How to locate clip within timeline containing specific filter

Hi,
I would like to locate in my timeline all the clips that contain a specific filter (in this particular occasion, MERCALI filter). But my timeline contains hundreds of clips. How do I locate the ones I am looking for without having to click on each and everyone of the cut clips?
Thank you.

That just isn't something that anyone asked for. Or not enough people, in any case.
We have asked for a way to eliminate all filters.
After Effects has a hotkey to show all modified parameters, so Premiere Pro could certainly have it. Put in a feature request.

Similar Messages

  • Renaming Clips within Timeline

    I'm trying to export clips from FCP to AE. Because of this I have to rename each individual clip that I export just to keep track. However, the clip on the timeline still has its original clip name from the original. When I try to rename the clip to match the export name, all the clips chunks belonging to that one long clip gets renamed too.
    How do I rename just the individual clip without changing the original file name?
    Thanks.

    You can't. Unless you get Automatic Duck Pro Export for After Effects. www.automaticduck.com
    Shane

  • CS5 movie clips in timeline don't auto-play

    So I used flash for some relatively extensive movies back in the MX days, but haven't done much with it since. I'm trying to build a relatively simple movie now in the newest version of the software, but I'm having some trouble.
    I want to create various smaller movie clips with animations in them, then drop them into the main timeline and have them animate automatically when the playhead hits them. However, when I view the movie (or test it) all I get is the first frame, they don't animate.
    Did I set up the document wrong or something, or is this something basic I missed in the newer versions? Is there a better way to structure this?

    Theoretically that's how I always thought it's supposed to work, but it isn't... I created a new document (new > actionscript 3.0) to test this out, then a movie clip within it containing a block that moves left to right. Doesn't animate in the main timeline. Do I need to specifically tell the clip to animate on that frame? Seems redundant.

  • How do I make my Timeline play forward or reverse depending on its current location?

      I'm attempting to make a side scrolling site. I have a wide div set up in the main timeline that animates 1000px at a time on the x-coordinate between the labels I have set for each "page".
    I would like to click a button and go to the associated label and stop. I am faced with 2 problems:
    1. Sometimes this would require the playhead to move in reverse rather than forward.
    2. I originally had stop triggers on the timeline under the labels but if I am able to get my first problem fixed these triggers would stop the animatin before reaching the label.
    I'm just learning java so I'm guessing I need an if statement and a function.
    Example of what I'm trying to figure out:
    I want to press work button and play to label "work".
    If I'm at label "home" I need to play(); and stop at label "work". If I were at label "blog" I would need to playReverse(); to label "work".
    Please help! I've been going looney trying to figure it out!

    Thank you for your reply!
    My post may have been a little misleading...
    I have a navigation bar with 5 items.  Home, work, blog, about, contact.  My main timeline has a symbol that is 6000px wide. Inside that symbol are individual symbols that make each of these "pages" which are 1000px each. My timeline has animations that last 1.5 secs each and animate the main symbol 1000px on the x dimension to stop on the main stage which is 1000px.  Essentially it creates a 5 "page" side scrolling layout. I have the five labels on the timeline starting at 0s with "home", 1.5s labeled "work", 3s labeled "blog"... etc.
    I wish to be able to click blog and travel forward or reverse on the timeline and then stop on "blog".  Then If you click home you should reverse along the timeline and stop on "home".  If I have any stop(); triggers on the timeline it would stop in transition to my target label without reaching it.  In addition a generic play(); or playReverse(); doesnt target a specific label which is whats required for my navigation bar.
    I need to play forward or reverse from the current location on the timeline and stop when it reaches a specific label. Visually you would be sliding back and forth across the pages as you use the navigation.
    Is there a way to do this with variables?
    I'm going to try triggers on the timeline like this sym.setVariable("pageValue", "home"); when on the "home" label.    sym.setVariable("pageValue", "work"); when on the "work" label.
    but then how would I tie that to my buttons?
    If I click work and I'm on home I need it to check:  var myVariable = sym.getVariable("pageValue"); and then an if or else statement I think?  I'm such a noob. I'm trying really hard to grasp it
    something like:   if pageValue = "home" { sym.play();} else if pageValue = "blog","about","contact" {sym.playReverse} if pageValue = "work" {sym.stop();};
    I know there is probably all kinds of syntax errors there but can someone understand what I'm getting at?
    to make this even more tricky I am interacting with the stage with an html and css navigation bar that lays over the stage so I need this to be in function style (see code)
    function goHome()
    javascript:var targetComp = AdobeEdge.getComposition('EDGE-57204389');
       targetComp.getStage().playReverse();
    and then call it like this in html
    <li><a href="javascript:goHome();" class="three-d">
                                  Dynamic
                                  <span class="three-d-box"><span class="front">Dynamic</span><span class="back">Artisans</span></span>
                        </a></li>
    This works to play the stage in reverse but its not the functionality I need.  Any help would be greatly appreciated and a great learning point for me and hopefully others in my situation!

  • How to unglue clips that are stuck together in the timeline

    I've looked everywhere, I'm sure it's there but I can not find how to "unglue" clips that are stuck together in the timeline.  NOT break apart clip items, but get rid of those pesky things that attach the different levels of video together.  And BTW what the heck are those little claws called?
    Thank you so very very much in advance!    

    You can't move tracks. Everything in the timeline has to be connected to the primary storyline at some point. Each clip that's connected can be connected individually so it's free floating and the connection point can be moved anywhere you want, or the clips can be strung togother and connected at a single point. You can Opt-Cmd-click to change the connection to a new location, but it has to be connected somehow.

  • Changing Speed of clip in timeline in a specific wqay

    I realize there are a variety of ways of affecting
    a change to the speed of a clip already in the timeline,
    but I'm trying to figure out how to do it in one very specific way:
    If I have 3 clips (A,B,C) and I want to change the speed
    of B so that it is slower, but not expand the clip from
    it's original length (meaning it will still occupy the
    same spot, duration and length in the timeline), is there a way of accomplishing that just by punching a specific figure
    in somewhere (i.e. make it move at 50%).
    I know about fit-to-fill, time remap, right clicking a clip
    and changing speed. However, I don't want the clip to
    expand past it's spot in the timeline, just play slower in the spot it occupies.
    The closest I've come is going into the time remap tool and lowering the end keyframe so it moves slower, but this is
    imprecise. I want to be able to punch in 50%, or 60% somewhere and have it take, without expanding. The time remap tool won't let me punch in 50%, although that indicator moves when I drop the ending keyframe down a little.
    Can what I'm describing be done, and if so, how? Thanks.

    Match frame back to the original media. Slow it down, then cut it back in.
    You cannot slow down the clip in the timeline without it expanding. You are telling FCP to take the existing clip and make it longer...of course it will expand in size. It doesn't know that you don't want it to do that. It assumes (rightly so) that you want the clip, with the IN and OUT points you designated, to be slower. Keeping it in the same spot on the timeline means cutting off the head or tail of the clip...losing points you told FCP you wanted.
    Simple to just load the clip into the viewer, slow it down to the speed you want, then cut it in.
    Shane

  • I have mistakenly deleted a mail folder which I had created. Can't remember if it was located to 'iCloud' or 'On My Mac'. How can I retrieve the emails contained in this deleted folder? Your help will be immensely appreciated!

    I have mistakenly deleted a mail folder in which I had created. I can't remember if it was located to 'iCloud' or 'On My Mac'. How can I retrieve the emails contained in this deleted folder? Your help will be immensely appreciated!

    Yeah not a problem. It does seem though that if you did not have a Time Machine backup then you may not be able to recover the deleted folder :/ But for future reference to prevent any of this, a Time Machine backup is a great investment.
    What it does is create an entire backup of your computer anything from personal information down to the screen saver.
    What you first need is a new external hard drive (I would recommend a 1TB or higher just to prevent running out of space soon).
    after that, just plug in the drive to your computer.
    once it is plugged in, in the top right hand corner, close to the wi-fi symbol, you should see a symbol that looks like a clock with a backwards arrow around it.
    click on that and select "open time machine preferences"
    just turn the button to the "on" position, and select the backup drive and Time Machine does the rest
    very great tool

  • Background noise removal takes about 3 seconds into each clip in timeline to kick in, so each clip has noise in the first few seconds.  How do you get this to remove noise from the very start of the clip?

    Background noise removal takes about 3 seconds into each clip in timeline to kick in, so each clip has noise in the first few seconds.  How do you get this to remove noise from the very start of the clip?

    insert a 5 second gap in the beginning of the timeline.

  • How to put clip into 16:9 timeline then scale footage?

    How do I drop a clip into a 16"9 SD timeline and scale the footage up until its fits the frame, then export to Youtube SD widescreen.

    Assuming you wish to drop a 4:3 clip into the DV widescreen sequence? Select clip on timeline to highlight it, then go to Effects panel and use MOTION effect - the SCALE parameter can be use zoom in, and you might want to use POSITION as well if heads are getting cut off. Can pan-and-scan to keep action centered. Study up on using KEYFRAMES also, since you may need to animate the framing to keep subject in frame.
    When happy with the edit, just export as H.264 using the YouTube SD wide preset
    Thanks
    Jeff Pulera
    Safe Harbor Computers

  • How to jump to next marker of selected clip in timeline?

    So, I finally figured out how to mark my clips in CS6, but for the life of me I can't figure out how to navigate between clip markers in the timeline.  There's an obscure reference in the help files but as far as I can tell it's talking about sequence markers, not clip markers?
    I have a clip selected, there's a marker in it, all I want to do is jump to it in the timeline.  How?         

    Clip marker timeline navigation has been removed.  Please file a feature request to restore all the clip marker functionality we had in every previous version of PP.
    https://www.adobe.com/cfusion/mmform/index.cfm?name=wishform

  • IPhone 5S IOS 8. Can't figure out how to disable the "live" location feature within the native calendar app used for mapping/travel time.  Have looked everywhere and it's driving me nuts.  Thanks for any help on where to make the change!!

    iPhone 5S IOS 8. Can't figure out how to disable the "live" location feature within the native calendar app used for mapping/travel time etc.  Have looked everywhere and it's driving me nuts.  Thanks for any help on where to make the change!!

    iPhone 5S IOS 8. Can't figure out how to disable the "live" location feature within the native calendar app used for mapping/travel time etc.  Have looked everywhere and it's driving me nuts.  Thanks for any help on where to make the change!!

  • How do i reposition the timeline to the left margin?

    I dip into FCP Pro X when I have a new project to edit - in between doing other things.  The interface reminds me of the dash on my old Merc A160.  It has very few buttons and they have multiple functions, but to change the time on the clock I always have to consult the manual.  Less is not always more - something Apple struggle to understand sometimes.  If I was using FCP all the time (heaven would be not having several different jobs) I would probably figure it out - but, because there is nothing intuitive about the interface, I have to relearn how to use it every time I come back to it.  Just like the buttons on my Merc.  I have completed a couple of editing projects in FCP.  But I haven't looked at it for some months.  In between I have been using Resolve (because a lot of my footage is shot in Log mode - something FCP doesn't handle at all - and I have to use a LUT to make the clips usable in the editing process).
    I have a wedding to edit.  Three cameras, three audio tracks on the cameras plus the church PA audio and a Roderick recording from a mic work by the groom.  I would like to choose an audio track and sync the video to that - but I learned last time that is not possible (or not easy).
    I looked at multicam sync clips but I can't see how I can use this to fit my workflow - it requires too many decisions up front and I don't have small clips - I have two 1hr "clips" and some smaller ones from the handheld camera.  I don't want to chop up the "master" clip and I can't see how to easily sync everything together in such a way that I can see it all.   Yes I see that I can choose different angles in a different editor, but I don't want to get into that at this stage - I just want to see all my material in a timeline so I can make major edit decisions first.  Oh I wish I had not thrown out FCP 10...
    So what I want to do this morning is just drop clips into the timeline from the main camera, chop it up and remove the bits of the ceremony that I don't want in the final video and then choose clips from the other cameras to replace the main camera. 
    So, I drop a clip in the timeline.  Its the warmup to the wedding.  People are sitting down.  The organ is playing.  I don't want this in this timelines.  So I trim the clip from left to where I want it to start.  Great.  Except...
    ... the timeline now starts halfway across the display and I have a blank black box to the left.  I cannot, for the life of me, see how to move the start of the clip back to the left margin.  Nor can I imagine why anyone at Apple thinks this is a useful thing to do?
    In between all of this I have the usual Yosemite instability issues and, for whatever reason, Preview keeps crashing so using the FCP User Guide is more or less impossible.
    Any clues?
    And don't say use Resolve on Windows instead.  I don't need much persuasion, and I hate Windows.

    I don't agree with you here.  Resolve is much easier to use - I don't have to try and get into the heads of the developers and its is easy to see how my material slots into the editor.
    I am still trying to get my head around the way FCP organises the material.  Events/Projects?  What are they thinking here?  How does this fit into a wedding video?  I can create meaningful "events" (wedding/photoshoot/reception) etc but why would I?.  Is a "project" just a timeline - a "sequence" in normal film editors?  Why not call it that then?  I cannot figure out what kind of environment Apple were imagining when they came up with this way of organising things?  They must have had some kind of job in mind where events and projects make sense.  The manual is silent on where the clips actually go - are they organised within events?  within projects"  or within both?  Whatever it is, it might be easier to understand what FCP is doing if Apple explained what this structure means and why they have adopted it.  I am left to guess.
    What I can't seem to get rid of is the groups (I have no idea what else to call them) which are just a date and under which my clips appear.  I don't want this hierarchy but I can't see how to get rid of it...   Clips that should be together, but were filmed on different dates, are in different places - and I cannot see how to group them together without these dates imposing another level of hierarchy,  I struggled through the last couple of videos not really understanding where my clips were and ended up with multiple copies all over the place.  Right now I don't know if I have all my footage in the library or not - its so hard to construct a meaningful organisation in this crazy interface.  I just deleted 8 copies of a lapel mic audio track - I have no idea how I got 8 copies of that into this library.  Does FCP just import duplicates without warning?  Its so hard to correlate what is in the library with my folder structure on disk...
    To my mind, this is one project - a wedding video.  And this video will include multiple sequences.  But my clips need to be ordered in such a away that makes sense to me - I am not sure how to do that in FCP, but its easy in file manager.  The clips were shot in various locations on multiple occasions.  But this has nothing to do with the finished product, which will have its own order of things, not necessarily related to the order of shooting.  In FCP (or Resolve) I would have the clips in bins and my various sequences which I could then assemble.   Now I guess these are projects?  They aren't "projects" at all - at least to in my mind.  I don't like having to think about this project (the wedding video) in some weird way which only makes sense to the FCP developers.  Maybe they never filmed a wedding!
    Thanks for the advice re multicam clips.  I came to the same conclusion  but there is an awful lot of stuff to synchronise and I am not confident that FCP will do this in one go.  But now I have to learn and get familiar with the different editing environment for multicam clips.  Oh joy!  I am hoping I can add more clips to a multicam clip afterwards - once I sort out how to get my footage into some meaningful structure without all these surplus dates...  The clips have been imported so that the file structure creates keywords - which would be ok, perhaps, except for this extra date-related hierarchy which means I have to keep expanding the tabs to see the clips.
    As for Synchronised clips, if you read the user guide there is nothing to warn you that this is an audio-only sync.  Or which video track you are going to end up with. "For example, if you select two video clips and three audio clips from different sources that were all recorded during the same take, Final Cut Pro automatically analyzes and syncs the clips together into a new clip in the Browser."  Perhaps, when they wrote this manual, they were thinking this would create a multicam clip.  Or maybe its an old manual - I don't suppose they get updated automatically.  Maybe I better go look to see if there is a newer version on Apple's website.
    I seem to spend a lot of my time undoing the default settings in FCP.  I don't want my footage disappearing into an impenetrable amorphous mass in some hidden library somewhere, so I have to remember to change that default - the wording in the inspector is not very clear and sometimes I find that it is importing the material into its library and creating another copy.  I generally only notice when my backup software suddenly starts copying gigabytes of data to tape...
    I don't want to see my footage an in iMovie layout with no tracks either.  Especially my audio tracks, so I always have to unpack them.  I miss the little buttons to turn off different audio tracks - yes I know there is another way to do this, but its not obvious (as with everything else in this software) and means fumbling around in the interface to find how to do it - and its slower if you want to flip between audio tracks to decide which one to use at any given point.  Its the same with synchronising clips.  You expect to select the clip, right click and get a sync option.  But its in a separate menu under Clip.  Why?  If you want to copy a clip to another library its not under a clip menu - but under the file menu?  Why?  I think its a terrible mess - and I think that Apple introduced a level of complexity to this interface with little to show for it.  I am new to Resolve.  It looks complicated with all its colour wheels and stuff, but actually its very intuitive and easy to use.  And its very easy to structure clips and sequences without having to spend hours trying to figure out how Apple think you should do things.  if you use FCP all the time then fine - you get used to it.  But is it truly a better way to work?   I like structure - it helps me to understand my material - but FCP is anti-structure and forces a virtual schema on its users.  If you like that, well and good - but it shouldn't be compulsory.
    I got my head around using keywords - but I hate it - its just extra work for me and I hate the loss of the direct relationship with my material.  Its very hard to see whether I have used all the material or not and how it all fits together.  Now I have duplicated stuff everywhere and lots of things missing - but no real organisation.  And I have to remember how I keyworded clips to find them - not easy in a big project.  And since I have lots of big clips I have to remember not to change the I/O points without first saving the subclip and assigning a keyword.  Extra work and easy to stuff up.  Its a problem too if you edit a subclass without realising it is just a virtual clip so every instance will be edited.  Sometimes thats a good thing, but not always.  The issue is that this happens invisibly so you have to be very careful working with these virtual clips.  Subclips are safer - you always know whats happening - and that's increasingly difficult when you have lots of subclips which are really the same material but grouped separately.
    Its much the same with all Apple's software today - its all written from some other planet.  I have had to take out a subscription to Office 365, use Dropbox and oneDrive instead if iCloud and download Resolve to deal with my Blackmagic camera.  Its a consumer world at Apple now - and an iMovie view of the world.  Apple like to hide half the functionality because they think it makes things look easy.  Their manuals are useless and their online Help worse.
    And yes, thanks for the Shift-Z.  That works, though finding it in the manual is another matter.  But why this behaviour in the first place?  Is there any reason why you would want your timeline to start halfway across the screen?  Why doesn't the clip just snap back to the left as it would in any other editor?  Its little quirks like this that make this a very frustrating experience.  I am not editing all the time - I am just as likely to be in Dreamweaver, Indesign, Illustrator or Photoshop - or working on business projects.  I don't feel I should have to wade through a badly written user guide or ask basic questions in this forum every time I come back to FCP Pro X - that was never the case with the old FCP.  Its just like the clock on my car - daylight saving happens here twice every year and the time has to be changed.  I always need to refer to the manual.  To my mind that is a crap user interface.
    FCP Pro X has some nice new features.  But its hard to justify this when everything else is so hard to use.  Its like connected tracks.  Why is that an improvement?  I always start with an audio track from my master camera - because its on tape and runs for the whole take - but its impossible (or very difficult) to do this in FCP Pro X.  If I have a jumble of clips and its not clear where they fit, I can't assemble them, in sequence on a separate track - I have to connect them, arbitrarily, to an existing track.  And then undo that connection later.  I have to rethink my workflow every time to try and fit in with FCP Pro X.
    In an earlier life I was a software developer.  The golden rule of applications in business was that you built your application to suit the workflow of the user.  You could streamline it, but not change the sequence unless the business had made a decision to do that already.  I wrote quite a few large applications for various areas of the business - I used them to make sure they worked, and I used the existing workflow.  A user could come back from holidays and know immediately how to use the app to do their job.  A new user could use the app without weeks of training.  Its not hard to write intuitive software - but its impossible if you set out to impose a new workflow or method of organisation on a user.
    Apple seem to have missed this altogether.  FCP will always be a dog, for that reason alone.  I have never used Avid or Premiere Pro, but I imagine no-one else has adopted Apple's upside-down way of doing things.  That spells lots of training issues for anyone adopting FCP Pro X.  And now since you have to work with  colour grading apps, like Resolve, users have to work backwards for Apple and forwards for everyone else, in the same project.
    After this project I am going to look seriously at Premiere Pro - but only if I decide I can't use Resolve on its own for everything.  I have been an Apple diehard for 12 years after being a Windows guru for a decade before that.  I am close to giving up on Apple.  Having to buy Office was very difficult - but the Apple apps have been dumbed down (Pages) or were never up to the mark (Numbers).  I can't use iCloud because it doesn't support half my material so I have Microsoft oneDrive which also goes against the grain.  And I am running Yosemite which means crashes at regular intervals and reboots several times a day.
    I am an Apple shareholder too.  But I beginning to think they have lost the plot.  I hope not.

  • Move clips from timeline to event sub folder?

    Aloha,
    Is there a way to move clips in the timeline that I have cleaned into a sub folder in an event library?
    I come from a non FCP background and still trying to wrap my mind/workflow around the FCP formula.  Generally I clean clips and drop "some" into a "to be used later" folder. 
    Example - While on location I might shoot some location shots while im waiting around.  The locations shots will use in the last 3 mintues of a 25 minute finished project.  When I get to post I edit and clean all clips in the order they are received.  When I find the location clips I simply move them to a folder labled "to be used later".  When I get to the section of the project/timeline were the clips are needed I drag them or the entire folder into the timeline.  
    I see how to make a folder inside an event but I am not able to drag a clips from the timeline to this created folder.  I have tryied to hold down Shift, CMD, OPT, CTRL and have no sucess.
    Thanks you for your time and help.
    Frederick
    Marbelle

    Aloha Fox,
    Thanks for taking the time to answer my questions.  I feel you really understood my concern and gave me some good viable options.
    There is a lot for me to learn and unlearn. I have been editing for over 16 years and most of that time I was using Edius. This is big paradigm shift coming to the Mac and FCPX. 
    The idea for me is to edit the video and move the "to be used later clips" into a bin/folder instead of moving them to the location in the timeline were they will be used at that very moment.  Its just a preference, I know plenty folks would just move the clip to the location.  Edit software is just a tool I have to decide if FCPX is the right tool for me. 
    Thank you again Fox for your time and understanding of my question. 
    Be blessed,
    Frederick
    Marbelle

  • TellTarget to play a movie clip within a movie clip

    I currently have two movie clips in my scene with a button
    that lies inside one of the movie clips. We will call this movie
    clip for the sake of this post "ph." The button inside of ph has a
    rollOver/rollOut movie clip called "Buick_rollOut" attached to it
    as a parked movie clip through tellTarget. Currently Buick_rollOut
    only works if I put the parked movie clip on the same level as ph.
    I want Buick_rollOut to be within the movie clip, ph, that contains
    the button. I want that button be able to tellTarget the location
    of Buick_rollOut within ph. I hope this makes sense. Here is my
    code for the button that lies within ph. (this code only works when
    Buick_rollOut is located outside of ph on the same level).

    Is this code running on the button? What's the name of the
    button?
    Things would be a little clearer if you replaced tellTarget
    with dot notation:
    Buick_rollOut.gotoAndPlay("rollOver");

  • Check if a cell contains specific text

    I am trying to do a check to see if a cell contains specific text (but may also include other text). I thought this might be accomplished with an 'if' statement. Is this possible in Numbers?

    I am assuming the word "carrot" can appear multiple times within the same cell so the COUNTIF function will not work for this case.
    Set up an auxiliary (second) table that is the same size as your "matrix". Each cell in this new table corresponds to a cell in your "matrix". Each of these cells will count how many times "carrot" appears in the corresponding cell of the "matrix". The formula below will count how many times the letters "carrot" appear in that exact order in a cell. In other words, "carrotstick" is also included in the count. Capitalization is not a factor. It assumes your "matrix" top left corner is cell B2 of Table 1.
    Table 2 cell B2=(LEN(UPPER(Table 1 :: B2))-LEN(SUBSTITUTE(UPPER(Table 1 :: B2),UPPER($A$1),"")))/LEN($A$1)
    Copy or fill that formula to the rest of the cells.
    Table 2 cell A1 = carrot (the word you are looking for)
    Somewhere else have a cell that sums the cells in Table 2.
    The formula works by removing all instances of the word "carrot" from the string then subtracting the length of the new string from the length of the original and dividing that by the length of the word "carrot". The result is the number of times "carrot" appears in that particular string.
    You could put a space before and/or after "carrot" in cell A1 to avoid counting words such as "carrotstick" but if "carrot" is the first and/or last word of the string, it will not get counted because that space will not be there in the string.
    Message was edited by: Badunit

Maybe you are looking for

  • G4'15 aluminum/tiger 10.4.11/

    I've been experiencing the strange problem of the computer going to sleep while I'm typing online or offline. I can't seem to connect it to any one thing. It's not the adapter or power connection. The adapter light remains green throughout the proces

  • Image gallery only on iPhone, not on iMac

    Hi, I would like to put some images on my iPhone6 and cancel them on my iMac afterwards. However it seems, iTune forces me to keep them on my iMac as well. Is there a hidden way I don't know? This should actually be a basic and simple thing to do...

  • CCMS Agent registeration issue in Satellite system

    Hi I am doing CCMS alert configuration for my ECC system. Solution Manager is the system we are using for alert monitoring and ECC is Satellite system. I have created the CSMREG user in solman system also successfully placed the generated agent file

  • X2100 M2 hangs on loading /sbin/loader during RHEL 4 ES Update 4 install

    I have this new X2100 M2. I have a RAID 1 setup with two disks. When I boot from the RHEL 4 ES Update 4 (32 bit) install CD, it hangs when loading /sbin/loader. If I specify "linux noapic" it does the same thing. If I specify "linux noprobe" it goes

  • I downloaded FF. but when i open it it always takes me to "getting started"

    in other words, why can't i get to page that is not so introductory?