How to map revision level materials to already created inspection plan?

Dear All,
I have created single inspection plan for many existing raw materials. Now it has been found that each raw material have different revision level as well as valid from date.
My inspection plan is created on 02.07.2014 and each raw material has different revision level with valid from date which is also very old (like 11.03.2012 for revision level 09).
My Requirement is:  how to correct my inspection plan?,  so that it will work for each assigned raw material and there will not be any material revision level wise problem created for the inspection lot so that my inspection lot should be created in REL status in QA32 transaction i.e. inspection lot is assigned automatically as per standard SAP functionality.
Thanks,
Narresh

Hi Amol,
Thanks for your reply.
In this business scenario, we are not creating inspection plan for each raw material because there is similarity in inspection for 40-50 raw materials and total number of raw materials are around 500. This will be very difficult and unnecessarily data creation in the system.
As per my understanding revision level is for material master revision and if material master changes then how it affect so much on inspection plan? also is it means that for every revision in future we will have to create new inspection plan?  hence I believe that if I will make back dated inspection plan for raw materials then it may work. Is my understanding is correct?
Expecting much better solution from QM experts.
Thanks,
Narresh

Similar Messages

  • How can I verify an apple id already created without attaching a credit card?

    how can I verify an apple id already created without attaching a credit card?

    Why do you need to verify it? Have you received an email telling you to click a link to do so? - if so it's very possible that it's a scam designed to trick you into entering your credit card details. If you have received such an email don't follow any links in it. If it's not addressed to you by name it's unlikely to be from Apple.
    You could copy and paste the email into a post here so that we can have a look at it - remove your own email address when you do this.
    If there is some other reason you want to verify the ID please give more details.

  • How to map the node which i have created dynamically into the view

    Hi All,
    Many thanks to all ur answers in advance.
    I have created a node dynamically.I want to display the fields which i have fetched in that node.
    i dont know how to map the node which i have created dynamically into the layout of the view.
    Other than Using ALV is there any other way to do.
    for example usin table control

    Hi,
    use the reference variable of view to access the corresponding UI element and then use the method of that UI element to do data binding with context node.
    for ex:
    Context node = flights
    element = inputfield, ID = inp_name
    data view type ref to if_wd_view.
    data lr_inp type ref to cl_wd_input_field.
    lr_inp ?= view->get_child_element( ' INP_NAME' ).
    use following methods of input field to define the data binding.
    SET__DDIC_BINDING( )
    BOUND__PROPERTY( ).
    BOUND__PRIMARY_PROPERTY( ). " for input field it is value property.
    Get the reference of view from wddomodifyview method as importing parameter(view). Store this parameter as controller attribute.
    Thanks,
    Rahul

  • How to create inspection plan in mass for material

    Dear Guru,
                    How to create inpection plan for material in MASS, usually we will create inspection plan in QP01 but in mass for more than one material how to maintaain? Please help
    Regards
    Karthik.

    Hi raja
    refer following lonks
    QM- LSMW FOR INSPECTION PLAN
    Re: CEWB:Inspection Plan upload
    bapi for qm inspection plan
    Regards
    Sujit

  • Assignments of materials and vendors to inspection plans for the plant 1500

    Hi to all,
    Please give me solution for make assignments of materials and vendors to inspection plans for the plant 1500.
    Thanks,
    NAgesh

    hi gang,
    try to make usage decision ,kindly check in material document which you have created while making the GR, check in which storgare location you have specified and try to transfer the stock from quality to unrestricted.and also make a note on batch number also if you have activated the batch management
    regards
    thyagarajan

  • How to find revision level

    hi my requirement is that,
    i have to get the revision level for each material number in a specific plant,
    is there any function module which can get this data,
    actually this revision level has to be brought from table AEOI table,
    but its key fields are
    AENNR
    AETYP
    OBJKT
    i donot know how to get these fields.
    can some one help.
    thanks & rgds.

    hi charlie,
    thanks for the response,
    actually my problem was that the table AEOI had the value to be extracted but i didnot have input fields to retrive that value, what all i had were material number and plant,
    so i was asking how to find the link between matnr, werks and  fields  aennr, aetyp, objkt.
    anyways, i found from sdn that, we can pass matnr as objkt, and aetyp as 41( for material) ,
    and out of the records retieved latest would bare the correct revlv.
    thanks.

  • Revision level not updated in Delivery inspection

    Dear QM friends
    I am facing the below issue when implementing delivery inspection.
    We are maintaining Engineering Change Number concept and it is applicable for Material Master, BOM and Task lists. So our inspection Plan will always maintained with Change Number for all inspection type.
    This Change number concept works fine in GR inspection (Inspection type 01) in following way. Revision number was maintained in Schedule Agreement Line Item, additional Data screen (In administration BOX). When GR was made inspection lot generated and shows the Revision number for the material in inspection lot display QA03 (Header). If plan having same change number system assigns the Plan and releases. Also this revision number can be viewed in QA32 screen itself.
    This is failing when creating inspection lot for a delivery. Origin 10 and inspection type used was 10. Inspection plan maintained with change number. Schedule agreement (Sale order) having revision number in the same tab of above said. Even though in lot display QA03 it was not appearing. So the same is not coming in QA32 screen. But inspection plan was attached automatically.
    We need same change number (Revision level) concept for Delivery inspection also. Kindly help us, i have missed any masters, or config or any steps i have to do to solve this issue.
    Thanks n Regards
    Madhan

    Any one kindly help us to resolve the issue.
    Thanks & Regards
    Madhan

  • How can we place an image in already created inline graphic frame?

    Hi,
    AIM::
    To place an image in the inline graphic frame.
    OBSERVATION::
    As i have analysed the snippet Runner,i came to know that it allows to load the placegun with the file(in my case image). but in order to place it,we need to click on the document..and then the image is placed at (0,0) of the page(I suppose Indesign does it automatically).
    what is needed,is to place image in already created inline graphic frame. i have created a inline graphic frame at some position in the story,but now i required to place image in this created frame.

    I have the same problem. Can you give me a short code sample for that.
    I have an image and want to place it in the currently selected frame...

  • Create Inspection plan at once for many materials through QP01. Possible?

    Dear Friends,
    Is it possible to create Inspection Plant for more than one material at onece through QP01 when operation activity and Characteristics are same. I will change the Characteristics specifications afterwards.

    As suggested in earlier reply you can assign multiple materials to one inspection plan.
    But you may still need more than one plan because of
    1. UOM is maintained in Inspection plan header. So you have to create different inspection plan if you receive materials in different Unit of measures.
    2. Usage is also at header level, so depending on configuration, usage for 01 inspection type may be different from usage for 0101 inspection type.
    If you like the user exit approach.
    1. Create a dummy material and assign default inspection plan to this material.
    2. In the user exit change the inspection plan assignment.  Assign inspection plan from this dummy material.
    Form us this was a very useful approach during testing or for new material where inspection plan was not created in time.
    Once this default inspection plan is assigned, inspection lot is released even without inspection plan. If we need,  we can always change the default inspection plan in QA02 transaction before RR
    AK Marwadi.

  • Report to see all materials assigned to an inspection plan

    Hi,
    Is there any way to list all materials with a inspection plan assigned to them?
    Kind regards,
    Kristoffer Pehrson

    HI,
    another way could be the use of QP03.
    Select your inspection plan. In the plan overyou press the button "material assignment". YOu should get a listof all materials that are linked to the plan. But you should keep an eye on thegroup counter, as all group counters and assignments are shown.
    Another way could be to build query with SQ01.  
    Hope that helps.
    Jens

  • How to Convert a Hard Cover Book already created to a soft cover book

    We created a hard cover book, not realizing we needed to select hard cover vs. soft book before creating. When we went to buy the book we realized there are no options at the shopping card to make it a soft book. How can we make this a soft book without having to recreate the whole book. (It took 2 days and is 71 pages...that's a lot of "do-over..." Thanks.

    just for safety duplicate the book first then select it and go to themes and select the softcover this time - it will warn about possible text loss which usually does not happen but since you have a copy you are fine even if there is an issue
    LN

  • SSRS - How to enable drilldown after report is already created?

    I forgot to check the enable drilldown checkbox while creating a simple matrix report. Is there a way to edit this without creating the whole report again ?

    Hi blastoSO,
    According to your description, you have created a matrix report without selecting “Enable drilldown” item. Now you want to edit it and make it to be an drilldown report(as you selected “Enable drilldown” when creating). Right?
    In Reporting Service, when you create a matrix report with wizard, if you select “Enable drilldown”, it will automatically set each child group can be toggled by its parent group. If you didn’t select “Enable drilldown”, you don’t have to recreate a new
    report, the only thing you need to do is set visibility for each child group manually. We have tested this situation in our local environment. You can follow these steps below:
    In report design view, click your matrix to select it.
    In Row Group pane, right click on a child group, select Group Properties.
    Click Visibility tab, choose “Hide” in When the report is initially run, select the parent group from dropdown list in Display can be toggled by this report item.
    Repeat step2 and step3 for each child group. Save and preview.
    Reference
    Add an Expand/Collapse Action to an Item
    Best Regards,
    Simon Hou

  • How to add the Drawings while creating Inspection Plan

    Dear all,
    As we can attach the files in QM01 - Create Notofication thru "Choose an Object" .
    In similiar way can  "Choose an Object" object can be attached to Insp. plan or any other way to attach drawing.

    in case of inspection if want to see the the drawing during Result recording then
    You can create a document in Cv01n & attach  drawing document ........
    then
    1.use it in Inspection Method & attach inspection method in the inspection lot.
    2.use it in PRT as document  & attach it in inspection.
    In case of notification DMS( document mgt system-CV01n) can be used & attached in Notificaton.
    Regards
    Sujit

  • Synchronizing Material Master revision level across multiple plants

    Hello,
    If an organization uses material master revision level to maintain the details of material's validity across different plants then we see a material master with different revisions in that organization. Now I  would like to understand the impact of this practice in big organizations , is it advisable to have a material master with different revisions in different plants? , if not then which is the best way to synchronize these material masters ( with different revision level ), which are already in use?
    Bets Regards,
    Avinash
    Message was edited by: Ulf Petzel

    Hello Ulf,
    Thanks for your reply, the actual issue is..
    There are two companies; both are using the same material.
    We are building a central system and synchronizing the materials from all companies.
    While synchronization, we found that revision level are different across companies.
    1.      Should we avoid using revision level in our organization?
    2.      If I can find the validity of a material with change no + material + plant, then what is the purpose
             of the revision level?
    3.     What will be the impact, if we remove the entire revision level across all companies?
    4.     In real world, across different organizations, how revision level is synchronized across companies or at least in the central system.
    Please let me know your valuable inputs.
    Thanks
    Sridhar  

  • Material revision level

    Hi,
    What is the procedure to assign Revisin level to already existing Material .
    and tables where Revision level is reflected
    Thanks

    My requirment is to   assign new  Revision level to material and change revision level of already existing revision levels of material.  and to display Purchase order with material with revision level.
    for already existing material with  revision level , Purchase Order and Delivery Schedule is showing Revision level.
    (Revision level is assigned using CC11 and stored in table AEOI).  it is updated to table ekpo.
    for PO and Delivery schedule , m picking data field from EKPO-REVLV.
    and it is working fine. PO an DS shows REVISION LEVEL field.
    ( above case was during implementation )
    but for last one year no one updated the revision level  of material.
    now requirement is to update the material with revision level.
    But the Problem when i try to assign new revision level to material or want to change the already existing revision level of material then ,it is assigned to material with CC11 and CC12 and  shown in table AEOI . but revision value is not updated to table EKPO for field REVLV . so by thins  PO and Delivery schedule is coming without  revision level.
    how to reflect revision level assigned to material to table EKPO ? may be m missing some step ...
    i checked OS54 table
    my OS54 settings are
    REV LEV ACT                   (active)
    Ext. Revision Level            (inactive)
    Higher REV Level              (Active)
    Rev Lev Automatically      (inactive )
    Effect  Profile                    ECN00001
    Please give me kind suugestions ....
    Thanks

Maybe you are looking for

  • Validation in Tabular form column

    Dear All, i am using tabular form (Apex 4.1) to create new project users. i want to apply validation on column of tabular form. i have multiple entry in tabular form .i want to iterate throuh all records to check validation but my code is not iterati

  • Memory leak using GWT 1.4 and JDK 1.5

    We are running the following: OS : Solaris 5.10 WebLogic version: 10.0 JDK : Java(TM) 2 Runtime Environment, Standard Edition (build 1.5.0_14-b03) Java HotSpot(TM) Server VM (build 1.5.0_14-b03, mixed mode) GWT : 1.4 Oracle : 10g We have found memory

  • I click on links in websites and nothing happens.

    I click on links on Facebook Fox News among others and nothing happens, When will this get fixed? == This happened == Not sure how often == About 2 months ago.

  • Flash Media Encoder Live Problem

    FME locks up good !  FME freezes . FME Stops sending streaming audio . // I hope this is posted in the correct forum. I'm using Adobe Flash Media Encoder Live 3.0.1.5963 . Windows XP Pro SP 3 Pentium 4 3.06 ghz 'dual core' cpu 1.5 GB rambus 800 mhz M

  • Trouble shoot update rules error??

    Hello Experts, After i created an update rules, when i tried to activated the update rules, i encountered the error message as below: "IC=MA1SD_0 IS=MA1_IS_12VCITM error when checking the update rules Message no. RSAU461" can anyone advise how shall