    Larry
    Laurence C.
    Senior Test Development Engineer
    Dyson Ltd
    Solved!
    Go to Solution.

    Larry,
    afaik the setting for "Run as Admin" is per OS process. As the "Run Exe after installation" is a different process as the application you installed by it (e.g. "MyApplication.exe"), i wouldn't expect the MyApplication.exe to require/use admin-rights.
    Norbert
    CEO: What exactly is stopping us from doing this?
    Expert: Geometry
    Marketing Manager: Just ignore it.

  • Lead Time calculation in process order

    Hi,
          I have a process order to be created of 112.6 L. i have only one phase  & one resource allocated. i have maintained my OH time as 1 H in my master recipe. now for resource i have maintained scheduling formula as ZRUNA = OH.
    After creating Process order the system calculates phase timing as 1:17:44. Can anyone pls let me know how did system calculate 17 min & 44 sec extra.
    Thanks & Regards,
    Rohan Somji

    Dear Rohan,
    1.Check the length of break timings defined in the resource that is assigned in the phase.
    2.Check in OPUZ whether for the process order type and plant combination whether scheduling is to include the break time also
    (whether the check box for scheduling with breaks) is included.
    Check and revert back.
    Regards
    Mangalraj.S

  • HT1597 How can I STOP iTunes from automatically trying to add podcasts to my iPod when I plug it in and sync it, so I can manage the files? I have already unchecked "Sync Podcasts" and "Automatically include,"yet EVERY time I sync it,it still transfers po

    How can I STOP iTunes from automatically trying to add podcasts to my iPod when I plug it in and sync it, so I can manage the files? I have already unchecked "Sync Podcasts" and "Automatically include,"yet EVERY time I sync it,it still transfers podcasts as the last step, and at other times randomly, when trying to just add some MP3's to a playlist, for example.  I can't seem to find any other option to uncheck, and can't find an answer from my so-far internet searching.

    erict, you blew me away with that suggestion! It was something so simple I couldnt believe I hadnt thought of it! But in the end it didn't work, which I was really surprised about. On Windows anytime anything was moved itunes was hoplessly lost, but on this mac it still kept up with everything. I tried renaming folders, moving folders, and even renaming moved folders but it still kept trying to import.
    I even went as far as deleting EVERYTHING i had moved to the Mac, which didnt really work. It still kept trying to import what wasnt there which made it continue to freeze up. However, after doing this it, the freezing was not nearly as bad. It gave me enough of a break to cancel it through the itunes dialog box at the top of the app. So in the end, thats all I really needed to do, only before I had deleted everything the freezing would not allow me to do it.
    So now Im reimporting everything again, only slowly, and only a few Artists at a time.

  • I am using I Photo 9.2.3 with OS 10.6.8 When I upgraded to current I photo some of my Iphoto books i put together disappeared.  Cant find them anywhere, including in the time machine...I photo cant open older files...How can a find  th book entitled "Mom"

    I am using I Photo 9.2.3 with OS 10.6.8 When I upgraded to current I photo some of my Iphoto books i put together disappeared.  Cant find them anywhere, including in the time machine...I photo cant open older files...How can a find  the book entitled "Mom"  ?  Does Apple keep ordered books on file?

    Apple keeps books for a short time (used to be 40 days. I've not seen a recent time frame)
    What version did you have?
    Books do nor exist except in the iPhoto database so you can not "find" a book vista TM. You restore a previous library (be sure NOT to overwrite your current library) and switch to it
    LN

  • How to stop process chain, if it is taking too much time than expected.

    Some times if a process chain takes to much time to finish than expected, how I can stop the process chain and execute it again.
    Thanks in Advance.
    Harman

    how I can stop the process chain ??
    If the job is running for a long time ,
    1)GOTO RSMO and SM37 and check the long running job over there.
    2)There you can see the status of the job.
    3)If the job is still running you can kill that job
    4)delete the failed request from data target.
    for more details go to this below link
    how to stop process chain if it yellow for long time
    how I can execute it again ?
    GOto Function module  RSPC_API_CHAIN_START
    and give u r process chain name there.and execute.

  • How to avoid the long time consuming process of settlement on periodic basi

    For investment Project(purpose of capitalisation) related expenses We would like to show it  Directly in Balance Sheet rather than P/L  A/C.Whether it is feasible or not?as per one of consultant it will be first hit the p/L and after settlement it will only be shown in B/Sheet.So how to avoid the long time consuming process of settlement on periodic basis.

    Hi, could you write down an example? And what you mean by investment project-is this an WBS?

  • How can we process the CRM Order again for second time in debugging mode

    Hi,
    Can anybody please tell me how can we process the CRM ORDER for second time.  that I want to process in debugging mode.
    Thanks,
    bsv

    Hi bsv,
    Are you trying to reprocess a BDOC for debugging purpose?
    If the BDOC is not with a final status, you will be able to reprocess it using the reprocess button in the smw01 search result list.
    And you may put /h on the popup when you click on the 'reprocess' button.
    If it is allowed to make some changes in the CRM ORDER for testin purpose, it would be easier to perform debugging.
    A more 'careless' way is to deactivate the outbound or inbound queue in transaction smqs or smqr, then in smq1 or smq2 to locate the interested queue, and click on button 'debug LUW'.
    Hongyan

Maybe you are looking for

  • How to import from desktop (file) avchd in FCE4.0.1

    I copied from a camera onto my macbook avchd footage for later use in FCE4. I used the importcommand log and transfer. I have three maps; DCIM (empty), MISC (AUTPRINT.MRK) and PRIVATE with a lot of files. I tried all the maps (or files in it) to drag

  • Convert to .WMA

    My Verizon Wireless LG VX8200 music phone only plays .wma's. Is there a way that I convert .mp3's to .wma's on my mac? Are there any free programs i can use to do this?

  • Best email solution for the iPhone

    After having messed with this since Friday, I've concluded that GMail is the best solution for iPhone email as of today. Let me explain. Yahoo Push would be the best if I could specify a different reply-to address. As it stands now, having my emails

  • Please Help --Export to excel time out issue

    500 Connection timed out Hi Friends, We have a query which runs about 3 minutes on web and  brings bach 54000 rows  , but when the user tries to export to excel It give timeout error as below. Connection timed out (-5) Error: -5 Version: 6020 Compone

  • Sles9  sp2   scsi error  internal  target failure  buffer I/O error

    Apr 3 10:40:41 hostname kernel: SCSI error : <2 0 0 0> return code = 0x10000 Apr 3 10:40:41 hostname kernel: end_request: I/O error, dev sdb, sector 24047 Apr 3 10:40:41 hostname kernel: Buffer I/O error on device sdb1, logical block 2998 Apr 3 10:40