How to link a Delivery to an Inspection Lot a posteriori?

Hello,
we need to created Inspection Lots and make the analysis before the delivery. Thus we use Inspection Type Origin '89'.
Afterwards, however, we would like to update the Inspection Lot and link it to the actual delivery. This would help in the reporting for example.
Do you now how we could do that?
Thank you in advance and regards,
Didier

Thanks but it does not fit our process.
Here are more details:
We create a sales order
The sales order is sent to an external shipping system
The truck driver check-in in the external shipping system
A sample of the load is sent to the lab for analysis
The analysis is carried out and gives its visa
The truck driver can check-out in the shipping system and leaves
The shipping is sent to SAP and a delivery is created
The lab manager, at the end of the day would like to assign the delivery number to the inspection lot.
This would help in administring/reviewing the inspection lot status, etc.
Do some useful reporting with the actual quantities, truck id, etc.
regards,
Didier

Similar Messages

  • Table for Delivery number & Quality inspection lot number.

    Hi Gurus,
    In which table, Delivery Number & Quality inspection lot number  are related?
    Reg.
    Amol

    Hi,
    In LIPS
    If required modify layout and select Inspection lot option
    Kapil

  • How to use SAP XI to get Inspection Lot IDOC when Insp. lot is created

    I want to create a 3rd party .NET app that gets an Inspection Lot IDOC when an inspection lot is created, gather the inspection results, then push the results back to SAP in an IDOC. How do I use SAP XI to do that? I developed an HTTP listener .NET app and configured a sender communications channel for the SAP System and a receiver connunications channel for the HTTP adapter in the XI integration scenario, but how do I configure the XI integration scenario to send my app an IDOC when an inspection lot is created, and what IDOCs do I use?
    Thanks,

    Hi Ed
    I think you can use
    IDOC TYPES : QALITY01, QALITY02
    in XI you can create
    IDOC to HTTP as a scenario
    IDOC need to be triggered from SAP system and you can import the IDOC metadata into XI from SAP
    Check this thread it will help
    Re: IDOC to HTTP
    Thanks
    Gaurav

  • Link Between delivery and material document

    Dear All,
    how do we link between delivery document,
    and between delivery document and accounting document,
    with regards
    Mohammed Raees

    Hi there,
    Material doc is the PGI document which is created whenever there is material movement either GR or GI. In VL02N --> document flow, select the GD goods issue & click on display document. It will take you to the material doc. There is a field called material slip in that. The value stored in material display is the delivery num. That is how you link the delivery & material doc.
    From the material doc if you click on accounting docs, it will give you the A/c document num & the costing doc num (if available).
    From the material doc, select the item & click on details from ityem, it will give you the GL account for which the GI is posted.
    Regards,
    Sivanand

  • Inspection lot not getting cancelled after the inbound delivery is created

    Hello,
    The scenraio is like this.
    1. Material was procured in plant A.
    2. Using the stock transfer purchase order, transferred the material from Plant A to Plant B.
    3. Outbound delivery was created, Handling units were assigned and Post Goods issue was done.
    4. As soon as this was done, inbound delivery got created automatically in plant B and Handling units were assigned.
    5. Inspection lot was created with origin "08".
    6. Now I want to reverse all the transactions, so I did as mentioned below.
    7. Handling units were deassigned from the inbound delivery and inbound delivery was successfully deleted.
    8. Now tried to do the reverse post goods issue and got the error "Handling unit XXXXXX cannot be reversed"..Goods movement cannot be reversed for handling unit XXXXX because it has been changed or assigned to object since the last goods movement posting".
    The issue is that as soon as the inbound delivery is deleted, the inspection lot status should change, which has not changed. So kindly let me know how to make the system cancel the inspection lot as soon as the deassignment of handling units is done in inbound delivery or the inbound delievry is deleted.
    Regards,
    Narendra Bora

    Hello,
    Can anyone please reply.
    Regards,
    Narendra Bora

  • How to link stability samples to inspectionplan (CWBQM)

    Hi Guys
    Can you just let me know how i link individual samples for quality inspection,in stabilty studies to the inspection  plan of (CWBQM).
    I have to  link that to the individual physical samples ,curently  we go to change scheduling and in that manually attaching group and group counter to the physical samples.
    Please let me know
    Regards
    Mangesh

    Hi Guys
    To  the message below ,the same ia m asking inshort  can anyone tell me how to  create a separate inspection plan for each storage condition specified in the stability study.
    Where you can link storage conditions in CWBQM ?
    Thanks in advance
    Regards
    Mangesh

  • Inspection lot not getting generated during SD delivery

    Hi QM experts,
    I am working on QM in SD function. I activated inspection type 10 in the material master in QM view as shown below.
    I created a QM info record SD through QV51 for the combination of customer and Sales organization and assigned the material and quality inspection as before delivery as shown below.
    Now I created a sales order for the material with sales organization and when I making the delivery system is allowing delivery and no inspection lot is generated and delivery is also not stopped. am i missing something..can u please guide..
    Thanks
    Kumar

    Hello,
    You have activated 10 and 11 both , any specific reason ?
    If you activated 10, then system will allowed you delivery check QM customization---> During Shipping. have you assigned inspection type against Delivery type in customization ?
    Regards

  • Inspection lot In created state

    Hello,
    I am using the Inspection type 10 and the corresponding inspection plan of usage 6 is also maintained. I had 2 questions regarding the same:
    1.  Upon delivery creation an inspection lot is also created. But the lot is in created state and as a result result recording and UD is not possible. Am not able to figure out why,
    2. Here they want to use Handling unit management(cartons) whenever stock transfer takes place from 1 store to the other. How can we trigger quality when this transfer takes place. What would be the settings required for this?
    Any help on these issues would be greatly appreciated.
    Sincerely,
    Aji

    1. Upon delivery creation an inspection lot is also created. But the lot is in created state and as a result result recording and UD is not possible. Am not able to figure out why,?
    check following things:
    1.Date of creation of task list must be prior to that of creation of Inspection lot date.
    2.Usage in customization of inpection type & in Task list must be same.
    3.Task list must be released.
    now go to QA02>click on "Inspection specification>then on sample & save.
    2. Here they want to use Handling unit management(cartons) whenever stock transfer takes place from 1 store to the other. How can we trigger quality when this transfer takes place. What would be the settings required for this?
    This depends upon the T code & process that you use for stock transfer.Generally its 08 inspection type that is used.

  • Sample results to one inspection lot

    Hi,
    Please confirm if the following is possible:
    Record result for samples say 5 samples by today and then assign those sample result to one inspection lots after one week.
    It yes then how ?
    Regards

    Hi Sun
    First we need inspection lots to enter the results. If you mean five inspection lots results want to enter in one inspection lot. As per my knowledge it is not possible for transferring multiple result values to one inspection lot.
    If you want to transfer one inspection lot to another please go through below link.
    http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/60221c69-0f8b-2b10-eebf-bec51a601dd6?QuickLink=index&…
    Regards
    Kesava

  • Material document cancelaation after genarating the Inspection lot

    Hi All,
      Pls let me know how to cancel the material document after Inspection lot created in QM
    Regards
    Raj

    hi
    it is difficult once you have posted the material using QM ,kindly refer the following link for reversing the stock posting
    http://help.sap.com/erp2005_ehp_03/helpdata/EN/af/b9b3341a933f50e10000009b38f83b/frameset.htm
    regards
    thyagarajan

  • Document attach to inspection lot

    Hi
    How to attach the doc. in QM inspection lot? There is no standard functionality available.
    Regards,
    Vairavan
    Edited by: p vairavan on Mar 26, 2008 1:14 PM

    Hi,
    Normally document will be attached in Inspection method , which inturn will be attached to MIC and subsequently you can see this in result recording screen.
    By this way it is attached to the inspection lot.
    If you are in ECC 6.0 , In the Quality Inspector role, you can display, upload, and delete documents during results recording for inspection lots.
    See the link below
    http://help.sap.com/saphelp_erp2005/helpdata/en/84/bc5a4254781853e10000000a155106/frameset.htm
    Hope this will helps you.
    Regards
    K.M.Arun
    Edited by: ARUN KM on Mar 26, 2008 8:24 PM

  • Resetting a sample for an inspection lot

    How to reset a sample to an inspection lot, and transfer stock to inspection lot.

    Try using the transaction codes QAC2 and QAC3 for both of your queries.
    or open the inspection lot in change mode and assign the sample you would like.
    Hope this helps you.

  • Inspection Lot Creation after GR

    Dear PP/QM Masters,
    I have question regarding inspection lot creation after goods receipt.
    There will be GR once at the end of the shift with batch number. As batch generated during shift will be different, there will be multiple GR entry. But for every material only one result recording per shift is required and not for all batches generated. So, how to avoid creation of so many inspection lot? Automatic Inspection lot creation is required hence no question of manual creation of inspection lot.
    I checked function module ‘QAPP_CUST_IP_CREATE’ for inspection point functionality but its description “You can use the available function module to generate inspection points for the inspection during production already when the inspection lot is created.” Can I use function module ‘QAPP_CUST_IP_CREATE’ for restricting creation of inspection lot after GR?
    Request all Masters to help me in solving this.
    Thanks and regards,
    Devang

    Dear All,
    First of all thanks a lot for your response.
    I checked ‘Control Inspection Lot’ setting but even that can not solve my problem as in our case though GR with confirmation will be once in a shift (though in system shift is not defined) but batches will be different and hence material document will be separate. And requirement is to have single inspection lot per shift even if batches and material documents are separate.
    One option is to have multiple line items for GR in MB31 or MIGO or in COR6N. But all this transaction allows only one line item for GR against process order. So, can you suggest any function module or option to have multiple line items for GR.
    Thanks and regards,
    Devang

  • Inspection lot for inspection type 10,11,12

    Hi,
    My requrement is system should generate inspection lot at the time creation of sales order & before PGI.I assigned
    inspection type 10,11,12 in QM view in material master.I have a quality planning with usage -3 & status -4.But when I am creating sales order & doing PGI system is not generating inspection lot.
    manoj

    Hi
    check following   QCC0>Qulity inspection>Inspection lot creation>Inspection at shipping>
    Assign Inspection Lot Origin to Delivery Type
    Assign agaist del type:
    10 ; Outbound Delivery
    11 :Delivery w/o Ref.
    similerly for 12
    Also
    Assign Inspection Type to Delivery Category -->assign inspection lot origin & Inspection type for del catagory
    Regards
    Sujit

  • You cannot cancel GR, since inspection lot is already partly posted

    I get the error message when I try to reverse the GR posting in MF41. However, how can this be possible when the inspection lots created for these have a CRTD status, meaning they cant be accessed because they have lacking characteristics.

    Hii,
    Stock postings can be reversed with movemnt type 102, (GR for P.O- Reversal). Goto MIGO >w.ref to P.O. Once doc is revesed u need to cancel the Inspection lot. To cancel Insp lot goto QA32 , select insepction lot choose Usage decision>Functions--.cancel lot in UD screen.
    If UD is taken & u want to reverse stock posting, use SAP note 175842.
    However, how can this be possible when the inspection lots created for these have a CRTD status, meaning they cant be accessed because they have lacking characteristics.?
    For CRTD status also u can cancel lot with above procedure. CRTD status is bcoz in improper inspection plan. goto QA02>selct lot>goto Insp spec tab for grp & grp no. Then goto QP02-> check for any Miissing MIC or control key or any param at header,opearation / chrac level. Save inpsection plan then reassign.
    with regards,
    K.Lokesh.
    Edited by: Lokesh K on Jun 15, 2010 10:53 AM

Maybe you are looking for

  • Error while running autoconfig in DBtier

    Hi , While running a autoconfig on DBTier we got the following errror : The following report lists errors AutoConfig encountered during each phase of its execution. Errors are grouped by directory and phase. The report format is: <filename> <phase> <

  • Cache Memory Allocator \ Short Term Memory Allocator Issues

    Hi all I have a number of identically configured (High School) Servers which are giving me the same memory errors (some more frequently than others) and I've run out of ideas. They are all HP Proliant DL360 G6 Servers, NetWare 6.5 sp8 with eDir 8.8 s

  • Rotated image at 120% zoom

    Hi Framers, I use Frame 7.1p116 and have some small graphics of arrows in my text. These are imported by reference, Anchored Frame, At Insertion Point. When I display at 100% ot 140% (or other values) the display is just fine. But at 120% one of the

  • Podcast rejected, can't get it to resubmit...

    I have had a podcast on itunes for the past 3 years.  I recently switched servers, so I stuck a HTTP 301 redirect on the old feed to send it to my feedburner page.  Almost immediately I received notice from Apple that my show had been rejected from t

  • Get rid of the new interface.

    This new interface SUCKS! ! ! ! I want it GONE! ! ! I DON'T want to have to worry about GETTING it BACK! ! ! TELL ME HOW TO GET RID OF THIS T R A S H ! ! !