How to migrate the whole SAP environment to another server.

Hi!
We have to discontinue a SAP Server as it is aging and on disk space. We are running SAP 4.7 SR1 1.00 in this server.
<b>Now my question is; in the new Server how I will dump all SAP data of previous Server. </b>I am going to install SAP $.7 SR1 2.00 IDES in new Server on Windows 2003 and Oracle 9.2.
Also, will the programs written for R/3 40 1.00 IDES will match or work in R/3 47 2.00 IDES ?
With regards,
Pratip Bhattacharyya
<b></b>
([email protected])

Hi! Mike,
Thanks for your effort. But let me tell you the scenario in detail.
We have a server dl2kdv01. In this Server SAP R/3 4.7 SR1 100 IDES (Kernel 620)is running. Due to hardware problem and disk space problem management has decided to move this SAP System to a  new Server dlwsdv10 where only Solution Manager is running. Ours’ is a Dev. env. SAP systems are running on Windows 2003  Server with Oracle 9.2 DB.
Now as I cannot find R/3 4.7 SR1 200 IDES. So I have downloaded R/3 4.7 SR1 2.00 IDES (Kernel 640).
Now my question is,
1. If I install the downloaded version than how I will add the database of old SAP to the new one.
Whether I have use transport client method or any other system. I need full step-by-step procedure.
2. Whether all programs and adapters designed in the earlier version will fully compatible to the new SAP System.
Hope, I have clearly describe my requirement.
You can directly mail me also.
With regards,
pratip Bhattacharyya
[email protected]

Similar Messages

  • How to migrate the whole Oracle Applications from one Server  to New IBM eS

    We are on 11.5.10.2 with IBM/p670 servers.
    We want to migrate the whole oracle Applications 11.5.10.2 to new IBM eServer p5 590.
    what is the best approach to migrate the whole Application.
    Best Regards
    Zia

    Rapid clone is there
    Manually also you can do
    Copy all tops
    Ensure tns connectivity to oracle home by tnsnames.ora entry change
    make changes in context.xml
    remove entries in FND_NODES for old servers
    run AC
    (Above steps do for DB tier then CM and then AdminTier - supposing admin and DB are diff nodes)
    Start services
    This should do the work
    Sunil Choudhary
    http://www.onelife.in
    Message was edited by:
    Sunil Choudhary

  • How to migrate the data from DB to another DB

    Hi folks,
                 In my project I have one requirement. Let me explain in detail we are maintain two databases one for
                 master database called *GIIS* and one is history database HIST. Both DB version is 10g R1.
                 (Both DB’s have same no table as well structures)
                 1.  The GIIS database contains nearly 400 tables (master table as well as temporary table)   
                       each Master table having it’s own temporary table.
                 2. Whenever we made the entry first it will go to temporary table after authorized that entry it will move to the master table
                 3. But the temporary table contains the data after move to master table .
                 4.     The temporary table data’s will be move to the HIST database each and every day at the night.
                    This migration we done through the procedure.  After migration complete the temporary table data’s will de deleted.
    My Question:
               1.     Whether it’s good practice to migrate the data from GIIS DB to another HIST DB using oracle stored procedure.
                     (we created the DB link from GIIS to HIST) 
               2.     If not can any one suggest me the way to migrate the data from GIIS to HIST.?
               3.     Is there any other possibility to migrate the data from GIIS to HIST with out using procedure?Thanks
    Arun

    Arun wrote:
    Hi Mr.Aman Brother
    First of all sorry . I am not saying that don't command my requirement. Just i want know the way of migrate the data from one DB to another DB.
    you saying that IMPORT/EXPORT is one of the way to do migration.
    But in client side they don't know how to do the IMPORT & EXPORT the database..
    Can you suggest me the another way to do that
    Arun,
    If the client doesn't know how to do exp/imp, I would really doubt and would be immensely concerned before suggesting the client any other way. If they don't know, tell them that there is a concept called test database which is used for learning so they should invest time to learn this technique since the other options suggested by fellow members are far more tougher than this one.
    Aman....

  • How to migrate users from one environment to another

    Hi Guys,
    R12.1.1 on Linux
    What is the best way to migrate or copy users from dev or prod to new instance that is a fresh install.
    Thanks in advance

    Hi,
    You can use FNDLOAD to migrate the users/responsibilities.
    Note: 232029.1 - How to move User/Responsibilities across 11i Apps instances
    Note: 376469.1 - Can FNDLOAD Migrate User Accounts Without Forcing Users To Change Their Passwords?
    Regards,
    Hussein

  • How to migrate the  SAP KM Content to MS SharePoint

    Hi
    How to migrate the  SAP KM Content to MS SharePoint
    Is there any links that can give me brief view on this

    we can integrate portal content to share point check this below link for[  Integrating SAP Portal Content into Microsoft SharePoint Portal Server|http://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/6844e48d-0901-0010-b4b2-d5666689ca8b] and [Integrate Microsoft Sharepoint Services into Knowledge Management|http://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/30ba1508-27e7-2a10-2295-9dab5b78c614]. hope these helpful.
    regards
    Mahesh

  • How to migrate the Objects from 3.1c to BI7

    Hi,
    We are in Functional Upgradation.
    How to Migrate the Objects( Infocubes,DSO,Datasources,Rules...etc...) from 3.1C to BI 7.0
    Please help me to doing this....
    regards,
    anil

    BW Upgrade tasks (BW 3.1C to BI 7.0)
    Prepare Phase:
    Task     How-To     Who
    Review BI 7.0 feature lists     Review BI 7.0 feature lists for possible inclusion in developments.     Basis/BW
    Obtain the BI 7.0 upgrade guide     Download the upgrade guide from http://service.sap.com/inst-guides -> SAP NetWeaver -> Upgrade
         Basis/BW
    Review all upgrade SAP notes     In addition to the upgrade guide, check, download, and review all SAP notes for your upgrade
         BI 7.0 Upgrade notes
         SAP Web Application Server 6.40 upgrade notes
         OS and DB specific upgrade notes
         SAP BW Add-on upgrade notes
    (e.g. SAP SEM, ST-PI, etc)
         Plug-In upgrade SAP notes
         Other notes identified in above notes and/or upgrade guides.
         Basis/BW
    Check DB and OS requirements for the target SAP BW release     Check DB version/patch level and OS version/patch level required for upgrade
         First check the most current information from the SAP BW homepage http://Service.sap.com/BW  -> <SAP BW release> -> Availability
         Additionally, the u201CPlatformsu201D link will take you to the main DB/OS page for BI 7.0 and SAP Web AS 6.40.
         Note: In some cases there are differing requirements for SAP BW 3.0B/SAP BW 3.1 Content and BI 7.0
         Basis
    Check SAP BW Add-on upgrade requirements     Do you have SAP BW add-ons installed that require additional handling (e.g. SAP SEM, Enterprise Portal Plug-in, etc)?
         SAP SEM (SAP BW based components) requires SAP SEM 4.0 which is part of the mySAP ERP 2004 suite.
         WP-PI release must be at 6.00 before the upgrade begins. As mentioned before this add-on is merged with PI_Basis after the upgrade.
         Basis
    Check SAP BW upgrade requirements          Minimum Support Package and kernel levels for upgrade
         SAP BW Frontend requirements for new SAPGUI, SAP BW BEx Frontend and SAP BW Web applications.
         Source system Plug-In requirements     Basis
    Check compatibility requirements with 3rd party software          3rd Party Reporting tools (example: Crystal)
         ETL Tools (example:  Ascential, DataStage, etc)
         Scheduling tools (example. Control-M, Maestro, etc)
         Monitoring tools (example: HP OpenView, Patrol, etc)
         Other OS or DB related tools     Basis
    Check new component requirements for BI 7.0          If SAP BW web reports were developed in SAP BW 2.x, a windows version of IGS 6.40 (Internet Graphics Service) is required for conversion and future rendering of web graphics (i.e. Charts and GIS Maps).
    The IGS chart migration will also be required after the SAP BW web report conversion.
         If you used or activated any SAP BW Web Applications in SAP BW 3.x, or if you have used charts in SAP BW 2.x web reports, you will need a windows version of IGS 6.40 (Internet Graphics Service) to execute the IGS chart migration after the upgrade.
         If ESRI GIS software is in use, a different version of ESRI software maybe required for BI 7.0.  (ArcView 8.2?).
         If you plan to use Information Broadcasting, please review the requirement for additional infrastructure components such as EP, KMC, Workbook pre-calculation service, and Web AS connectivity to your mail servers.
    Detailed information is available in the SAP NetWeaver u201904 master planning guide (http://service.sap.com/instguides  -> SAP NetWeaver).
         Basis
    Test and distribute new SAP BW Frontend
              Install and test the new BI 7.0 Frontend (including the new version of SAPGUI for Windows if applicable).
         A detailed FAQ on the new BI 7.0 Frontend is available on the SAP service marketplace alias BWFAQ (http://service.sap.com/BWFAQ).
         After successful testing, the new SAPGUI for Windows and SAP BW Frontend can be distributed to the BW teams and end users.
         Basis
    Alpha Conversion:
    Ensure that your InfoObject data is consistent from a u201Cconversionu201D perspective (Alpha Converter tool)      Check that you have executed the Alpha Converter tool to check the consistency of your InfoObject definitions and data for InfoObjects that utilize the ALPHA, NUMCV and GJAHR conversion exits.
    Note: The Alpha conversion is not part of the SAP BW upgrade itself, but the upgrade simply checks to ensure you have successfully executed the check tool.
    Transaction RSMDCNVEXIT
    Check the system status:
         u201CAll Characteristics Have Correct Internal Valuesu201D: The Alpha converter has been successful executed. The upgrade preparation can continue.
         u201CNo Check yet/Inconsistent Internal Vales existu201D:
    The Alpha converter check has not been executed.
         u201CCharacteristics have Inconsistent Internal Valuesu201D:
    The Alpha converter tool check has been executed and data problems have been detected. The InfoObject and data must be processed before the upgrade can be started.
         BW
    Upgrade SAP Note updates     Check for newer versions of your SAP notes for the Upgrade.
    Tip: The SAP service marketplace offers an option to subscribe to OSS notes so you can be notified of changes when you log on.
         Basis/BW
    Confirm SAP BW support package, kernel and DB/OS configuration     Analyze current Support Package and DB/OS/Kernel configurations in your SAP BW landscape in relation to the SAP BW 3.x upgrade requirements.
         Apply necessary support packages, kernel patches, and DB and OS patches to meet upgrade requirements
         Basis
    Alignment of SAP BW objects within your SAP BW system landscape     Check and, where required, re-align SAP BW Objects and developments in your SAP BW system landscape (Development, Quality Assurance and Production).
    SAP BW Object differences can impact the quality of testing in the Development and Test environment and can lead to change management issues.
         This check is to minimize risk and ensure productive objects are being tested prior to the Production upgrade.
    Where alignment issues exist and realignment is not possible, alternative testing plans should be devised.
         Basis/BW
    Confirm all developments are deployed.     Ensure that all SAP BW developments are deployed or they are to be re-developed/tested after the upgrade.
         In the DEV system, all SAP BW development transports should be released (i.e. transport created and released) and imported to all downstream systems (i.e. QAS and PRD systems).
    For SAP BW developments not already collected in the transport collector, a decision must be made:
    Deploy the developments or wait until the upgrade has completed to deploy.
    o     Development to be deployed should be collected, released, and imported into the QAS and PRD systems.
    o     Developments that should be deployed after the upgrade should be re-tested/re-developed after the upgrade.
         In the QAS or PRD systems, ensure that all SAP BW development transports have been imported prior to the upgrade.
         BW
    Implement BI 7.0 Business Explorer Frontend     Install, evaluate, test and distribute the new BI 7.0 Business Explorer Frontend.
         Basis/BW
    Pre-upgrade Process:
    Download required BI 7.0 support package Stack for inclusion in the upgrade     Determine the equivalent support package level of the source SAP BW release and the target SAP BW release.
         There is a minimum requirement that you upgrade to at least the equivalent support package level on the target SAP BW release so that you do not lose functionality, corrections, and data.
         It is recommended to upgrade to the latest version of all support packages during the upgrade via the upgradeu2019s support package binding functionality.
         BI 7.0 Support Packages are delivered via SAP NetWeaver u201904 Support Package stacks (SP-Stacks). It is not recommended to partially apply some of the SP-Stacksu2019 individual support packages. You should apply all of the SP-Stacks support packages at once.
    For more information on the SP-Stacks and SAP NetWeaver SP-Stacks, please see the SAP service marketplace alias SP-Stacks (http://service.sap.com/sp-stacks)
         You should also review, download, and bind in support packages for all add-on components that are installed on SAP BW and will be upgraded during the SAP BW upgrade (e.g. SEM-BW, ST-PI, etc)
         Basis
    Apply latest Support Package tool patch     Apply latest SPAM patch before executing PREPARE     Basis
    Validate the SAP BW (ABAP) Data Dictionary and the Database Data Dictionary for consistency     Check Database consistency
         Transaction DB02:
    o     Execute ABAP SAP_UPDATE_DBDIFF and re-execute DB02 check. This gives a truer view of the SAP BW objects in DB02.
    o     Check missing database objects (indices, tables, etc)
    o     Missing indices may identify erred data loads or process problems
    Tip: Missing indices on InfoCubes can be restored by RSRV or ABAP SAP_INFOCUBE_INDEXES_REPAIR
    Note: check for running data loads before executing a repair!
    o     Check DDIC/DB consistency
         Verify database objects and consistency
    (e.g. SAPDBA check for offline data files)
         BW
    Remove unnecessary SAP BW temporary database objects     Delete all SAP BW temporary database objects:
         Execute routine housekeeping ABAP SAP_DROP_TMPTABLES.
         This reduces the numbers of database objects that need to be copied during the upgrade.
         Note: take care not to delete objects that are in use as this will cause queries, compressions, etc to terminate.
         BW
    Validate your SAP BW Objects for correctness prior to your upgrade     Using the SAP BW Analysis Tool (transaction RSRV), perform extensive tests on all important SAP BW Objects to ensure their correctness prior to the upgrade.
    Note: this test should be repeatable so you can re-validate after the upgrade!
         Ensure that any inconsistencies are identified and corrected
         RSRV has a number of extensive tests and if all checks are executed will consume a large amount of time. Multiple tests can be performed in parallel.
         Tip: Some corrections in development can be deployed to other systems via transport in advance of the next upgrade.
         BW
    Ensure DB Statistics are up to date prior to the upgrade          Check DB statistics for all tables.
    Tables without statistics, especially system tables, can seriously impact upgrade runtimes.
         Check DB statistics for missing Indexes for InfoCubes and Aggregates
    o     User transaction RSRV to check      BW
    Check SAP BW Support Package status     Check the status of all support packages (via transaction SPAM)
         Ensure the Support Package queue is empty
         Confirm all applied Support Packages     Basis
    Check all u2018Repairsu2019     Check for unreleased repair transports
         Release all unreleased transports
    In your QAS and PRD system, check if all repair transports have been imported (i.e. systems are aligned)
         Import missing repair transports into down stream systems. This will avoid differing message and/or errors during the upgrade.
         BW
    Check InfoObject status          Check for revised (modified) InfoObjects that have not been activated.
    All InfoObjects should be active or saved (not activate):
    o     Check all inactive InfoObjects:
    Transaction RSD1 (Edit InfoObjects),
    click on u201CAll InfoObjectsu201D radio button and click the u201CDisplayu201D button.
    Modified InfoObjects are denoted by yellow triangles!
    o     Determine if revision should be activated or removed.
         'Reorgu2019 or u2018Repairu2019 all InfoObjects
    This checks and repairs any discrepancies in the InfoObject definition and structures. It is common to have obsolete DDIC and table entries for InfoObjects after multiple upgrades and definition changes. These obsolete entries normally do not effect normal SAP BW operations.
         Transaction RSD1 (Edit InfoObjects), Select u201CExecute Repairu201D or u201CExecute Reorgu201D Use expert mode for selective executions.
         BW
    All ODS data loads must be activated.          Activate all inactivated ODS Object requests.
    All ODS u2018Mu2019 tables must be emptied prior to the upgrade as a new activate process is implemented
    o     Inactivated ODS request can be located via the Admin workbench -> u2018Monitoringu201D button -> u2018ODS Status Overviewu201D
         BW
    All Transfer and Update rules should be active          Check for inactive Update and Transfer Rules
    o     All update rules and transfer rules should be active or deleted.
    o     Look into the table RSUPDINFO for update rules and search for the version "not equal" to "A". Likewise use the table RSTS for Transfer rules/structure.     BW
    All InfoCubes should be active          Check for inactive InfoCubes and Aggregates (Aggregates are InfoCubes too!)
    o     All InfoCubes should be activated or deleted.
    o     Execute ABAP RSUPGRCHECK to locate any inactive InfoCubes. See SAP note 449160.
         BW
    All Web Report objects should be consistent prior the upgrade.          Check the consistency of your SAP BW web objects (web reports, web templates, URLs, roles, etc). All objects should be consistent prior to web object conversion after the upgrade. It is recommended to ensure consistency before the upgrade.
    o     For Original release SAP BW 3.x:
    A SAP BW web reporting objects check can be executed via a new check in RSRV. This is provided via a SAP BW support package.
    Please see SAP note 484519 for details.
         BW
    Backup your system before starting PREPARE     Before execution PREPARE, perform a full database backup (including File system). Ensure you can recover to the point in time before PREPARE was executed.
         Database admin
    Address any instructions/errors generated by PREPARE          Address any issues listed in log files Checks. Log generated by PREPARE.
    o     Repeat PREPARE until all checks are successful.     Basis
    Complete any Logistic V3 data extractions and suspend V3 collection processes          Extract and empty Logistics V3 extractor queues on SAP R/3 source systems.
    o     The V3 extraction delta queues must be emptied prior to the upgrade to avoid any possible data loss. V3 collector jobs should be suspended for the duration of the upgrade.
    They can be rescheduled after re-activation of the source systems upon completion of the upgrade.
         Note: If you perform any data loads after executing PREPARE, re-check the status of all delta queues in SAP BW and the source systems(s).
         BW
    Complete any data mart data extractions and suspend any data mart extractors          Load and Empty all Data mart Delta Queues in SAP BW. (e.g. for all export DataSources)
    o     The SAP BW Service SAPI, which is used for internal and u2018BW to BWu2019 data mart extraction, is upgraded during the SAP BW upgrade. Therefore, the delta queues must be emptied prior to the upgrade to avoid any possibility of data loss.
         Note: If you perform any data loads after executing PREPARE, re-check the status of all delta queues in SAP BW and the source systems(s).
         BW
    Check that your customer defined data class definitions conform to SAP standards          Check all customer created Data classes used by SAP BW Objects (i.e. InfoCubes, ODS Objects, Aggregates, InfoObjects, and PSAs) to ensure they conform to SAP standards.
    o     Check your data class definitions as detailed in SAP Notes 46272 and 500252.
    o     Incorrect data classes could create activation errors during the upgrade.
         BW
    Remove unnecessary SAP BW temporary database objects     Delete all SAP BW temporary database objects:
         Execute routine housekeeping ABAP SAP_DROP_TMPTABLES.
    For more information see SAP note 308533 (2.x) and 449891 (3.x).
         This reduces the numbers of database objects that need to be copied during the upgrade.
         Note: take care not to delete objects that are in use as this will cause queries, compressions, etc to terminate.
         Basis/BW
    Backups!     Before executing the upgrade, ensure that you have a backup strategy in place so you can return to the point where loading was completed and the upgrade started.
    Ensuring you can return to a consistent point in time (without having to handle rollback or repeats of data loads) is key to having a successful fallback plan.
         Database Admin
    Before Execution:
    All SAP BW administration tasks should have ceased          Cease all SAP BW administration tasks such as Object maintenance, query/web template maintenance, data loads, transports, etc at the beginning of the upgrade.
    The Administrators Workbench and the Data Dictionary are locked in the early phases of the upgrade.
         Reminder: Users can execute queries until the time that the upgrade determines that the SAP BW System should be closed*
    - timing depends on the type of upgrade selected
         Basis/Admin
    Remove unnecessary SAP BW temporary database objects     Repeat the deletion of all SAP BW temporary database objects after you have stopped using the SAP BW Admin workbench*
         Execute routine housekeeping ABAP SAP_DROP_TMPTABLES.
    For more information see SAP note 308533 (2.x) and 449891 (3.x).
    - timing depends on the type of upgrade selected
         BW
    Check system parameters     Check OS, DB, and Instance profile parameters.
         Check System Instance parameters for new BI 7.0 specific parameters. See SAP note 192658 for details
         Check for any DB specific parameters for BI 7.0
         Check for any new OS parameters     Basis
    Check Database archiving mode     Turn database archive log mode back on if it was disabled during the upgrade!
         Database Admin
    After Execution:
    Check the systemu2019s installation consistency     Execute Transaction SICK to check installation consistency
         BW
    Check the system logs     Perform a technical systems check.
         Example: Check system and all dispatcher logs (inc. ICM logs)
         Basis
    Apply latest executable binaries     Apply the latest 6.40 Basis Kernel for all executables
         Tip: use the SAP NetWeaver u201904 SP-Stack selection tool to find all binaries. (http://service.sap.com/swdc)
         Basis
    Review BI 7.0 Support Packages for follow-up actions.          Review SAP Notes for all SAP BW Support packages applied during (bound into the upgrade) and applied after the upgrade:
    o      Search for Note with the keyword u201CBWu201D, u201CSAPBWNEWSu201D, and u201C<BW release>u201D
    o     Follow any required instructions identified in the SAP Notes
         Basis
    Apply latest patches          Apply the latest SPAM patch
         Apply any required support packages that were not bound into the upgrade.
         Basis
    Apply additional BI 7.0 Support Packages
    (if required)          SAP recommends that customer remain current on SAP Support Packages.
         Review SAP Notes for all SAP BW Support packages applied in previous task.
    o      Search for Notes with the keyword u201CBWu201D, u201CSAPBWNEWSu201D, and u201C<BW release>u201D
    o     Follow any required instructions identified in the SAP Notes
         Basis
    Resolve any modified SAP delivered Role issues      If SAP delivered Roles were modified, then these modifications may incorrectly appear in the upgrade modification adjustment tool (SPAU).
         Review and implement SAP note 569128 as required     Basis
    Configuring Information Broadcasting EP/KMC Connections
         If you plan to use the EP integration functionality of Information broadcasting (Broadcast to the EPu2019s PCD, Broadcast to KMC, or Broadcast to Collaboration Rooms):
         Ensure the SAP EP is at the same SP-Stack level as your SAP BW system.
         Follow the online help documentation to configure and connect the SAP BW system and the SAP EP system. (http://help.sap.com).
         For broadcasting to KMC, ensure that KM has the u2018BEx Portfoliou2019 content available.
         Basis
    Re-check SAP BW Object and consistency     Execute RSRV to check SAP BW Object consistency
         Repeat tests that we executed prior to the upgrade.
         Validate results      BW
    Check InfoCube views for consistency     Check consistency of InfoCube fact table views
         It is possible that fact table view /BIC/V<InfoCube>F is missing if a number of SAP BW upgrades have been performed before. See SAP Note 525988 for instructions for the check and repair program.
         BW
    Perform SAP BW Plug-in (SAPI) upgrade follow-up tasks          If required, Re-activate the SAP BW u201CMyselfu201D source system in SAP BW.
         The SAP BW internal plug-in (SAPI), which is used for internal data mart extraction and u2018BW to BWu2019 communication, is upgraded during the SAP BW upgrade. The source system is de-activated to prevent extractions and loading during the upgrade.
         It may be required to replicate export DataSources and reactivate transfer structures/rules for internal data loads (i.e. ODS Object to InfoCube objects).
    o     Tip: It is advised to do this step for all export DataSources to avoid possible errors during execution of InfoPackages
         Check that all other Source Systems are active.
    o     Activate as required.     Basis/BW
    Check SAP BW Personalization is implemented     (SAP BW 2.X upgrades will have performed this in the previous task).
    Validate that personalization has been activated in your SAP BW system.
    Note: It has been observed that in some cases, BEx Personalization has to be re-activated after an upgrade from SAP BW 3.x to BI 7.0. It is advised to check the status of personalization after the upgrade.
         Enter the IMG (transaction SPRO), select SAP Business Warehouse -> Reporting relevant settings -> General Reporting Settings -> Activate Personalization in BEx
    Check the status of the Personalization settings. All entries should be active u2013 highlighted by an unchecked check box.
         To activate highlighted Personalization, click Execute.     BW
    For SAP BW 2.0B/2.1C -> BI 7.0 Upgrades:
    Convert ODS secondary indexes to new standard     For SAP BW 2.0B/2.1C -> BI 7.0 Upgrades:
    Convert any customer created ODS Object secondary indexes to the new ODS Object index maintenance process.
         Re-create all indexes in the ODS Object definition screen in transaction RSA1.
         ODS indexes must conform to the new naming convention
         BW
    Converting IGS chart settings
         Convert you existing IGS chart settings (converts IGS chart settings from BLOB to new XML storage format)
         Ensure you have the latest SAP Web AS 6.40 IGS (stand alone windows version) installed and working
    o      Test via transaction RSRT
         Execute the conversion process as directed the BI 7.0 upgrade guide.
         Note: This step is required for all BI 7.0 upgrades     Basis
    Backup your SAP BW system     Perform a full database backup (including the File system)
    Remember to adjust your backup scripts to include new components such as the J2EE engine, pre-calculation service, etc.
         Database Admin

  • How to highlight the whole row of a particular line item of sale

    How to highlight the whole row of a particular line item of sales order depending on condition?
    Please help its urgent..
    Looking forward your reply.
    Moderator message: please do more research before asking, show what you have done yourself when asking, do not flag posts as "urgent".
    [Rules of engagement|http://wiki.sdn.sap.com/wiki/display/HOME/RulesofEngagement]
    [Asking Good Questions in the Forums to get Good Answers|/people/rob.burbank/blog/2010/05/12/asking-good-questions-in-the-forums-to-get-good-answers]
    Edited by: Thomas Zloch on Aug 9, 2011 9:30 AM

    Any ideas on what would cause this NOT to work? I added this row right after the table is created and populated and it is still not highlighted when I enter the form. The snippet of code that does this is:
    MyTableModel modelS = (MyTableModel)dataModel.get("S");
    jTable1 = new JTable(modelS);
    jTable1.setRowSelectionInterval(0,0);MyTableModel is this:
    class MyTableModel extends DefaultTableModel {
      public MyTableModel(Object[] columnNames, int numRows) {
        super(columnNames, numRows);
      public boolean isCellEditable(int row, int column) {
        if (TableKey == 'S') {
          if (column == 6) {
            return false;
        if (TableKey == 'O') {
          if (column == 0 || column == 4 || column == 5) {
            return false;
        if (TableKey == 'P') {
          return false;
      return true;
    }Can anyone help? Thanks.
    Allyson

  • HI how to debug the whole SC creation process

    Hi
    I need small help from all you great guys.
    I am working with EBP application.
    I want to know the process of creation of shopping cart to the creation of PO in the r/3 system.
    How to debug the whole process. I can create a shopping cart in the EB web. I want to know what is hapening in the backend during the creation of shopping cart.
    I know the web transaction for the creation of the shopping cart. I tried to debug the process by going SE80 and giving the web transaction , but it is very cumbersome process and i was confused. Is there any way i can know what is happening in the backend and how the SC data is transferred to the bacend and how PO is created in the R/3 system
    sankar

    Hi Sankar Rao
    we can debug the shopping cart from sap GUI via tran.  /nBBPSC01
    1 Click on internal Goods/services  and select the product for which you want to create a SC and press enter.
    2 In command window input  /h and press enter
    3 Click on the button Order it will go in debug mode.
    4 Insert break points on Statement - Select
    5 Insert break points on Statement - Insert
    6 Insert break points on Statement -  update
    and press F5 key to move one step ahead and F8 key to halt directly at each break point.This way go upto the save mode and order your SC at run time in debug mode.
    regards,
    Nimish Sheth
    NB Do rewards points for helpful anwsers.

  • How to Migrate the Existing Content

    Hi every1,
      I want to know how to Migrate the existing content in Interwoven to new Content Management system
    Thanks & Regards
    Vasu

    Hi Vasu,
    as said, I don't know Interwoven in detail. But if you would get the Interwoven Business Package, maybe you could get some insight how to access Interwoven content per API (at least, Interwoven <i>has</i> a Java API, see http://blogs.ittoolbox.com/km/content/archives/005150.asp for example; but I would ask Interwoven or within some Interwoven forum for the details, and on this site for the details of SAP KM API... ).
    Hope it helps
    Detlev
    PS: Please consider rewarding points for helpful answers on SDN. Thanks in advance!

  • How to migrate the 9.3.1 to 11.1.1.3

    Dear All,
    Can any one know how to migrate the version 9 to11 for HFM?
    What are the pre requisits?
    Thanks in Advance....

    1>You need to reconfigure Webserver,application server Tomcat/wensphere/weblogic to new environement
    2>Schema upgrade:take backup of the databases,schema and run schema upgrade utility
    3>take backup of hfm application objects security,metadata,data forms,data grids,rules,journals etc. and upload to 11
    Above are the steps in brief,by which you will get an idea.But you may need to refer readme for migration.
    thanks

  • How to migrate the Workbooks from BW3.1 to BI7

    Dear Team,
    How to Migrate the workbooks from Bw3.1 to BI7. We have recently upgraded to BI7. What are necessary steps and necessary cares needs to take for this.
    Best Regards,
    SG

    Migration is manual. When you open up a 3.x component in a 2004s tool in migrates it. There is no automatic migration available
    Rolling out the New SAP NetWeaver 2004s BI Frontend Tools
    Migrating Advanced BEx Analyzer Workbooks - What VBA is Supported?
    Hope it Helps
    Chetan
    @CP..

  • How to migrate the Flexmonkey's ActionScripts to run in FlexUnit?

    how to migrate the Flexmonkey's ActionScripts to run in FlexUnit?
    an example will be great. thanks!!

    You don't need to migrate anything.
    The earlier FlexMonkey code as well as the current will run in FlexUnit 4 without modification. The only issue that you may encounter is that there is a known bug (waiting for a fix from the authors) where FlexUnit .9 tests (older FlexMonkey tests) run in the newer environment don't complete 100% of the time. Hoping we will see a fix on this shortly.
    Mike

  • How to print the whole JFrame

    Hi,
    I got this code somewhere from the net.
    import java.awt.*;
    import javax.swing.*;
    import java.awt.print.*;
    /** A simple utility class that lets you very simply print
    *  an arbitrary component. Just pass the component to the
    *  PrintUtilities.printComponent. The component you want to
    *  print doesn't need a print method and doesn't have to
    *  implement any interface or do anything special at all.
    *  <P>
    *  If you are going to be printing many times, it is marginally more
    *  efficient to first do the following:
    *  <PRE>
    *    PrintUtilities printHelper = new PrintUtilities(theComponent);
    *  </PRE>
    *  then later do printHelper.print(). But this is a very tiny
    *  difference, so in most cases just do the simpler
    *  PrintUtilities.printComponent(componentToBePrinted).
    *  7/99 Marty Hall, http://www.apl.jhu.edu/~hall/java/
    *  May be freely used or adapted.
    public class PrintUtilities implements Printable {
      private JFrame componentToBePrinted;
      public static void printComponent(JFrame c) {
        new PrintUtilities(c).print();
      public PrintUtilities(JFrame componentToBePrinted) {
        this.componentToBePrinted = componentToBePrinted;
      public void print() {
        PrinterJob printJob = PrinterJob.getPrinterJob();
        printJob.setPrintable(this);
        if (printJob.printDialog())
          try {
            printJob.print();
          } catch(PrinterException pe) {
            System.out.println("Error printing: " + pe);
      public int print(Graphics g, PageFormat pageFormat, int pageIndex) {
        if (pageIndex > 0) {
          return(NO_SUCH_PAGE);
        } else {
          Graphics2D g2d = (Graphics2D)g;
          g2d.translate(pageFormat.getImageableX(), pageFormat.getImageableY());
          disableDoubleBuffering(componentToBePrinted);
          componentToBePrinted.paint(g2d);
          enableDoubleBuffering(componentToBePrinted);
          return(PAGE_EXISTS);
      /** The speed and quality of printing suffers dramatically if
       *  any of the containers have double buffering turned on.
       *  So this turns if off globally.
       *  @see enableDoubleBuffering
      public static void disableDoubleBuffering(Component c) {
        RepaintManager currentManager = RepaintManager.currentManager(c);
        currentManager.setDoubleBufferingEnabled(false);
      /** Re-enables double buffering globally. */
      public static void enableDoubleBuffering(Component c) {
        RepaintManager currentManager = RepaintManager.currentManager(c);
        currentManager.setDoubleBufferingEnabled(true);
    }From my main class (where the JFrame resides), the print() method is invoked to print the JFrame. However, when it is printed, it only prints the top left part of the JFrame, not the whole JFrame. Can anyone help please? Thank you very much.

    public int print(Graphics g, PageFormat pageFormat, int pageIndex) {
        if (pageIndex > 0) {
          return(NO_SUCH_PAGE);
        else {
          Graphics2D g2d = (Graphics2D)g;     
          g2d.translate(pageFormat.getImageableX(), pageFormat.getImageableY());
           double xScale = 0.63;
           double yScale = 0.56;
          g2d.scale(xScale, yScale);
          disableDoubleBuffering(componentToBePrinted);     
          componentToBePrinted.paint(g2d);
          enableDoubleBuffering(componentToBePrinted);
          return(PAGE_EXISTS);
      }Hi all,
    Alright I managed to scale it to print the whole JFrame. But another problem surfaces. When I select draft quality printing, it doesn't print the whole JFrame. Other printing qualities (standard, high) do print the whole JFrame. I am really puzzled. Anyone has any clue?
    And I have an unrelated question to this topic. How do I set a JTextField so that when I click on it the first time, it highlights its content? Have to work around with the mouselistener?
    Thank you.

  • How to read the whole name of a music title while scrolling down a list of titles? With the new iOs7 Music App there is no more black box showing the entire name!

    How to read the whole name of a music title while scrolling down a list of titles? The old software-app had the function to click for a longer time on a titles beginning letters until a black box revealed the entire name. I miss this function especially for my classical music, because lots of pieces start with similar words. E.g.:
    "Beethoven: Variations On "Ein Mädchen Oder Weibchen", Op. 66 - Var. 1"
    "Beethoven: Variations On "Ein Mädchen Oder Weibchen", Op. 66 - Var. 2"
    Scrolling in a list of title, I can't distinguish the titles, because just the first words are shown followed by: "...".
    That's horrible!

    Or you could include a width to your body style:
    body {
    background-image: url(Logo/sky1.jpg);
    background-position: center center;
    background-attachment: fixed;
    width: 75%;}
    It might work or not depending on your other color scheme.

  • How to fill the whole screen of my iMac with the photos included in an iDVD project. (iDVD v. 7.1.2)

    How to fill the whole screen of my iMac with the photos I included in an iDVD project. (iDVD v. 7.1.2). I mean, during playing the burned dvd.
    When I do "Enter Full Screen", the slide show fills the screen but the photo itself remains in the middle with a wide black border filling the rest.
    Any cure for this ?

    Hi
    In iDVD Preferences - Turn off - TV-Safe area - and the Photos will fill the full area with just letterboxing or pillars as max.
    Then "Save as a DiskImage" and test this and see if this plays better - before burning DVDs that's not as You want them.
    Bengt W

Maybe you are looking for

  • Iphone calendar displaying wrong times in day/week view

    I work a lot of night shifts and consequently I input a lot of night shifts to my iphone calendar. They usually work. However, in a couple of weekends time I have some nights which I have input as starting on 30th march 20.45 ending 31st march 08.00,

  • Higtogram calculation

    Hello Experts, I am reading a white paper about CBO statistics the link is here. http://www.oracle.com/technetwork/database/focus-areas/bi-datawarehousing/twp-optimizer-stats-concepts-110711-1354477. In the part of Frequency Histograms, in number 4.

  • IE8 Applet Issue on ADF

    I am having issue with Applet on a .jspx page when using IE8 browser. I am running on: JDEVADF_11.1.1.7.0_GENERIC_121026.1729.6438 This blocking our progress at the moment, so any help please. I created a simple ADF Web Application with a single page

  • Dynamic Group Prompting Parameters

    Using CRXI I would like to create a report where I can dynamically set groups based on parameters.  For example, users would be prompted to select from three different group levels: by date, by location, by charge group.  So, they can select group by

  • Adobe Indesign 1.5.2

    I am using Windows XP SP2 on a Dell Optiplex 745 and I am having this problem. When I double-click on an InDesign file, the InDesign application starts, but the file doesn't open. I have to "manually" select Open and navigate to the file to open it.