How to maintain One product cost collector for multiple materials and configuration setting

Hi experts,
my requirement is that i want to maintain one product cost collector for multiple materials ans also i want to know the configuration setting for the same.
I have used KKF6N but it is not working in my case. I went through KKF6M also but there i found multiple cost collectors.
please guide me in the same.
Thanks in advance.

Hi Shripad,
you cannot assign same  Product cost collector to different material.
Because you creating cost collector for material combination of material /production version,material /Bom Routing.
so please create individual cost collector for every material.
if you have any query kindly revert back.
Please mark the answer as helpful if it is helpful to you.
Because march 5 onwards scn has stopped awarding points to liked content.
Starting now: No more points for likes on comments/replies
Thanks & Regards
Sandeep Kumar Praharaj

Similar Messages

  • How to use one pop up window for multiple buttons and input fields?

    Hi Experts,
    I have created a pop up window that will be opened from multiple buttons in the same view. There are input fields that the data will be populated from a pop up window.  How can I set up which button that a pop up window is opened from? I also would like to populate the data from a pop up window to the input field next to a clicked button. There are 6 buttons and 6 input fields that share the same pop up window. I would very appreciate your responses.
    Thank you,
    Don

    Hi,
    Try creating 2 context attributes, one in your component controller and the other in the pop-up view. Bind the attribute of pop-up view to the component controller attribute.
    In the main view, on click of every button set a unique code in the controller's context which helps you in identifying the button clicked. Since u have created a binding to the pop-up view attribute the value flows from the controller.
    In the init method of your pop-up view, check the value of the attribute and based on that display which ever UI elements are required.
    Eg:
    On Button 1 click set value "B1", Button 2  value "B2" etc. In the init() of pop-up view u can check the values and perform the required operation:
    if(("B1").wdContext().currentContextElement().getButtonIdentifier()){
    else...{
    Hope this helps you.
    Regards,
    Poojith MV

  • Product cost collector for sales order related production

    Hi Friends,
    This is Azam and here i am new to this discussion forum.
    we are in situation that use diffrent variant for configurable material in sales order related production,
    I would like to have some information about use product cost collector for this kind of sales order related production,
    also I want to know difference between prelimanary cost estimate or cost estimate for sales order?
    Please co-operate me.
    I would be highly appriciated if you can respond at the earliest.
    Thanks
    Azam

    Hi,
    Here, for each sales order item, you will have sales order cost estimate. This enables the system to compute the variances once the actual costs are booked against the production.
    In the case of preliminery cost, we get the preliminery cost for production order as a plan cost and is not being used for the computation of variance but only for comparision purpose which is very marginally used.
    Trust this helps much and do encourage our efforts!
    Cheers!

  • Abolish product cost collector for production order

    Dear Experts,
    we use for some production order types the product cost collector. Now we plan to abolish them and change the settlement for production order. Which things do we have to pay attention? Do we have to finish our running production orders first or is it possible to change customizing during running production process. Thanks for your hepl!
    Best regards
    Steffen

    Hi Ajay,
    thank you for your answer.
    We have tested two variants:
    1. new order type, so we can process two separate settlements, for orders with PCC and the new orders without PCC. After archiving of all prodorders with pcc, archiving of pcc it should be possible to switch back to old order type.
    2. change customizing without finishing existing orders, settlement for existing orders, all orders which already have been processed will be settled by pcc (status pcc usage in order header) We have not be seen any strange system behavior.
    We use the pcc collector for different order types in different plants and want to abolish plant by plant. In this time the pcc will still be customized/exists.
    Best regards
    Steffen

  • How to show one prompt that works for both Graph and Table views?

    Have an analysis with a graph and a table. The information in the table and graph are different so cannot use a pivot table w/graph.
    Each view has a view prompt for Year and Month (tried both separately and also as one combined column ‘201001’) so user can easily change months.
    Too much data to use the slider because it will not graph.
    Page prompt does not allow user to switch dates easily.
    Since this will be a link from a dashboard, do not think making this a dashboard from a dashboard would be good so not a dashboard prompt.
    Saw something about Master Detail linking, but does not appear to work with graph prompts.
    How would the analysis be configured to show one prompt that works for both the Table and the Graph?
    One prompt would change both the table and the graph.

    Master Detail Linking almost works.
    Table view can show all the results without error.
    Graph view needs to be limited or errs with "Exceeded configured maximum number of allowed input records."
    Is there a way to set the initial Master Detail Linking value to the top sorted value?

  • How to use one dynamic connection managers for multiple parallel data flow tasks

    hi there:
       I have 6 databases residing on the same server. What I want to do is  call a store procedure with identical name on each database dbo schema and transport results to a centralized place. The key is to have those SPs run in parallel instead
    of in sequence as each SP may take around 10 mins to finish. 
    The simplest way is to create 6 OLE DB connection managers and create 6 DFT tasks. However, I do not want to maintain 6 OLE DB connection managers as there is a chance to have more connection  managers.
     What I did so far is to create a OLD DB connection manager and use expression to set up connectionString properties so that it will get populated by variables at run time. It is fine when running all SPs in a Foreach Loop Container. However, it takes
    around 60 mins to finish.
      When I try to run it in parallel ( basically created 6 DFTs but use only one Dynamic Connection Manager), the connection string gets confused therefore all DFT tasks failed.
       Does anyone here have some experience on this topic?
    Thanks
     hui
    --Currently using Reporting Service 2000; Visual Studio .NET 2003; Visual Source Safe SSIS 2008 SSAS 2008, SVN --

    Yes, basically, on the connectionString property of ONE OLEDB, you are using an expression to supply value and this expression is pointing to a variable. 
    In this case , you can update this variable from a table which contains many connection strings. It's good if you want to execute Store procedures in a sequential order. When in parallel mode, this will cause issues as connectionString gets overwritten. 
     I am thinking about using script task to exec sp.
     The whole idea is that I do not want to maintain a large number of Connection Managers. 
    Hope it helps
    --Currently using Reporting Service 2000; Visual Studio .NET 2003; Visual Source Safe SSIS 2008 SSAS 2008, SVN --
    So you are not able to run parallel executions using same conn mgmr, even with dynamic connectionstring, is that correct? Yes, script task will be a way to go if you wish to execute it in parallel, you may connect to SS and query the proper conn string with
    SELECT/WHERE clause in each script > pass it to a script variable > use that script variable and execute the proc. This will require only two things to change in each script, the WHERE condition to get the conn string and the proc name (you may even
    get the proc names the same way you get conn string) and everything else will be same. Let us know how that goes. 
    Hope no two or more procs doing insert/update/delete on the same tables.

  • How to use one pageflow to cater for multiple display?

    Hi, I trying to use one pageflow to display different kind of contents because the logic behind the retrieval is similar except that different parameter(string) us passed in for different content retrieval.
    How do i achieve the above? thanks in advance :D
    Cheers

    What do you mean by "display different kind of contents"? do you mean you want to display PDF/HTML/Image based on certain parameters or You are using different media like PC/PDA etc.
    In both cases you can redirect to different success page based on your query parameters.
    if(param.equals(image))
    forward image.jsp
    if(param.equals(pdf))
    forward pdf.jsp
    else
    forward html.jsp
    Hope it helps

  • How to make one album show up for multiple artists?

    I'd like some albums to show up under multiple artists in iTunes in Windows.  Say for example "The Basement Tapes" by Bob Dylan and The Band.  It would be nice to see this album under both these artists.  Or to have "Two Men With the Blues" show up under both Willie Nelson and Wynton Marsalis.  Can I do that with iTues?  If so I haven't figured out how.  It would be nice if using a delimiter such as as comma, slash of semi-colon would signify to iTunes that it should lists those songs under all artists but it doesn't.  At least commas didn't work.  Any help would be appreciated.

    iTunes doesn't have the ability to do what you want, i.e. to define multiple separated values in a field and then have the item show up when looking at a selection based on each of those values. "Bob Dylan", "The Band" and "Bob Dylan & The Band" are three distinct values that can't be linked together. Sort values can change where in a list things are displayed but shouldn't be used to attempt to merge different values as results are undefined and unpredictable.
    tt2

  • Report to analyze multiple product cost collectors

    Hi,
    Is there any report which can be used be analyze more than one product cost collector (material) on actual and target cost and usage,
    Basically just as KKBC_PKO can be used to analyze a single material at a time
    Is there anyway to use it for more than one material ?

    Built a Z-Report
    The Z-report can be reused for any other sap instance also

  • Essence of product cost collectors

    In REM
    what is essence of product cost collector (KKF6n), {As I understand production cost collectors
    are cost carrying elements}, but needs to have more insights like how it captures
    production costs ( i.e through activities, price maintained in accounting view....)
    Does it make any difference if product cost collector is executed before MRP run, or it has
    to be executed only after MRP run

    Dear Eshwer,
    1.Product Cost collector is one of the master data in REM scenario.
    2.This product cost collector is no where related to MRP.
    3.Product Cost collector is used as a cost object in REM scenario,which means all the cost will be
    booked under this product cost collector for that material.
    4.Whatever the confirmations that are done in MFBF or MF41 or MF42N,the cost will get debited or
    credited accordingly for that material and the impact will be seen in the product cost collector.
    5.This product cost collector will be having an order number which will be used for order settlement and
    variance calculation.
    6.For creating a product cost collector you will require a production version.
    7.so whenever you do an assembly or activity or component backflush,the cost will be booked under
    this product cost collector.
    8.So as such there's no relation between MRP and a product cost collector.
    I hope this pints will help you to some extent.
    Revert back with your further queries.
    Regards
    Mangalraj.S

  • REM Product cost collectors and Production version

    Hi All,
    Can some one pls let me know
    What are the product cost collectors in REM and how to create the product cost collectors ?
    What is the production version and the difference between production version and controlling version?
    Thanks & Regards,
    Bujji

    Dear Bujji,
    A product cost collector is a cost object in Product Cost by Period that collects the periodic actual costs incurred in the production of a material. It can be created in txn KKF6N.
    [Product Cosr Collector|http://help.sap.com/saphelp_47x200/helpdata/EN/08/77ba810a1611d3a6b900104b55d538/frameset.htm]
    [Product Cost Collectors: Collective Entry for Repetitive Manufacturing |http://help.sap.com/saphelp_47x200/helpdata/EN/08/77ba810a1611d3a6b900104b55d538/frameset.htm]
    A production version determines the various production techniques that can be used to produce a material. It defines the following information:
    Alternative BOM for a BOM explosion
    Task list type, task list group, and group counter for assignment to task lists
    Lot-size restrictions and period of validity
    A material can have one or more production versions.
    It can be defined in the Material Master (txn MM02) in one of the following views:
    MRP 4
    Work Scheduling
    Costing 1
    The costing version is a different issue. It is a costing parameter and is used to save several cost estimates for the same material, with the same costing variant and the same costing date (e.g. in oder to cost the material several times with minor changes without creating new costing variants).
    BR,
    Antje

  • Old material overwritten by new material code in Product cost collector

    Hi SAP Gurus,
    How can I work around if a product cost collector with material XXX has been overwritten by a new material YYY when creating the KKF6N.
    Both material code having the same plant, same orde type,same production version but just different material code.
    When saving the preliminary costing for the product cost collector for material YYY, the system prompted me the order number 700022 which is already existing and created for material XXX.
    By right, this shd not be happened but indeed it did.
    Now when displaying the report S_ALR_87013127 - Order Selection, the report showed the new material YYY was created with order number 700022 but the content of the data was for old material XXX.
    Now my problem is how can I get back the product cost collector for material XXX as the original order number 700022 was meant for material XXX and not mat YYY.
    And also when executing backflush (MFBF) for old material XXX, the error msg prompted as 'content of order 700022: Mat YYY transferred to interface (IMSEG):Mat XXX due to this I can't backflush material XXX.
    Really appreciate your expertise on this urgently.
    many thanks!

    problem due to system bug, have to log to OSS for help.

  • Question in Product Cost Collectors

    Hi All,
    I have one question in Product Cost Collectors.
    We are using REM and we have multiple products with same BOM routing. Is it possible to assign several materials to to one Product Cost Collector inorder to reduce number of cost collectors.
    For example, for routing we can create  a Group and assign serveral materials to a group.
    Thanks and Regards
    Purushothaman

    Hi Purushottam,
    In REM, it is required to create it for every material.
    Even if material has more than one production version, need to create separate Product Cost Collector.
    Some more explanation on Product Cost Collector -
    u2022 Object in cost accounting used in Repetitive Manufacturing.
    u2022 A separate product cost collector can be created for each production version or material. The collected costs are settled to inventory at the end of the period.
    u2022 The functions performed for product cost collector during the period end closing process include :
    u2022     Work in process (WIP) caculation
    u2022     Variance calculation
    u2022     Settlement
    u2022 In Repetitive Manufacturing, all costs attributed to the production of a material are collected on a product cost collector and settled periodically (period-based Controlling).                                                             
    u2022 The product cost collector is settled periodically according to the posting period  (for example monthly) .                                                       
    u2022 For a material , product cost collector is made for each  version
    u2022 The actual cost collected can be viewed through product cost collector.
    Hope it is clear now.
    Srini

  • Planned issues against a Product Cost Collector

    Hi, I am very new to Product costing and currently looking to find out the planned quantities that are there against the actual quantities that are issued through a Product Cost Collector for producing a Semi finished good maintained in Kg. Any help?
    Thanks
    Deepankar

    Hi
    The issue is solved.
    The problem was on our end that some of the transports were missing. Ajay was right and those transports were missing.
    Thanks Ajay.
    Really appreciate it

  • Profit center change in product cost collector

    Hi All,
    I would like to know what precautions we should take for mass changes of profit center corrections in the "Product Cost Collector".
    I want to make  same profit centers in material master and in product cost collector for that we need some  report on "Product Cost Collector" or table name so that we may compare the profit center in material master and Product cost collector in order to make them in sink.
    Regads,
    Raj

    Hi All,
    My query is from which T-code of product cost collector or any table by i get matrial and profit center combination.
    Also i would like to know any precaution if any change of profit center in material master for product cost collector (privious is X cost center and now i am changing to say Y).
    Regds,
    Raj
    Edited by: RBS123 on Jul 15, 2009 8:24 AM

Maybe you are looking for

  • Program not working in background

    Hello, I have a Z program that uses open dataset stmts that writes the file out into a specified directory in the appl server path. The prgram runs fine in foreground.  But when scheduled in background it fails. The job logs are : Dierctory does not

  • Dreamweaver suddenly stopped and can't get it started anymore

    While i was working with dreamweaver it all of a sudden stopped and closed. I couldn't get it to work anymore. So I restarted my computer. No luck. I tried to reinstall dreamweaver, but after 20 minutes installing it came back that it couldn't be ins

  • FYI: R.I.P. MobileMe

    The 'grace period' for downloading from the iDisk and migrating the account has now ended: any files still on MobileMe have been deleted and migration is no longer possible.

  • Help With Third Party Wireless Cards

    Hello, I am needing some help with third party wireless cards. I have purchased and installed the Linksys WMP54G wireless PCI card into my G4. From what ive seen on the discussions page here, this card is known to work with the G4s in place of the mo

  • Downloaded app to wrong computer

    I recently received an email from Apple that I had been gifted an app. Without realizing the consequences, I downloaded the app to my Work computer (WinXP Pro). But all of my Apps and Music are stored on my Home computer. Now if I try to sync to my W