How to Migrate MS Project Server 2007 to 2013

Hi
Can any one share some reference for migrating Project Server 2007 to 2013.
As in general process--
We can take the backup and and restore it in 2013 environment.
How to migrate Portfolio Server?
After restroring any steps need to be followed.
Please guide.
Thanks
Geeth If you feel that the answer which i gave you is Helpful please select it as Answer/helpful.

Hello,
For Portfolio Server 2007 options, review this guide:
http://www.microsoft.com/en-us/download/details.aspx?id=20815
Also see:
http://blogs.technet.com/b/projectadministration/archive/2010/07/21/anouncing-project-portfolio-server-2007-migration-documentation-to-project-server-2010-just-released.aspx
Paul
Paul Mather | Twitter |
http://pwmather.wordpress.com | CPS

Similar Messages

  • 2 Problems after migration Project Server 2007 to 2010

    Hi Everyone!!
    I have 2 issues after migrate MS Project Server 2007 to Project Server 2010, in fact i had a lot issues, but i can solve almost all, so after solve all issues, just is pendings 2 issues very rare:
    Backgrounds:
    Migrated from: Windows Server 2008R2 - SQL Server 2008 R2 - Proejct Server 2007 with WSS 3.0 - All updates are up to date (CU is up to date) and all platform is ok
    To: Windows Server 2008R2 - SQL Server 2008 R2 - Project Server 2010 SP2 - SharePoint Server 2010 SP2 - All updates are up to date (CU is up to date) and all platform is ok
    3 Servers in the Farm, ---->  1WFE-1WAPP-1DB
    Issues:
    In the Project Center, some migrate Project don't show the icon with image about project documents, risk and issues although that project effectively have documents , risk and issues
    In "Server Settings" , in section "Operational Policies"  in "Project Sites" almost all projects don't show the URL with Project Site
    For the issues 1 and 2, i tried some things:
    Re publish all projects (approx 700 projects) with a script via PowerShell available in technet
    Run the Wizard Again
    Rebuild Solution
    Restart the all Servers in the Farm
    Restart Services ----> IIS - Project EventService - ProjectQueue - SharePoint Timer
    and  i can't solve it yet!!!
    Please Any Ideas?
    Erick Gutiérrez PMI Membership #ID 2089740 MTCS - Microsoft Project Server Managing Projects

    Have you restored content DB successfully?
    for point 2 have you performed:
    have you synchronized project site under server setting -->  operational policies --> Bulk Update Project
    Sites 
    http://pwmather.wordpress.com/2012/10/08/projectserver-2010-bulk-update-project-site-issue-ps2010-msproject-sp2010-sharepoint/
    after doing this publish all the project which are having issue it may solve your 1st issue.
    You can check if below condition is applies to you (PWA 2007)
    You may need to use the WSS site re-linker tool –
    now built in to Server Settings in PWA as “Bulk Update Project Sites”.  If you have changed URL die to a different port then re-linking should get your sites in order. In upgrade scenarios the “Previous Site Path” Web application might show as a GUID
    in the drop down – however it still works and will re-link the sites.
    http://technet.microsoft.com/en-us/library/cc197498(v=office.12).aspx
    kirtesh

  • Project Server 2010:- How to add Own Workspace filter in workspace web part like project server 2007

    Hi All,
    I am using project server 2010.
    Can some one advise me how can I add Own Workspace filter option in workspace web part like project server 2007 which is showing all projects name page by page. There no filter option available. I am not sure if there is any out of box feature. 
    Thanks in Advance..

    Nitin,
    PS2010 shows by default the workspaces you have permissions to. Unfortunately, there is no more filtering options available.
    The only solutions are to write a custom webpart, or develop your own SSRS Report, which you can customize the way you want.
    Refer to Paul's excellent blog post on this topic here:
    http://pwmather.wordpress.com/2011/08/05/custom-projectserver-project-site-workspace-view-in-pwa-ps2010-ps2007-epm-msproject-ssrs/
    Cheers,
    Prasanna Adavi, Project MVP
    Blog:
      Podcast:
       Twitter:   
    LinkedIn:

  • Steps to migrate Project Server 2007 from SQL Server 2005 to SQL Server 2008?

    We need to migrate Project server 2007 from SQL Server 2005 to SQL Server 2008.
    1. Is it as simple as doing backup and restore of databases and pointing Project Server to the new DB server? Or there are some specific steps that should be followed?
    2. Article at
    http://technet.microsoft.com/en-us/library/dd207290(office.12).aspx is about moving databases from one DB server to another (same versions). At one place, it mentions to
    backup all databases but at another place it mentions that
    You should only back up the Draft and Published databases from the source database server.
    What should be done when moving from 2005 to 2008?
    Regards,
    Amit
    Gupta

    High Level step you can get this form  Tech net or MSDN too
    Shut down the SharePoint servers (App / Web)
    backup all of the SharePoint and Project
    Server databases from the SQL 2005 server
    copy these over to the new SQL 2008 server and restore all of
    the databases with the same names
    script out all of the logins used by SharePoint/PS from the SQL 2005 server and create these on the SQL 2008 server
    script out the Delete expired sessions SQL job from the SQL 2005 server and create this on the SQL 2008 server - or create them manually on the SQL 2008 server
    repoint the SQL server DNS Alias from the SQL 2005 server to the SQL 2008 server, if SharePoint and Project Server was installed using the actual SQL server name and no alias, you can create a DNS alias for the old SQL 2005 server name that points to the SQL
    2008 server. This is so that the SharePoint servers can still connect to the same SQL server name
    Start up the SharePoint servers
    kirtesh

  • Copy Custom toolbar from one instance to another in Project server 2007

    Hi,
    I am currently using project server 2007. We have a number of instances in our Project server enivoronment. Is it possible to copy customized toolbar from one instance to another? If yes, how?
    Thanks in advance 

    Hi Khaldun,
    As per my reply in your previous post, here is a link explaining how to use the organizer:
    Http://blogs.msdn.com/b/project/archive/2010/10/22/tips-and-tricks-copy-custom-views-filters-tables-and-other-elements-to-other-projects.aspx?Redirected=true
    Basically, just copy the toolbar from the global source instance into a blank project file. Then do the same operation from the blank file containing your toolbar into the destination global model, still using the organizer. 
    Hope this helps. 
    Guillaume Rouyre - MBA, MCP, MCTS

  • Migrate Active Directory 2003 to 2012 R2 and Exchange Server 2007 to 2013.

    My question is which one need to migration first. Active Directory 2003 to 2012 R2 and FFL & DFL or Exchange Server 2007 to 2013.
    Md. Ramin Hossain

    My question is which one need to migration first. Active Directory 2003 to 2012 R2 and FFL & DFL or Exchange Server 2007 to 2013.
    Domain. For Exchange installation and upgrading to 2013, you need to make sure that your domain controllers can understand attributes of exchange 2013. Besides if you have DC/Exch on the same server which is 2003 is not supported. Because Windows Server
    2003 is not supported.
    Migrate your domain to at least 2008 R2 and then proceed with Exchange 2013.
    Mahdi Tehrani   |  
      |  
    www.mahditehrani.ir
    Please click on Propose As Answer or to mark this post as
    and helpful for other people.
    This posting is provided AS-IS with no warranties, and confers no rights.
    How to query members of 'Local Administrators' group in all computers?

  • Can't create data analysis views in windows 7/project server 2007

    In Project Server 2007, when trying to create a new Data Analysis view or edit an existing one, we get the following error: "An error was encountered in loading the page". Using the F12 developer tools, I tracked it down to the following line:
    "cn = new ActiveXObject("ADODB.Connection"), and in javascript the more specific error is "Automation server can't create object".
    I assumed it was a browser permissions issue, and so I ensured the site is in trusted sites, and set the security level to low, but the same error is still occurring.
    This error only occurs for users who are on Windows 7. This page works fine for users on Vista. The Windows 7 box has IE 9, the Vista box has IE 7.
    Is Project Server 2007 supported in Windows 7/IE 9? Is there another security setting to look for?
    edit: I have also checked the registry on the client and confirmed that adodb.connection is registered, and the dll exists.
    Thanks,
    Mike G.

    Hi Mike,
    If you refer to
    this link, IE9 is supported by PS2007. Anyway, in the F12 developer tool, try to set the default browser to IE8. Also add the PWA url to the compatibility site settings in IE.
    Hope this helps,
    Guillaume Rouyre, MBA, MCP, MCTS |

  • Unable to view Data Analysis in Project Server 2007

    Hi,
    I am currently using Project server 2007. One of our PM is not able to view Data Analysis information which are available to other PM.
    It says 'The query cannot be processed. Either the user doesn't have access to Analysis service Database or the database doesn't exist"
    We checked the following. 
    Tools >
    Internet options > Security tab > Click Trusted Sites >
    Custom Level > Search for Access data source across domains and its enabled. 
    Kindly advice. Thanks in advance!

    Hi Nathik,
    You should also check that the PM in question has not been granted specific permission. If he doesn't have the "View OLAP Data" and "View Data Analysis" permissions, he will not be able to use the data analysis. Also check
    that the PWA URL is in the trusted site of IE. Finally press CTRL F5 to clean IE cache. Check also that the OLAP cubes were successfully built.
    A good way for you to debug is to use your admin account on his machine to see if it is a permission issue or a IE setting issue.
    Hope this helps,
    Guillaume Rouyre, MBA, MVP, P-Seller |

  • Unable to open PWA in browser and MSP on application server in project server 2007. ERROR: Sending the Soap message failed or no recognizable response was received.

    Hi All,
    I am using project server 2007 and WSS 3.0. 
    I have been facing a strange issue for couple of days. I am unable to open PWA in browser and MS Project Pro on application server.
    Everything is correct whether it is URL or MS Project profile account on MSP.  This is strange because i can open same PWA/MSP from other computers (Database server / Client PCs) but not locally on server.
    When i try to connect to MSP on App server, i get the following errors in event viewer.
    Event Type: Error
    Event Source: MSSOAP
    Event ID: 16
    User: N/A
    Computer: APP-Server-Name
    Description:
    Soap error: Connection time out..
    Event Type: Error
    Event Source: MSSOAP
    Event Category: Client 
    Event ID: 16
    User: N/A
    Computer: APP-Server-Name
    Description:
    Soap error: An unanticipated error occurred during the processing of this request..
    Event Type: Error
    Event Source: MSSOAP
    Event Category: Client 
    Event ID: 16
    User: N/A
    Computer: APP-Server-Name
    Description: Soap error: Sending the Soap message failed or no recognizable response was received.
    Event Type: Error
    Event Source: MSSOAP
    Event Category: Client 
    Event ID: 16
    User: N/A
    Computer: APP-Server-Name
    Description:
    Soap error: Unspecified client error..
    One more issue i am facing and i guess that is related to above issue. The Issue is, when i am creating a new project, It's workspace gets created but doesn't get linked to the project and i can't link it manually because it already exists for the project.
    sandeep

    Hi Paul ,
    Thanks for reply. The project server URL was already added to the Trusted
    Sites/Local Intranet areas in IE. 
    sandeep

  • After Migrating to project server 2013 some of my Mpp are not opening in project professional

    After migrating to project server 2013 from 2010. my some of mpp are not opening in project professional. 
    project professional taking some time and then showing checkin error. There are no logs on project server to this issue.
    but you can see these project in project server 2013 without issue. I have also tried the EditLink function. but result is same project professional not able to open. Check in error.

    Hello,
    Can you try this:
    Open one of those Projects in PWA to edit in the browser
    make a slight change (new dummy task etc.)
    Save and Publish from the web
    Close and check in from the web
    Wait for the jobs to complete
    Open project professional
    try and open the same project again from there
    Paul
    Paul Mather | Twitter |
    http://pwmather.wordpress.com | CPS

  • Project Server 2007: use cannot add lines to or recall timesheet

    I have a certain user that, for some reason, cannot use the Add Lines or Recall Timesheet function in Project Server 2007 SP3. The weird thing is, it works on another laptop, so it must be something related to the user's machine - but I'm baffled as to what
    the exact cause may be.
    There's no error what so ever - no Error On Page as is pretty common with these behaviors.
    Here's what I've tried so far:
    - Internet Explorer 8 version is supported
    - Deleted ActiveX controls, but these don't seem to be a prerequisite for Timesheets
    - IE Compatibility mode on/off
    I have no idea what else to check, and I want to make sure I've tackled everything before escalating this to SysOps for a browser/OS reinstall.

    Hi DMachiels,
    Have you tried to refresh your IE session deleting the cache (CTRL F5)?
    Also ensure that the PWA URL is include in the IE trusted sites (intranet and internet).
    Hope this helps.
    Guillaume Rouyre - MBA, MCP, MCTS

  • Currency Symbol in Project Server 2007

    Hi,
    Is it possible to change the currency symbol resource wise in Project Server 2007?
    I need a resource rate to be in INR and another resource rate should be in GBP.
    K.Gokulraj

    Yes you're correct. All enterprise resources on server's project will have the currency defined in the server settings.
    Actually the options doesn't mean that more than 1 currency can be used in the projects, but that projects can be published with another currency than the one defined in the PWA server settings. Note also that you'll be warned (see screenshot below) of enterprise
    projects with a different currency due to the fact that it can cause redition issues.
    I'd suggest to convert the non-standard rate into the enterprise currency. You might add a resource custom to give the information on the resource native currency.
    Hope this helps.
    Guillaume Rouyre - MBA, MCP, MCTS

  • SQL Query to get Project Plan Name and Resource Name from Reporting database of Project Server 2007

    Can you please help me to write an SQL Query to get Project Plan Name and Resource Name from Reporting database of Project Server 2007. Thanks!!

    Refer
    http://gallery.technet.microsoft.com/projectserver/Server-20072010-SQL-Get-a99d4bc6
    SELECT
    dbo.MSP_EpmAssignment_UserView.ProjectUID,
    dbo.MSP_EpmAssignment_UserView.TaskUID,
    dbo.MSP_EpmProject_UserView.ProjectName,
    dbo.MSP_EpmTask_UserView.TaskName,
    dbo.MSP_EpmAssignment_UserView.ResourceUID,
    dbo.MSP_EpmResource_UserView.ResourceName,
    dbo.MSP_EpmResource_UserView.ResourceInitials
    INTO #TempTable
    FROM dbo.MSP_EpmAssignment_UserView INNER JOIN
    dbo.MSP_EpmProject_UserView ON dbo.MSP_EpmAssignment_UserView.ProjectUID = dbo.MSP_EpmProject_UserView.ProjectUID INNER JOIN
    dbo.MSP_EpmTask_UserView ON dbo.MSP_EpmAssignment_UserView.TaskUID = dbo.MSP_EpmTask_UserView.TaskUID INNER JOIN
    dbo.MSP_EpmResource_UserView ON dbo.MSP_EpmAssignment_UserView.ResourceUID = dbo.MSP_EpmResource_UserView.ResourceUID
    SELECT
    ProjectUID,
    TaskUID,
    ProjectName,
    TaskName,
    STUFF((
    SELECT ', ' + ResourceInitials
    FROM #TempTable
    WHERE (TaskUID = Results.TaskUID)
    FOR XML PATH (''))
    ,1,2,'') AS ResourceInitialsCombined,
    STUFF((
    SELECT ', ' + ResourceName
    FROM #TempTable
    WHERE (TaskUID = Results.TaskUID)
    FOR XML PATH (''))
    ,1,2,'') AS ResourceNameCombined
    FROM #TempTable Results
    GROUP BY TaskUID,ProjectUID,ProjectName,TaskName
    DROP TABLE #TempTable
    -Prashanth

  • What Project Server 2010 and 2013 make possible in terms of timesheeting, "freezing" timesheets and expenses.

    We have recently gone live on a Timesheeting system based on Project Server 2007.
    I now want to know how the system could be improved using 2010 or 2013.
    But first you would need to know our requirements and what we did in 2007 ...
    We needed the GUI of My Timesheets and the Admin tasks but approvals based on what project/task it was. Ie PM approval not line management approval.
    We managed it by entering timesheets in My Timesheets, importing to My Tasks and then regularly picking up published Task Updates in the Table EPMAssignmentByDay and capturing them in an added table in the Reporting database. We had a few key requirements
    which required some customisation:
    Need to capture the timestamp of when approved. to nearest hour. plus approver ID (ie status manager) and the cost centre at that time of the resource (they can move sometimes)
    Need to be able to freeze approved records - so that after that point they can't be changed. And financial reports can run and know the data won't change.
    2 - is a headache for us. There is no mechanism to stop a user from trying to update frozen records. We currently have to just ignore the updates
    We also wanted expenses - but that wasn't possible in 2007.
    The new "Single Entry" mode looks like it will make life easier for the users.
    But:
    Is there any concept of timestamping the approvals?
    Is there any concept of freezing the approved data?
    The new Timesheet user-defined fields. Could these be used to add an expense amount and comment?
    I now know my way around the 2007 Reporting Database (at least parts of it) - but haven't found documentation to tell me what changed at the level need to answer the questions above.
    Thank you
    MikeCro
    MikeCro

    One of my colleagues pointed me to the MSFT paper "Managing timesheets in Microsoft Office Project Server 2007"
    It tells me that there is a field called "Processed" in the timesheet tables in 2007.
    It also says "This block is designed to indicate when a timesheet has been transferred to a third-party system. 
    Customers may also use this field to block the timesheet from being recalled." - which feels like MSFT are trying to give the hooks I need. This could enable me to close off changes - at least at timesheet level if not timesheet line level.
    But which field is it in which database table?
    I also notice that there is a tantalising comment for one value of the enumeration TimesheetEnum.Status in EPM 2013:
    PendingSubmit: Value=5. Pending submission; used when one or more timesheet lines are pending approval after a timesheet is submitted and project manager coordination is required.
    This sounds very like it would support what we want: each of the lines in a timesheet week to be approved by the different approvers and then lock the timesheet.  (Even better would be to lock a row after PM has approved and a weekly processing
    day reached)
    Can anyone point me to this level of detail of what is in project Server 2013. or is this in 2010 as well.
    MikeCro
    MikeCro

  • How to migrate Exchange HUB transport 2007 server with Exchange Hub transport 2010.

    Hi,
    How to migrate hub transport 2007 server with Exchange 2010 hub transport server.
    Regards
    Anil 

    Hi Anil
    You do not do an in-place upgrade of Exchange - you build new Exchange 2010 Hub Transport Servers, you can utilize existing hardware by uninstalling and installing Exchange 2010 - but you must have Hub Transport Servers that match the Exchange version in
    place for all Mailbox Servers that have the same Exchange version.
    Essentially there must be Exchange 2007 Hub Transport servers in place whilst there are Exchange 2007 Mailbox servers.
    Read "Upgrading from Exchange 2007 Transport -
    http://technet.microsoft.com/en-us/library/dd346708%28v=exchg.141%29.aspx"
    Exchange 2010 will synchronise certain configuration like Transport Rules and journaling when installing the first Exchange 2010 Hub Transport server, but from then on you must ensure synchronisation yourself.
    Send Connectors and Recieve Connectors will need manual configuration.
    Oliver
    Oliver Moazzezi | Exchange MVP, MCSA:M, MCITP:Exchange 2010,Exchange 2013, BA (Hons) Anim | http://www.exchange2010.com | http://www.cobweb.com | http://twitter.com/OliverMoazzezi

Maybe you are looking for

  • How to add a computed field to a reports

    I have a report where I would like to add a column that is the sequence of the row. It is not the rownum in the db, but I want it to be a row number for what is returned. So, if I return 10 records, I would like a column to contain 1 through 10 to de

  • Where is the data of RWB stored ?

    Hi all, does anybody know in which SAP tables the data (e.g of Message Monitoring) of the RWB is stored ? Thx and cheers

  • How to crop a mp3 file and create a new small one from it?

    Hi all, I would crop a long mp3 sound file and create a new small one with the short part from the long mp3 sound file. How to do it? Anybody can help me? Thank you very much. Regard David

  • MergedCompositeChannels and smart object

    Is mergedCompositeChannels include previos smart filter ? My filter plugin drawing some lines on document for comic artists. I'm using Channnel Port Suite's ReadScaledPixels Callback with mergedCompositeChannels for preview. When I create the smart o

  • Lightroom 4 Keywords

    I've been experimenting with LR4, but can't figure out how to reset all keywords and restart from scratch. I've deleted every catalog I can find (they were all under a Lightroom folder under Pictures). I start Lightroom and create a new catalog.  I e