Hi Sursh
Create a transaction varinat through SHD0.
For the department field, activate the Requred check box field.
Then activate the variant.
Regards
SAP Student
Similar Messages
-
How to make the Deprtmnt field in the cost center master data as required ?
Dear Experts,
I want to make the Department field in the cost center master data as required field.....how do i do it?
regards
SureshHi Eli,
Thanks for the quick reply
while creating the Cost center itself the field should come as required field........can that be met with this enhancement?. Because the transaction code being used int the enhancement is for change mode but i want this feature in create mode itself.
thanks
regards
Suresh -
Deleted cost centre master data log
Hello,
Does anyone know if there is a way/report to see which cost centre master data was deleted, i.e. something like a log file?
I found a report that can show change documents, but it does not include deleted cost centres.
Thanks in advance!
RenéHi,
Refer Note: 1090861 KS02: Change documents for time periods deleted/Create
regards
Waman -
"Region" field in Cost center master data needed as mandatory
Hello Gurus,
I would like to ask you where exactly in SPRO we can customize the field "Region" in Address tab in Cost center creation as a mandatory? so far its only optional
is this possible?
thanks in advance for your help.
HanaHey Hana,
According to [this thread|Re: KS01 , Field status Cost center master data;, you will need a user exit to accomplish that. -
Company code field in cost center master data
I am trying to create some cost centers, but noticed that the company code field is not available for entry in the cost center master data. In other words, the company code field does not appear or is hidden. My understanding is that an entry in company code field in cost center master data is mandatory. Can someone advice as to what setting is missing?
Hi MG,
Appearance of the field "Company Code" in cost center master data depends on the following point...
In Controlling Area settings in OKKP, if you have opted for single company code, then, whatever the cost center you create under this controlling area is obviously belongs to that company code only. So, system will not display the filed "Company Code" in cost center master data.
If you have opted for cross-company code controlling in OKKP settings, then, when you create a cost center in that controlling area, then the system will give the field "Company Code" in cost center master data so that in which company code you need to create the cost center.
I hope u got it...
Srikanth Munnaluri -
How to Make the Name 1 field in cost center master data as compulsory
Hi,
We have requirement from the client to make the Name 1 field in the adress tab of the cost center master data as a compulsory field when the cost center master data is accessed through KS01, KS02 T code.
There is also existing cost center master data in SAP system for which NAME 1 field is blank. How the issue of the existing master data can be dealt if there are no data NAME 1 field in the existing cost center master data.
regards
Partha BHi
This path refers to exit COOMKS01.... (For Cost Center Enhancement using Custom fields)
For the above requirement, I belive COOMKS02 is the right one.... (Custom checks before saving)
Br, Ajay M -
How to Add new fields in Cost element Master data transaction: KA01/02/03?
New fields ZORGUNIT(CHAR 4) is needed to be added in a separate tab. The data should be updated in cost element master data trx.
>
Sr!^^ wrote:
> Hi
>
> try with PM01
Is there any relevancy in your answer?
Have you read the question? -
Remove Mandatory field in Cost center master data
Dear All,
I want to remove the mandatory person responsible in the cost center master data. How to do this
Regards
Vasanthahi Vasantha,
as far as I know, this is not possible. If a field is mandatory or not in cost center master data is determined by the system.
hope this helps
ec -
How to make 0datefrom a compounding key to master data having single key ?
Dear Experts,
I am trying to add 0DateFrom to compound a master data object via RSD1.
In the Compounding tab, i keyed in the 0DateFrom and tried to activate but system does not allow :
Message :
Characteristic ZCONxxx: InfoObject 0DATEFROM is not allowed in the compound
Message no. R7596
Diagnosis
InfoObjects 0DATETO 'Valid to' and 0DATEFROM 'Valid from' are not allowed in the compound.
System Response
Characteristic ZCONxxx can not be activated.
Procedure
Define attributes or the texts for the characteristic as time-dependent. The fields 'Valid from' and 'Valid to' will then be automatically included in the master data tables or text tables.
I then followed the advise on from the message and ticked the DateFrom attribute in the master data. This attribute is existing one. But the system says :
Characteristic ZCONxxx: Attribute 0DATETO cannot be used w. time-dependent attribte
Please advise. I must compound the master data with datefrom. How can it be done when BI disallows?
Thanks in advance.
regards
Pascal
Edited by: Pascal Gabin on Aug 15, 2011 10:47 AMHi
In SAP standard reminders are triggered based on requirement type 103 (dunning). Instandard it is assigned to output type MAHN. You can create a new requirement by modifying requirement 103 which considers confirmation entered in PO. Then it can be assigned to the reminder output type in output schema.
Regards
Antony -
Suppress business area field in cost center master data(KS01)
Hi
As the client is not using business area, he don't want the business area field to appear in the cost center creation screen(KS01).
Is there any work around to this
Regards
AravindHi Aitipamula,
Have you looked transaction code <b>OB65</b> to deactive the business area?
Also you can technically use transaction variant (t/code SHD0) to supress the field. For more information, please check this link.
http://help.sap.com/saphelp_nw04/helpdata/en/7d/f639fb015111d396480000e82de14a/content.htm
Hope this will help.
Regards,
Ferry Lianto
Please reward points if helpful. -
Company Code field now shown in Cost Center Master Data
Hi
I am new, I configured CCA. Created Controlling area and versions. When I created a cost center company code field not shown. I think one cost center assined to a one company code but in cost center master data Company code field not shown. I want to cost center company code specific. I using ECC6
Pl help.Hi,
When you will assign additional company codes, the cost centre created now, by default will be assigned to the existing company code, and for the new one - you will have to define cost centres again. So, everything is fine, do not worry.
Regards,
Eli -
How to make the Profit Center Field Mandatory in Cost center Master Data
Dear All,
Please let me know how to make the Profit Center Field mandatory in Cost Center Master Data as well as my Internal Order Master Data?
Thanks in advance!
Regards,
Rajeswari Shankar.Hi Rajeswari,
You can modify message number KS096 to "Error" via OBA5. Thus, the users would no be able to save a cost center without entering a profit center. (Depending on your release you can make KS096 modifiable by implementing note 486781.)
Concerning the internal orders (transaction KO01), you can run KOT2 and set Profit center field as required entry in "change field selection" section.
Regards,
Greta -
How to find out Plant wise Cost centre/ Profit Centre
Hi Guru
My problem is How to find out plant wise cost centre. To be more clear------ I want to know what cost centre is valid for a particular plant
My mail Id. [email protected]Hi,
Then this explains the problem.
The message number starts with a Z and so it is not a standard SAP message because SAP does not link cost centres or GLs to Plants
But also, the message doesn't indicate a problem with the link? it is stating that you should check that the GL account and the PROFIT CENTRE are valid for the posting for the period???.
It looks like someone has written a custom modification in your system and so we are , unfortunately, unable to help because the data would be in custom tables and not standard SAP tables.
You can only solve this problem by speaking to someone within your own company who knows the mdofication that has been done.
Sorry
Steve B -
Change the profit centre in the cost centre master after a year
Hi All,
Could you'll please let me know whether it was possible to change the profit centre in the cost centre master and if i did what will be the implications.
Thanks and Regards,
VandanaRefer transaction code OKEG.
You can maintain master data for cost centers, cost elements, activity
types, and business processes with time dependencies. You can make
changes at any time for any given time interval. Data storage also takes
place with a time reference. In this way, a master data record can have
multiple database records storing different information.
The smallest interval is one day. To ensure data consistency, you cannot
change each field daily. The timeframes in which you can change a field
depend on the field functions, which are fixed by the system and cannot
be changed. Master data maintenance includes an automatic check for each
field's time-based consistency, resulting in individual time-based
maintenance for each field.
The following dependencies are supported:
o Not time-based
o Day-based
o Period-based
o (Fiscal) year-based
This function provides an overview of the time dependencies of
individual master data fields during master data maintenance, along with
checks and storage of consistency timeframes. You find this information
in the "Time dependency" column.
If you use fields requiring characteristics greater than one day and
which are changed for the system lifetime of the object, the system
automatically creates a new database record for this processing
interval, and changes the time-based validity of existing records. The
change is logged in the master data record with the time reference.
However, a great number of changes in multiple timeframes will result in
a correspondingly great number of data records.
Fields which you can change freely (indicated in the DAY column) can
possess different time dependencies only if you mark them additionally
as historically relevant. This activates the time-based updating for the
records.
Object 1000 has one master data record created with a fiscal year of 12
periods and the cost center name AAAAAAAAAA. During master data
maintenance, you change the cost center name in period 5 to BBBBBBBBBB.
The system reacts with one of two options.
o "Name" is marked as historically relevant. The existing master data
record for periods 1 - 12 must now become three records:
1000 01-04 AAAAAAAAAA
1000 05 BBBBBBBBBB
1000 06-12 AAAAAAAAAA
o "Name" is not marked as historically relevant. The existing master
data record remains intact, with the name changed for the entire
existence of the record:
1000 01-12 BBBBBBBBBB
Edited by: Ravi Sankar Venna on May 19, 2009 4:03 PM -
How to change company code in cost center master
Hi,
Can anyone throw me the light about how to change company code in cost center master? User make some mistake. They maintained wrong company code in cost center master and there are some transactions already posted to this cost center. I would appreciate all attention and point will be reqard. Thanks much
Best Regards,
BirdHi,
The cost center master data fields have time dependancy. Following are the details of time dependancy.
You can maintain master data for cost centers, cost elements, activity types, and business processes as time-based. Changes to any other time interval are possible at any given time. Data storage is also time-based. In this way, you can store multiple database records for a master data record, each holding different information.
The time-based dependencies are determined by SAP and cannot be changed. The following dependencies are possible:
Not time-based
Day-based
Period-based
Fiscal Year-based
Cost Center's company code field's time based dependancy is Fisal Year Based and hence, the company code can be changed on cost center only on new fiscal year. And hence, system will not allow changing company code on cost center master data until new fiscal year if transactions are posted to the cost center.
You may have to think of work around :
1) Create new cost center with correct co code
2) Repost the cost posted to old cost center (with wrong co code) to the new cost center.
Explore the possibility of this work around on your system with the key user and then see whether this option works out.
Hope this helps. Pls. assign points if this is helpful.
Regards,
Chirag
Maybe you are looking for
-
Report is showing dupilcate records in Excel and correct records in PDF.
Hi, I have a problem, when i run the query of report in toad then count is 24 and same records are coming in PDF, RTF and HTML format but some duplicate records come when same report is run in excel or delimited format.
-
I've been having problems syncing my iPhone to my address book on my mac. Ive recently purchased an iPhone and am currently updating all my contact list & entering new ones. As a member of mobileme I am using the option of updating on the contacts on
-
Since upgrading to ios8 i can only delete two text message conversations at a time. I then have to close messages and reopen to delete any more than two. Has any one else seen to experienced this problem? Any solutions?
-
Can i use fcpx on os 10.8.5
due to other apps i have on my mbp, i'm not quite ready to update to mavericks. can i use fcpx on os 10.8.5?
-
I just updated itunes to the current 7.0.1.8 version. Unlike the previoius version, after auto-updating when I dock my ipod, the "My ipod" disappears. The challenge this creates is I now have now way of right clicking on the icon to safely remove it