How to link summarization level to COPA- KE30 (T CODE) report ?

Hi,
I have created a report (t code KE30) and want to utilise one of the exixting summarization level. When i run the report it reads data from segment level. What settings are needed such that when i run the report it should read data from summarization level and not from segment level? pl advice
BR,
Abhishek

Hi
http://wiki.sdn.sap.com/wiki/display/ERPFI/COPAPerformanceImprovementusingSummarization+Levels
Regards

Similar Messages

  • Summarization Levels in COPA. Tr Code KEDV

    Dear All,
    I request you to give me some Clarifications on Summarization Levels namely;
    1) Are the summarization levels build form Line Items tables(CE1XXXX and CE2XXXX).
    2) If so how does it get the field "PLIKZ"(Plan/Actual Indicator) for Plan line items as this field so not part of CE2XXXX, so How is it Updated?
    3) Assuming that there are Performance problems even after using Summarization Levels, can you please explain as to how exactly do the Indexs work.?
    4) In Indexes, there are 5 Columns with the title "Field", each of the column containing multiple rows, can you please explain what is the use of each of the columns.?
    5) i have gone through the OSS Note "83204", in it there is a path(given below) given to download the information on Summarization Levels. However, i was not sure as to how to download it Could you please let me know how to download it.If Possible can you upload the document under "Wiki" or " Articles".
    Below is the data and the file path from the note:
    ===============================================
    The document can be downloaded via ftp from the sapserv3 server (binary
    transfer mode). The German or English version is stored in directory:
    (~ftp/)general/R3server/abap/note.0083204
    under the name h83204dt.doc or n83204en.doc.

    Hi,
    Please follow instructions in note 480180 to download the file. Also for creating index you can refer to note 35288. Together with summarization levels and a proper secondary index you should not face major performace issue. If the performance continues to be bad then you must think about archiving the CE1 or CE4 tables in CO-PA.
    Regards,
    Abhisek

  • How to link to a Topic's Bookmark from code

    Our developers program in Visual Objects, and when creating the F1 link between our applications and my CHM files, use the topic's htm file number (e.g. 1234.htm) to call the CHM file and open the appropriate topic.
    Is it possible for them to call the CHM file, open the appropriate topic and then scroll to a given bookmark within that topic?
    If this is possible, any ideas as to what the syntax might be?

    Try using 1234.htm#bookmark.
      The RoboColum(n)
      @robocolumn
      Colum McAndrew

  • COPA Summarization Levels

    Hi All,
    I have created summarization levels in COPA and when I run the COPA KE30 report with the summarization levels being active or inactive, it produces the same numbers in the Dev system, so no issue there. But in QA system, same summarization levels do not provide the same numbers. The numbers when summarization levels are activated are less than half of the numbers when summarization levels are deactivated. Same problem in the PRD system. I have tried to resolve the issue by creating the summarization levels directly in the PRD system.But the numbers did not match in that case either. The numbers provided by the report when the summarization levels are deactived are less than even half of the numbers when the summarization levels are activated.
    I have checked the report parameters in the DEV, QA and PRD systems and they are same.
    Please let me know what may be causing this inconsistency.
    Can it be because of some basis problem? I mean some memory problem etc which may be causing the summarization tables not to have all the data in QA and PRD systems.

    You wouldnt have any message in reports yaar.
    Just compare the authorisations in the development system with others.
    Also, do one thing., execute transaction SU53 immediately after the report execution, to see for any missing authorisations.

  • CO-PA Summarization Level

    Hi,
    I am very unclear about summarization levels in CO-PA. Please can any one explain me what is the real significance of summarization level, why do we need it and steps to configure it, and on what logic is data extracted from it.
    Thank you,
    Sam

    1. What is use of summarizattion in COPA?
    summarization level in Profitability Analysis (CO-PA):
    A summarization level is a tool for improving performance.
    Summarization levels store an original dataset in summarized form. This gives quick access to presummarized data for functions that do not need detailed information, and means that the data does not need to be summarized separately each time.
    you can check this in this link
    http://help.sap.com/saphelp_nw04/helpdata/en/ae/bd116e940f11d2b63c0000e82debc6/frameset.htm
    2. If we dont give summarization in COPA Account based will records be available in RSA3 - yes
    2. How to create summarization level for a datasource?
    You can do this in Transaction - KCDU/KCDV or SPRO
    Hope it helps.
    Regards

  • Summarization level

    Hello Friends,
    Are there any standard function modules available to update Summarization levels in COPA?
    Thanks.

    check the function module
    RKD_TR_LEVEL_CREATE
    you can check the function group KEDB .
    Regards
    Satish Boguda

  • COPA - KE30 Report

    Hi Friends,
    How to maintain planned values in COPA - KE30 Report ?
    Awaiting your suggestions.
    Srini

    Thank you for your mail but how ? when generate the KE30 report it is displaying the sales values but not Cost and Revenue.
    Could you please advise ?
    Awaiting your reply.
    Thanks & Regards
    Srini

  • CO-PA Summarization Levels

    Hi,
    for a report with many characteristics I created 4 summarization levels in such a way that
    Summarization Level 2 includes all characteristics of the Summarization Level 1 + some more
    Summarization Level 3 includes all characteristics of the Summarization Level 2 + some more
    Summarization Level 4 includes all characteristics of the Summarization Level 3 + some more
    In the report options, in Presummarized data section, I selected "Read upon each navigation step".
    Now when I execute the report, data is first read from the Summarization Level 1. During drill down data is read from further summarization levels depending on which characteristic is used for the drill down.
    There is one thing that I don't understand:
    None of these summarization levels is used by the system if it does not contain the characteristic "Product".
    As Product is not used for the initial selection of the report I initially put it on Summarization Level 3. But the system did not want to use Summarization Levels 1 and 2 then.  When I added the Product to the Levels 1 and 2, everything is working fine. However this is not what I need because Product is not displayed on the first screen of the report.
    Do you know why the characteristic "Product" is required in each summarization level?
    I will appreciate your help very much!
    With best regards,
    Marcin

    Hi Surya,
    My report is calling all summarization levels.
    At the start the summariyation level 1 is called. It is most aggregated so it is little time needed to start the report. It contains only the most frequently used characteristics.
    During drilldown other summarization levels can be called (this is achieved thru the option "Read upon each navigation step"). It depends on which characteristic is used for drilldown: if the characteristic used for drilldown is not included in the currently used summarization level, the next least aggregated summarization level which includes this characteristic is called.
    The most frequently used characteristics are included in the most aggregated summarization level, the least frequently used characteristics are included in the least aggregated summarization level, which contains all characteristics used in the report.
    With best regards,
    Marcin

  • How to link Business Place with plant

    Dear Expert,
    We are getting Business Place wise FBL3N report for Vat Payable GL code.
    We have created Business Place under Extended Witholding Tax tab.
    We are generating tax invoice in different plant.
    But how to link Business Place with plant so that FBL3N report will show Business place.
    Regards,
    Alok

    You can't make an entry directly to production server.
    You have to make the changes in Dev server then transport it to production server.
    Try the follow path
    SPRO-IMG-Cross-Application Components-General Application Functions-Place of Business-Assign Business Places to Plants.

  • How to link BOM Alt with BOM qty

    Hi,
    How to link BOM Alt with BOM qty in a report??
    e.g.
    BOMA, Alt 1
    MatX Qty = 10
    BOMA, Alt 2
    MatX Qty = 15
    How to reach a perticular case, as STPO do not have a field for BOM Alt (i.e. for STLAL)
    Rgds,
    MS.

    Hi,
    STPO does not have BOM alt field.
    So when we see the out put of STPO, all the BOMs with all alternatives are displayed under single BOM number.
    How to identify a perticular BOM alternative to reach a perticular component. (Same component is used in all BOMs)
    Rgds,

  • How to link printer?

    now i am doing a project, the project is almost finish. actually, now i want to add a extra function into my project. i want to use a printer to print out a receipt. but i don't know how to link to printer. anyone got a source code for linking printer??? thank u very much!
    my email: [email protected]

    Look at this link, it will give you some ideas
    http://forum.java.sun.com/thread.jsp?forum=57&thread=263262

  • How to "active"  copa  summarization level ????

    Hello:
        I create COPA  summarization level  in R3 .When I save the level, the system generates these tables and sets the status to "active, without data".I need to fill the level with data, at which time the status changes to "active".But I don't know how to do it !
      Thanks for your help!
       lian

    Dear Consultants, Learner & Readers,
    The problem with changing the status of a summarization level from "To be created" into "Active, without data" in a system that is not open for customizing can indeed be solved by execution of program RKETREGN as  it's described in attached SAP Note 52636.
    I quote from the note:
    If you have created summarization levels, the tables generated  are not also transported. To create the tables in the target  system, start report RKETREGN (Summarization Levels: Generate Tables for Summarization Levels) in the target system. Enter 'KE'     for application, '01' for sub-application and 'CE1xxxx' for TABNAME (Replace xxxx with your operating concern). If the program does not run, then the program terminates with “error message KE707 when building summarization levels
    I hope this answers your query.  Else do not hesitate to get back for more clarifications.
    You may write to my personal mail id : fico_rss at yahoo.com
    Best regards
    Dr. Ravi Surya Subrahmanyam, PhD (Finance)
    Senior SAP FICO Consultant,
    Answerthink India Ltd
    Hyderabad. India
    Phone :  +91 - 9848550024
    Email : [email protected]

  • KE30 is not picking the data from summarization level

    Hi Techies,
    We are facing one issue in KE30 tcode.
    We are able to run the same report in our QLTY, its showing "Data is getting fetched the data from summarization level 33" and we can see the output within 5 mins, But if we use same parameters in PRO, its showing "Data is getting fetched from segment level".
    So we are not getting data in PRO, its throwing TIME_OUT error....
    Request you to suggest how we can map these summarization level to the particular report.
    *We have already rebuilt and refreshed the summarization levels, then also it is being picked from segment level.
    Thanks in advance,
    NIck Loy

    Hi,
       In KE30 right click on the report. Click on change. Go to the options tab. In the performnace block check if radio button "use a summarization level" is selected.
      If the customizing is correct then the select stamenet generated by the report may not be in sync with the summ level i.e. the chars in the selection of the report must be there in the summ level.
    regards
    Waman

  • COPA Summarization level.

    Dear Gurus,
    Can any one explain me about COPA Summarization level  and how we can do in the system.
    Thanks and regards.
    Ramesh.

    Hi,
    Please check the note 83204 which provides you a detailed information about the usage strategy for summarization levels.
    Best regards,
    MLM

  • Summarization Levels COPA

    Hello all,
    I´ve created a Summarization Level using transaction KEDV.
    The Summarization Level has still the status "to be created" in KEDV, even when I safe it, it does not change the status, so the tables are not built.
    When I try to update/ built/ rebuilt the level by using KEDU, it says it is not possible, because of the status "to be created".
    How can I change the status and built the tables for the summarization level?
    Thanks for your answers,
    Michael

    Try using the program "RKETREGN" to build.

Maybe you are looking for

  • HP LaserJet 4L printer cannot print from Windows 7

    I currently bought a new computer and wanted to connect my old printer to my new computer.  I bought a new USB cable cord in order to connect my old printer to my new computer.  The model of my printer is HP LaserJet 4L.  However, after I put everyth

  • Vmware tools for fc10 fail to compile some modules

    I'm running esxi 3.5 u3 - when I try to install vmware tools on fedora core 10 (linux kernel 2.6.27.5). vmmemctl breaks: os.c: 590  erro struct proc_dir_entry has no member named get_info vmghfs breaks: bdhandler.c:29:27:  erro: asm/semaphore.h : no

  • Cannot open MXF XAVC files in quicktime or FCP7

    I am working with a new Sony FS7 video camera  that records in XAVC codec as mxf  files - Same as the F5 or F55. I have installed the new ProApps update that is supposed to  make it easy to use XAVC in Final Cut 7 which I still use and have also upda

  • Dynamic Safety stock

    Hi All, We are recently implemented dynamic safety stock calculation functionality with "Range of coverage profile'. Functionality working fine But client asking for report stating that how much is the dynamic safety stock. Is there any way to find o

  • Upgrading to Windows Vista Ultimate

    I originally had Vista premium, but recently I loaded ultimate onto my computer.  but now i have both ultimate and premium on my harddrive.  i need help to remove the premium files and move the ultimate files onto the C: recover drive. Thanks to anyo