How to migrate a local calendar to a WebDAV server?

Because I do not like to sync using iCloud I installed Maverick Server to have a local server for my calendars. The other devices in my home can then connect to it. I found it easy to set up using this webpage and it works with a test calendar. I add something in iCal with my MacBook and seconds later it appears on my iPad.
But I am puzzled on how to migrate my local calendars in iCal to the server. I tried to export them to the desktop and then import them into the server calendar I see in iCal. Then iCal gives this warning:
Should I proceed? I do not want to damage 12 years of iCalendar data. I have backups, but preventing a mess is always easier.

Surprisingly, this morning all calendars showed up in my iPhone. Apparently there is a delay.
But now there is another issue with the error:
"The server responded with an error.
Access to “event from years ago” in “the second added calendar” in account “local” is not permitted.
The server responded:
“403” to operation CalDAVWriteEntityQueueableOperation."
[Ignore] [Try Again] [Revert to Server]
Each event starting with the beginning of that calendar (years ago) seems to generate an error. It will take a day to click on Ignore for all those events.
Will ask this in a new thread. For now the issue this thread is about is solved, thank you. I also updated my profile, except for my iPad. No 'edit' option next to that one. Strange.

Similar Messages

  • How to delete a local file in the presentation server.

    Hi All,
    How to delete a local file in the presentation server. As we do using 'delete dataset dsn' in application server. How can i achieve this. My requirement is after uploading file using gui_upload, i want to delete that source file. Please let me know, how can i achieve this.
    Thanks in advance.
    Regards,
    Vishal

    data: l_rc type i.
      data: f_name type string.
        move 'c:\YourFile.txt' to f_name.
        CALL METHOD CL_GUI_FRONTEND_SERVICES=>FILE_DELETE
          EXPORTING
            FILENAME             = f_name
          CHANGING
            RC                   = l_rc
         EXCEPTIONS
           FILE_DELETE_FAILED   = 1
           CNTL_ERROR           = 2
           ERROR_NO_GUI         = 3
           FILE_NOT_FOUND       = 4
           ACCESS_DENIED        = 5
           UNKNOWN_ERROR        = 6
           NOT_SUPPORTED_BY_GUI = 7
           WRONG_PARAMETER      = 8
           others               = 9
        IF SY-SUBRC <> 0.
        MESSAGE ID SY-MSGID TYPE SY-MSGTY NUMBER SY-MSGNO
                   WITH SY-MSGV1 SY-MSGV2 SY-MSGV3 SY-MSGV4.
        ENDIF.

  • HT4968 How to sync a local calendar with an iCloud calendar, automatically.

    I have several iCloud calendars including one for the daily business events. I use a local copy (generated to export/import) for sync with other systems like a BB. The export/import step is a stop gap since, first, its manual and, secondly, its not really synchronizing. Hence, my question: is there a SW or a batch process which snycs iCloud calendars with a local calendar??
    Thanks
    MSt

    You can get 2-way synchronization between iCal and google calendar, but you have to start with a google calendar and import that into iCal. You can't sync an existing local iCal calendar with google.
    Here's what I would suggest:
    1. Export your local iCal calendar as a .ics file.
    2. Make a new calendar on google calendars.
    3. Upload your .ics file so that it populates your new google calendar with the events from your local iCal calendar (do this via google calendar's web interface).
    4. Then use iCal to sync that newly-created google calendar with iCal.
    5. Now you can use iCal to edit events in this new google calendar, and they will be synched with the google calendar. You can also edit events using the google calendar web interface, and they will be synched with the version visible in iCal the next time you open iCal or ctrl-click "Refresh" that iCal calendar.
    6. You can keep your original local iCal calendar, or delete it, once you know your new setup is doing what you want it to.

  • How do I access group calendars on 10.8 server from a calendar client?

    Hi,
    I have a brand new installation of 10.8.2 . I installed the server app and started Calendar, Contacts, DNS, File Sharing, Mail, Open Directory and the Wiki services. I created a group with some users in it. I also created a group wiki and enabled the calendar for that wiki. The user group has r/w access to the wiki. The web interface to the wiki works from a client 10.8.2 client system. I can edit the group calendar through the web interface. I created an account in the Calendar application that connects to the server and shows the users' calendar. I altered the server path to /principals/__uids__/wiki-GROUPNAME/.
    The calendar shown is still that for the user and not the one of the group. Hence my question: how do I access group calendars on a 10.8 server from the calendar application on a client?

    yrmomsadic wrote:
    Forgot to mention, you can techinically force it to work, but iCal breaks it for some unknow reason, taking it back to the users account after a day or two.  The best work around has been to create a new user, named the group name, and then allow delegates to access the calendar.  This however screws things up with the iphone calendar, as it didn't/doesn't handle delegates.  Again, hoping Apple comes to their senses on this.
    You can still delegated calendars on iOS, but the setup is a little tricky.  You have to add an entirely new calendar account, and enter the full ugly url with the users uuid.  It would be so nice if iOS just supported CalDav delegation.

  • How to migrate Planning from Production to Disaster-Recovery server?

    We are using Planning 11.1.1.3 Oracle repository. Presently our DR Planning Application name is different than production's name, and the DR's Windows server names are different from Production's. Otherwise, all other configuration the same.
    How do we migrate Planning from Production to Disaster-Recovery server? We stopped Planning on DR server. Then we exported production planning Oracle repository and imported it to DR Planning. We restarted DR's Planning. DR planning seems to be running fine, but I am afraid to click "Refresh Planning" on DR Planning - it might update Production server. So how can I be sure DR and Production planning are disconnected ?
    Is there anything we need to do? This method seems to be faster than migrating with LCM.
    Edited by: Essbase Fan on Oct 18, 2010 10:11 AM

    You are definitely go about it the correct way, if you are migrating the whole planning application I have to agree it is a safer and quicker route.
    The connection information to essbase is stored in the planning system database/schema so as long as you have not migrated that then you should be good to refresh.
    To put your mind at rest, log into the planning application and edit the datasource associated with the application then you will see where the essbase server is it is going to refresh.
    Cheers
    John
    http://john-goodwin.blogspot.com/

  • How to migrate the whole SAP environment to another server.

    Hi!
    We have to discontinue a SAP Server as it is aging and on disk space. We are running SAP 4.7 SR1 1.00 in this server.
    <b>Now my question is; in the new Server how I will dump all SAP data of previous Server. </b>I am going to install SAP $.7 SR1 2.00 IDES in new Server on Windows 2003 and Oracle 9.2.
    Also, will the programs written for R/3 40 1.00 IDES will match or work in R/3 47 2.00 IDES ?
    With regards,
    Pratip Bhattacharyya
    <b></b>
    ([email protected])

    Hi! Mike,
    Thanks for your effort. But let me tell you the scenario in detail.
    We have a server dl2kdv01. In this Server SAP R/3 4.7 SR1 100 IDES (Kernel 620)is running. Due to hardware problem and disk space problem management has decided to move this SAP System to a  new Server dlwsdv10 where only Solution Manager is running. Ours’ is a Dev. env. SAP systems are running on Windows 2003  Server with Oracle 9.2 DB.
    Now as I cannot find R/3 4.7 SR1 200 IDES. So I have downloaded R/3 4.7 SR1 2.00 IDES (Kernel 640).
    Now my question is,
    1. If I install the downloaded version than how I will add the database of old SAP to the new one.
    Whether I have use transport client method or any other system. I need full step-by-step procedure.
    2. Whether all programs and adapters designed in the earlier version will fully compatible to the new SAP System.
    Hope, I have clearly describe my requirement.
    You can directly mail me also.
    With regards,
    pratip Bhattacharyya
    [email protected]

  • HT4968 How can move one local calendar to iCloud?

    I just upgraded to Lion and would like to push my older  calendar to my other iOS deviced with iCloud. Hope someone can help me!

    Found a reply on the blog! Sorry: I'm just new to these communities.

  • How to send a local PDF file(on presentation Serv) as attachment in a mail.

    Hi,
    This is urgent requirement..
    Please help.. Some scanned document is saved as PDF  file locally (on Presentation Server) that i want to send as attachment in mail.
    I tried with SO_NEW_DOCUMENT_ATT_SEND_API1 Function Module but
    It is just sending the file as attachement, but when i open that file into mail..it is not opening. Is there anythign so that i can just give filepath and that file can go to mail.
    I am selecting the filepath in selection screen but in FM SO_NEW_DOCUMENT_ATT_SEND_API1  there is no option of giving the file path. So it is not taking right file.
    Is there any other function module ?

    http://www.sap-img.com/abap/sending-email-with-attachment.htm

  • How to migrate html file (workspace homepage) from one server to another

    Hi,
    Does any one know how to move a html file that is attached as homepage for Workspace from one server to another server?
    When I try using Export option, I dont see this file to select.
    Thanks in advance,
    PM

    You can use LCM functionality.
    Thx

  • How to migrate the whole Oracle Applications from one Server  to New IBM eS

    We are on 11.5.10.2 with IBM/p670 servers.
    We want to migrate the whole oracle Applications 11.5.10.2 to new IBM eServer p5 590.
    what is the best approach to migrate the whole Application.
    Best Regards
    Zia

    Rapid clone is there
    Manually also you can do
    Copy all tops
    Ensure tns connectivity to oracle home by tnsnames.ora entry change
    make changes in context.xml
    remove entries in FND_NODES for old servers
    run AC
    (Above steps do for DB tier then CM and then AdminTier - supposing admin and DB are diff nodes)
    Start services
    This should do the work
    Sunil Choudhary
    http://www.onelife.in
    Message was edited by:
    Sunil Choudhary

  • Migration of local SLD to Central SLD on different host.

    Hello Experts,
    We have migrate the local SLD existing on the SAP PI System to a new Central SLD on a different host on SAP Solution Manager system.
    I followed the OSS Note 720717, which contains the description of the changes that have to be exectued in the SAP XI/PI Environment, during the SLD Migration. This note does not give any details of the description of changes for the other SAP Systems such as SAP ECC, BI etc registered in the SLD.
    Can anyone provide the OSS Notes, SAP Doc URL or the steps on how to migrate the local SLD existing on SAP XI/PI System to the new Central SLD on the SAP Solution Manager system.
    Thanks for help in advance.
    Best Regards,
    Haleem

    Firstly
    I recommend to avoid having 1 SLD for multiple clients - like Solution Manager, BI, ECC
    This is because clients may end up having conflicting requirements for the same SLD
    - for example the small user group for Solution Manager may have a flexible and easy going policy on J2EE downtime
    - but if you take down the Solution Manager J2EE that houses the SLD and PI uses this SLD - then you could have a severe affect on PI useage
    Secondly
    Although you can migrate content - this still does not guarantee the target landscape will work
    - you may still need to manually re-implement target landscape configuration
    let me give you an example
    SLD 1 is being moved to SLD 2
    Portal 1 is pointing to SLD 1
    Even if you migrate the content of SLD 1 - including the ECC and Portal technical system landscape information
    Portal 1 is still pointing to SLD 1 - this then needs to be manually re-pointed to SLD2
    and that might not be all the complete steps either !
    The complete steps of migration from the client side may not be available  (I have found only steps to
    migrate SLD content not migrate client use of the SLD)
    - they may only be available as the documentation for the original configuration steps required to step SLD and the client
    - therefore when migrating SLD you must go through the client setup documentation for SLD and check your
    target landscape is consistent
    Lastly - other considerations include
    Lets say you also export model and CIM content from SLD 1 to SLD 2 - this means SLD 2 has an import line from SLD 1
    - if you decomission SLD1 then you need to switch the import line which is not recommended - this could cause severe problems and may require you to create a new import line to upload content from SAP /swdc (which you need to keep the SLD bug free and latest definitions)
    Just a few thoughts on issues you may encounter
    Best wishes
    Stuart

  • Local Calendars to iCloud

    Community,
    I am using SyncMate to sync my calendar from my corporate Android phone to my Mac. That works fine. The content of the Android calendar is synced to a local calendar in iCal.
    Unfortunately the local calendars are not snced into the iCloud.
    Is there any way how to sync these local calendars to iCloud or is there a way to sync my Android to the iCloud calendar of my iCal?
    Tanks for all your comments
    Oliver

    Thanks Sjazbec,
    you are right. But with help of SyncMate I can sync my lical iCal with my Android. The next step is the problem.
    In my iCal I have the iCloud calendar and the local ones. SyncMate dous sync to a local calendar but not to the icloud calendar.
    Regarding SyncMates FAQs the icloud calendar doesa not allow changes from outside of iCal itself. The local caleendars are not synced with the cloud. My question is if there is a way to sync the local iCal caldars with the cloud.
    Kind Regards
    Oliver

  • How to create local calendar?

    At times of Snow Leopard I had a local calendar and several calendars from my Exchange account.
    At that time I created Automator-based processes and entered them to my local calendar to be executed at specific intervals.
    After first syncing with MobileMe and then migrating to iCloud, my local calendar dissappeared and the "process" schedules have been moved to MobileMe and then iCloud.
    However, those process schedules can only be executed on my iMac and I DONT WANT them to be synced to my other devices (MacBook, iPhone).
    So I need my local calendar back.
    How can I create a local calendar on my iMac?
    Thanks for all hints...
    Matt

    Roger, you made my day!
    I did miss the command "New Calendar" in the "File" menu (or however those menus are called in english. have a german OS).
    Instead, I always tried to create a new local calendar via the  "Account" settings - which was absolutely stupid!
    However, when exporting those Automator based entries and trying to re-import them into my local calendar, the "possibly dangerous" Automator actions have been removed.
    But I could open those (recurring) entry in edit mode and just "switch" it to my local calendar without losing any information.
    Thank you so much for your hint, which lead me to the right way!
    Matt

  • How to migrate local iCal data - iCal Server 2?

    Hi folks,
    my topic already says everything: How can I migrate my local iCal calendars to iCal Server 2 without having to touch each appointment?
    (10.6.2 Server + iCal Server 2 is properly running and well configured in iCal)
    Tnx,
    Christian

    I found the solution
    1. export the local calendar you wish to migrate
    2. import the exported file again
    3. you will be asked in which calendar you wish to import -> choose the server-side calendar
    that's it!

  • How do I move a calendar from iCloud back to a local calendar?

    I've got a number of calendars that are stored in iCloud.
    Now I would like to make them local calendars again, i.e., make them appear in the category "ON MY MAC".
    How can I do that? (without loosing any dates)
    TIA,
    Gabriel.

    Try a new post in the iCloud forum where they handle such things.
    DALE

Maybe you are looking for