How to link two recording channels for stereo?

I have a zoom 6 interface which naturally records vocals in stereo with audition with its built in stereo
Mic. However, I have an external stereo mic which connects to two different inputs on my interface.
I want to link these two inputs in audition to record in stereo without recording two separate busses.
How can I do this?
Thanks!

You need to select a stereo input option in the channel sources choice on the track control panel (LHS). If it's possible to pair the two inputs, then this is where you do it.
Alternatively, just don't bother! Simply record two mono tracks and mix them down to a stereo track afterwards. Mind you, if you are recording vocals like this, then there really isn't a lot of point, as your voice is mono anyway, and you only really need a single output from the mic - one side or the other would do. If you are recording ambient sound, then okay, stereo - but you really don't need that for a single voice.

Similar Messages

  • Is there support to stereo mix record channel for windows vista or at least XP ?

    i have lenovo N500 and conexant HD smartaudio 221 on board with windows vista.
    i read somewhere that smartaudio don't support stereo mix record channel in their driver for vista.
    do they support the stereo mix record channel for windows XP ?
    (i tried to ask them in their site, but couldn't manage to do that)

  • Work flow? How to link multi-cam sequences for DVD output?

    Pr cs4 (very new)
    Still taking baby steps each day... please take my hand and help me!
    Final output will be 2 DVD's (each DL) each about 2 hrs. Content are chamber music student groups in two recitals.
    I have assets from two camera angles. I have successfully practiced on one of the groups performance (10 min.) following the steps illustrated in a multi-cam tutorial.  http://www.adobe.com/designcenter/video_workshop/?id=vid0234
    This leaves me with a great multi-cam sequence for that group located in the Project Panel, exactly what I want.
    Now, I want to know what is the best method (workflow?) to ultimately produce a DVD containing about 10 of these type performances (one after the other) with chapter markings for each group, titles etc.?
    I have yet to use Encore and I'm guessing that is where I'll send the finished edit for DVD production, though I don't know at what step I jump there?
    Do I try to create one very long multi cam sequence of all the content, then send to Encore? Or can I create seperate multi-cam sequences (each performance) then link them together, adding transitions and make the DVD? This would be my preference to keep things more manageable, especially with audio synching.
    With my practice multi-cam sequence on the timeline, I tried to drag the same sequence from the Project Panel to the end of the timeline to simulate how this would work, but it does not add to the timeline as a clip would.
    This is probably childs play for you pro's, but we were all baby's at one time...I just happen to still be one!
    Thanks for your patience and advice,
    Kenny

    Yes I did...now toss me a cookie please.
    I am trying to quickly get up to speed in Pr CS4 to get this project completed. In the process, I'm trying to learn and understand the interface and correct terminology so as to make my questions intelligible to a community that posses vastly greater understanding than myself.
    Is there anyone who can help with my main question at hand? Namely, how to go about creating a full length sequence (in the timeline) made via the nesting of synchronized multi-camera clips within a new "multi-cam sequence"?
    As I said, I have completed a small test sequence in this fashion, nesting clips in a new sequence then using multi-cam monitor to record cuts. Now I need to add about 10 more of these together in a completed sequence to then send to DVD production.
    Is this intelligible?
    Thanks, Kenny 
          __0
       _ \<,_
    Date: Wed, 4 Nov 2009 09:11:06 -0700
    From: [email protected]
    To: [email protected]
    Subject: Work flow? How to link multi-cam sequences for DVD output?
    please take my hand and help me!
    Well, at least you had the gumption to admit that up front.
    >

  • How to Maintain two different prices for same material in different qty?

    Dear all,
    How to maintain two different prices for same material in different batch quantities in purchase order(ie.,info record)?
    (Vendor is supplying quantities in 2 different batches & also in different prices)
    Expecting valuable reply.
    Jeyakanthan

    In a PO you can create 2 items, and each item can be maintained with a different price in the conditions.
    In info record it is not possible to have different prices for the same period, except for scales.
    so if you have a price of e.g. 2 USD for 1000 kg and 1,90 USD for 2000 kg then you can maintain this in scales, but you still have to have 2 items in the PO so that each one can individually find its price.
    Alternative you can create contracts (as well with more than one item) to reflect the different prices and batches.

  • How to link two combo boxes? (urgent)

    Hello,
    I am wondering how to link two combo boxes in Acrobat Pro 9. Basically, I need to link a building with a list of rooms. There are 3 building choices in my first combo box. For the sake of example, Building A, Building B and Building C. When one of the buildings is selected, I want a 2nd combo box to display the rooms that are located in that building. So by selecting building A, you would then be able to choose a room from the list of available rooms in the second drop box. The buildings cannot share a list of rooms because they have the same room numbers. Is anyone able to help?
    - Travis

    You can also use ajax. When the first combo box element is selected, it will call the ajax function and that ajax function will bring the data from the database and place it in second combo box.

  • How to link two authorizations to an object.

    Hello,
    In the EWA report I received the following recommendation:
    "If you do not want to disable development in your system, you have to exclude OBJTYPE=DEBUG with ACTVT=02 from the profile and allow any other object type for S_DEVELOP. This means that development and debugging with visualization are still possible.
    You can do this by linking two authorizations to object S_DEVELOP: One with all object types (except "DEBUG") and all activities and another for object type DEBUG only with all activities (except 02)."
    How to achieve this?
    Thanks
    Galina

    > I try not to maintain transactions in SU24. 
    >...
    > We have a small user population. 
    I can understand that, however it still has a downside when your user base grows, or you move on and someone else needs to take over, or the functional consultants leave the building and when you upgrade or apply support packs and need to make some changes, then you don't know why the authorization was added manually - at least not without having to sieve through a sea of documentation and mails etc.
    It is easier to find a transport request and it's documentation IMO, and who knows about it, approved it, tested it, etc.
    It is just a little organizational discipline thing, but it does go a long way.
    Cheers,
    Julius

  • How to link two XL Reporter  templates into single sheet

    Hi
    I'm Using SAP Business One 2005B, PL 04.
    I want to link one template into another XL Reporter Template. Kindly guide me, how to link.
    Thanking You

    How to create a to  new template with these two templates,  linking it  to a  base table.
    I have taken delivery document based on Item delivered. I have grouped it by item Group. I want to link the Instock based on warehouse for those Items. If i try it in a single template i cant get the value for either one of them. How to get these data.

  • How to Link two Portlet

    Hi ,all.
    I am beginning study Porttal, I had build two Portlets by Java, The Portlet1 and Portlet2 .
    How to link to Portlet1 from Portlet2 ?
    How to pass value to Portlet1 and Portlet2 ?
    Thanks and Best Regards!

    Steps
    1) create 2 Oracle PDK portlets (p1 and p2 with same parametr name. let say 'param') using Jdeveloper and register with Portal
    2) p1's code
    <%@page contentType="text/html; charset=windows-1252"
    import="oracle.portal.provider.v2.render.PortletRenderRequest,oracle.portal.provider.v2.http.HttpCommonConstants,oracle.portal.provider.v2.ParameterDefinition,oracle.portal.provider.v2.url.*"
    %>
    <%
    PortletRenderRequest pReq = (PortletRenderRequest)
    request.getAttribute(HttpCommonConstants.PORTLET_RENDER_REQUEST);
    %>
    <P>Welcome <%= pReq.getUser().getName() %>.</P>
    <P>This is the <b><i>Show</i></b> render mode!</P>
    <%
    ParameterDefinition[] params =
    pReq.getPortletDefinition().getInputParameters();
    %>
    <p>This portlet's input parameters are...</p>
    <table align="left" width="50%" ><tr><td><span class="PortletHeading1">Name</span></td><td><span class="PortletHeading1">Value</span></td></tr>
    <%
    String name = null;
    String value = null;
    String[] values = null;
    for (int i = 0; i < params.length; i++)
    name = params.getName();
    values = pReq.getParameterValues(name);
    if (values != null)
    StringBuffer temp = new StringBuffer();
    for (int j = 0; j < values.length; j++)
    temp.append(values[j]);
    if (j + 1 != values.length)
    temp.append(", ");
    value = temp.toString();
    else
    value = "No values have been submitted yet.";
    %>
    <tr>
    <td><span class="PortletText2"><%= name %></span></td>
    <td><span class="PortletText2"><%= value %></span></td>
    </tr>
    <%
    %>
    <form action="<%=UrlUtils.htmlFormActionLink(pReq, UrlUtils.PAGE_LINK)%>" method="get">
    <%=UrlUtils.htmlFormHiddenFields(pReq, UrlUtils.PAGE_LINK) %>
    <input name="param" type="text" size="10">
    <input name="submit" type="submit">
    </form>
    </table>
    3) no change in P2's code.
    4) run portal you can pass value from p1 to p2
    cheers

  • How to link two ID account to only one

    I have two Apple ID account, and I would like to link them into one account without losing my purchase on both account. How this is possible?

    You cannot link two Apple ID's together.  You can only log into one and download its purchases, and then log out and into the other account.  You should choose one to continue using for the foreseeable future, and hope that someday Apple allows you to link accounts.

  • How to link two .java files together?

    hello everybody,
    is it possible to link two or more .java files together? I mean is if I have 3 .java files. (a.java, b.java, c.java) then I have 3 .class files too. How do I use the method in other .java files. For example :
    public a extends Applet {
    // call b.class
    b();
    public b extends Applet implements ActionListener {
    void title1() {
    How to call the b.class? How to call the title1() method?
    Is it related to JAR or package??
    Thanks for helping me. v(^_^)v

    O.K, you do not link ".java" files together.
    You compile them into class files and they can create new instances of each other and and access their variables and work together.
    I recommend "Sam's Teach Yourself Java in 21 Days".
    It will start you out with the basics.
    --Ian                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    

  • How to link two controls?

    Hi,
    I'm trying to link two controls together, a slider and a numeric, so that if I change the value of one control, the other will also show the new value.
    Does anyone knows how to do that? Is that even possible?
    Thank you for your help
    Solved!
    Go to Solution.

    altenbach wrote:
    Tim's answer is correct and appropriate. No code needed.
    That's different.  Usually Christian shows me yet another, more efficient way, to code something.  Well, I guess you can't get more efficient than no code.
    There are only two ways to tell somebody thanks: Kudos and Marked Solutions
    Unofficial Forum Rules and Guidelines

  • How to link two selectOneListBox?

    Hello, I'm trying to link two selectOneListBox. The operation is as follows, when you select a value in the first select, the second select will be charged with the values related.
    I'm building the components in a programmatic way. A example code for the first select is:
    ProcesosBean.java
    HtmlSelectOneListbox select= new HtmlSelectOneListbox();
    select.setId("select"  +i);
    select.setSize(1);
    UISelectItems items = new UISelectItems();
    ArrayList arr = new ArrayList();
    for (int i = 0; i < list.size(); i++) {
         arr.add(new SelectItem((ListBean) list.get(i)).getId(), ((ListBean) lista.get(i)).getValue()));
    items.setValue(arr);
    comboCampos.getChildren().add(items);
    MethodBinding mb = FacesContext.getCurrentInstance().getApplication().createMethodBinding("#{processAction .loadSelect}",     new Class[] { ActionEvent.class });     
    comboCampos.addValueChangeListener(new ValueChangeListener() {
         public void processValueChange(ValueChangeEvent arg0) throws AbortProcessingException {
    comboCampos.setValueChangeListener(mb);     I tried to use "addValueChangeListener" and "setValueChangeListener" but does not work.
    In the ProcessAction class, I will get the values of the second select, for the selected value, and it will charge the second select, in a programmatic way.
    I thought this could be done with javascript, but I don't know how to call the ProcessAction method. Any suggestion?
    Edited by: dcastellar on Oct 15, 2009 1:03 AM

    Well, I found a problem in the first implementation (with the a4j function), you can't change the view (ej: the values of the inputs), but it's works fine in the rest.
    The second alternative, I was wrong about the object that I used. It wasn't the ValueChangeEvent not the ActionEvent. This alternative works correctly.
    a example of the code that I use is: (I do not use the jsf tags, I show the components programmatically)
    the bean class
    HtmlSelectOneListbox select= new HtmlSelectOneListbox();
    select.setValue("");
    MethodBinding mb = FacesContext.getCurrentInstance().getApplication().createMethodBinding("#{processAction.loadSelect}",new Class[] { ValueChangeEvent.class });
    select.setValueChangeListener(mb);the action class
    public void cargarComboFormato(ValueChangeEvent  event) {
    }thanks for all, and sorry for my bad english.

  • I'm using pages 5.2 and feeling completely stupid by not knowing how to link two text pages together. Can anyone help? please...

    Hi there, I'm trying to use pages 5.2 for the first time and I cannot find how to connect two consecutive pages together as I use to do with earlier versions of Pages... Any help?

    Word Processing templates have what is called a Document Body.
    That is the area defined by the margins and holds a default text area which flows from page to page.
    Examples of WP templates are the Letters, Reports, CVs etc.
    Layout templates have that switched off and require you to add Textboxes or Shapes into which you can type text. Each page is an individual Section and no text flows from page to page.
    Examples of Layout templates are the Brochures, Business Cards, Posters, Newsletters etc
    In Pages '09 you can manually link Textboxes to flow in your own set order and across pages. Pages 5 has dropped this along with 100 other features.
    Peter

  • Separate sampling rate for two different channels for a USB-6009 daq

    Hi, 
    I am using a USB-6009 and incorporating the 'daq assistant' to change the sample rate.  I am trying to find a way to set the sampling rate to two unique values for two separate channels.  I've tried setting up two daq assistants and adjusting the sample rate different for each channel, though this does not work.  Is there any way to set the sample rate high for all channels then reduce the rate for a different channel - or an alternative?  I would appreciate any input on this, thank you!
    - Anthony
    Solved!
    Go to Solution.

    All tasks on a DAQ board that use a sampling clock must use the same clock.  Therefore, you cannot have two tasks on the same DAQ board sample at different rates.
    Alternatives would be:
    1. to combine all of the channels into a single task and just accept the extra data
    2. get an extra DAQ board to use in parallel
    There are only two ways to tell somebody thanks: Kudos and Marked Solutions
    Unofficial Forum Rules and Guidelines

  • How to link two rows together? Weights should be tied to returns!!

    Hello CB experts! I have a question. It may be simple or it may not; not sure. So, I’m looking for some guidance here. I have historical return on my sheet named ‘Symbols’. In my ‘Returns’ sheet, I have Shares, Return, Volatility, and Weights, along with a Covariance Matrix and a Correlation Matrix on the sheet. I put an Efficient Frontier curve in there and the top performing components of the Dow. I also, have a sheet named ‘Returns-CB’; this is where my CB analysis is. So, from E6:AH6 and E8:AH8, I have defined CB assumptions (they are pretty much all the same). Anyway, my question is this: how do I link the items in row 6 to the items in row 8? If I have 12% return and 30% return for stock AA and stock BA, I should NOT have 0% weight; I want to invest in these stocks. Similarly, if I have a weight of 15% for stock CAT, I should NOT have 0% return. This doesn’t make any sense. Can someone please tell me how to link the returns and weights. It works perfectly fine in the ‘Returns’ sheet; I used MS Solver to get this working. I was trying to do something similar in the ‘Returns-CB’ sheet.
    You can download the file from here:
    http://www.mediafire.com/view/?5lk0gtcd261cy3c
    Thanks everyone!!

    I know this has something to do with constraints. For instance, Cell C8 must = 100%. Cells E8:AH8 will change, depending on the weights of the stocks (this is contingent on risk; defined assumptions and parameters of the distribution curves). Likewise, Cells E6:AH6 must change, depending on the potential future returns of the stocks (this is also contingent on the risk). It seems like, if I define an assumption, it wipes out any formula that I have in the cell. So, I'm not sure how to 'link' the E6:AH6 range and the E8:AH8 range. Does anyone here have any ideas on this?

Maybe you are looking for

  • How do I move my movies from an external hard drive to iCloud?

    Hi folks Sorry if this is really stupid question... I have a couple of hundred movies which I have purchased from iTunes. They were completely clogging up the memory on my MacBook Air and I was living in a place with very poor internet access so I be

  • ITunes Version 7.0.2.16 and Windows Vista Home Premium

    I am still using iTunes Version 7.0.2.16, and due to my failing computer, I am unable to upgrade to a newer iTunes version. I am about to replace my old computer and the new computers all seem to come with Windows Vista Home Premium. Do you know if W

  • How do I permanently get rid of Yahoo in the search bar?

    I "Manage Search Engines" and remove it, but every time I restart Firefox it's there again as the default. How do I get rid of Yahoo permanently? It is not my chosen search engine, and brings up very limited results.

  • Photoshop CC 2014.2.1 can't sync settings with Creative Cloud

    Good day, Photoshop CC 2014.2.1 can't sync settings with Creative Cloud for some reason. I'm signed in, no firewalls, the router is fine. Other apps, Premiere Pro for example, sync without issues. Photoshop keeps saying "Connecting to Creative Cloud.

  • How to get context information?

    suppose i have created master detail.if i put mouse on any attribute of master ,related detail should be shown as context message.