How to make lot size dependent in Material master?

Hello Experts,
               I created a Material master for a Finished product in Pharma industry and in work scheduling screen, under the section "In house production time in days", I see that "lot size independent". What change(s) in my settings in the Material Master can change it to "lot size dependent"?
Does any changes in the  "Lot size data" section in the view "MRP1" have any effect on this field?
Also one more question:
Where is the Usage for BOM first specified? Is it in material Master or when creating a BOM?
Thank you.
Message was edited by: Visu Venkat

Hi Visu
No,Lot size data in MRP1 view will not have any effect in inhouse production time in work scheduling view.
You need to maintain the base qty in work scheduling in order to get the scheduling time for lot size dependant.
BOM useage is first specified only during BOM creation.
Suppose if u maintain the BOM useage in material master before creation of BOM, then still u can create a BOM with different useage. During these case, there will be always inconsistencies.
Hence Useage is always specified first during BOM creation.
Hope u r clear now.
Regards
Vijay

Similar Messages

  • Lot size dependent / independent

    Hi, please advise when the system uses this lot size times data in mrp4 view? Where we need to specify that whether lot size dependent or independent need to select? When the system uses this data and when the system uses the planned delivery days and in-house production days which is in mrp2? Pls advise.

    Dear,
    Planned Delivery Time use for  external procurement Like raw materials.
    In-house production time use for in house manufacture materials like HELB and FERT.
    In-house production time is independent of the order quantity.
    Lot size depnendent timing calculate from the routing.  It is calculated byadding the lead times of all operations, the float before production, and the float after production.
    You schedule the routing for a base qty The in the scheduling results screen click the button" scheduling results"
    You will get the results screen in days.
    In that screen at the botton there is abutton update material master.
    After this go to CA96 There update the material master.
    Please refer this link,
    Re: set up time dependant and independant of order qty
    Regards,
    R.Brahmankar

  • How to make default Currency  depending upon plant in table entries

    Hi,,
    How to make default Currency  depending upon plant in table entries?
    I am making entries in SM30.
    I have the following fields in z table.
    plaant , material,month.year,PFvalue,Currency.
    Can  some body throw light for this issue,please?\
    I am familiar  with modification-events.
    With Regards,
    Jaheer

    Hi,
      In PBO, within a LOOP, table control is filled via a Structure/Work Area.
      In that module, code as follows,
    LOOP AT SCREEN.
        IF WA-FIELD1 = C_1 AND SCREEN-GROUP1 = C_G1.
          SCREEN-INPUT = 0.
          MODIFY SCREEN.
        ENDIF.
    ENDLOOP.
      Here, WA is a strcture & FIELD1 is its field, like that...
      I already did this.
      Check it out & Reply.
    Yours,
    R.Nagarajan
    We can

  • How to make free size in undotablespace

    how to make free size in undotablespace
    how to remove expiried values in undotablespace??
    Edited by: user10896195 on Mar 4, 2011 11:23 AM

    an undo tablespace is simply a tablespace where Oracle decides how many RBS's to create
    and how big they should grow to.
    Under the covers -- it is still JUST ROLLBACK SEGMENTS -- no different. It is just that
    WE decide how many and how big instead of you.
    If you have an undo retention period that is very small, there is nothing to motivate us
    to extend an rbs -- hence you have the same problem. You want to up the undo retention.
    Bear in mind that this parameter (retentation) is a SUGGESTION from you to us. It'll not
    cause us to "blow out" undo space - if you constrain us to x megabytes -- we'll stop.
    See
    http://asktom.oracle.com/pls/asktom/f?p=100:11:::::P11_QUESTION_ID:6894817116500
    Edited by: Santosh Deshmukh on Mar 3, 2011 11:42 PM

  • How to make components' size constant?

    I have a newbie question for you. How to make the size of components (button, combobox, etc...) constant? I mean they keep the same size as the users change window's size.
    Thanks.
    Sraiper

    You need to use a layout manager that respects the minimum and maximum size of the components and set the minimum and maximum sizes to be the size that you want the component to be. FlowLayout respects minimum and maximum, and so does BoxLayout. BorderLayout and GridLayout don't respect the min or max sizes. You can usually get what you want with a combination of layout managers. If you gave me a better idea of how you want to layout your components, and what you want the resizing behavior to be, then I could give you some more specific recommendations about the layouts you should use.
    Try making some ascii drawings.
    Example:
            small size window              large size window
        |                       |  |                                      |
        | []check     o radio   |  |  []check                             |
        | []check     o radio   |  |  []check                   o radio   |
        |             o radio   |  |                                      |
        |  ___________________  |  |                            o radio   |
        | |_____textfield_____| |  |                                      |
        |  ________   ________  |  |                            o radio   |
        | |_button_| |_button_| |  |                                      |
        |_______________________|  |  __________________________________  |
                                   | |____________textfield_____________| |
                                   |                 ________   ________  |
                                   |                |_button_| |_button_| |
                                   |______________________________________|Make sure you put
    before and
    after your drawings so the forum doesn't mess them up.

  • How to make the Region Fild in Vendor Master as a Mandatory?

    HI All,
    can anyonde guide me about:
    How to make the filed: "Region" in Vendor Master a Mandatory while entering the Data.
    PL.help.
    Thanks,
    Roopan.

    Hi
    Go to T-code OBD3.
    Check with account group you use for the vendor.
    Double click on the account group.
    Double click on the general data and on then on the address group. You can maintain region here as Mandatory.
    Reward if this helps
    Thanks

  • How to make Buyer and Planner fields in Master Items Form Required without

    How to make Buyer and Planner fields in Master Items Form Required without using personalization?
    1) Steps to Reproduce
    Under Application Developer Common Modules responsibility,
    1) Query Region MTL_SYSTEM_ITEMS
    2) Click on Region Items
    3) Add Buyer Id and Planner Code attributes with Required checkbox checked.
    4) Bounce iAS server and JVM and clear java cache
    5) Changes not taking effect
    Current Application Release: 11.5.10.2 (3460000)
    Current INV Rollup: INV.J RUP22 (9878808)
    Current WMS Rollup: WMS RUP19 (9951502)
    Product Installation List :
    Product Installation: 11i.BOM.J: Installed
    Product Installation: 11i.EGO.E: Installed
    Product Installation: 11i.ENG.I: Installed
    Product Installation: 11i.INV.J: Installed
    Product Installation: 11i.PO.I: Installed
    Product Installation: 11i.WMS.G: Installed
    client needs to make the Buyer and Planner fields under Inventory->master Items form to be required.
    He tried using the Application Developer Common Modules responsibility, to find the Master Items Region and added the Buyer Id and Planner Code attributes with the Required check-box set to Yes. He bounced the iAS server and cleared java cache, but the changes do not take effect.
    client does not want to use form personalization.
    Can you please provide more assistance for using Application Developer Common Modules responsibility?
    Edited by: jemar98 on Aug 9, 2011 1:44 PM

    A forms developer could make those fields required with a CUSTOM.pll extension if you didn't want to use forms personalization. Both are considered customizations to standard functionality and may or may not require rework after patching or upgrades.

  • How to cancel serial no. profile from material master ?

    dear all SAP experts,
                I have 1 mateial in which i assign serial no. profile in work scheduling view in material master. So how can cancel serial no. profile from material master ?
    Suggest me
    regards,
    Nitin Nerkar

    As long as no serial numbers exist for the material you are able to cancel or change the serial number profile.
    As soon as serial numbers exist for the material and you want to change or delete the serial number profile, you must note the following:
    The previously assigned serial numbers are no longer suited to the current serial number profile.
    The indicator for the stock check may have changed. If this is the case, you can copy the profile settings in the serial number using the executable report program RISERNR9. However, you should only start this program once the changes have been updated in the material master record.
    You can no longer delete the serial number profile in the material master record. Instead of this, you create a serial number profile without serialization procedures in Customizing and enter this in the material master record.

  • How can we update insp. type in material master on mass basis.

    Hi Team,
    We are using LSMW for material master. I was told that we can not update inspection type  through LSMW. Is it possible thru LSMW if not, how can we update insp. type in material master on mass basis.
    Is there any T-Code to update mass chages for inspection type in material.
    Please suggest.
    Thanks

    Hi,
    You can use  TCode -QA08.
    This Tcode have facility to Inspection Type activation in single  / mass material.
    Also useful for deactivation, special setting at Inspection Type level.
    Regards,
    JM

  • Please guide me how to include storage location to existing material master

    Hi Guru's,
    Please guide me how to include storage location to existing material master....
    please provide step by step process or provide any documentation that would be helpfull to me...
    please let me know of my question is not clear..
    Thanks in advance and will give full points....
    Srinivas...

    Hi
    First :- You can define the storage loctions in the plant under the customization :- SPRO -> Enterprise Structure ->Definition -> Materials Management ->Maintain storage location
    Once defined under the plant, you can create the same storage locations in the material master
    Second :- Under SPRO -> MM -> Inventory -> palnt parameters, for your plant check the field " Create Storage locations Automatically" . This will lead to create new storage locations at the time of GR, even if you have not maintained under step 1.
    Hope it answers your question.
    Regards,

  • Different fix lot size depending on the production version

    Hi all,
    I have the next scenario:
    2 production versions. 2 different fix lot size por each. So:
    Prod Version 1 - Fix lot size 200
    Prod Version 2 - Fix lot size 300
    I created the Quota Arrangement just to make SAP to take my favourite version. And trought the quota, I can define the lot size for each version. BUT.
    If I change the version in the order or in the planned order, the quantity don't change.
    So: How can I manage 2 different fix lot size for 2 different product versions? If I change the version once the order is created, how can I do the system change de quantity to the right one?
    Thanks in advante
    << Please do not offer points >>
    Edited by: Rob Burbank on Oct 1, 2010 2:53 PM

    I have n't  tried this scenario,
    This is my Idea
    Create a two production version
    for ex: lot size 100 to 1000, set the rounding profile qty as 1000
    for lot size 1001 to 99999, set the lot rounding profile value to 5000
    BY this way u can get the two lot based on the rounding profie
    Expert; please correct if i am wrong
    Edited by: Sundaresan . E. V on Oct 1, 2010 4:12 PM

  • How to make window size same as linked file?

    Hi
    I understand how to make the link and have it open in a new
    window upon click, but how do I make this map open in a window that
    is exactly the same dimensions as the map png file itself, as
    opposed to opening in the same size of the browser window.
    http://www.enhancedwireless.net/Company/contact.shtml
    and click on the MALAYSIAN driving directions.
    Thanks
    KB

    That works fine and is quite acceptible, but it won't work
    for the initial
    default page - which is what the question is about.
    Murray --- ICQ 71997575
    Adobe Community Expert
    (If you *MUST* email me, don't LAUGH when you do so!)
    ==================
    http://www.dreamweavermx-templates.com
    - Template Triage!
    http://www.projectseven.com/go
    - DW FAQs, Tutorials & Resources
    http://www.dwfaq.com - DW FAQs,
    Tutorials & Resources
    http://www.macromedia.com/support/search/
    - Macromedia (MM) Technotes
    ==================
    "818g" <[email protected]> wrote in message
    news:egm8m5$gd5$[email protected]..
    > I'd do it with javascript. Highlight the link text in
    Dw, type
    > "javascript:;"
    > in the link box, hit enter, open the Behaviors panel,
    click on the Add
    > behavior
    > button (plus sign) and choose "Open Browser Window" from
    the menu. In the
    > Open
    > Browser Window dialog box you can define the width anf
    height of the
    > window.
    >

  • How to make the Sourcelist checkbox in Material MasterPurch view- Mandatory

    Hi All,
    Can anyone please let me know how to make the Source list checkbox mandatory in Material Master.
    Ie for example if i am creating and ERSA Material, i want to make the source list option mandatory by default whenever i create an ERSA Material. I know the option to make the Source List mandatory at Plant Level.
    But i want to make source list mandatory at material. By default..it has to appear mandatory on the Material. I want to do this
    specially based on Material Type. Ie i want this to be mandatory only for specific material types i chose.
    Please suggest me the possible ways.
    Thanks
    Sridevi

    Hi, Get Source List Field sel. group from OMSR which is 16 by default change it to new field say 210, then goto OMS9 enter Field sel. group 210,  Check for field 'MARC-KORDB' & change it to mandatory for Field reference ERSA, if you cannot find there you need to create new field reference & assign it to ERSA in OMS2 &

  • How to make page size %100?

    Hi everyone,
    I am asking for you help how to change the size of page (artboard)
    I want to design a photography portfolio, and when website is opened, I want sizes of entire page to be %100 width and height, like in http://sisila.dphoto.com
    Does the software only allows us to generate pages like 600x800 or let me say 400x500?
    thanks in advance

    Hi!
       Nowadays, i think is not possible without importing the catalyst project in Flash Builder and editing the code. Please, correct me if I'm wrong.
    Gabri <U>

  • How to change the current period in material master

    hi everybody,
    as i have installed sap 4.7 ides version on my home pc for practice , but hwenver i am creating the new material  master in the system , i observe that in accounting1 tab the current period is 12 2002 , how should i change the current posting period so that i can start the transaction in current uear 2009 and then later i can work in 2010 ....
    i have tried  the transaction mmrv, mmpv, mmpi through some resources but i didnt know how to do the settings in the system in IMG (SPRO) kindly help me through , i have wasted lot of time in this..
    i hope MM team will help me out of this...
    AMIT BATHLA

    Hi,
    Check in OMSY Transaction that, Which current month and year is having your comapny code.
    and go to T.Code MMPV
    enter Next Month of that cureent period and Year
    and Execute. You find the message that your current period has changed.
    Do the same process month by month till reaches to current period and year.
    Let me know if you have further queries.
    Padma.

Maybe you are looking for

  • Blue Screen when starting up

    I am unable to startup...it either freezes with the gray loading spinning wheel or goes all blue and does not let me continue. I haven't been able to start up in safe mode, all it does when i try is take longer before it freezes. furthermore, I am un

  • Installation of HANA SP7 failed with hdbnsutil call failed.

    Hello, I am trying to install HANA to play around with it a little.  I tried to install using the tool hdblcmgui since the old method was deprecated and during the Installing SAP HANA database step, the install fails with the following error message.

  • After restart or power off and on. total recent apps and data(call,sms history) loosing.

    i am using BlackBerry Z10 with 10.3.1. OS. 2-3 times i was tried. when ever i restart my Mobile, i am loosing recent apps and data like call and sms history. eg. today is 25th Apr 2015. today i was restarted my mobile. after restart data and apps are

  • Blinking page

    My CS5.5 Dreamweaver has a problem. When I'm in design mode and typing in a page it blinks with every keystroke. I think I'm going to have convulsions if I don't get this fixed. What could be causing that?

  • Does it exist a JDK 1.4.2 for Linux X86 64bit (not Itanium!!)

    Hi Gurus, I'm installing a NW7.0 on a Linux (x86_64). As you know a JDK 1.4.2 needs to be in place before running sapinst. However on SUN website there is no JDK for that type of machine. The itanium version doe snot work and if I installed a X86 (32