How to increase work space area in report? Lanscape mode?

I see...some of report got wider area....it creates report printable in landscape mode..
how can i increase workspace?...i want wider workspace...i don't know, how to do that.
Please help.

Hi
To change the page to a larger size in CR, change the printer setup of the report file by selecting a different paper size. (Click File > Printer Setup)
For example, you can change the paper size from 'letter' to 'legal' to increase the paper height from 11 inches to 14 inches.
The options available in the Print Setup dialog box are dependent on the paper sizes that your printer driver supports. Different printers have varying page size options.
Hope this information is useful to you.
Regards
Asha.

Similar Messages

  • How to increase the performance of a report

    can any body tell me how to increase the performance of a report?////
    i have prepared a report to show the expense detail .I have used BSIS and BSAS table.
    But whenever I am executing it is facing runtime error (TIME_OUT error ).
    Moderator Message: Duplicate Post. Read my comments in your previous thread.
    Edited by: kishan P on Nov 25, 2010 1:38 PM

    Please SEARCH in SCN before posting.
    Also post performance related issues here.

  • How to increase the space of a page in Application Designer ?

    Folks,
    Hello. I am developing a page in Application Designer.
    I need to place multiple records with many fields in the page. But the entire space of the page is not enough to place the fields. We need to use a vertical scroll to increase the space of the page to hold all of the fields. But I don't understand how to do this feature.
    Can any folks tell me how to increase the space of a page in Application Designer in order to hold many fields ?

    Folks,
    Hello. Thanks a lot for replying. It's correct !

  • Increase work process to specific Reports..

    HI
    is it possible to increase work process time to specifi report, becasue i am getting below error while running the report
    The program "SAPLKARS" has exceeded the maximum permitted runtime without
    interruption and has therefore been terminated.
    After a specific time, the program is terminated to make the work area
    available to other users who may be waiting.
    This is to prevent a work area being blocked unnecessarily long by, for
    example:
    - Endless loops (DO, WHILE, ...),
    - Database accesses with a large result set
    - Database accesses without a suitable index (full table scan)
    The maximum runtime of a program is limited by the system profile
    parameter "rdisp/max_wprun_time". The current setting is 600 seconds. If this
    time limit is
    exceeded, the system attempts to cancel any running SQL statement or
    signals the ABAP processor to stop the running program. Then the system
    waits another 60 seconds maximum. If the program is then still active,
    the work process is restarted.
    please get me the solution asap
    thanks By engli

    You can set rdisp/max_wprun_time this value dynamically and chage it back to original value after your report is finished.
    before you start your reoprt or program do this,
    T-CODE --> RZ11 --> rdisp/max_wprun_time --> change value --> new value --> hit OK.
    After your report is finished you can switch back to old value.
    Regards
    SM.

  • How to increase table space?

    how can you increase table space ?( using BR* tools) but whats the procedure/way ?

    Hi,
    execute command brspace –f tsextend and supply tablespace name
    u will have 2 options one to increase size and other add datafile
    Connect to dataabse
    issue
    sql> alter tablespace <name> add datafile <'path'> size <2000m>;
    to resize
    sql>alter dataabse datafile <'path'> resize 2000m;
    or ref
    http://help.sap.com/saphelp_erp2005/helpdata/en/38/9f3fed3c32a74da3367d5f18dafb14/frameset.htm
    regards
    Vinod

  • How to increase "available space"

    Hello.  I'm on my first Mac and have Snow Leopard 10.6.8 and want to upgrade to Mtn. Lion.  It says that it requires 2GB of memory, which I have, and 8GB of "available space."  I have 6GB.  Does Apple have a snappy way to increase "available space" that does not require opening the computer up?  Thank you.

    iStuckagain wrote:
    Thank you all for your help.  Your answers made me cringe, and since I was cringing so much that I decided to go back and look at the numbers and I have to apologize: I gave the wrong number for disk space.  (Feeling like a dork right about now.)
    My computer comes with two 2GB (banks) of DDR3 memory, so the memory is 4GB.  I got some help learning about and locating the Applications>Utilities>Activity Monitor>System Memory section and found that I have 1.82 GB free, 641MB wired, 1.42GB active, 139.7MB inactive, and 2.18 GB used.  Adding free and used gives 4GB total memory, and so I think I do have just under 2GB free.  I will check out both places you listed, Eric Root, and I will get, as you suggested, Csound1, as much RAM as my computer permits.
    And regarding "disk space," I don't have 6GB, I have 640GB!  I looked a few tabs over and found that my disk usage is 333.92GB utilized and 305.87GB free, so it looks like I have 640GB (650, but 640 useable?) of disk space in total and that just over half is being used. 
    I'm sorry for the poor researching in my original post, but I'm pretty new to the inner workings of computers.  That's just where I am right now.  It appears that the memory I thought I had enough of, I need more of, and the disk space I thought I was out of, I have plenty of!  Jeez.  Anyway, I appreciate the help from all of you and I will take care of that RAM problem pronto   .
    You're welcome

  • How to create work space in the share point work space ?

    Hi,
    I have office 2010 with Share point work space.
    I have lot of files in the remote drives ( //sever1 ..etc ) and it is hard to find the files and modify them every time.
    So I have created groove work space and added one of the file from remote driver
    and then I have modified the file in the groove and it should be modified in the remote driver also, But it is not modifying.
    Please let me know any other ways to do this.
    I would like to reference the file in the share point work space tool. It should be modify in the remove driver once it is saved from space and vice versa.
    Thank you.

    Didn't know Workspace can sync folders, I only use it to sync offline folders and SharePoint. As an alternative, you can use SyncToy (
    http://sharepointdragons.com/2012/04/10/synctoy/ ) which for sure is able to sync multiple file locations (btw, it uses the Sync framework, the same that's being used by Workspace)
    Kind regards,
    Margriet Bruggeman
    Lois & Clark IT Services
    web site: http://www.loisandclark.eu
    blog: http://www.sharepointdragons.com

  • How to increase footnote space?

    Hi!
    I am working on a piece of text in Indesign CS6. The text contains the work at the top and a commentary to the work in the footnote area. The commentary is quite lengthy, thus there are many footnotes for just one paragraph. The opening paragraph to the work has approx. 12 footnotes on its own.
    Unfortunately, Indesign has made half of the work that was originally on the page go onto the next page as there are too many footnotes at the bottom. This has left a whole load of space, and I have noticed this on all pages. That Indesign automatically shifts text onto the next page when a certain amount of the footnotes are inserted. Does anyone know how I can get rid of this limitation and put in unlimited amounts of footnotes on every page of the document? Increase the amount of space for footnotes?
    Thanks in advance for all the help !

    The short answers is you can't increase ID's space for footnotes.  Unlike certain word-processors, InDesign will begin a footnote only on the page where the note's reference falls in the main text.  Thus if you have 3 footnotes in one line, for example, there's a good chance ID will push that line to the next page and leave a gap on the preceding page.
    If your commentary is very lengthy then ID's footnotes simply may not work well: you may need to put the commentary in a separate story running through a separate set of frames on each page -- a task all too familiar to PageMaker veterans.   Once you get going the work isn't as tedious as you might think, plus you get more flexibility: with a page big enough for two columns, you can put notes in the outer column, and encroach on the bottom of the main-text column as necessary.
    Check out Peter Kahrel's workarounds and scripts for handling notes.
    David

  • How to increase font size in the report when emailed as PDF

    How do I increase the font size of the report when I distribute the report as PDF to the users. I tried using different paper sizes in the LayOut tab in Broad Caster and Orientations. When I open the PDF from the mail I see the report shrinked and not readable, but when I magnify the report the numbers are visible with no loss in quality. I cannot give the users to print a shrinked PDF file. I would like to see a visiable font and print the same size what I see.

    The size of the font is increased by selecting a bigger page size while emailing. This will automatically increase the size of the page.

  • How to increase the size of a report ( width)

    hello Everybody ,
    In my report, I want to increase the width to put additionnal objects but I don't spread the big frame which bounds the report.
    How must I process to do it (increase the size of report) ?
    Helps
    Regards

    Go on Object navigator
    paper layout
    main section
    there are height and weigth you can adjust as required
    vikas

  • How  2 increase line size of  classical report displayed thru  modular prog

    Hi guys,
    I have displayed a classical report through a modular program using LEAVE TO LIST-PROCESSING AND RETURN TO SCREEN 130.
    But now i want to increase the line-size of my classical report as only half of the report is getting displayed.
    I tried the following thing:-
    SY-LINSZ = 125.
    perform f_report_pass.
    *Print repost showing records which were not saved
    perform f_report_fail.
    LEAVE TO LIST-PROCESSING AND RETURN TO SCREEN 130.
    but that did not work.
    Please help me increase the line size.
    Regards
    Rahul Gambhir

    Hi Vasanth
    I am using a modular program hence there isnt any statement :-
    REPORT ZXXX NO STANDARD PAGEHEADING LINE-SIZE 255
    This is the code that I am using :-
    SY-LINSZ = 200.
    perform f_report_pass.
    *Print repost showing records which were not saved
    perform f_report_fail.
    LEAVE TO LIST-PROCESSING AND RETURN TO SCREEN 130.
    Regards
    Rahul

  • How to increase the width of a report

    Respecetd guru's,
    i am facing problem to generate a report in our oracle report biulder.
    becuase i have task to generate FORM NO.X .though i am in HRM module is has so many entity inside .and when i am trying to put thsese its exceed the margn line.
    so how i solve this problem..
    plez help me out..

    Hi,
    You might want to post this in the reports forum.
    Reports
    -Arun

  • How to Increase Line space between two lines in ALV Grid

    hi,
    I want to increase the line space between any two lines in ALV GRID. Can anybody has solution for this issue.
    Regards,
    Madan

    Hi Madan
    It's not possible
    Regards
    Gregory

  • HOW TO INCREASE HD SPace - Logic FCP=almost full

    MBP 2.2 120GB HD, anyone know of a larger HD they can recommend at a decent price?
    Prefer 7200, but really want largest...also noticed there are some FW LAcie that apple sells also with eSata, but moving files means taking HD.
    I know the loops alone are 26+GB. So what would be the best to do?
    Thanks

    http://barefeats.com/rosa06.html
    Seagate Momentus 5400.4 250GB http://storagereview.com/pairnew_seagateofferings
    Im waiting a few more months for 7200RPM 250gig drives to arrive.

  • Has speed increase work in area broken my boadband...

    Suspiciously we've had no broadband since Saturday and BT have been upgrading in the area. I think they've messed something up at the exchange. The DSL light on the modem is off. We can can still make phone calls. We have an engineers appointment booked, but that's going to involve me losing a day's wages, which I won't get back off BT if it turns out to be their fault. I don't want an engineers visit, I just want them to go back to the cabinet and do it properly. Can anyone offer an opinion as to whether I should just wait a few days and see if they correct the problem themselves?

    JamesA wrote:
    Suspiciously we've had no broadband since Saturday and BT have been upgrading in the area. I think they've messed something up at the exchange. The DSL light on the modem is off. We can can still make phone calls. We have an engineers appointment booked, but that's going to involve me losing a day's wages, which I won't get back off BT if it turns out to be their fault. I don't want an engineers visit, I just want them to go back to the cabinet and do it properly. Can anyone offer an opinion as to whether I should just wait a few days and see if they correct the problem themselves?
    A friend was in the same situation and he did make a complaint for compensation, as bt reunded it as a gesture of goodwill.
    ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------BT Infinity 2 | 80/20 | SamKnows™ Infinity 2 Member | (EASBF)
    Stephen

Maybe you are looking for

  • Report for Validity Start and End Date in PO

    Dear All Is there any report where I can get PO validity start and end date which user input in addtional data header tab of PO? Regards Satish Kumar

  • Javax.servlet.* package does not exit

    While compiling servlet followinng errors are coming C:\Servlets+JSP\HelloServlet\src\helloservlet\HelloServlet.java:2: package javax.servlet does not exist import javax.servlet.*; C:\Servlets+JSP\HelloServlet\src\helloservlet\HelloServlet.java:3: pa

  • TV Shows will not play on 5G  iPod

    I just bought a 5G 30GB iPod yesterday after my 2G was stolen (so I am a relatively experineced user). I have been able to update my old music and everything seems to be working fine except for playing TV Shows. I have dowloaded an episode of Lost an

  • Applescript/Photoshop save JPEG dialog hangs open

    re: OS 10.8.2 / Photoshop CS5.1 I have searched this issue but have not found a resolution. Every post I've found presents "save current document in file filePath as JPEG with options myOptions" as sufficient. When I try it, the dialog just hangs ope

  • What event handling code do I need to access a web site ?

    Hello I am doing a GUI program that would go to a program or a web site when a button is clicked. What event handling code do I need to add to access a web site ? for instance:     if (e.getSource() == myJButtonBible)           // go to www.nccbuscc.